CA2067160A1 - Integrated manufacturing system - Google Patents

Integrated manufacturing system

Info

Publication number
CA2067160A1
CA2067160A1 CA002067160A CA2067160A CA2067160A1 CA 2067160 A1 CA2067160 A1 CA 2067160A1 CA 002067160 A CA002067160 A CA 002067160A CA 2067160 A CA2067160 A CA 2067160A CA 2067160 A1 CA2067160 A1 CA 2067160A1
Authority
CA
Canada
Prior art keywords
information
nature
factory floor
manufacturing
products
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
CA002067160A
Other languages
French (fr)
Inventor
Edward H. Coon
Mark S. Lee
Olin H. Bray
Donald A. Seccombe, Jr.
Robert T. Leo, Jr.
Cameron M. Mcquaid
Stephen R. Urban
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Combustion Engineering Inc
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of CA2067160A1 publication Critical patent/CA2067160A1/en
Abandoned legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F17/00Digital computing or data processing equipment or methods, specially adapted for specific functions
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/80Management or planning

Abstract

An integrated manufacturing system operative for managing the distribution to a factory floor as well as throughout a factory of the information that is necessary to effectuate the production of products on the factory floor. The information required for this purpose encompasses, but is not necessarily limited to, both the design information which is generated within the engineering enterprise and the scheduling information which is generated within the manufacturing resource planning system. This information consisting of design and manufacturing data pertaining to the product to be produced is in turn stored in a central repository for all shared information from whence as needed it is capable of being distributed in a logical and efficient fashion through operation of the integrated manufacturing system to the factory floor as well as throughout the factory so as to thereby enable the product to be produced on the factory floor in a most timely and most cost-effective manner.

Description

~vo 91/05308 2 0 6 7 1 6 0 PCr/US90/05689 i ,: . ,-`
: , ;, .,,.
' ' . `

. .
.
.; AN INTEGRATED MANUFACTURING SYSTEM
' :' ` BACKGROUND OF THE INVENTION
This invention relates to the production of products, and more spec;fically, to an integrated manufacturing system S for managing the distribution to a factory floor and throughout -a factory of the information that is necessary to effectuate the production of products on the factory floor.
It has long been known to manufacture products in factories. Moreover, it has long been known that one of the 10 primary factors to which consideration normally is most often given before commencing the construction of a new manufacturing facility and/or the refurbishing of an old one is the nature of .the product which will be manufactured therein. Also, the fact that particular types of facilities are better suited for the lS manufacture of certain kinds of products than are others is well accepted. Finally, it has long been known that the confisuration of the exterior and the interior of a manufacturing facility as well as the manner in which the production equipment is arranged within the facility are 20 predlcated, in large measure lf not entirely, upon the nature of the steps which are required to be performed in order to effect the successful manufacture of tne given product in the particular facility.
Continuing, factories built prior to World War II
25 commonly were built in the form of multistory buildings.
Moreover, in accord with the design and use of such multistory buildings as factories, the heaviest of the manufacturing equipment normally was located in the basement and/or first .

.

., ' ' , ' ; . ` ' ;~; '''; ' " ' ' ~

w o 91/05308 P~T/US90/05689 20~7~60 - 2 -floor of the multistory factory building. The upper floors of : the multistory factory building were thus left free to be usedfor purposes of receiving the lighter manufacturing equipment thereat and/or to permit assembly-type operations to be S conducted thereat. As a consequence of the manufacturing equipment being laid out in the aforedescribed fashion in such multistory factory buildings, the materials from which the products were being fabricated, as these materials progressed through the various stages of manufacturing culminating in the 10 completed production of the products, were customarily required to be moved about within the multistory factory building, i.e., from one portion of one floor thereof to another portion of the same floor thereof and/or from one floor thereof to another floor thereof. With the materials having to be moved about 15 within the multistory factory building, this resulted in valuable manufacturing time being lost since obviously while the materials were in transit between one point and another - within the multistory factory building there was no manufacturing operation being performed thereon.
However, following World War II as new factories were being built it became more and more common to find such new factories being built in the form of single story buildings, i.e., being built so as to be all on one level. Moreover, by the middle of the l950's not only were factories being built so 25 that they were all of one level but also so that they were laid out in a particular fashion. Namely, in terms of layout such ~factor1es were being made to embody a layout wherein the raw materials from which the products were to be manufactured were made to enter the factory building at one end thereof. Then, 30 while in the process of traversing the interior of the factory building these raw materials progressively were subjected to successive operations of the manufacturing process such that by the time they reached the o~her end of the building they had been transformed into finished products. As finished products, 35 they were then shipped out of the factory building from this other end thereof. One of the benefits that was derived from the use of such a layout was that it enabled a reduction to be :, . . , .:.
2 11 ~ 7 1 6 0 PCI/US90/05689 . . .
had in the amount of production time lost due to materials having to be moved from one area to another within the factory building which had served to disadvantageously characterize the use of multistory buildings for manufacturing purposes.
The focus in the 1960's and 1970's, insofar as - factories and the manufacturing operations conducted therewithin are concerned, shifted from one of plant construction and layout to one largely of looking at ways of achieving a more effective and efficient utilization of the manufacturing equipment being employed in the factory building.
In one way or another much of this effort was centered on realizing a reduction in the extent to which a human was required to be involved in the actual operation of the manufacturing equipment. Said another way, much of this effort in one way or another was centered on ways in which it might be possible to automate more and more of the manufacturing equipment's operation. One outgrowth undoubtedly attributable to this effort was the fact that numerically controlled (NC) machines began to be seen in increasing numbers within factory buildings.
The period following this, up to and including the present, has been characterized by and large by the fact that more and more attention has been devoted to finding ways in which more and more use can be made of computers in connection with manufacturing operations. By way of exemplification and not limitation n this connection, reference is had here in particular to the development during this period of what have come to be referred to as computer-aided design (CAD) systems and computer-aided manufacturing (CAM) systems. Very broadly stated, one might say that the difference between a CAD system and a CAM system resides primarily in the fact that as may be ; derived from the name applied thereto a CAD system is a system wherein the use which is made of the computer in such a system is related to the design of a product, whereas a CAM system is a system wherein the use which is made of the computer in such a system is related to the manufacture of a product.

.
~ . .

,.
, WO 91/05308 i . , PCr/US90/05689 .:

To thus summarize the preceding discussion herein, it is well accepted by virtually all that a number of significant changes have occurred over the past 40 years or so both in the manner in which factory buildings are constructed and the interior thereof is laid out, and in the manner in which manufacturing operations are conducted therewithin. For instance, it is known that in the era of multistory factory buildings notwithstanding how effectively and efficiently each of the individual operations which collectively combine to make up the total manufacturing process for a given product may have been made to be, manufacturing conducted in multistory factory buildings was nevertheless characterized by the fact that it was inherently inefficient, i.e., was not as efficient as it might otherwise have been. Reference is had in this connection to the fact that a multistory factory building by its very nature customarily gave rise to a requirement that the materials from which the products were being fabricated, as these materials progressed through the various stages of manufacturing culminating in the completed production of the products, needed to be moved about within the multistory factory building, i.e., from one portion of one floor thereof to another portion of the same floor thereof and/or from one floor thereof to another floor thereof. This requirement that the materials be moved about within the multistory factory building resulted in valuable manufacturing time being lost since obviously while the materials were in transit from one point to another within the multistory factory building there were no manufacturing operations being performed thereon.
In an effort to overcome the inefficiencies in the manufacturing process occasioned by the use of multistory factory buildings wherein materials were required to be moved from one location to another therewithin in order to enable manufacturing operations to be performed thereon thereby giving rise to lost manufacturing time while the materials were in transit, factory buildings as discussed hereinbefore began to be built all on one level, i.e., in the form of single story factory buildings. Furthermore, the movement towards replacing -, '' ~ ' ' ., ', ' ': ' ' ~ " ' ' .- . ' , ' . ' , , , ~, ' .' I ' ,' '. . ' . .

~ w o 91/0530~ 2 0 ~ 7 1 6 0 PCT/US90/05689 , multistory factory buildings with single story factory buildings was then followed by a movement towards laying out the interior of the single story factory building in such a manner that the raw materials from which the products were to S be manufactured were made to enter the factory building at one end thereof whereupon while in the process of traversing the interior of the single story factory building from one end to ` the other thereof, these raw materials progressively were subjected to successive operations in the manufacturing process such that by the time they reached the other end of the single story factory building they had been transformed into finished products and it was from this other end of the single story factory building from whence as finished products they were then shipped. By employing such a layout of the single story factory building, it was thus possible to realize therefrom a ; reduction in the amount of manufacturing time which was lost due to the need to move materials around from one location to another within the factory building for purposes of enabling manufacturing operations to be conducted thereupon as compared to the amount of production time which was lost due to materials having to be moved from location to location within a multistory factory building for purposes of enabling manufacturing operations to be performed thereon.
Thereafter, the focus of attention appeared to shift - 25 from one which was centered on how factory buildings were being constructed and/or how the interior thereof was being la;d out to one which was centered on finding ways that would ena~le manufacturing equipment to be employed more effectively and more efficiently. This change in the focus of attention undoubtedly contributed in large part to the increasing frequency with which one found NC ~achines being employed in factory buildings and to the development of what are known today as CAD systems and CAM systems.
Once again, however, we have reached a point in time 35 wherein notwithstanding how effectively and efficiently through the use of NC machines and/or CAD systems and/or CAM systems, etc. it may now be possible to perform each of the individual .

, ,:

manufacturing operations which collectively combine to encompass the entire manufacturing process for a given product, time which could otherwise be better spent in the productive performance of manufacturing operations is now being lost 5 unnecessarily just as was the case in the 1940's in the days when multistory buildings were being utilized as factories.
However, unlike in the days of multistory factory buildings wherein valuable manufacturing time was being lost by virtue of the need to move the raw materials which were used in the 10 manufacture of products extensively about from one location to another within the multistory factory building in order to - enable the requisite manufacturing operations to be performed thereon, today the loss in valuable manufacturing time can be attributed not to the need to extensively move raw materials 15 around but to the need to extensively move information around.
The information to which reference is had here is the design and manufacturing data that is required for purposes of effectuating the manufacture on the factory floor of products.
Today's loss of valuable manufacturing time can occasion a 20 number of problems in the manufacturing process. Moreover, these problems may manifest themselves in a number of ways. In this regard, by way of exemplification and not limitation, - there can be the problem of late delivery or missed schedules, and/or the problem of nonconforming products attributable to 25 poor quality or the use of out-of-date data, and/or the problem of high rework and scrap levels, and/or the problem of few inventory turnovers, and/or the problem of an information poor environment wherein there is no movement of data and/or the wrong data is moved and/or the movement of data is not timely, 30 and/or the problem of no or inadequate feedback in the status of operations within the factory, and/or the problem of no or inadequate feedback in the manufacturing capability of the equipment being employed in the factory, etc.
A need has thus been evidenced in the prior art for a 35 new and improved system suitable for use for purposes of managing the distribution to a factory floor and throughout a factory of the information, particularly as it relates to . - . .... . - . . . . . . . .

. .

W O 91/05308 2 0 6 7 1 6 o PCT~us90~0;689 .;, ~ .. '; . :

design and manufacturing data, which is necessary to effectuate the production of products on the factory floor. More specifically, a need has thus been evidenced for such a system, which is capable of distributing in a logical and efficient fashion to the factory floor as well as throughout the factory from a central repository for all shared information, information consisting of design and manufacturing data pertaining to the product to be produced so as to thereby enable the product to be produced on the factory floor in a - 10 most timely and most cost-effective manner. Moreover, - desirably such a system should encompass, but not necessarily be limited to, the central repository for all shared information, the engineering enterprise wherein the design information pertaining to the production of the product is -~ `15 generated, and the manufacturing resource planning system wherein the scheduling information pertaining to the flow through the factory of materials culminating in the production of the finished product is generated.
It is, therefore, an object of the present invention 20 to provide a new and improved integrated system suitable for use for managing the distribution to a factory floor and throughout a factory of information required for the manufacture of products.
It is another object of the present invention to 25 provide such an integrated manufacturing system for distributing to the factory floor and throughout the factory information in the form of design and manufacturing data that is necessary for the production of products on the factory floor.
It is still another object of the present invention to provide such an integrated manufacturing system which is characterized in that it encompasses a central repository for all shared information wherein is stored the information that is distributed to the factory floor and throughout the factory.
A further object of the present invention is to prov~de such an integrated manufacturing system which is characterized in that it encompasses an engineering enterprise .

.. , ~ . :

.

- WO 91~05308 ~ . PCI/US90/0~689 20671~0 .. .

whereln the des~gn information pertalning to the production of the product which is distributed to the factory floor and throughout the factory is generated.
A still further object of the present invention is to 5 provide such an inte~rated manufacturing system which is characterized in that it encompasses a manufacturing resource planning system wherein the scheduling information pertaining to the flow through the factory of materials culminating in the production of the finished product which is distributed to the 10 factory floor and throughout the factory is generated.
Yet another object of the present invention is to provide such an integrated manufacturing system which is - characterized in that it is capable of being used in a new ; factory building.
Yet still another object of the present invention is to provide such an integrated manufacturing system which is character~zed in that it is capable of being retrofitted into - an existing factory building.

- 20 SUMMARY OF TH INY~NTION -~
In accordance with the present invention there is provided a new and improved system in the nature of an integrated management system suitable for use for the purposes of managing the distribution to a factory floor as well as the 25 distribution throughout a factory of the information which is required to effectuate the manufacture of products on the factory floor. The subject integrated management system comprises product information entry means, configuration management means, manufacturing resource planning means and 30 factory floor means. In addition, the subject integrated management system may further include other design/manufacturing information source means. The product information entry means is designed so as to be operative to -generate from specifications, which are furnished by the ~5 customer with regard to the products that are to be manufactured, certain forms of information which are required for purposes of effectuating the manufacture of products on the - . . , . , ., . , - .
- . . . .. . . . .. . . . .....

WO 91/05308 2 0 6 71 6 ~ PCT/US90/05689 factory floor. As such, the product information entry means functions as the source of product specific information such as, by way of exemplification and not necessarily limitation, information of a design/drawing nature, of a process planning nature, of a bill of materials nature and of an estimated cost nature. The configuration management means functions as the central repository for all of the shared information that is required for purposes of effectuating the manufacture of products on the factory floor. To this end, the configuration 10 management means functions as the source of information such as, by way of exemplification and not necessarily limitation, information of an engineering/manufacturing control change nature, of an overall facility information control nature and of a product description, i.e., bill of information, nature.
15 The manufacturing resource planning means functions as the source of information of a scheduling nature that is required for purposes of effectuating the manufacture of products on the factory floor. In this regard, the manufacturing resource planning means functions as the source of information such as, 20 by way of exemplification and not necessarily limitation, information of a scheduling nature, of a purchase order/work order nature and of an inventory control nature. The factory floor means functions as the source of information relating to ` the operations which take place on the factory floor during the 25 course of effectuating thereat the manufacture of products.
Thus, the factory floor means functions as the source of infor~ation such as, by way of exemplification and not necessarily limitation, information of a work center load nature, of a general work center operations nature, of a 30 manufacturing method nature, of a data collection nature, of a direct numerical control (DNC) nature, of a quality feedback nature, of a maintenance nature and of a tooling/fixturing status nature. When the subject integrated manufacturing system also includes other design/manufacturing information 35 source means, this other design/manufacturing information source means functions in the nature of an additional source of design inf~rmation and/or manufacturing information. More , WO 91/05308 : . PCI`/US90/0~689 20~7160 - lO-spec~fically, by way of exemplification and not necessarily limitation the other design/manufacturing information source means functions as a source of information such as information of a detail drafting nature and of a numerical control (N/C) 5 programming nature.

:~ BRIEF DESCRIPTION OF THE DRAWINGS
Figure 1 is a schematic representation in block . diagram form of an integrated manufacturing system constructed in accordance with the present invention;
Figure 2 is a schematic representation in block diagram form of the configuration management means of an ! integrated manufacturing system constructed in accordance with the present invention;
Figure 3 is a schematic representation in block diagram form of the four subfunctions which are encompassed within the manage configuration function that is performed by the configuration management means of an integrated manufacturing system constructed in accordance with the present - 20 invention;
Figure 4 is a schematic representation in block diagram form of the information flow between the four .: subfunctions illustrated in Figure 3 of the manage configuration function of the configuration management means of an integrated manufacturing system constructed in accordance with the present invention;
Figure 5 is a schematic representation in block diagram form of the store and retrieve documents subfunction of the manage configurat~on function of the configuration 30 management means of an integrated manufacturing system constructed in accordance with the present invention;
Figure 6 is a schematic representation in block diagram form of the control changes subfunction of the manage configuration function of the configuration management means of an integrated manufacturing system constructed in accordance with the present invention;

,, , . ; ,, -: ' ' " ;. ' ',' . ' , ' .
.. ' ' ,, j' -~ '. "

WO 91tO5308 2 0 ~ 7 ~ 6 o Pcr/US90/0~689 " . , .
- 1 1 - ` ` - , :.:
- Figure 7 is a schematic representation in block . diagram form of the approve documents information required by the configuration management means of an integrated manufacturing system constructed in accordance with the present s invention;
Figure 8 is a schematic representation in block . diagram form of the approve documents information, which is broken down by storage type, required by the configuration management means of an integrated manufacturing system constructed in accordance with the present invention;
Figure 9 is a schematic representation in block diagram form of the approve documents information, which is broken down according to central distribution, required by the configuration management means of an integrated manufacturing system constructed in accordance with the present invention;
~: Figure 10 is a schematic representation in block .. ~,.~ .
. diagram form of the approve documents information, which is . broken down according to distribution list, required by the configuration manufacturing system constructed in accordance with the present invention;
Figure 11 is a schematic representation in block . diagram form of the approve documents information, which is broken down according to content, how stored and how distributed, required by the configuration management means of an integrated manufacturing system constructed in accordance with the present invention;
:. Figure 12 is a schematic representation in block diagram form of the authorization list information required for access control purposes by the configuration management means of an integrated manufacturing system constructed in accordance with the present invention;
Figure 13 is a schematic representation in block diagram form of the change requests information required by the configuration management means of an integrated manufacturing system constructed in accordance with the present invention;
Figure 14 is a schematic representation in block diagram form of the change requests information, which is ., . ,.. . :
' ~ ~ -. '', ~, .. . . . , -- -.

.

WO 91/0~308 PCI/US90/0~689 2067160~ 12-broken down according to sign-off list and approvals, required : by the configuration management means of an integrated manufacturing system constructed in accordance with the present invention;
Figure 15 is a schematic representation in block : diagram form of the information flow through the manufacturing resource planning means of an integrated manufacturing system constructed in accordance with the present invention; .
. Figure 16 is a schematic representation in block ' lO diagram form of the scheduling function of the manufacturing resource planning means of an integrated manufacturing system constructed in accordance with the present invention;
Figure 17 is a schematic representation in block diagram form of the manufacture product function of the factory floor means of an integrated manufacturing system constructed in accordance with the present invention;
Figure 18 is a schematic representation in block diagram form of the data collection element of the manufacture product function of the factory floor means of an integrated 20 manufacturing system constructed in accordance with the present invention;
; Figure l9 is a schematic representation in block diagram form of the data distribution element of the manufacture product function of the factory floor means of an integrated manufacturing system constructed in accordance with the present invention;
Figure 20 is a schematic representation in block diagram form of the checkout and download bill of information subfunction of the data distribution element of the manufacture 30 product function of the factory floor means of an integrated manufacturing system constructed in accordance with the present invention;
Figure 21 is a schematic representation in block diagram form of the checkout and download the work center files subfunction of the data distribution element of the manufacture product function of the factory floor means of an integrated :- . . . . . . . .

, . .. . : .
- . . . - , . .

. . : .. .. ,, .. ,.,,: .. ~
. . ... ... . ..
. , - , ;.
.

:

manufacturing system constructed in accordance with the present invention;
. Figure 22 is a schematic representation in block diagram form of both the check in work center files subfunction and the check in bill of information subfunction of the data distributlon element of the manufacture product function of the factory floor means of an integrated manufacturing system constructed in accordance with the present invention;
Figure 23 is a schematic representation in block diagram form of the maintenance element of the manufacture product function of the factory floor means of an integrated manufacturing system constructed in accordance with the present invention;
Figure 24 is a schematic representation in block diagram form of the tooling element of the manufacture product function of the factory floor means of an integrated manufacturing system constructed in accordance with the present invention;
Figure 25 is a schematic representation in block diagram form of a first portion of the information model for the data collection element of the manufacture product function of the factory floor means of an integrated manufacturing system constructed in accordance with the present invention;
Figure 26 is a schematic representation in block diagram form of a second portion of the information model for the data collection element of the manufacture product function of the factory floor means of an integrated manufacturing system constructed in accordance with the present invention;
Figure 27 is a schematic representation in block diagram form of the information model for the maintenance element of the manufacture product f ; ~ion of the factory floor means of an integrated manufacturing system constructed in accordance with the present invention; and Figure 28 is a schematic representation in block diagram form of the information model for the tooling element of the manufacture product function of the factory floor means :

.
. ....... , ~ : " ;: : .
. -, , , , , ,, ,: , wo 91/05308 PCl /US90/05689 :
20~7 1~0 ` ` ' - 14 -of an integrated manufacturing system constructed in accordance with the present invention.
:;

Referring now to the drawing, and more particularly to Figure 1 thereof, there is depicted therein in block diagram form an integrated manufacturing system, generally designated by the reference numeral 10, constructed in accordance with the present invention. The integrated manufacturing system 10 is operative for the purposes of managing the distribution to a factory floor as well as the distribution throughout a factory of the information which is required to effectuate the manufacture of products on the factory floor. As best understood with reference to Figure 1, the integrated manufacturing system 10 comprises suitably connected in operative relation one to another, as will be more fully described hereinafter, product information entry means, generally designated in Figure 1 by the reference numeral 12;
- configùration management means, generally designated in Figure 1 by the reference numeral 14; manufacture resource planning means, generally designated in Figure 1 by the reference numeral 16; factory floor means, generally designated in Figure 1 by the reference numeral 18; and other design/manufacturing information source means, generally designated in Figure 1 by the reference numeral 20.
For purposes of setting forth a description of the nature of the construction and the mode of operation of the integrated manufacturing system 10 to which the present invention is directed, the integrated manufacturing system 10 will not be described in the context of its utilization for purposes of effectuating the manufacture on the factory floor of any particular type of product. Rather, insofar as the - description that follows of the integrated manufacturing system 10 is concerned, it will be assumed that the integrated manufacturing system 10 is suitable for use for purposes of effectuating the manufacture on the factory floor of any given - - , , . ......... ,.-. ;, ~ ~, ~ , .

, .,..... . ~ , ~ . , . - . .
,-. - . : : . ~ .

- w o gl/05308 Pcr/us9o/o5689 1~- 206716~. l,,`.....
:
type of product. Further to this point, although the integrated manufacturing system 10 is capable of being utilized in connection with the manufacture of products that are produced by means of a continuous manufacturing process as contrasted to a discrete manufacturing process, the integrated manufacturing system 10 is deemed to be more suitable for use in connection with the manufacture of products that are produced by a discrete manufacturing process.
With the preceding by way of background, a 10 description will now be had, with particular reference being given to Figure 1 of the drawing, of the integrated manufacturing system 10 which forms the subject matter of the present invention. As noted above previously, the description of the nature of the construction and the mode of operation of the integrated manufacturing system 10 will be had herein in the context of the manner in which the integrated manufacturing system 10 is employed in order to effectuate the manufacture on a factory floor of any type of product, but with most attention being directed herein to products that are produced by means of 20 discrete manufacturing processes.
- Reference will be had first to the product information entry means 12. The product information entry means 12 is designed so as to be operative to generate certain forms of product specific information which are required ror purposes of effectuating the manufacture of products on the factory floor. These certain forms of product specific information are generated in response to input, the latter being depicted schematically in Figure 1 of the drawing wherein this input is denoted by the reference numeral 22, in the form 30 of the specifications which have been furnished by the customer with respect to the particular product that the customer seeks to have manufactured on the factory floor and which will be manufactured on the factory floor utilizing information distributed to the factory floor as well as throughout the factory in accordance with the mode of operation of the - integrated manufacturing system 10 which forms the subject matter of the present invention. As used herein, the term : ' , ' ' ' ' ~ ' '' ' ~ -~

' ' '' ' ' ' ' ' . ~' ' ' . ' :
' ~ . : ' ' ' ' .

2 ~ 6 7 ~ 1~ 0 16 ~customer~ is being used in its broadest sense; namely, as simply a means of designating the party for whom the product is being manufactured.
Continuing, the product information entry means 12 in s accordance with the best mode embodiment of the present invention has various forms of data housed therewithin. More specifically, housed within the product information entry means 12 in accord with the best mode embodiment of the present invention is information, i.e., data, in the form of the designs for the particular types of products which it is contemplated would be manufactured on the factory floor, such information, i.e., data, being denoted at 24 in Figure 1 of the drawing. Secondly, in accord with the best mode embodiment of the present invention there is housed within the product information entry means 12 information, i.e., data, in the form of the drawings for the particular types of products which it is contemplated would be manufactured on the factory floor, such information, i.e., data, being denoted at 26 in Figure 1 of the drawing. Thirdly, housed within the product information entry means 12 in accord with the best mode embodiment of the present invention is process planning information, i.e., data relating to the various process steps that would be required for purposes of effectuating the manufacture on the factory floor of the particular types of products which it is contemplated would be manufactured thereat, such information, i.e., data, being denoted at 28 in Figure 1 of the drawing.
Fourthly, in accord with the best mode embodiment of the present invention there is housed within the product information entry means 12 information, i.e., data, in the form of the bills of materials for the particular types of products which it is contemplated would be manufactured on the factory floor, such information, i.e., data, being denoted at 30 in Figure 1 of the drawing. Fifthly, in accordance with the best mode embodiment of the present invention the product information entry means 12 has housed therewithin information, i.e., data, in the form of the estimated costs for manufacturing the particular types of products which it is WO 9]/05308 PCI/US90/05689 20~7160 contemplated would be manufactured on the factory floor, such information, i.e., data, being denoted at 32 in Figure 1 of the drawing. Although the product information entry means 12 has been depicted in Figure 1 and has been described hereinbefore as having housed therewithin various particular forms of data, i.e., the forms of information denoted in Figure 1 of the drawing by the reference numerals 24, 26, 28, 30 and 32, it is to be understood that the product information entry means 12 may equally well without departtng from the essence of the 10 present inventlon have housed therewithin a greater or a lesser number of forms of information, as established in particular by a consideration of the nature of the information, which the - integrated manufacturing system 10 is required to manage the distribution of to the factory floor as well as throughout the factory.
Consideration will next be given to the configuration management means 14. The configuration management means 14 is designed to function as the central repository for all of the shared information that is required for purposes of 20 effectuating the manufacture of products on the factory floor.
To this end, the configuration management means 14 functions as the source of various forms of information, i.e., data. More specifically, in accord with th Dest mode embodiment of the present invention the configuration management means 14 functions as the source of information, i.e., data, of an engineering control change nature, such information, i.e., data, being denoted at 34 in Figure 1. Secondly, the conf~guration management means 14 in accord with the best mode embodiment of the present invention functions as the source of information, i.e., data, of a management control change nature, such information, i.e., data, being denoted at 36 in Figure 1.
Thirdly, in accord with the best mode embodiment of the present invention the configuration management means 14 functions as the source of information, i.e., data, of an overall facility information control nature, such information, i.e., data, being denoted at 38 in Figure 1. Fourthly, the configuration management means 14 in accord with the best mode embodiment of . , , . ~ , . .......................... . .
- , , - . . . , ~ , . .
- ~ . ~', . ,:

w o gl/05308 PCT/US90/05689 2 0 6 ~ ~ 6 - 18 - ;
.
the present invention functlons as the source of information, i.e., data, of a product description, i.e., bill of information, nature, such information, i.e., data, being denoted at 40 in Figure 1. Although the configuration 5 management means 14 has been depicted in Figure 1 and has been described hereinbefore as being the source of various particular forms of data, i.e., the forms of information denoted in Figure 1 by the reference numerals 34, 36, 38 and 40, it is to be understood that the configuration management 10 means 14 may equally well without departing from the essence of the present invention serve as the source of a greater or a lesser number of forms of information, as established in particular by a consideration of the nature of the information, which the integrated manufacturing system 10 is required to manage the distribution of to the factory floor as well as throughout the factory.
With further regard thereto, the configuration management means 14 fulfills a number of different roles. A
more detailed description of these different roles will now be had herein. For purposes of this description, reference will be had in particular to Figures 2, 3, 4 and 5 of the drawing with some occasional reference also being had to Figure 1 of the drawing. As best understood with reference to Figure 2, the top level summary role of the configuration management means 14 is, as the name given thereto implies, to manage conftgurations. To this end, as denoted by the arrow ident1fied in Figure 1 by the reference numeral 42, inputs are received by the configuration management means 14 from the product information entry means 12. Numbered among these inputs which are communicated in electronic form from the product information entry means 12 to the configuration management means 14 through the use of any conventional form of electronics means suitable for use for this purpose are a multiplicity of inputs each of which serves to convey from the 35 product information entry means 12 to the configuration management means 14 a different type of product specific information relating to the product that the customer desires , .,, , , . . . . ~ .
.
,: : - ' ' :
., .

,, ~,. ' ~ ' ' : -WO 91/05308 PCT/US90/0~689 2067160~ ~, J ~

t~ have manufactured on the factory floor. More specifically, the product specific information provided by virtue of these inputs encompasses things such as customer product requirements, product performance requirements, previous S product designs and product documents, e.g., product drawings, and product change requests of an engineering and/or manufacturing nature.
In turn, in a manner to which further reference will - be had hereinafter there are transmitted in electronic form 10 through the use of any conventional form of electronics means suitable for use for this purpose outputs from the configuration management means 14 to each of the other means, i.e., the product information entry means 12, the manufacturing resource planning means 16, the factory floor means 18 and the 15 other design/manufacturing information source means 20, which when combined with the configuration management means 14 - collectively comprise the best mode embodiment of the integrated manufacturing system 10 which forms the subject matter of the present invention. These outputs from the 20 configuration management means 14 by means of which information is transmitted therefrom in electronic form to the product information entry means 12, to the manufacturing resources planning means 16, to the factory floor means 18 and to the other design/manufacturing information source means 20 are denoted by the arrows which are identified in Figure 1 by the .
reference numerals 44, 46, 48 and 50, respectively. The nature of the information which is transmitted in electronic form, ii~ i.e., is transmitted via outputs 44,46,48 and 50 from configuration management means 14 to the product information 30 entry means 12, to the manufacturing resource planning means 16, to the factory floor means 18 and to the other design/manufacturing information source means 20, respectively, includes information relating to product structures, product approved changes, revised product designs and product 35 documents, e.g., product drawings, and product notification lists. Other information which passes in electronic form through the outputs 44, 46, 48 and 50 from the configuration WO 91/05308 PCI`/US90/05689 2067 160 ~

' management means 14 to the product information entry means 12, to the manufacturing resource planning means 16, to the factory floor means 18 and to the other design/manufacturing information source means 20, respectively, is information which is deemed to be of a control nature. The latter information, i.e., the information of a control nature, is deemed to include ; information such as information relat~ng to englneering and manufacturing product standards, governmental and company policies and procedures relating to faGtory floor operations, product inventories, factory floor costs, etc.
Continuing with the description of the configuration management means 14, the manage configurations role, i.e., function, of the configuration management means 14 of the - integrated manufacturing system 10 consists, in accordance with the best mode embodiment of the invention, of four ' subfunctions, i.e., subroles. These four subfunctions, as best understood with reference to Figure 3 of the drawing, of the manage configurations function of the configuration management . means 14 are, in accordance with the best mode embodiment of the ~nvention, the following: identify product structure, identify/create the bill of information, store and retrieve -~ documents, and control changes. For ease of reference thereto in Figure 3 of the drawing, the manage configurations function is denoted therein generally by the reference numeral 52, the identify product structure subfunction is denoted therein - generally by the reference numeral 54, the identify/create the bill of information subfunction is denoted therein generally by the reference numeral 56, the store and retrieve documents subfunction is denoted therein generally by the reference numeral 58 and the control changes subfunction is denoted therein generally by the reference numeral 60. The manner in which information is made to flow among these four subfunctions, i.e., among the identify product structure subfunction 54, the identify/create the bill of information subfunction 56, the store and retrieve documents subfunction 58, and the control changes subfunction 50, is best understood w~th reference to Figure 4 of the drawing wherein there is to .
, ' ~ . -WO 91/05308 PCr/US90/05689 20671~1~,i..., ;;.,, be found an illustration of this information flow among the subfunctions 54, 56, 58 and 60. It should be understood here that the flow of informatlon among the subfunctions 54, 56, 58 and 60 takes place in an electronic form through the use of any 5 conventional form of electronic means suitable for use for such a purpose.
The primary output in terms of subfunction from the ; manage configurations function 52 of the configuration management means 14 is the product structure subfunction 54.
10 During the product design and product manufacturing process additional documents are created ~nd related to the product structure subfunction 54 so as to create the bill of information subfunction 56. Next, there is the third subfunction, i.e., the store and retrieve documents subfunction 15 58 which as depicted in Figure S of the drawing deals with the actual storage and retrieval of the various types of documents : required for purposes of effectuating the manufacture of the product desired by the customer. Essentially this is a librarian and/or archive type function. Finally, there is the 20 fourth subfunction, i.e., the control changes subfunction 60.
, The role of the control changes subfunction 60 is to exercise - control over changes from both product engineering and product manufacturing which relate to the product that the customer desires to have manufactured on the factory floor. As best 25 understood wi~h reference to Figure 6 of the drawing, the ; control changes subfunotion 60 is capable of being further decomposed with respect to the aforereferenced changes into the functions of evaluating, of approving and of implementing changes. These functions of evaluating, of approving and of 30 implementing changes are denoted by the reference numerals 62, 64 and 66, respectively, in Figure 6 of the drawing.
In the way of a brief immarization of the preceding discussion concerning the configuration management means 14, the primary function which the configuration management means 35 14 is intended to perform is that of being a central repository of all shared product related design and product related manufacturing information, i.e., data, needed for purposes of . - . . . . . . . ~ . . :, . .

' . ' ' . .' ; . . -. - , ~" ' : ,', :' , ' ' : . ' ' 2~67 ~6 ` ' ' ' ' `-effectuating the manufacture on the factory floor of the : product that the customer desires. To this end, when certain : common information, i.e., data, relating to the product that the customer desires to have manufactured on the factory floor is required, there is a need to be able to quickly identify which documents contain the desired information, i.e., data, and where copies of these documents are located.
Ident1ficatlon of documents as well as of their location is had through the use of the directory function capability which the lO configuration management means 14 embodies. There is a need for thts directory function regardless of whether the documents themselves are stored in a computer or whether they are stored elsewhere. Moreover, it is a requirement of this directory function that it be possible through the use thereof to locate 15 all types of documents, such as by exemplification but not necessarily limitation, contract drawings relating to the products to be manufactured, standard product drawings, product : manufacturing process plans, product manufacturing rules, and NC programs.
The principal benefits which flow from the fact that the configuration management means 14 embodies such a directory -` function are two-fold. Namely, first it renders it possible to find needed product related information, i.e., data, quickly.
To this end, at a minimum it is possible through the use of the 25 directory function of the configuration management means 14 to - f;nd where the needed, i.e., requested, information is located although if such product related information, i.e., data, is not in a computerized form some time may be required to retrieve the product related information, i.e., data. Over the 30 long term though, i.e., once all of the product related information, i.e., data, as well as the location thereof has been computerized, then both the locations and the retrieving of such product related information, i.e., data, will be able to be accomplished in a much more timely and expeditious 35 fashion. In turn this reduces the cost involved in locating and in retrieving such product related information, i.e., data.
More specifically, it is thus possible to avoid the costs . . .

, , W O 91/05308 P ~ /US90/05689 20~7160 ` `, .~ .:
assoc~ated with conducting long searches to find the required product related information, i.e., data, or the costs associated with reconstructing the product related information, i.e., data, that is needed because the latter could not be found or because it would have been too costly to try and - locate the latter. Possibly though from the standpoint of the manufacturing process itself even more important than the cost savings which can be realized therefrom, i.e., from the use of the directory function which the configuration management means ` 10 14 embod~es, is the fact that it is possible to shorten the time that it would otherwise take to accomplish the manufacturlng process because the product related information, i.e., data, is capable of being obtained much more quickly when ; needed and is capable of being passed on to the next stage of 15 the manufacturing process as soon as the need therefor exists at the next stage of the manufacturing process.
The benefits that have been described hereinbefore wh kh one is capable of realizing through use of the repository/directory funct~on that the configuration management 20 means 14 embodies are capable of being increased further when the bill of information function which the configuration management means 14 also embodies and to which reference has previously been had herein in connection with the description of the integrated management system 10 as illustrated in Figure 25 1 of the drawing wherein the bill of information function is denoted generally by the reference numeral 40 is coupled with the repository/directory function. With further regard to the matter of bills of information, a bill of information is similar in nature to a bill of materials or a product 30 structure. To this end, a group of individual parts means nothing unless you also have the bill of materials therefor.
For it is only then, i.e., from the bill of materials, that you can see how the individual parts are related one to another, i.e., how the individual parts are intended to fit together so 35 as to form the product in question. Similarly, a collection of files and paper documents means very little unless you also have a bill of information which shows how this collection of , " . `

ftles and paper documents are related one to another. Thus, it is to be understood that as employed herein the term "bill of informatton~ is intended to encompass all of the following.
Namely, the bill of information includes all of the design and :5 manufacturing information needed to make the part or product.
Further, the bill of information includes both the product structure, i.e., bill of materials, and all of the information -about each part in the product. In addition, the bill of information also shows the relationships among the documents, 10 such as when drawings or process plans refer to other standard drawings. In summary, the bill of information is the superstructure that gives the repository/directory functton its power and flexibility.
Referring again to the configuration management means 15 14, in order to perform its intended role as one of the operattng components of the integrated management system 10 constructed in accordance with the present invention the configuration management means 14 in accord with the best mode embodtment of the present invention is made to possess certain 20 particular functional capabilities. Moreover, these functional capablltties which the conftguration management means 14 is made to possess in order to perform its intended role as one of the operating components of the integrated management system 10 constructed in accordance wtth the present invention have been -25 identtfied hereinbefore.
Attention is thus next focused herein on the nature of the information that is required to support these functional capab~llttes which the configuration management means 14 possesses. To this end, the configuration management means 14 30 in order to be able to perform the functions intended to be performed thereby as previously described herein must have available thereto the requistte information to be able to track approved documents and to relate them to components/parts and versions of components/parts. To facilitate such tracking, 3s each approved document, which it is to be understood may relate to one or more parts, is identified by, i.e., bears, a document identiftcation number. Also, since approved documents are - - . . , --: :

.-~
.

.
~.

- 25 - 2067~60 !;
.
created on a certain date and by a certain source, each approved document has an identifiable date and an identifiable source associated with it too. In addition, since each identifiable source has an identifiable location, each approved 5 document further has associated there~ith an identifiable locatton. Insofar as parts are concerned, each of the various ; parts is identified by a combination of a part number and a version number. In addition, the parts are related to each other through a product structure, i.e., through the "consists 10 of~ and the "used in" roles thereof. Therefore, in summary, to support the performance thereby of its various functions the configuration management means 14, as best understood with reference to Figure 7 of the drawing, needs to have available thereto all of the information enumerated above, i.e., for ;15 documents, the document identification number and the date, source and location identification thereof, and for parts, the part number and version number therefor as well as the manner in which the parts relate one to another.
With further regard to the matter of the information 20 that is required to support the various functions which the configuration management means 14 is designed to perform, it is desirable that in this connection the approved documents be broken down by subtypes. One way of subtyping the approved documents is by content. To this end, insofar as content is 25 concerned, the approved documents can be subtyped as specifications, proposals, contracts, drawings, standard drawings, solid models, process plans, shop orders, NC
programs, etc. Another way of subtyping the approved documents is by how they are stored, i.e., as files on a computer or as 30 hardcopy documents. While all approved documents have much information in common, Figure 8 of the drawing contains an illustration of the information related by each storage type.
Further to this point, note is made here of the fact that computer files may consist of text, graphic data created by a 35 CAD system, or scanned images. Yet a third way of subtyping the approved documents is by how they are distributed. Namely, some such documents may be stored centrally and checked out as . ' "''' '.

-. . . . . . . . ..
- - . : - ... ~ : . . , . : ( . - .

.
' ' '., , ,. , I '' 20~7160 26 -illustrated ln Figure 9 of the drawing, while for other documents copies may be sent to every one on a distribution list as best understood with reference to Figure 10 of the - drawing. The three ways of subtyping the approved documents S enumerated above are, as best understood with reference to Figure 11 of the drawing, each independent of each other.
Continuing with this discussion of the information which is needed to support the functions that the configuration management means 14 is designed to perform, i.e., which is 10 needed to enable the configuration management means 14 to perform the functions desired therefrom, one other consideration which must be borne in mind in this connection is the matter of how access to the approved documents is controlled. In this regard, as best understood with reference lS to Figure 12 of the drawing, such access to the approved drawings is in accordance with the best mode embodiment of the invention preferably controlled through the use of an authorization list. To this end, each approved document class has an authorization list, which includes authorization 20 entries. Each authorization entry in turn specifies a person and an operation, e.g., retrieve or modify. With further reference to the authorization list, since each authorization list is created on a certain date, each authorization list has a certain date identified therewith. It is to be understood 25 here that the authorization list can be modified, such modification being had by means of an authorization list change, the latter being made on a certain date and being applicable to a specific entry on the authorization list.
In the case of-centralized documents, to which 30 reference has previously been had herein, the centralized documents, as best understood with reference to-Figure 9 of the drawing, are stored at an identifiable location and access thereto is tontrolled through checkout transactions.
Continuing, each checkout transaction has an identifiable ; 35 number associated therewith. The way in which these checkout transaction are employed is that for each such transaction a copy of the approved document in question.is checked out to a - - . : . :

.
.. ~

' ~', " ' ~.

w o 91/05308 PcT/vsso/056~9 - 27 2 Q 67 1 6 ~
; :
person. Further, the checkout occurs on a certain date by which the checkout can be identified and the approved document in question may have an anticipated checkin date as well. The checkout transaction also specifies how the approved document 5 in question will be used, i.e., for retrieval or modification, since many users can checkout a document for retrieval only, but only one user can have the document if it is going to be ;~ modified. There is a comparable checkin transaction, but it only has to be concerned with the actual date when the document 10 was checked back in. However, there does exist a need for the check1n transaction to be related to a specific checkout ; transaction wherein the latter is identified by either the checkout transaction number or the combination of document identification for the specific copy of the approved document 15 that is being checked back in, the person, and the date. In accordance with the best mode embodiment of the present invention, encompassed within the body of informatlon, i.e., data, that is made available to the configuration management means 14 to support the accomplishment by the latter of the 20 various functions that the configuration management means l4 is designed to perform as one of the operating components of the integrated management means lO constructed in accord with the present invention, is the information, i.e., data, required for purposes of effectuating the aforedescribed checkout 25 transactions and checkin transactions.
Still another subject that needs to be addressed with respect to the nature of the information that is requirea to be made available to, i.e., that is required to be contained in, i the configuration management means l4 to support the 30 accomplishment by the latter of the various functions that the configuration management means l4 is designed to perfor. is the subject of changes. In this connection, consideration must be - given to the need to relate change requests to particular approved documents and to the need to exercise control over 35 such change requests through the medium of necessary sign-offs and approvals. In Figure l3 of the drawing can be found an illustration of the nature of the information, i.e., data, . - . .

, . . , . . . . - - , .............. .. . . . .

-. . - . . ~ . -W o 9]/05308 PCT~USgO/05689 .

which in accord with the best mode embodiment of the invention is deemed to be necessary in order to accomplish the handling by the configuration management means 14 of such change requests. Similarly, in Figure 14 of the drawing can be found 5 an illustration of the nature of the information, i.e., data, which in accord with the best mode embodiment of the present invention is deemed to be necessary ;n order to accomplish the handling by the configuration management means 14 of such change request sign-offs and approvals.
The next component of the integrated manufacturing system 10 constructed in accordance with the present invention to which reference will be had herein is the manufacturing resource planning means 16. The manufacturing resource planning means 16 functions as the source of information of a 15 scheduling nature that is required for purposes of effectuating the manufacture of products on the factory floor. To this end, by way of exemplification and not necessarily limitation, the manufacturing resource planning means 16 as best understood with reference to Figure 1 of the drawing functions as the 20 source of informatlon, i.e., data, of a scheduling nature, the latter being denoted generally therein by the reference numeral - 82; of a purchase order/work order nature, the latter being denoted generally therein by the reference numeral 84; and of an inventory control nature, the latter being denoted generally 25 therein by the reference numeral 86. The basic information flow through the manufacturing resource planning means 16 in accord with the best mode embodiment of the invention is thus as depicted in Figure 15 of the drawing.
With further reference to the manufacturing resource 0 planning means 16, and in particular the scheduling function thereof, the various elements which in accord with the best mode embodiment of the present invention comprise the scheduling function of the manufacturing resource planning means 16 can be found illustrated in Figure 16 of the drawing.
35 Namely, as best understood with reference to Figure 16 of the drawing, the scheduling function, which is denoted therein generally by the reference numeral 68, of the manufacturing .:

- ~.
; ,.

:'~
- 29 - 2 06 71 ~ 0 resource planning means 16 includes customer order entry, denoted therein generally by the reference numeral 70; master production schedule (MPS), denoted therein generally by the reference numeral 72; material requirements planning (MRP), 5 denoted therein generally by the reference numeral 14; and shop floor control, denoted therein generally by the reference numeral 76. However, this latter shop floor control element 76 serves only to generate the shop orders and the dispatch lists.
Both of these outputs, i.e., the shop orders and the dispatch 10 lists, identify the specific operations that are scheduled and their resource and time requirements. The difference is that in accord with the mode of operation thereof the shop orders output is operative to group all of the operations for a specific shop order. On the other hand, in accord with the 15 mode of operation of the dispatch list output, the latter ; output groups all of the operations by work center. More specifically, the dispatch list for a particular work center lists all of the operations that need to be performed at that particular work center regardless of shop order. As can be 20 seen with reference to Figure 16 of the drawing, associated with the scheduling function 68 of the manufacturing resource planning means 16 are two additional elements. These are inventory control, the latter being denoted generally by the reference numeral 78 in Figure 16 of the drawing, and 25 purchas :, which is denoted generally in Figure 16 of the drawing ny the reference numeral 80. In conclusion, note is ; also made here of the fact that the manufacturing resource planning means 16 traditionally includes a costing module in add~tion. However, since such a costing module is not directly 30 related to scheduling, it is for this reason that a discussion thereof in connection with the description of the elements depicted in Figure 16 of the drawing has been omitted.
Referring again to Figure 1 of the drawing, it can be seen therefrom that another component yet to be described 35 herein, which the integrated manufacturing system 10 constructed in accordance with the present invention preferably also embodies, is the other design/manufacturing source means . .. . , - , . ~ . ~ . , .

2067160` 30 -20. Moreover, when the subject integrated manufacturing system 10 also embodies the other design/manufacturing information source means 20 the latter is designed to function in the nature of an additional source of design information and/or 5 manufacturing information. More specifically, by way of exemplification and not necessarily limitation, the other design/manufacturing information source means 20 functions as a source of information such as information, i.e., data, of a detail drafting nature, the latter being depicted generally at 10-88 in Figure 1 of the drawing, and of a numerical control (N/C) -programming nature, the latter being depicted generally at 90 in Figure 1 of the drawing.
- ~he final component of the integrated manufacturing system 10 constructed in accordance with the present invention, 15 which has yet to be described herein, is the factory floor means, the latter as noted herein previously being depicted at 18 in Figure 1 of the drawing. The factory floor means 18, in accord with the best mode embodiment of the present tnvention, functions as the source of information relating to the 20 operations that take place on the factory floor during the course of effectuating thereat the manufacturs of products. To this end, the factory floor means 18 functions as the source of information which by way of exemplification and not necessarily limitation includes information, i.e., data, of a work center load nature, the latter being depicted generally at 92 in Figure 1 of the drawing; of a general work center operations `nature, the latter being depicted generally at 94 in Figure 1 of the drawing; of a manufacturing method nature, the latter being depicted generally at 96 in Figure 1 of the drawing; of a 30 data collection nature, the latter being depicted generally at g8 in Figure 1 of the drawing; of a direct numerical control (DNC) nature, the latter being depicted generally at 100 in Figure 1 of the drawing; of a quality feedback nature, the latter being depicted generally at 102 in Figure 1 of the 35 drawing; of a maintenance nature, the latter being depicted generally at 104 in Figure 1 of the drawing; and of a ' , ' . .. ~

:
WO 91/05308 PCrtUS90/056~39 ~ - 31 - 2067160 ;:

toollng/fixture status nature, the latter being depicted generally at 106 in Figure l of the drawing.
Continuing with tne discussion of the factory floor means 18, it is deemed to be desirable at this point for purposes of ensuring that there exists no misunderstanding with respect thereto that there be set forth herein once again the fact that in the integrated manufacturing system 10 constructed in accordance with the present invention, it is the factory floor means 18 that provides the manufacture product function, i.e., that effectuates the actual manufacture on the factory floor of the product desired by the customer. Moreover, as best understood with reference to Figure 17 of the drawing, insofar as the manufacture product function, the latter being depicted at 108 in Figure 17, sf the factory floor means 18 is concerned, there are essentially five major elements, which collectively comprise the manufacture product function 108. As best seen with reference to Figure 17 of the drawing, these : five major elements are that of data collection, the latter being depicted at 110 in Figure 17; that of data distribution, 20 the latter being depicted at 112 in Figure 17; that of -maintenance, the latter being depicted at 114 in Figure 17;
that of tooling, the latter being depicted at 116 in Figure 17;
and that of quality, the latter being depicted at 118 in Figure 17.
Focusing attention first on the data collection element 110, the latter has only two subfunctions associated therewith. As best seen with reference to Figure 18 of the draw~ng, these two subfunctions are to capture data, the latter being depicted at 120 in Figure 18, and to report data, the latter being depicted at 122 in Figure 18. Each of these ~wo subfunctions 120 and 122 capture and report, respectively, Gn at least the same three different types of data, i.e., work center data, the latter being depicted at 124 and 126, respectively, in Figure lB; manufacture work order (shop order) status, the latter being depicted at 128 and 130, respectively, in Figure 18; and time and attendance data, the latter being depicted at 132 and 134, respectively, in Figure 18. Some data .. . , ~ . , . , . .,~

~ W O 9]/05308 PCT/US90/056X9 ~05~ ~60 . 32 -pertaining to work center status 124,126 may be captured, i.e., obtained, through a monitoring of the particular work centers, but in the case of the work center status 124,126 of other particular work centers data (e.g., work center breakdown) must s be explicitly entered manually. Some examples of data pertaining to work center status 124,126 include idle, working on an order, waiting for material, waiting for an operator, down for unscheduled repair, and down for preventive ; maintenance. On the other hand, all manufacture work order status 128,130 must be entered manually. To this end, manufacture work order status 128,130 is really captured as a - status for each operation within the order. By way of illustration in this regard, an operation may be scheduled, started, completed, or in process (sometimes with a percent completed or a number of parts complete). Transactions to indicate what is being done are entered manually when operations are started or stopped. These transactions in turn provide the necessary information for updating the manufacturing work order status 128,130. Thus, by way of summary, the transactions pertaining to manufacture work order status 128,130 that are entered manually include those of selecting an operation, of starting an operation, of completing an operation and of stopping an operation, which in the case of the latter in addition requires the number of units produced or the percent completed to be also inputted as part of the transaction.
Next attention will be directed herein to the data distribution element 112 of the manufacture product function 108 of the factory floor means 18. In accord with the intended 30 mode of operation thereof the data distribution element 112 in accord with the best mode embodiment of the present invention involves the identifying of and the moving of information, i.e., data, between the configuration management means 14 and the factory floor means 18, and between the factory floor means 18 and the appropriate work centers whereat the various operations required in the course of manufacturing the product desired by the customer are actually performed. As best seen .

. . .
- , .:
. .
:
'; ' .

~, - . , W O 91/05308 2 ~ 6 7 1 6 ~cT/usso/0;68s - 33 - 1~
.. . .
w~th reference to Figure 19 of the drawing, the data - distr1bution element 118 in accord with the best mode embodiment of the present invention consists of a minimum of four subfunctions. These four subfunctions, each of which can 5 be found illustrated in Figure 19 of the drawing, are the following: checkout and download the bill of information (from the configuration management means 14 to the factory floor means 18), the latter being depicted generally at 136 in Figure 19; checkout and download work center files (from the factory floor means 18 to the appropriate individual work centers), the latter being depicted generally at 138 in Figure 19; check in work center files (to the factory floor means 18 from the appropriate individual work centers), the latter being denoted generally at 140 in Figure 19; and check in bill of information (to the configuration management means 14 from the factory ' floor means 18), the latter being denoted generally by the reference numeral 142 ~n Figure 19. -Consideration will now be had herein in greater detail to the checkout and download bill of information ~' 20 subfunction 136 of the data distribution element 112.
Moreover, for this purpose reference will be had in particular to Figure 20 of the drawing. Referring thus to Figure 20, as illustrated therein the checkout and download bill of information subfunction 136 in accord with the best mode 25 embodiment of the present invention encompasses the five following subelements: accept trigger request, request bill of information, check bill of information file status, get bill of information files, and download bill of information files to factory floor. These five subelements are illustrated in 30 Figure 20 at 144,146,148,150 and 152, respectively.
With further reference to Figure 20, as depicted therein the checkout and download bil, of information : subfunction 136 first must accept a trigger request, i.e., subelement 144, that indicates what information needs to be 35 downloaded. In this regard, the trigger most commonly employed for this purpose is the shop order or dispatch list from the manufacturing resource planning means 16. A request from the ;~ ' ': :, . . " ' ' ~
'~' : ' wo 91/05308 PCI/US90/05689 .,, ;,..................................... ..

2 ~ 6~ ~ 6 0 - 34 factory floor or a work center for a file that has not already been downloaded may also, however, serve as an additional form of trigger. In either case, though, the trigger must provide enough information to determine what files are needed, when 5 they are needed, where they are needed, and how they are to be used. These files in most instances will only be checked out for read-only use. However, in a few instances there may actually exist a need to modify one or more of these files. In which event, if one or more of these files do need to be 10 modified, then the new version, i.e., the modified version, of the file or files will also have to be returned as part of the subsequent check in transaction, e.g., in accordance with check !
; in work center files subfunction 140 and/or check in bill of information subfunction 142.
Next, in accord with the mode of operation thereof the checkout and download bill of information subfunction 136 is designed to request the bill of information, i.e., `
subelement 146. The bill of information to which reference is had here, i.e., that contemplated by subelement 146, comprises 20 the list of files needed to actually manufacture on the factory floor the product desired by the customer. In this regard, for some applications it may be desirable to subdivide the bill of information into an engineering bill of information and a manufacturing bill of information. The intended mode of 25 operation of the subelement 146, i.e., request the bill of information, is simply to return a list of the files in the bill of information, i.e., to simply provide a listing of the files in the bill of information. In this connection it should be noted here that a request directly from the factory floor 30 for a specific file would bypass the request the bill of information subelement 146 and would be transmitted directly from the accept trigger request subelement 144 to the check bill of information file status subelement 148.
Turning now to a discussion of the check bill of 35 information file request subelement 148, the role thereof is to check the file status for all of the bill of information files or all of the requested files. This involves checking with the : . . ... . ; .~
. - ., , .. ; ..
; . - .
.. . . . . .
, ; ~ ;, -.
" ;

W O 91/05308 P ~ /US90/05689 2067160 - 35 - .~
, i; , , configuration management means 14 to ensure that all of the needed files have been released and are available for use on the factory floor. A similar request will normally also have been made of the configuration management means 14 by the s manufacturing resource planning means 16 such that a shop order will not have been released by the manufacturing resource -planning means 16 unless all of the necessary data files have : also been released. However, this may not always be possible.
For example, if there is a tight delivery schedule and the product desired by the customer will take three months to manufacture, some of the operations in the manufacturing process may need to be started on or before all of the data, e.g., data needed for purposes of operations to be performed toward the end of the manufacturing process, is available.
Another possibility is that all of the data may have been released when the shop order was generated, but subsequently a problem may have been found ca~sing the data to be "unreleasedn. Therefore, a status check must be done at this point, i.e., the check bill of information file status subelement 148 must perform the role intended thereof, even if in doing so the effect thereof is to simply repeat something which was done previously.
Continuing with the discussion of the check bill of information file request subelement 148, there are several problems which can occur during the aforedescribed status check. For example, it may be found that one file in the bill ; of information 40 has a status that prevents it from beingdownloaded. This in turn may stem from the fact that the file has not been released, or from the fact that the file has already been downloaded for update. In any event, in such a case there then arises a question as to whether the entire shop order should be held up pending availability of the file in question, or whether only those operations that need that ; particular file should be held up.
The next subelement of the checkout and download bill of information subfunction 136 to be discussed herein is the get bill of information subelement 150. In accord with the -. . - . ~ ; i ., ;, ., ~ .

.: :. , -, . . , , . . , ., ~- :
~' ' '' ' ' ' '' ` ' , ' '-', '' ,-'` '.' ' i ' .i...... . .
-, WO 91/05308 P(~r/US90/05689 i .. .. .
~ 7 1 ~ 0 - 36 -mode of operation intended thereof, the get bill of information subelement 150 is operative to get all of the files in the bill of information 40. To this end, there is a need to be concerned with the fact that hardcopy documents may be a part of the bill of information 40. The configuration management : means 14 is capable of tracking and controlling these hardcopy documents as well as computerized data. However, the configuration management means 14 does not embody the capability whereby it would be possible therewith to retrieve and download such hardcopy documents. As such, one way of overcoming this limitation is to provide the configuration management means 14 with, i.e., to store electronically therewithin, an access procedure for hardcopy documents. By way of exemplification and not limitation in this regard, - 15 reference is had here to the fact that hardcopy documents can be scanned and stored as raster images in the configuration management means 14 such that they then can thereafter be transmitted therefrom electronically.
For purposes of completing the discussion of the checkout and download bill of information subfunction 136, a description will now be had herein of the download bill of information files to the factory floor subelement 152. The download bill of information files to the factory floor subelement 152 is designed to be operative such that therethrough either one file which was specifically requested may be downloaded or such that therethrough all of the files in the bill of information may be downloaded.
8efore leaving the subject of the checkout and download bill of information subfunction 136, a further comment will be had herein with respect to the get bill of information subelement 150 and the download bill of information files to factory floor subelement 152. To wit, some of the products specified in a shop order, i.e., a manufacturing order, may take several months to complete. In such a case, all of the files in the bill of information should not be downloaded initially. Rather, the files in the bill of information should be downloaded as they are needed. As such, it is des~rable - . . .............................. . .
~- : .. , ,, . , . ... , ~

WO 91/05308 PCr/US90/05689 `
that within the checkout and download bill of information subfunction 136 there be encompassed a mechanism for identifying downloadable material and when such material should be downloaded. On the other hand, an alternative approach s thereto would be to initially check the file status for all of the files in the bill of information as determined by the shop order, but to only download files as they are required for purposes of accomplishing operations on the factory floor. In other words, the shop order may be released and all of the files in the bill of information may be released and aYailable, but individual files will not be downloaded until the operation that requires them is scheduled to be performed on the factory floor. If this alternative approach is taken, it will be necessary before the files are downloaded that their status be checked once again. The advantages associated with this alternative approach are that it minimizes both the storage requirements on the factory floor and the amount of data that has to be downloaded at once.
Continuing with the discussion of the data distribution element 112 of the manufacture product function 108 of the factory floor means 18, attention will next be focused on the checkout and download the work center files subfunction 138 thereof. For this purpose, reference will be had in particular to Figure 21 of the drawing. As will be readily apparent from even a cursory examination of both Figure 20 and Figure 21 of the drawing, the checkout and download the work center files subfunction 138 bears a great deal of similarity to the checkout and download bill of information subfunction 136, which has been described previously herein, except for the fact that the checkout and download the work center files subfunction 138 is designed to be operative to download files from the factory floor means 18 to the appropriate individual work centers whereas the checkout and download bill of information subfunction 136 is designed to be operative to download files from the configuration management means 14 to the factory floor means 18. Thus, the checkout and download the work center files subfunction 138 and the checkout ' ' : ~ ' ' ' ' ~ '' ' ' ';
, ' ' , , ', : WO 91/05308 PCI`/US90/0~689 ~ . s ., : 2~7~6Q - 38 -and download bill of information subfunction 136 both encompass a similar set of subelements. To this end, the checkout and download bill of information subfunction 136 encompasses, as has been described hereinbefore, the following five subelements: accept trigger request subelement 144, request bill of information subelement 146, check bill of information file status subelement 148, get bill of information files subelement 150 and download bill of information files to factory floor subelement 152. Similarly, the checkout and download the work center files subfunction 138 encompasses the following four subelements: the accept a trigger request from a work center subelement 154, the identify the files for the work center subelement 156, the checkout work center files subelement 158 and the download files to work center subelement 160.
Many of the same considerations which apply to the checkout and download bill of information subfunction 136 are ~- also applicable to the checkout and download work center files subfunction 138. By way of exemplification and not limitation in this regard, reference is had here to such considerations as the nature of the triggers which are employed to initiate - requests to the checkout and download bill of information subfunction 136 and to the checkout and download work center files subfunction 138. Another such consideration is the matter of when to download which file or files. In this connection, with specific reference to the checkout and download work center files subfunction 138, by knowing the operation that is to be performed all of the files that are required therefor may be identified, but the operator at the individual work center may not need all of them. As such, the checkout and download work center files subfunction 138 is designed to be operative such that some files may always be downloaded if they are explicitly needed. Another consideration which needs to be addressed in the case of the checkout and download work center files subfunction 138 is that - 35 of how to deal with a bad file status such as, for instance, if another work center has requested the file for update. Also, w~ /u~u~ PCl`/US90/0~689 ' _ 39 2067160 , .. .
there is the matter of what happens if a work center requests a file that has not yet been downloaded from the configuration management means 14 to the factory floor means 18. In such a case, a suitable request should flow from the factory floor 5 means 18 to the configuration management means 14 and in response to such a request the file when it is requested should, if possible be downloaded, i.e., passed down to the work center where it is needed. Namely, the user at a work center should be able to get the file that is needed regardless 10 of where the file may be.
With further reference to the data distribution element 112 of the manufacture product function 108 of the factory floor means 18, the last two subfunctions thereof that -are yet to be described herein are those of the check in work center files subfunction 140 to which reference has previously been had herein in connection with the discussion of Figure 19 of the drawing and the check in bill of information subfunction 142 which has also been referred to herein previously in connection with the discussion of Figure 19 of the drawing.
Inasmuch as the check in work center files subfunction 140 and - the check in bill of information subfunction 142 bear so muchsimilarity one to another, it is deemed desirable for purposes of the discussion thereof, which follows herein, that they be discussed together. Moreover, for purposes of this discussion reference will be had in particular to Figure 22 of the ; drawlng. Basically, the main difference between the check in work center files subfunction 140 and the check in bill of information subfunction 142 is that the check in work center files subfunction 140 is designed to be operative to check in 30 files to the factory floor means 18, the latter function being schematically depicted at 162 in Figure 22 under the heading "Retrieval Only Files", whereas the check in bill of information subfunction 142 on the other hand is designed to be operative to check in files to the configuration management 35 means 14, the latter function being schematically depicted at 164 in Figure 22 under the heading "Retrieval Only Filesn. In either case, i.e., in the case of the check in work center . . - ~ . -. . ~. " , .
. .
; , - , . . . . .
.. . . . - . .
.. . .. . . ..
- :.... . . ., , . , :
. , , . , . .. ~ ..
.

WO 91/05308 PCr/US90/05689 ;, .
c~ ~ ~ 7 ~ 6 0 - 40 -files subfunctlon 140 or in the case of the check in bill of information subfunction 142, a check in simply changes the status of the file being checked in. Since most files will be checked out for retrieval only, the effect of the check in 5 function is to simply delete the lower level copy, i.e., the one at the individual work center or at the factory floor means 18, respectively. This is because the original copy of the file is maintained first in the configuration management means 14 and is thereafter maintained at the factory floor means 1~.
10 Unless the downloaded copy of the file is changed, it does not need to be transferred back up during the check in. However, if the file is changed, it should be returned from whence it came as a new version. It should not replace the current version. The fact that such changes to the files may occur is 15 acknowledged in Figure 22 under the heading "Modified Files" at 166 and 168, respectively. Further to this point of changes to the files, mention is made here of the fact that among the functions which the configuration management means 14 is designed to perform are those of keeping track of and of 20 relating to each other the respective versions of the files.
With further reference to the five major elements that collectively comprise the manufacture product function 108 of the factory floor means 18, a discussion will now be had herein of the third of these major elements; namely, that of 25 the maintenance element which is seen at 114 in Figure 17 of the drawing. As best understood with reference to Figure 23 of the drawing, the maintenance element 114 in accord with the illustrated embodiment of the present invention preferably embodies four subfunctions. These four subfunctions are the 30 following: the managing unplanned breakdowns subfunction which is identified generally by the reference numeral 170 in Figure 23, the scheduled/preventive maintenance subfunction which is - identified generally by the reference numeral 170 in Figure 23, the special project(s) subfunction identified generally by the 35 reference numeral 172 in Figure 23, and the spare and consumables inventory subfunction, i.e., the inventory management consumables subfunction which is identified WO 91/05308 PCl/US90/05689 41 i ~ .

generally by the reference numeral 176 in Figure 23. The aforedescribed subfunctions 170, 172, 174 and 176 of the maintenance element 114 are designed to be operative so that they will identify which operations and manufacturing orders S will be affected by a breakdown at a work center. In addition, : the subfunctions 170, 172, 174 and 176 of the maintenance element 114 are designed to be operative so that they can also identify any preventive maintenance that is scheduled for the near future 50 that such preventive maintenance can be done 10 while the work center is down. With further regard to the special project(s) subfunction 174, as best understood with reference to Figure 23 of the drawing, the term "special project(s)" is intended to encompass the following activities:
- rebuild a machine identified generally by the reference numeral 178 in Figure 23, install a new machine identified generally by the reference numeral 180 in Figure 23 and relocate a machine identified generally by the reference numeral 182 in Figure 23.
Finally, although not depicted explicitly in Figure 23 of the drawing, it is to be understood that in accord with the best 20 mode embodiment of the invention the maintenance element 114 preferably also includes an electronic messaging capability and a hardcopy rPquest logging capability for unplanned maintenance requests.
A discussion will next be had herein of the fourth of the five major elements that collectively comprise the manufacture product function 108 of the factory floor means 18;
namely, that of the tooling element which is seen at 116 in Figure 17 of the drawing. Reference will be had for purposes of this discussion in particular to Figure 24 of the drawing.
30 Thus, in accordance with the best mode embodiment of the invention and as best understood with reference to Figure 24, the tooling element 116 includes five subfunctions. These five subfunctions are the following: the enter new tooling in inventory subfunction which is identified by the reference numeral 184 in Figure 24, the schedule use of tooling subfunction which is identified by the reference numeral 186 in Figure 24, the checkout/checkin of tooling subfunction which is ., - . . ., ,, , , :

;. - . ~ ' ' . . ~ ~ . ., :

. : . : - .: . ,. :
. . . .
. , , , ~ , ,~: . ' WO 91J05308 PC~/US90/05689 .- , . ..
2 ~ 6 0 - 42 -identifled by the reference numeral 188 in Figure 24, the rewcrk or calibrate tooling subfunction which is identified by the reference numeral 190 in Figure 24, and the scrap old tooling subfunction which is identified by the reference numeral 192 in Figure 24. With further regard to the tooling element 116 it is to be understood herein that in many cases individual tools will be identified by serial number. In other cases, rather than keep track of each individual tool it may be feasible to only keep track of the number of tools of a specific type.
The final one of the major elements that comprise the manufacture product function 108 of the factory floor means 18 is the quality element which is seen at 118 in Figure 17 of the drawing. The quality element 118 in accordance with the best 15 mode embodiment of the invention may encompass therewithin a multiplicity of different subfunctions that are tailored to fit the specific nature of the application in which it is desired to employ the integrated manufacturing system 10 of the present invention. However, regardless of the particular application in which the integrated manufacturing system 10 of the present invention is being employed there will always be included in the quality element llQ a statistical process control ~ subfunction.
- Continuing with the discussion of the five major elements, i.e., the data collection element 110, the data distribution element 112, the maintenance element 114, the tooling element 116 and the quality element 118, of the manufacture product function 108 of the factory floor means 18, each of these five major elements has associated therewith an information model. In this regard, by way of exemplification and not limitation thereof, a description will be had hereinafter of the information model for the data collection element 110, the information model for the maintenance model 114 and the information model for the tooling element 116.
Commencing, therefore, first with a description of the information model for the data collection element 110, reference will be had for thls purpose in particular to Figures .

WO ~1/05308 PCI/US90/~5689 . ~,,. .. ii.
- 25 and 26 of the drawing. Thus, as best understood with reference to Figure 25 of the drawing, the four basic objects that form the backbone of the information model for the data collection element 110 are the following: part, which is 5 identified generally in both Figures 25 and 26 by the reference numeral 194; process plan, which is identified generally in both Figures 25 and 26 by the reference numeral 196; operation, which is identified generally in both Figures 25 and 26 by the reference numeral 198; and work center, which is identified 10 generally in Figure 25 by the reference numeral 200.
Continuing herein with the description of the information model for the data collection element 110, a part 194 is made using a process plan 196, which in turn consists of operations 19B. Operations 198 on the other hand are done at lS work centers 200. Moreover, a part 194 is identified by a particular part order. A manufacturing work order depicted generally at 202 in Figure 26 of the drawing or shop order specifies that a part 194 is to be manufactured. The manufacturing work order 202 has an ident~fication order and is -~ 20 related to a specific customer order, which is in turn relatedto a customer and a contract. The manufacturing work order 202 is related to date in four ways, i.e., a schedu7ed start and due date, and an actual start and completed date. The shop order generated by the manufacturing resource planning means 16 25 initially specifies the scheduled start and due dates. The actual start and completed dates are filled in later when they are known.
The process plan 196 consists of one or more operations 198. Alternate operations 198 may also be defined.
30 The process plan 196 is identified by the number of the part - 194 to which it is related. Each operation 198 is also relatedto date in four ways, i.e., a scheduled start and due date, and an actual start and completed date. The process plan 196 is also related to one or more routings. To this end, a process 35 plan 196 specifies how to make a specific part 194 in general.
The routing specifies and collects data for the specific part 194 for the particular manufacturing work order 202. For .. ~ . . . . .

.:

- .

- . - . ' . ': ': ~ , ., . ~ ;
. . . ~

WO 91/05308 PCI/US90/0~689 ,~ _ 206716o example, the process plan 196 specifies the standard setup and run time for an operation 198 any time the specific part 194 is made. There is a separate routing for each manufacturing work order 202 to make the part 194. This separate routing is necessary to capture data that differs for each manufacturing work order 202, such as actual setup and run times. The routing also specifies which files, depicted generally at 204 in Figure 26, or documents are used to make the part 194. Note is taken here of the fact that file master copies are related to process plans 196, while file copies are related to specific routings.
In general, a process plan 196 may be related to many routings, i.e., one routing for each manufacturing work order 202 that specifies that part 194. A special case is when each : 15 part 194 is unique, i.e., a part 194 is only made once. In this regard, by way of exemplification and not limitatlon, this -~ is usually the case with tubular products, but not with machined parts. This information model for the data collection . element 110 can still handle this case by simply having onlyone routing for a process plan 196. The alternate approach, combining unique routing data with process planning data, creates a problem because it prohibits ever reusing a process plan 196.
Each operation 198 has a sequence number and a 25 description. The sequence number onl~ identifies the operation -~- 198 w~thin a specific process plan 196. To uniquely identify an operation 198 requires the operation sequence number, the process plan, i.e., part, number, the component number and the contract number. Each operation 198 also has a standard setup and run time. When the operation 198 is actually done, the actual setup and run time is collected and saved as part of the routing. An operation 198 also uses certain types of tooling, fixtures, and/or dies. Again, when the operation 198 is done the actual tooling, fixture, and/or die is identified preferably by serial number. This is helpful from the standpoint of both tooling inventory and ~aintenance. An operation 198, as related to a routing not a process plan 196, ; . , .. . -., . ~ . .

- , , - . ., . ~ .

WO 91/05308 PCl/US90/05689 20671~

also has an operational status such as scheduled, started, in-process or completed.
Finally, an operation 198 is done at a work center 200. The work center 200 is identified by an asset number and has a work center type and status. Each work center 200 also has a cumulative number of hours, which is used for scheduling maintenance. There are operators who are qualified to run particular types of work centers 200. Also, a routing specifies the actual work center 200 used for an operation 198 and the operator who performed the operation 198.
Turning next to a description of the information model for the maintenance element 114, reference will be had for this purpose in particular to Figure 27 of the drawing.
; Thus, as best understood with reference to Figure 27 of the drawing, the basic structure for the maintenance element 11~
information model involves work centers, denoted generally by the reference numeral 206 in Figure 27; maintenance orders, denoted generally by the reference numeral 208 in Figure 27;
and maintenance line items, denoted generally by the reference numeral 210 in Figure 27.
As described hereinbefore in connection with the discussion of the information model for the data collection element 110, a work center 206 is identified by an asset number, is used for an operation 198, and has a cumulative number of operating hours associated therewith. Some work centers 206 also require equipment certification. Work centers 206 are related to maintenance orders 208 in two ways. F rst, a maintenance order 208 is for a certain work center 206.
Second, a maintenance order 208 may affect zero, one, or more other work centers 206.
Every maintenance order 208 has a maintenance order identification and a description. It may also require a skill certification. The maintenance order 208 is done by an employee, who must have the requisite skill certification.
Also, the employee's skill certification must be current, if not the employee is re~uired to become recertified.

.:
~..

- . .

WO 91/05308 PCr/VS90/05689 2~7l~ 46-A maintenance order 208 may also require maintenance parts, which may be either stocked or special order parts.
Stocked parts have four roles relating them to quantity, i.e., quantity on-hand, quantity on-order, reorder point and standard order quantity. Special order maintenance parts have only two roles, i.e., quantity on-order and quantity on-hand.
Maintenance parts and materials are ordered through a purchase order to a vendor and with a due date. Maintenance parts and materials are inventoried and tracked by the maintenance 10 departments in each factory location, but all of the actual purchase orders may be generated through the purchasing module of the manufacturing resource planning means 16, so there must be a linkage between the maintenance element 114 and the manufacturing resource planning means 16. A second link is also needed so that the manufacturing resource planning means ; 16 will have information supplied thereto regarding machine down time and its impact on resource aYailability.
Each maintenance order 208 consists of one or more maintenance line items 210. There are two subtypes of 20 maintenance line items 210, i.e., preventive maintenance items . and repair items. Note is taken here of the fact that these are subtypes of maintenance line items 210 rather than maintenance orders 208 because a maintenance order 208 may include both types of items. For example, a maintenance order --208 generated to repair a work center 206 may also include any preventive maintenance items that would be needed in the near future. All maintenance orders 208 are described by a specific action and done at a certain time. The time the maintenance line item 210 is done is specified in two ways, i.e., a date 30 and clock time when the maintenance line item 210 was done and the cumulative number of hours on the work center 206 when the action was taken.
A repair item has both a time estimate and the actual time it took to make the repair. A preventive maintenance item 35 has a standard time that the work should take and an actual t~me that it took. Preventive maintenance items are scheduled .. ~ . . ..... .

WO 91tO5308 PCI/US90/0~689 47 2Q67~6~0 ,:
to be done either on a certain date or when the work center 206 has accumulated a certain number of hours of operation.
Finally a brief description will now be had herein of the information model for the tooling element 116. For this purpose, reference will be had in particular to Figure 28 of . the drawing. Thus, as best understood with reference to Figure ; 28 the basic structure in the information model for the tooling element 116 is that a specific tool, depicted generally at 212 in Figure 28, is specified in a checkout/checkin transaction, depicted generally at 214 in Figure 28. In the information model as illustrated in Figure 28 the tooling element 116 may encompass tooling, fixtures or dies. Other information which is encompassed in the information model, as shown in Figure 28, for the tooling element 116 relates to the tooling element 116 in either of two ways. First, some information in the information model of Figure 28 relates to a specific piece of tool, which is identified by a unique identification number, e.g., cumulative hours on a tool. Second, other information in ~ the information model of Figure 28 relates only to a certain - 20 type of tooling, not to a specific piece of tooling, e.g., quantity on-hand or a checkout/checkin transaction 214.
Continuing with the description of the information model as depicted in Figure 28 for the tooling element 116, one needs first to consider the information related to a unique piece of tooling. Each piece of tooling has an identification number, a tool type, a new/used status, and has a location specified in a tooling inventory in a given factory location.
The integrated manufacturing system 10 constructed in accordance with the present invention can also keep track of the cumulative number of hours a tool has been used. Further, a specific piece of tooling also has a date on which it was received and a date on which it was last used.
Secondly, one needs to take note of the fact that other types of information, which are contained in the information model as depicted in Figure 28 for the tooling element 116, are related to types of tooling, not to individual pieces of tooling. In this regard, a tool can be used on . . ~
" ~

, . , . . ~. . ' :

', ~ WO 91/0~i308 PCI`/US90/0~689 ~067~60 48-certain work centers and to make certain types of parts.
Further, all tools have associated therewith a quantity on-hand amount and a usage rate per month. Tool that is ordered has several additional quantities, i.e., a reorder point, an order quantity and a quantity on-order amount. There can also be purchase orders to vendors for purchased tooling. Each of these purchase orders has a generated date and a due date.
Note is also taken here of the fact that some types of tooling and materials, especially consumables, e.g., welding rods, are not tracked by serial number, only by the amount used.
A checkout/checkin transaction 214 is used to track - the location and usage of individual pieces of tooling. A
tooling checkout transaction has an identification number and specifies the date and time, the person checking out the tooling, the identification number of the tooling being checked 15 out, and the location where the tooling will be used. There may also be found to be a need to relate the tooling to the manufacturing work order 202 and/or the operation 198. Also, the information model as depicted in Figure 28 for the tooling element 116 assumes that a checkout transaction only relates to 20 a single piece of tooling. Namely, the current information model as depicted in Figure 28 for the tooling element 116 assumes that a single transaction cannot check out more than one piece of tooling.
Continuing with the description of the information 25 model as depicted in Figure 28 for the tooling element 116, as tooling is used it becomes worn and eventually needs to be - repaired or reworked. To this end, the tooling may be reworked internally or sent out to a vendor as part of a rework shipment. Moreover, if the tooling is being reworked internally, it may simply be checked out for rework without needing an additional information structure. A specific piece of tooling which is included in a rework shipment has associated therewith an identification number, the fact that it has been sent to a vendor, the fact that it was sent out on a 35 particular date and the fact that it is due back on a partlcular date. The shipment of tooling sent out for WO 91/05308 PCr/US90/05689 2067~a ., .
; reworking is later returned on a date. As a summary, each rework shipment may include tooling of different types and for each type of tooling there is a quantity shipped and a quantity returned, the two of which may be different because some of the pieces of tooling sent out for reworking may not be repairable.
Thus, in accordance with the present invention there has been provided a new and improved integrated system suitable for use for managing the distribution to a factory floor and throughout a factory of information required for the manufacture of products. Moreover, the integrated manufacturing system of the present invention is characterized in that the information distributed to the factory floor and throughout the factory is that information in the form of design and manufacturing data which is necessary for the production of products on the factory floor. In addition, in accord with the present invention an integrated manufacturing system is provided which is characterized in that it encompasses a central repository for all shared information wherein is stored the information that is distributed to the factory floor and throughout the factory. Further, the integrated manufacturing system of the pres~nt invention is characterized in that it encompasses an engineering enterprise wherein the design information pertaining to the production of the product which is distributed to the factory floor and throughout the factory is generated. Additionally, in accordance with the present invention an integrated manufacturing system is provided which is characterized in that it encompasses a manufacturing resource planning system wherein the scheduling information pertaining to the flow throughout the factory of materials culminating in the production of he finished product which is distributed to the factory floor and throughout the factory is generated. Also, the integrated manufacturing system of the present invention is characterized in that it is capable of being used in a new factory building.
Furthermore, in accord with the present invention an integrated manufacturing system is provided which is characterized in that - ~ .

' WO 91/05308 PCI`/~lS90/0~689 20671~

it is capable of being retrofitted into an existing factory bu~ld1ng.
While only one embodiment of our invention has been shown, it will be appreciated that modifications thereof, some s of which have been alluded to hereinabove, may still be readily made thereto by those skilled in the art. We, therefore, intend by the appended claims to cover the modifications alluded to herein as well as all the other modifications, which fall within the true spirit and scope of our invention.

;

" ' '" ' ' '. ~ ' " . ,. ' ,: ' ' . '' ' ' . ' ' "' '' ' ' ' ' ' ' ' . ~ ' '' . ' , ~' .-:

Claims (18)

What is claimed is:
1. An integrated manufacturing system for managing the distribution to a factory floor as well as throughout a factory of the information that is necessary to effectuate the production of products on the factory floor comprising:
a.) product information entry means operative for generating from a specification furnished by a customer regarding products to be manufactured information required for purposes of effectuating the manufacture of products on the factory floor, said information generated by said product information entry means including information of a design/drawing nature, information of a process planning nature, information of a bill of materials nature and information of an estimated cost nature;
b.) configuration management means connected in operative relation to said product information means, said configuration management means being a central repository for all of the shared information required for purposes of effectuating the manufacture of products on the factory floor;
c.) manufacturing resource planning means connected in operative relation to said configuration management means and therethrough to said product information entry means, said manufacturing resource planning means being the source of information of a scheduling nature required for purposes of effectuating the manufacture of products on the factory floor; and d.) factory floor means connected in operative relation to said manufacturing resource planning means and therethrough to both said configuration management means and said product information entry means, said factory floor means being the source of information relating to the operations that take place on the factory floor during the course of effectuating thereat the manufacture of products.
2. The integrated manufacturing system as set forth in Claim 1 wherein said shared information for which said configuration management means is a central repository includes information of an engineering/manufacturing control change nature, information of an overall facility information control nature and information of a product description nature.
3. The integrated manufacturing system as set forth in Claim 1 wherein said information for which said manufacturing resource planning means is a source includes information of a scheduling nature, information of a purchase order/work order nature and information of an inventory control nature.
4. The integrated manufacturing system as set forth in Claim 1 wherein said information for which said factory floor means is a source includes information of a work center load nature, information of a manufacturing method nature, information of a data collection nature, information of a direct numerical control nature and information of a tooling/fixturing status nature.
5. The integrated manufacturing system as set forth in Claim 1 further includes other design/manufacturing information source means.
6. The integrated manufacturing system as set forth in Claim 5 wherein said other design/manufacturing information source means is an additional source of design information.
7. The integrated manufacturing system as set forth in Claim 5 wherein said other design/manufacturing information source means is an additional source of manufacturing information.
8. An integrated manufacturing system for managing the distribution to a factory floor as well as throughout a factory of the information that is necessary to effectuate the production of products on the factory floor comprising:
a.) product information entry means operative for generating from a specification furnished by a customer regarding the products that are to be manufactured information required for purposes of effectuating the manufacture of products on the factory floor;

b.) configuration management means connected in operative relation to said product information means, said configuration management means being a central repository for all of the shared information required for purposes of effectuating the manufacture of products on the factory floor, said shared information for which said configuration management means is a central repository including information of an engineering/manufacturing control change nature, information of an overall facility information control nature and information of a product description nature;
c.) manufacturing resource planning means connected in operative relation to said configuration management means and therethrough to said product information entry means, said manufacturing resource planning means being the source of information of a scheduling nature required for purposes of effectuating the manufacture of products on the factory floor; and d.) factory floor means connected in operative relation to said manufacturing resource planning means and therethrough to both said configuration management means and said product information entry means, said factory floor means being the source of information relating to the operations that take place on the factory floor during the course of effectuating thereat the manufacture of products.
9. The integrated manufacturing system as set forth in Claim 8 wherein said information for which said manufacturing resource planning means is a source includes information c? scheduling nature, information of a purchase order/work order nature and information of an inventory control nature.
10. The integrated manufacturing system as set forth in Claim 8 wherein said information for which said factory floor means is a source includes information of a work center load nature, information of a manufacturing method nature, information of a data collection nature, information of a direct numerical control nature and information of a tooling/fixture status nature.
11. An integrated manufacturing system for managing the distribution to a factory floor as well as throughout a factory of the information that is necessary to effectuate the production of products on the factory floor comprising:
a.) product information entry means operative for generating from a specification furnished by a customer regarding products to be manufactured information required for purposes of effectuating the manufacture of products on the factory floor;
b.) configuration management means connected in operative relation to said product information means, said configuration management means being a central repository for all of the shared information required for purposes of effectuating the manufacture of products on the factory floor;
c.) manufacturing resource planning means connected in operative relation to said configuration management means and therethrough to said product information entry means, said manufacturing resource planning means being the source of information of a scheduling nature required for purposes of effectuating the manufacture of products on the factory floor, said information for which said manufacturing resource planning means is a source including information of a scheduling nature, information of a purchase order/work order nature and information of an inventory control nature; and d.) factory floor means connected in operative relation to said manufacturing resource planning means and therethrough to both said configuration management means and said product information entry means, said factory floor means being the source of information relating to the operations that take place on the factory floor during the course of effectuating thereat the manufacture of products.
12. The integrated manufacturing system as set forth in Claim 11 wherein said information for which said factory floor means is a source includes information of a work center load nature, information of a manufacturing method nature, information of a data collection nature, information of a direct numerical control nature and information of a tooling/fixture status nature.
13. An integrated manufacturing system for managing the distribution to a factory floor as well as throughout a factory of the information that is necessary to effectuate the production of products on the factory floor comprising:
a.) product information entry means operative for generating from specifications furnished by a customer regarding products to be manufactured information required for purposes of effectuating the manufacture of products on the factory floor;
b.) configuration management means connected in operative relation to said product information means, said configuration management means being a central repository for all of the shared information required for purposes of effectuating the manufacture of products on the factory floor;
c.) manufacturing resource planning means connected in operative relation to said configuration management means and therethrough to said product information entry means, said manufacturing resource planning means being the source of information of a scheduling nature required for purposes of effectuating the manufacture of products on the factory floor; and d.) factory floor means connected in operative relation to said manufacturing resource planning means and therethrough to both said ??nfiguration management means and said product informati?? entry means, said factory floor means being the source of information relating to the operations that take place on the factory floor during the course of effectuating thereat the manufacture of products, said information for which said factory floor means is a source including information of a work center load nature, information of a manufacturing method nature, information of a data collection nature, information of a direct numerical control nature and information of a tooling/fixture status nature.
14. An integrated manufacturing system for managing the distribution to a factory floor as well as throughout a factory of the information that is necessary to effectuate the production of products on the factory floor comprising:
a.) configuration management means operative as a central repository for all of the shared information required for purposes of effectuating the manufacture of products on the factory floor, said shared information for which said configuration management means is a central repository including information of an engineering/manufacturing control change nature, information of an overall facility information control nature and information of a product description nature;
and b.) factory floor means connected in operative relation to said configuration management means, said factory floor means being the source of information relating to the operations that take place on the factory floor during the course of effectuating thereat the manufacture of products.
15. The integrated manufacturing system as set forth in Claim 14 wherein said information for which said factory floor means is a source includes information of a work center load nature, information of a manufacturing method nature, information of a data collection nature, information of a direct numerical control nature and information of a tooling/fixture status nature.
16. An integrated manufacturing system for managing the distribution to a factory floor as well as throughout a factory of the information that is necessary to effectuate the production of products on the factory floor comprising:

a.) configuration management means operative as a central repository for all of the shared information required for purposes of effectuating the manufacture of products on the factory floor, said shared information for which said configuration management means is a central repository including information of an engineering/manufacturing control change nature, information of an overall facility information control nature and information of a product description nature;
b.) manufacturing resource planning means connected in operative relation to said configuration management means, said manufacturing resource planning means being the source of information of a scheduling nature required for purposes of effectuating the manufacture of products on the factory floor; and c.) factory floor means connected in operative relation to said manufacturing resource planning means and therethrough to said configuration management means, said factory floor means being the source of information relating to the operations that take place on the factory floor during the course of effectuating thereat the manufacture of products.
17. The integrated manufacturing system as set forth in Claim 16 wherein said information for which said manufacturing resource planning means is a source includes information of a scheduling nature, information of i purchase order/work order nature and information of an inventory control nature.
18. The integrated manufacturing system as set forth in Claim 16 wherein said information for which said factory floor means is a source includes information of a work center load nature, information of a manufacturing method nature, information of a data collection nature, information of a direct numerical control nature and information of a tooling/fixture status nature.
CA002067160A 1989-10-05 1990-10-05 Integrated manufacturing system Abandoned CA2067160A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US417,626 1989-10-05
US07/417,626 US5089970A (en) 1989-10-05 1989-10-05 Integrated manufacturing system

Publications (1)

Publication Number Publication Date
CA2067160A1 true CA2067160A1 (en) 1991-04-06

Family

ID=23654753

Family Applications (1)

Application Number Title Priority Date Filing Date
CA002067160A Abandoned CA2067160A1 (en) 1989-10-05 1990-10-05 Integrated manufacturing system

Country Status (6)

Country Link
US (1) US5089970A (en)
EP (1) EP0494983A1 (en)
KR (1) KR920704228A (en)
AU (1) AU6620090A (en)
CA (1) CA2067160A1 (en)
WO (1) WO1991005308A1 (en)

Families Citing this family (139)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5991732A (en) * 1989-02-15 1999-11-23 Moslares; Andres Monedero Strategical-tactical logistic system
JP2846054B2 (en) * 1990-04-20 1999-01-13 株式会社日立製作所 Output specification example information processing system
US5216612A (en) * 1990-07-16 1993-06-01 R. J. Reynolds Tobacco Company Intelligent computer integrated maintenance system and method
US5216593A (en) * 1991-01-24 1993-06-01 International Business Machines Corporation Method and apparatus for discrete activity resourse allocation through cardinality constraint generation
US5579231A (en) * 1991-03-19 1996-11-26 Fujitsu Limited Management system for manufacture
JP2900646B2 (en) * 1991-07-10 1999-06-02 三菱電機株式会社 Numerical control unit
US5644493A (en) * 1991-08-30 1997-07-01 Nsk Ltd. Production information processing system
US5321610A (en) * 1991-09-23 1994-06-14 The Cobre Group, Inc. Integrated product for implementing application software and process of developing integrated product for implementing application software
US5381332A (en) * 1991-12-09 1995-01-10 Motorola, Inc. Project management system with automated schedule and cost integration
US5311438A (en) * 1992-01-31 1994-05-10 Andersen Consulting Integrated manufacturing system
US5297054A (en) * 1992-04-03 1994-03-22 General Motors Corporation Expert system for automically generating gear designs
WO1994020918A1 (en) * 1993-03-11 1994-09-15 Fibercraft/Descon Engineering, Inc. Design and engineering project management system
US5586039A (en) * 1993-03-29 1996-12-17 Texas Instruments Incorporated Computer-aided manufacturing support method and system for specifying relationships and dependencies between process type components
US5446903A (en) * 1993-05-04 1995-08-29 International Business Machines Corporation Method and apparatus for controlling access to data elements in a data processing system based on status of an industrial process by mapping user's security categories and industrial process steps
JPH06325110A (en) * 1993-05-17 1994-11-25 Nec Corp Sheet metal cad system
JP3165765B2 (en) * 1993-09-20 2001-05-14 富士通株式会社 CAD design support equipment
US6345259B1 (en) 1993-09-28 2002-02-05 The Dow Chemical Company System and method for integrating business and manufacturing environments
US6141647A (en) * 1995-10-20 2000-10-31 The Dow Chemical Company System and method for integrating a business environment, a process control environment, and a laboratory environment
US5552995A (en) * 1993-11-24 1996-09-03 The Trustees Of The Stevens Institute Of Technology Concurrent engineering design tool and method
US6240328B1 (en) * 1994-01-10 2001-05-29 Motorola, Inc. Manufacturing method for assembling products by generating and scheduling dynamically assembly instructions
US6108617A (en) * 1994-05-05 2000-08-22 Texas Instruments Incorporated Method for tracking chemicals
US5721913A (en) * 1994-05-05 1998-02-24 Lucent Technologies Inc. Integrated activity management system
US7039595B1 (en) 1998-10-21 2006-05-02 Infor International Limited System and method for throughput measurement
US6801820B1 (en) 1994-05-27 2004-10-05 Lilly Software Associates, Inc. Method and apparatus for scheduling work orders in a manufacturing process
US5787000A (en) * 1994-05-27 1998-07-28 Lilly Software Associates, Inc. Method and apparatus for scheduling work orders in a manufacturing process
US7647241B1 (en) 1994-05-27 2010-01-12 Infor Global Solutions (Veenendaal) B.V Computer program product for determining and reducing customer service impact
TW283220B (en) * 1994-09-28 1996-08-11 I2 Technologies Inc
US5630123A (en) * 1994-09-28 1997-05-13 I2 Technologies, Inc. Software system utilizing a filtered priority queue and method of operation
US5969973A (en) * 1994-11-09 1999-10-19 Amada Company, Ltd. Intelligent system for generating and executing a sheet metal bending plan
EP0744046B1 (en) 1994-11-09 2003-02-12 Amada Company Limited Intelligent system for generating and executing a sheet metal bending plan
US5845258A (en) * 1995-06-16 1998-12-01 I2 Technologies, Inc. Strategy driven planning system and method of operation
US6188989B1 (en) 1995-06-16 2001-02-13 I2 Technologies, Inc. System and method for managing available to promised product (ATP)
US5832532A (en) * 1995-06-16 1998-11-03 I2 Technologies, Inc. Model-independent and interactive report generation system and method of operation
US5764543A (en) * 1995-06-16 1998-06-09 I2 Technologies, Inc. Extensible model network representation system for process planning
US7085729B1 (en) 1995-06-16 2006-08-01 I2 Technologies Us, Inc. System and method for allocating manufactured products to sellers
US5787283A (en) * 1995-10-27 1998-07-28 International Business Machines Corporation Framework for manufacturing logistics decision support
US6067525A (en) * 1995-10-30 2000-05-23 Clear With Computers Integrated computerized sales force automation system
US5828575A (en) 1996-05-06 1998-10-27 Amadasoft America, Inc. Apparatus and method for managing and distributing design and manufacturing information throughout a sheet metal production facility
US5864482A (en) * 1996-05-06 1999-01-26 Amadasoft America, Inc. Apparatus and method for managing distributing design and manufacturing information throughout a sheet metal production facility
US5886897A (en) 1996-05-06 1999-03-23 Amada Soft America Inc. Apparatus and method for managing and distributing design and manufacturing information throughout a sheet metal production facility
US5971589A (en) 1996-05-06 1999-10-26 Amadasoft America, Inc. Apparatus and method for managing and distributing design and manufacturing information throughout a sheet metal production facility
WO1997048063A1 (en) * 1996-06-07 1997-12-18 Peter Schimitzek Computer system for company management
JP3339779B2 (en) * 1996-07-17 2002-10-28 富士通株式会社 Manufacturing management system with SMT line
JP3889091B2 (en) * 1996-09-03 2007-03-07 三菱電機株式会社 Semiconductor development information integration system
JP3938221B2 (en) * 1997-06-04 2007-06-27 本田技研工業株式会社 Process information management system
US6233538B1 (en) * 1997-09-11 2001-05-15 Amada America, Inc. Apparatus and method for multi-purpose setup planning for sheet metal bending operations
US6324522B2 (en) 1997-09-15 2001-11-27 Mro Software, Inc. Electronic information network for inventory control and transfer
US7020594B1 (en) * 1997-10-01 2006-03-28 Sony Corporation Electronic Kanban worksheet for the design and implementation of virtual or electronic Kanban systems
US6889178B1 (en) * 1997-10-01 2005-05-03 Sony Corporation Integrated wafer fabrication production characterization and scheduling system
JPH11232324A (en) * 1998-02-16 1999-08-27 Nec Yamagata Ltd Load division type production management system and production management method
EP1058903A1 (en) 1998-03-02 2000-12-13 Northeast Equipment, Inc. doing business as Delta Mechanical Seals Apparatus and method for selecting a mechanical seal
US6173210B1 (en) 1998-03-02 2001-01-09 Northeast Equipment, Inc. Apparatus and method for selecting a mechanical seal
US6424878B1 (en) * 1998-04-28 2002-07-23 International Business Machines Corporation Method and apparatus for implementing custom business logic
US6396516B1 (en) * 1998-05-29 2002-05-28 Plexus Systems, Llc Graphical user interface shop floor control system
US6336053B1 (en) 1998-05-29 2002-01-01 Plexus Systems, Llc Graphical user interface shop floor control system
US6523045B1 (en) 1998-05-29 2003-02-18 Plexus Systems, Llc Graphical user interface shop floor control system
US6963847B1 (en) 1998-09-18 2005-11-08 I2 Technologies Us, Inc. System and method for managing ATP data in a distributed supply chain planning environment
US6418351B1 (en) * 1999-03-30 2002-07-09 International Business Machines Corporation Determining the capacity components of tools/toolsets in a manufacturing line
US6397118B1 (en) 1999-04-02 2002-05-28 American Standard Inc. Method and system for providing sufficient availability of manufacturing resources to meet unanticipated demand
US6415195B1 (en) 1999-04-02 2002-07-02 American Standard Inc. Method and system for providing sufficient availability of manufacturing resources to meet unanticipated demand
US6415194B1 (en) 1999-04-02 2002-07-02 American Standard Inc. Method and system for providing sufficient availability of manufacturing resources to meet unanticipated demand
US6393332B1 (en) 1999-04-02 2002-05-21 American Standard Inc. Method and system for providing sufficient availability of manufacturing resources to meet unanticipated demand
DE19921063C1 (en) * 1999-05-09 2000-06-29 Christoph Loesch Process controlled manufacture of articles allows the customer to tailor the product to specific requirements
US7039602B1 (en) 1999-06-14 2006-05-02 I2 Technologies Us, Inc. Configuring products with default sections determined according to optimization functions
JP3494590B2 (en) * 1999-06-18 2004-02-09 富士通株式会社 Transmission / reception system and transmission device
US7069101B1 (en) 1999-07-29 2006-06-27 Applied Materials, Inc. Computer integrated manufacturing techniques
US7092948B1 (en) 1999-09-09 2006-08-15 The Regents Of The University Of California Method and system of integrating information from multiple sources
US6560499B1 (en) 1999-10-29 2003-05-06 Demmer Corporation System and method for design and fabrication of stamping dies for making precise die blanks
US6640151B1 (en) 1999-12-22 2003-10-28 Applied Materials, Inc. Multi-tool control system, method and medium
IT1320899B1 (en) * 2000-02-25 2003-12-10 Pulsar Srl ITEMS TREATMENT PLANT AND ITEM CONVEYING APPARATUS USABLE IN SUCH PLANT.
US6775647B1 (en) 2000-03-02 2004-08-10 American Technology & Services, Inc. Method and system for estimating manufacturing costs
JP2002063240A (en) * 2000-06-06 2002-02-28 Mori Seiki Co Ltd Production management system
AU2001285803A1 (en) * 2000-07-11 2002-01-21 Pirelli Pneumatici S.P.A. Method for designing a tyre
US7133736B2 (en) * 2000-07-11 2006-11-07 Pirelli Pneumatici S.P.A. Method for designing a tire and method for producing at least one tire
US6708074B1 (en) 2000-08-11 2004-03-16 Applied Materials, Inc. Generic interface builder
US6701203B2 (en) * 2000-09-08 2004-03-02 International Business Machines Corporation Determining the capacity components of multi chamber systems
US7249044B2 (en) * 2000-10-05 2007-07-24 I2 Technologies Us, Inc. Fulfillment management system for managing ATP data in a distributed supply chain environment
US20020072956A1 (en) * 2000-10-06 2002-06-13 Willems Sean P. System and method for determining the optimum configuration strategy for systems with multiple decision options
US7188142B2 (en) * 2000-11-30 2007-03-06 Applied Materials, Inc. Dynamic subject information generation in message services of distributed object systems in a semiconductor assembly line facility
US7490301B2 (en) * 2000-12-25 2009-02-10 Fujitsu Limited Computer readable recording medium storing program for managing CAD data
US7343345B1 (en) 2001-01-19 2008-03-11 Taiwan Semiconductor Manufacturing Company, Ltd. Payment model for an enterprise resource planning system
US7313534B2 (en) * 2001-01-22 2007-12-25 W.W. Grainger, Inc. System and method for predictive maintenance and service parts fulfillment in a supply chain
US7212976B2 (en) * 2001-01-22 2007-05-01 W.W. Grainger, Inc. Method for selecting a fulfillment plan for moving an item within an integrated supply chain
US7324966B2 (en) 2001-01-22 2008-01-29 W.W. Grainger Method for fulfilling an order in an integrated supply chain management system
US20020128735A1 (en) * 2001-03-08 2002-09-12 Hawkins Parris C.M. Dynamic and extensible task guide
US7065499B1 (en) 2001-03-19 2006-06-20 I2 Technologies Us, Inc. Intelligent order promising
US20020138321A1 (en) * 2001-03-20 2002-09-26 Applied Materials, Inc. Fault tolerant and automated computer software workflow
US7024371B2 (en) * 2001-04-13 2006-04-04 I2 Technologies Us, Inc. High availability planning and scheduling architecture
US7043444B2 (en) * 2001-04-13 2006-05-09 I2 Technologies Us, Inc. Synchronization of planning information in a high availability planning and scheduling architecture
US7201936B2 (en) * 2001-06-19 2007-04-10 Applied Materials, Inc. Method of feedback control of sub-atmospheric chemical vapor deposition processes
US7160739B2 (en) * 2001-06-19 2007-01-09 Applied Materials, Inc. Feedback control of a chemical mechanical polishing device providing manipulation of removal rate profiles
US7047099B2 (en) 2001-06-19 2006-05-16 Applied Materials Inc. Integrating tool, module, and fab level control
US6913938B2 (en) * 2001-06-19 2005-07-05 Applied Materials, Inc. Feedback control of plasma-enhanced chemical vapor deposition processes
US6910947B2 (en) 2001-06-19 2005-06-28 Applied Materials, Inc. Control of chemical mechanical polishing pad conditioner directional velocity to improve pad life
US7082345B2 (en) * 2001-06-19 2006-07-25 Applied Materials, Inc. Method, system and medium for process control for the matching of tools, chambers and/or other semiconductor-related entities
US7698012B2 (en) * 2001-06-19 2010-04-13 Applied Materials, Inc. Dynamic metrology schemes and sampling schemes for advanced process control in semiconductor processing
US7101799B2 (en) * 2001-06-19 2006-09-05 Applied Materials, Inc. Feedforward and feedback control for conditioning of chemical mechanical polishing pad
GB2380276A (en) * 2001-07-11 2003-04-02 Inventec Corp Method and system for immediately issuing production plan
US7337019B2 (en) * 2001-07-16 2008-02-26 Applied Materials, Inc. Integration of fault detection with run-to-run control
US6571179B2 (en) 2001-08-24 2003-05-27 Xerox Corporation Intelligent power tool
US6553321B2 (en) 2001-08-24 2003-04-22 Xerox Corporation Intelligent assembly systems and methods
US20030061128A1 (en) * 2001-09-26 2003-03-27 Inventec Corporation Inventory management system for estimating supply by incorporating reparable products into future production
US20030078820A1 (en) * 2001-10-19 2003-04-24 Ouchi Norman Ken Object based workflow route
US20030115108A1 (en) * 2001-12-17 2003-06-19 William Scott Method and system for designing and ordering products for manufacture on-line
US20030115088A1 (en) * 2001-12-18 2003-06-19 Crossmark, Inc. System and method of routing, scheduling, and monitoring a workforce
US20030149608A1 (en) * 2002-02-06 2003-08-07 Kall Jonathan J. Suite of configurable supply chain infrastructure modules for deploying collaborative e-manufacturing solutions
US7225047B2 (en) * 2002-03-19 2007-05-29 Applied Materials, Inc. Method, system and medium for controlling semiconductor wafer processes using critical dimension measurements
US20030199112A1 (en) * 2002-03-22 2003-10-23 Applied Materials, Inc. Copper wiring module control
US20040006399A1 (en) * 2002-06-26 2004-01-08 Klein Alan L. Method and system for managing and monitoring an organization
JP2005535130A (en) * 2002-08-01 2005-11-17 アプライド マテリアルズ インコーポレイテッド Methods, systems, and media for handling misrepresented measurement data in modern process control systems
US6904440B2 (en) * 2002-09-23 2005-06-07 United Technologies Corporation Multi-tier material requirements flowdown generation
WO2004028939A2 (en) * 2002-09-26 2004-04-08 Trumpf Maschinen Austria Gmbh & Co. Kg. Gripping device comprising means for detecting double feeding and method for the operation thereof
TWI222587B (en) * 2002-10-07 2004-10-21 Inventec Corp Part number application method and system
CN1720490B (en) * 2002-11-15 2010-12-08 应用材料有限公司 Method and system for controlling manufacture process having multivariate input parameters
US7333871B2 (en) * 2003-01-21 2008-02-19 Applied Materials, Inc. Automated design and execution of experiments with integrated model creation for semiconductor manufacturing tools
US7205228B2 (en) * 2003-06-03 2007-04-17 Applied Materials, Inc. Selective metal encapsulation schemes
US7200454B2 (en) * 2003-06-30 2007-04-03 International Business Machines Corporation Method, system, and storage medium for integrating rework operations into an advanced planning process
US20050014299A1 (en) * 2003-07-15 2005-01-20 Applied Materials, Inc. Control of metal resistance in semiconductor products via integrated metrology
GB2404464A (en) * 2003-07-29 2005-02-02 Sendo Int Ltd Administration of a manufacturing process
US7354332B2 (en) * 2003-08-04 2008-04-08 Applied Materials, Inc. Technique for process-qualifying a semiconductor manufacturing tool using metrology data
US7356377B2 (en) * 2004-01-29 2008-04-08 Applied Materials, Inc. System, method, and medium for monitoring performance of an advanced process control system
US7379779B2 (en) * 2004-03-31 2008-05-27 Gregg O Ekberg Method and system for manufacturing
US7799273B2 (en) * 2004-05-06 2010-09-21 Smp Logic Systems Llc Manufacturing execution system for validation, quality and risk assessment and monitoring of pharmaceutical manufacturing processes
US6961626B1 (en) * 2004-05-28 2005-11-01 Applied Materials, Inc Dynamic offset and feedback threshold
US7096085B2 (en) * 2004-05-28 2006-08-22 Applied Materials Process control by distinguishing a white noise component of a process variance
US7333866B2 (en) * 2004-07-28 2008-02-19 Gregory John Knight Computer implemented management domain and method
US20060053297A1 (en) * 2004-09-03 2006-03-09 Huang Chien C System and method for protecting equipment data
US7398129B2 (en) * 2004-10-07 2008-07-08 Amada Company, Limited Representation of sheet metal part models
US7813901B2 (en) * 2004-10-25 2010-10-12 Amada Company, Limited Sketch generator for 3D sheet metal part models created by sheet metal part feature operations
US7343213B1 (en) 2004-11-24 2008-03-11 Honda Motor Co., Ltd. System and method for analyzing and communicating transmission assembly failure information
TW200622777A (en) * 2004-12-31 2006-07-01 Inventec Corp Manufacturing-order giving system and method thereof
US7555355B2 (en) * 2006-02-28 2009-06-30 Sap Ag Modeling production processes using reusable defined manufacturing segments
US20080301012A1 (en) * 2007-05-31 2008-12-04 Cogswell Thomas A Methods and systems for distributing computer modeled product design and manufacture data to peripheral systems
US7818081B2 (en) * 2008-05-19 2010-10-19 The Procter & Gamble Company Method for optimizing a manufacturing process having a plurality of interconnected discreet operating stations
US8214249B2 (en) * 2008-06-09 2012-07-03 Oracle International Corporation Resource planning system with carbon emission input
US8675231B2 (en) 2011-09-19 2014-03-18 Xerox Corporation Methods and systems for load leveling in a print shop
US9304815B1 (en) 2013-06-13 2016-04-05 Amazon Technologies, Inc. Dynamic replica failure detection and healing
CN111489043A (en) * 2019-01-25 2020-08-04 咸阳彩虹光电科技有限公司 MPS-based enterprise medium and long term production planning system and method
US10908593B1 (en) 2020-06-08 2021-02-02 Factory Os, Inc. Systems and methods for fabrication of a volumetric module

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4604718A (en) * 1983-04-25 1986-08-05 Simulated Designs, Ltd. Computer simulation system
US4796194A (en) * 1986-08-20 1989-01-03 Atherton Robert W Real world modeling and control process
US4827423A (en) * 1987-01-20 1989-05-02 R. J. Reynolds Tobacco Company Computer integrated manufacturing system
US4875162A (en) * 1987-10-28 1989-10-17 International Business Machines Corporation Automated interfacing of design/engineering software with project management software

Also Published As

Publication number Publication date
WO1991005308A1 (en) 1991-04-18
US5089970A (en) 1992-02-18
KR920704228A (en) 1992-12-19
AU6620090A (en) 1991-04-28
EP0494983A1 (en) 1992-07-22

Similar Documents

Publication Publication Date Title
US5089970A (en) Integrated manufacturing system
US5216612A (en) Intelligent computer integrated maintenance system and method
US5594639A (en) Order processing control module
Giesberts et al. Dynamics of the customer order decoupling point: impact on information systems for production control
Raturi et al. Coping with the build‐to‐forecast environment
US20030187865A1 (en) Computer system for maintenance resource optimization
Nyman et al. Maintenance planning, scheduling, and coordination
Driessen et al. Maintenance spare parts planning and control: A framework for control and agenda for future research
Samaranayake Current practices and problem areas in aircraft maintenance planning and scheduling–interfaced/integrated system perspective
Sillince et al. Integrating MRPII and JIT: A Management Rather Than aTechnical Challenge
Harhalakis Engineering changes for made-to-order products: How an MRP II system should handle them
Harris The impact of JIT production on product costing information systems
KR920007256B1 (en) Automatic product management system
Franz et al. Computer-aided truck dispatching under conditions of product price variance with limited supply
Dekker et al. Spare parts inventory control-an overview of issues for a large industrial complex
Toering Accomplishing a high delivery satisfaction by switching to a better process-supporting planning system
Olumolade et al. A decision‐support system for scheduling in a customer‐oriented manufacturing environment
Browne Simulation study of a job shop
Longworth Evolving project control practices
Ojha et al. Asset Management Integration with Other S/4HANA Business Applications
Hunt Application of CIM
JP2003108691A (en) Method for supporting exchange of plant component and its system
Börjesson Prerequisites for alternative working hours in an FMS
Halevi et al. Traditional Production Planning
Bryant A study of the adequacy of the Navy Industrial Fund accounting system for use with the RAMP SMP facility

Legal Events

Date Code Title Description
EEER Examination request
FZDE Dead