North American Palladium Ltd (USA)  

(Public, NYSEMKT:PAL)   Watch this stock  
Find more results for NYSEAMEX:PAL
0.0530
-0.0482 (-47.63%)
Apr 16 - Close
NYSEMKT real-time data - Disclaimer
Currency in USD
Range 0.05 - 0.10
52 week 0.05 - 0.39
Open 0.10
Vol / Avg. 24.47M/4.36M
Mkt cap 37.86M
P/E     -
Div/yield     -
EPS -0.18
Shares 391.50M
Beta 2.88
Inst. own 9%
Mar 30, 2015
North American Palladium Ltd at John Tumazos Very Independent Research Metals and Mining Conference
Feb 19, 2015
Q4 2014 North American Palladium Ltd Earnings Release
Feb 19, 2015
Full Year 2014 North American Palladium Ltd Earnings Call
More events from DailyFinance »    

Key stats and ratios

Q4 (Dec '14) 2014
Net profit margin -15.17% -30.30%
Operating margin 8.31% 1.36%
EBITD margin - 19.72%
Return on average assets -8.40% -12.39%
Return on average equity -19.70% -29.85%
Employees 422 -
CDP Score - -

Address

Suite 2350, Royal Bank Plaza, South Towr 200 Bay Street
TORONTO, ON M5J 2J2
Canada
+1-416-3607590 (Phone)
+1-416-3607709 (Fax)

Website links

External links

Analyst Estimates - MarketWatch
SEC Filings - EDGAR Online
Major Holders - MSN Money

Description

North American Palladium Ltd. (NAP) is a platinum group metal (PGM) producer that has been operating its Lac des Iles (LDI) mine in northern Ontario, Canada. The Company�s LDI mine expansion consists of transitioning underground operations to shaft access mining while utilizing a high volume bulk mining method. The Company�s Lac des Iles mine property is located in the northwest of Thunder Bay, Ontario in Canada. The Lac des Iles mine area is underlain by mafic to ultramafic rocks of the Archean Lac des Iles Intrusive Complex (LDI-IC). The Lac des Iles mine lies in the southern portion of the LDI-IC, in a roughly elliptical intrusive package measuring 3 kilometers long by 1.5 kilometers wide, referred to as the Mine Block Intrusive (MBI). The MBI hosts a number of platinum group element (PGE) deposits; the most defined of these are the Roby Zone and the Offset Zone. The mill design capacity is 15,000 tonnes per day.