CA2179842C CA002179842A CA2179842A CA2179842C CA 2179842 C CA2179842 C CA 2179842C CA 002179842 A CA002179842 A CA 002179842A CA 2179842 A CA2179842 A CA 2179842A CA 2179842 C CA2179842 C CA 2179842C
Authority
CA
Canada
Prior art keywords
cycle
data streams
resources
schedule
disk
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CA002179842A
Other languages
French (fr)
Other versions
CA2179842A1 (en
Inventor
Alexandros Biliris
Bruce Kenneth Hillyer
Euthimios Panagos
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
AT&T Corp
Original Assignee
AT&T IPM Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by AT&T IPM Corp filed Critical AT&T IPM Corp
Publication of CA2179842A1 publication Critical patent/CA2179842A1/en
Application granted granted Critical
Publication of CA2179842C publication Critical patent/CA2179842C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F17/00Digital computing or data processing equipment or methods, specially adapted for specific functions
    • G06F17/40Data acquisition and logging
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/46Multiprogramming arrangements
    • G06F9/48Program initiating; Program switching, e.g. by interrupt
    • G06F9/4806Task transfer initiation or dispatching
    • G06F9/4843Task transfer initiation or dispatching by program, e.g. task dispatcher, supervisor, operating system
    • G06F9/4881Scheduling strategies for dispatcher, e.g. round robin, multi-level priority queues
    • G06F9/4887Scheduling strategies for dispatcher, e.g. round robin, multi-level priority queues involving deadlines, e.g. rate based, periodic
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04NPICTORIAL COMMUNICATION, e.g. TELEVISION
    • H04N21/00Selective content distribution, e.g. interactive television or video on demand [VOD]
    • H04N21/20Servers specifically adapted for the distribution of content, e.g. VOD servers; Operations thereof
    • H04N21/23Processing of content or additional data; Elementary server operations; Server middleware
    • H04N21/239Interfacing the upstream path of the transmission network, e.g. prioritizing client content requests
    • H04N21/2393Interfacing the upstream path of the transmission network, e.g. prioritizing client content requests involving handling client requests
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04NPICTORIAL COMMUNICATION, e.g. TELEVISION
    • H04N21/00Selective content distribution, e.g. interactive television or video on demand [VOD]
    • H04N21/20Servers specifically adapted for the distribution of content, e.g. VOD servers; Operations thereof
    • H04N21/23Processing of content or additional data; Elementary server operations; Server middleware
    • H04N21/241Operating system [OS] processes, e.g. server setup
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04NPICTORIAL COMMUNICATION, e.g. TELEVISION
    • H04N7/00Television systems
    • H04N7/16Analogue secrecy systems; Analogue subscription systems
    • H04N7/173Analogue secrecy systems; Analogue subscription systems with two-way working, e.g. subscriber sending a programme selection signal
    • H04N7/17309Transmission or handling of upstream communications
    • H04N7/17336Handling of requests in head-ends
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2209/00Indexing scheme relating to G06F9/00
    • G06F2209/48Indexing scheme relating to G06F9/48
    • G06F2209/485Resource constraint

Abstract

An apparatus and method is provided that supports continuous media for conventional networked workstations and PC's. Described are user-level mechanisms and policies designed to give good, efficient multimedia service under the mild assumption that the operating system provides a preemptive real-time scheduling class that can be used to give CPU cycles to the multimedia processesin preference to other processes that are not time sensitive. There are no modifications to the operating system kernel and isochronous networks are not required. It suffices for an application to state that it wants to play a particular stream of a type known to the server (e.g. a file containing MPEG-1 video 32Ox240 pixels, 8-bit color, 30 frames per second), or for the application to specify a frame rate and an index describing the offset of each frame in a file.

Description

. DYNAMIC HIERARCHICAL RESOURCE
SCHEDULING FOR CONTINUOUS MEDIA
BACKGROUND OF THE INVENTION
Field of the Invention This invention relates to resource scheduling and, more particularly, to dynamic hierarchial resource scheduling for continuous media based on initial conservative estimates and then slack filling.
Description of the Related Art As loads increase on computers and workstations, smooth playout of continuous media streams have had greater difficulty in being maintained because of the computer's loss of Central Processor Unit (CPU) cycles and network and disk bandwidth, leading to delayed transfers. Demand has risen for continuous media service on networks of conventional workstations and personal computers running common operating systems that can handle more strenuous loads. But the normal mechanisms in this environment provide resource allocation with no allowance for time-sensitive behavior.
In order for media service to maintain a continuous stream of data, resources need to be managed to avoid 1.'~9~4~
shortages that would cause interruptions. In general, the most of the prior art has been geared toward hard, real-time scheduling. This approach requires an environment where every latency and resource requirement is known. See D. Niehaus, et al. The Spring Scheduling Co-Processor: Design, Use and Performance; In Proceedings Real-Time Systems Symposium Raleigh-Durham NC, pgs. 106-111, Dec. 1993; and K. Schwan et al., Dynamic Scheduling of Hard Real-Time Tasks and Real-Time Threads, IEEE Transactions on Software Engineering, 18(8): 736-748, Aug. 1992. Hard real-time scheduling is computationally expensive, and is not normally possible in general timesharing environments characterized by unpredictable resources and delays.
A second common approach has been with conservative resource usage estimates. Admission control limits the service load to that known to be safe in the worst case, or known to be safe with high probability. See, for example, D.P. Anderson, Metascheduling for continuous media. ACM Transactions on Computer Systems, 11(3):226-252, Aug. 1993 and D.P. Anderson et al.; a file system for continuous media; ACM Transactions on Computer Systems, 10(4):311-337, 1992. However, conservative estimates lead to low utilization in a general operating system setting.
Admission control and resource scheduling can also be performed by a model of the resources available and the resource consumption demanded by a new request. As an example, see P. Loucher et al.; The Design Of A
Storage Server For Continuous Media, The Computer Journal, 36(1):2-42, 1993. One problem here is that a resource model of the system cannot be both highly accurate and inexpensively computed, particularly for general timesharing environments. Another problem is that the precise resource consumption implied by a new request for service is generally unknown.
The above approaches generally share the "admission control assumption", namely that a request for service should either be refused immediately, or should be guaranteed good service. To support the admission control assumption, the systems must place fairly strong requirements on the determinism and predictability of the system and workload.

3a SUMMARY OF THE INVENTION
In accordance with one aspect of the present invention there is provided a method of playing back continuous media data comprising the steps of:
performing job admission based on loading of a server;
performing hierarchically scheduling of a plurality of resources based on an estimate of consumption of a plurality of data streams from each of said plurality of resources with respect to available time during a single schedule cycle of a plurality of schedule cycles substantially ensuring completion of at least one of said plurality of data streams within a particular time frame of said single schedule cycle; dynamically monitoring actual resource consumption to improve utilization of said plurality of resources with conservative admission at beginning of said single cycle and slack filling additional available time during said particular time frame of said single cycle; degrading a first part of one of said plurality of data streams with respect to a second part of one of said plurality of data streams deemed less important according to an application specified prioritization policy of said server during periods of resource insufficiency.

3b In accordance with another aspect of the present invention there is pi.-ovided a method of playing back continuous media comprising the steps of: performing hierarchical scheduling of a plurality of resources based on estimating t:he resources consumption and determining that at least one data stream will fit within a schedule cycle among a collection of data streams for reach of said plurality of resources;
dynamically monitoring actual resource consumption to improve utilization of said plurality of resources with conservative admission at beginning of said schedule cycle and by comparing actual resource consumption with predictions of hierarchical resource scheduling and serving additional data streams from said collection of data streams from a plurality of waiting queues when said actual resource consumption. is smaller as a means of slack filling any available time during said schedule cycle; and degrading parts of said at least one data stream deemed less important than remaining data streams of said collection of: data streams according to an application specified prioritization policy during periods of resource insufficiency.

3c In accordance with yet another aspect of the present invention there is provided an apparatus to play back continuous media comprising: schedule means for performing hierarchi<:al scheduling of a plurality of resources based on estimating resource consumption for determining that at 7_east one data stream will fit within a schedule cycle of a plurality of schedule cycles among a collection of data streams for each of said plurality of resources; means for dynamically monitoring actual resource consumption to improve utilization of said plurality of resources with conservative admission at beginning of said schedule cycle and for comparing actual resource consumption with predictions of hierax-chical resource scheduling and serving additional data streams from said collection of data streams from a plurality of waiting queues when said actual resource consumption is smaller as a means of slack filling any available time during said schedule cycle; and degrading means for degrading parts of said at least one data stream not fully served and deemed less important than remaining data streams of said collection of data streams according to an application specified prioritization policy during periods of resource insufficiency.
More specifically, the present invention (according to an exemplary embodiment) provides a method for handling continuous media efficiently and with good service quality on conventional computers and operating systems, S given a real-time scheduling priority such as in Sun's Solaris or Microsoft's Windows NT. The key elements of the method of the apparatus and method are to perform hierarchical resource scheduling based on conservative estimates of resource consumption, and based on dynamic monitoring of actual resource consumption, improve utilization by slack filling, protect the quality of service for the maximal number of important streams by focusing degradation during periods of resource insufficiency on the streams deemed least important ac-cording to some prioritization policy, and use application-specified policies to degrade streams, rather than a common server-specified policy.
Input/output (I/0) requests are scheduled by the present invention to the operating system on the server so as to manage the bandwidth of the disks, disk controllers, memory subsystem, and network to get the needed multimedia frames to the clients in the right ~~98~
timeframes. If the network supports bandwidth reservation, the network portion of the scheduling reduces to simple admission and monitoring. The techniques for resource management in the client/server 5 environment are also applicable to systems playing continuous media from local disks. The network scheduling is applicable to local area network (LAN) environments where the server send and client receive operations are closely coupled.
An alternative to the admission control assumption is provided that is suitable for a general application environment, such as UNIX workstations and PC's on networks, that may not support bandwidth reservation. A
hierarchical resource scheduler based on simple conservative resource availability and consumption functions, identifies the initial set of transfers to be issued to the operating system at the beginning of each schedule cycle. A method for dynamic slack determination and filling observes actual resource consumption during a cycle and dynamically initiates additional transfers to improve utilization.

~1~19~4~
In an environment where the available resources cannot be characterized precisely, and the resource demands implied by client requests for continuous media service are not accurately known, the methods of the present invention give good service to the most important continuous media jobs, focusing resource insufficiency on the least important jobs. Most important is determined by an arbitrary prioritization policy that places a rank ordering on the jobs. This is the best that can be done without stronger assumptions on the predictability of the system and workload.
The focus of the invention is on playback of continuous media, e.g. audio and video. The recording of continuous media is not a time sensitive activity. A
server having sufficient bandwidth to accommodate the stream can use buffering and delayed writes to handle recording of continuous media at its convenience.
BRIEF DESCRIPTION OF THE DRAWINGS
The features of the subject invention will become more readily apparent and may be better understood by referring to the following detailed description of an illustrative embodiment of the present invention, taken ~~~~~4~
in conjunction with the accompanying drawings, where:
Fig. 1 illustrates a general configuration of the scheduler in a preferred embodiment of the present invention;
Fig. 2 illustrates a flow of the overall approach of the present invention;
Fig. 3 shows a typical resource tree of the present invention; and Fig. 4 shows a typical flow of job scheduling in the present invention.
DETAILED DESCRIPTION OF PREFERRED EMBODIMENTS
Fig. 1 illustrates, in a simplified manner, the general configuration of the preferred embodiment.
Continuous media are stored on disks 20 and 22, and portions are buffered into memory as they are being accessed by user applications via the data transfers and connection requests. When a new job arrives and requests service, the job admission resource scheduler/server 26 generates one of three responses:
Trivial admit (The system is very underloaded and can provide the requested service);
Trivial reject (The system is very overloaded and ~~~98~~

service is refused); or Conditional admit (Service will be attempted).
The guarantee given by admission.is not unconditional good service. It is that the service to an admitted stream will not be degraded until all "less important" streams have first had their service cut off, where "less important" is defined by some importance ranking policy with respect to each application.
The server issues batches of disk transfers through the disk I/O 24 and network transfer requests through the network I/O 30 to the operating system to gain the benefits of disk scheduling and overlaps. This means the requests will complete in unpredictable orders. Cyclic scheduling is used to establish time frames that can be monitored to detect tardiness before jobs actually miss their deadlines.
For each cycle, the preferred embodiment performs relatively simple conservative resource modeling to grant bulk admission to this cycle for the most important jobs that can safely be predicted to complete on time as part of the server. During the cycle, the server does online tracking of actual resource consumption, and dynamically 2r~19~4~

admits additional transfers to this cycle when possible.
This maintains the inexpensive cost of simple modeling, while achieving a good utilization by dynamically filling slack regained from conservative estimates by the early completion of transfers.
The server does not actively manage CPU cycles. It runs in a real time process class so the continuous media service can prevent other jobs (that are not as time-sensitive) from starving the continuous media streams for CPU cycles. Given this, the system bottleneck is then normally somewhere in the disk, network, or memory subsystems.
The preferred embodiment of the present invention does not depend on a balanced architecture. The resource scheduling dynamically adjusts to the bottleneck resource, whether that be a disk, disk controller, network interface, or the memory subsystem. Consider, for example, a fast workstation with Ethernet versus one with a gigabit ATM network.
The network is not required to support bandwidth reservations, but if they are available, then the system efficiency will increase because more streams will be granted bulk admission to a cycle, and fewer will be served by absorbing slack dynamically freed during the schedule. In addition, clients obtain better assurance of high service quality because the hazard of network bandwidth shortages has been eliminated. For non-reservation networks like Ethernet, the clients will experience degradation if the network bandwidth goes away.
If the system is not totally isochronous so it can be perfectly scheduled, or if scheduling is not maximally conservative, then there will be overloads. Consider, for example, variable bit rate compressed video, or scripted presentations that have peaky bandwidth demands.
Given that the user interface provides VCR functions, including pause, fast forward, and rewind, a subsequent user can cause the peaks to coincide in the worst possible way.
Numerous techniques have been proposed for load shedding. Some systems serve three classes of clients, i.e. continuous media, interactive response, and background, the latter two have their service rate reduced to save resources for continuous media. Others suppose that some streams are pre-identified as degradable, i.e. able to cope with reduction of bandwidth, and their system degrades these streams first, based on measures of how loss tolerant each client is, spreading the degradation proportional to loss tolerance.
Still other proposals for load shedding include the use of scalable digital coding and service degradation by reducing resolution by deferral of processing for requests that the application has indicated that are less important and the reduction of bandwidth by reducing resolution or frame rate.
In actuality, these are policies, so the server has no business selecting which of these techniques to apply.
If a stream is missing its deadlines because of system overload, an application-selected policy should be applied to that stream. The server just provides the mechanisms.
A strategy of degrading service to cope with overload is perceptually significant, because slight degradation of the streams won't yield significant resource savings. For example, if the server disk subsystem is the bottleneck, dropping 10% of the streams ~1~~8~~

will shed l00 of the load, but dropping 10% of the frames in all streams sheds much less than 10% of the load because disk seek overhead becomes relatively higher.
Omitting a few frames from the middle of a whole track read may result in no mitigation of overload whatsoever.
The conventional admission control assumption leads to policies that accept new clients for service, even if this means degrading the quality of service provided to existing clients, up to some threshold beyond which new clients are refused. By contrast, the admission control of the preferred embodiment does not predict the degradation that would result from admitting the next client, because clients are admitted subject to the condition that any degradation required to handle a resulting overload will be focused on the least important streams. In particular, the present invention provides a mechanism to protect a subset of the streams, and uses a prioritization policy that explicitly chooses which streams to protect and which others to degrade. Any policy can be used that gives a rank ordering over all the streams. A simple policy that appears useful for the server is to protect the oldest streams, degrading the ~lr~~~~~

newest. Thus streams that have been running for a long time will tend to be protected from degradation, while streams that recently started may be interrupted if it turns out that there really isn't sufficient capacity to serve them. A new client who requests service can quickly see whether the quality of service is satisfactory and decide whether to continue or quit.
Thus resource insufficiency is focused on unsupportable newly added load, stimulating client driven load shedding. Furthermore, a client can state how it would like be degraded, e.g. lower frame rate or resolution, if it would otherwise be suspended because of resource insufficiency. Note that this has been a discussion of load shedding policy, i.e. who to degrade during overload, not how conservative to make admission control to set the tradeoff between system utilization and probability of degradation.
Consider composite streams such as video with audio, or scripted presentations consisting of a time-related collection of continuous media streams and discrete data objects such as images that will be synchronized at the client for joint presentation. From a human factors standpoint, loss of audio is a much greater failure than loss of video. Therefore, scheduling should consider more than a frame's intended presentation time. In systems that can't provide hard real-time guarantees, it will send small, valuable frames well ahead of time, and buffer them on the client side. This can be hidden in the client-side libraries that handle composite audio-video streams by pre-fetching audio data to the client buffer far in advance. Transfer scheduling to the client is distinct from presentation scheduling at the client.
The server of the preferred embodiment aggressively degrades some streams in exchange for better protection of others. For example, in the case of a newly arriving job, the server can boost the priority of some components while antiboosting the priority of others, provided (a) that the bandwidth-weighted average priority does not increase and (b) it doesn't injure established streams unless these streams have antiboost priority. This way, a stream is only permitted to boost if it does not cause an overload, or causes an overload that only degrades antiboosted streams.

It may be necessary to prevent boosting the priority of a scripted component now in exchange for hurting another component in the future, otherwise it could cheat by appending dummy components to the end of 5 a script, boosting to get good service now in exchange for degradation of the dummy portion that won't really be used anyway. Two ways to handle this are (1) an economic solution: charge for the entire composite, including dummy portions, or (2) pre-verification or 10 policing of the entire schedule: during no cycle does the bandwidth-weighted boost exceed the antiboost.
Similarly, it may be necessary to prevent padding of composite streams with dummy streams that exist only to be degraded. Two ways to handle this are (1) economic:
15 charge for the entire composite including dummy portions, or (2) discriminate against higher bandwidth jobs so that adding a dummy stream and degrading it maximally, boosts the remaining streams only to the priority they would have obtained had the dummy stream not been a member of the composite in the first place.

~1~~~~

The overall approach of favoring older streams encourages a client to improve its priority by opening a stream hours ahead of time, but not starting the actual data transfer until much later, at which point it could have amassed sufficient priority to displace clients that had been running smoothly for the past tens of minutes.
In the ensuing discussion, the following terminology is used:
- Cyclic scheduling: a periodic activity that, given the service desired by each job for each time period, schedules the necessary operations based on estimates of the server's capacity for each resource and the estimated resource demands of each job.
Good estimates can improve server efficiency, but the algorithms will dynamically compensate for overconservative estimates as actual resource utilization is observed.
- Cycle fault: occurs when some activities that are scheduled for a time period have not completed by the end of that cycle. These unfinished activities are terminated or rescheduled according to their job's disposition policy.

~1*~98~2 1~
- Estimated server slack: with respect to a resource and a cycle, is the amount by which the estimated server capacity exceeds the estimated job demands.
As shown in Fig. 2, when a new request arrives 40, job admission is performed. Note that it is necessary to treat the job, which may be a composite stream or scripted presentation, as the unit of admission and priority. It would not be satisfactory to degrade a scripted presentation late in its show just because it closes one file and opens another, therefore giving the appearance of starting a very young continuous media strand.
The goal of job admission is quick rejection of new jobs when the server is clearly in a state of heavy overload. Otherwise a job is conditionally admitted and the cyclic scheduling will attempt to ensure that the job receives service only if sufficient server capacity actually is available. This strategy differs from the more common approach, in which systems must predict resource demands and capacity very accurately and reject a job if the server actually would not be able to serve it. Because of the robustness of the present invention's c1~~~4~

cyclic scheduling, a simple algorithm is sufficient for job admission.
Given the lightly loaded resource threshold parameter, XR, the job multiplicity threshold parameter,-Y, and the resource insufficiency threshold parameter Z, a job J is tested for admission as follows:
* If all current jobs are being served 42 without cycle faults and the estimated resource consumption for J is less than XR% of the estimated server slack for each resource R, then Trivial Admit 44;
* Else if the current number of admitted jobs exceeds Y 46, then Trivial Reject 48;
* Else if some conditionally admitted jobs currently are not being served because of resource insufficiency for resource R 50, and the sum of their estimated resource demands for R plus the estimated demand for R by the new job J exceeds the estimated server capacity by a factor of Z%, then Trivial Reject 52.
* Else Conditional Admit 54.
The threshold parameters XR, Y, and Z need empirical ~1 ~98~~

determination. X = 25o and Z = 100% are reasonable starting values. Y is set low enough that scheduling and disposition processing, which are linear in the number of jobs, do not dominate the scheduling cycle.
The admission algorithm can be modified in an alternate embodiment, if it is desirable to have a class of jobs that are permitted to barge into the server and displace currently running jobs. In that case "trivial reject" would be replaced with "repeatedly remove from the system the least important job until the current job can be conditionally admitted".
An admitted job is assigned to the first cycle during which it has service requests. The job's data transfer requests for the cycle are inserted into a priority queue for that cycle, ordered by the prioritization policy. For example purposes, this discussion uses the prioritization policy discussed earlier, i.e. an older job has higher priority than a younger job, and the priority of a continuous media stream belonging to a job is equal to the priority of the job plus any boosting or antiboosting. When the transfer for a job completes or is disposed of at cycle end, the job is assigned to the next period during which it has service requests.
The scheduler needs to know at the beginning of a cycle how much data is requested, and from which disks.
The transfers requested by a job are conveyed to the server by a stream description or script that identifies the specific data frames needed and the times at which they are needed. This encompasses a variety of styles of client interaction, ranging from client driven frame-by-frame read operations to server-driven periodic data transmission subject to client commands such as pause, fast-forward, or rewind. Among the ways to provide this information are a frame index and desired frame rate; a file name and frame rate for a data format known to the server, such as Motion JPEG or MPEG; or a specification that reserves bandwidth from a particular disk, and a sequence of read requests (offset and length) that arrive in a timely fashion so the server can retrieve the data during the scheduled time frame.
One property of the interface to note is that the application is not requested to state how much of various resources in various categories it needs to obtain its i desired quality of service. It just states frames per second and identifies the data to be played. It is the server's responsibility to assess resource demands and determine whether the server can handle it.
Each stream that requires frames during a cycle is scheduled for one transfer during the cycle. The cycle length is set to balance a tradeoff. On one hand, a short cycle improves the response time of new streams starting up. On the other hand, a long cycle improves system efficiency because overheads are amortized over larger transfers, although the total required buffer space grows with increasing cycle length. For the continuous media transfers of the present invention, the space requirement is directly related to the cycle length because one cycle's volume of data is buffered between disk and network.
For example, take the average data rate of a stream as R, and w as the percent of the disk resource that is to be wasted on access time overhead. For a disk whose transfer rate is rd, let to and tt be the expected average access and transfer time, respectively.
This implies:

21'~9~4~

1 - w t S w x (t + t ) > t 2 x t a a t t w a For an average transfer size of B bytes, tt x rd = B.
But within a cycle of length T, B = T x R bytes can be transferred. Therefore, T x R = tt x rd and:
T=
Leading to:
t~ x r.
n ~ 1 w) x to x rd w X R
In order to waste less than w = 500 of the disk on access time overhead, the cycle length needs to be set:
to X rd T z R
For example, consider a SCSI disk with 20 ms.
average access time and 3.4 MB/s disk transfer rate, ~I~~~4Z

playing MPEG video streams having an average bandwidth of 1.12 megabits per second. Then the cycle period should be 1/2 sec or more.
Any fast subsystem can use the idle time at the end of the cycle to work ahead, bounded by the buffer space allocated to each stream. For example, it is desirable for the disk subsystem to buffer ahead by 1 second to provide robustness in the face of rare disk delays such as seek retries (typically, 20 ms.) or recalibration cycles (typically 3/4 sec.).
Issuing multiple concurrent disk reads to a single disk enables the operating system's disk scheduling to improve the average access time, which supports a shorter cycle period. By allocating disk space in track-sized blocks, transfers scheduled by known methods are so efficient that constrained placement of data on disk becomes unimportant.
The cycle length is directly related to the latency of starting a new stream. If the network and disk cycle times are 1/2 second, the maximum server-induced latency for successful startup of a new job is 1 second. This is tolerable from a human factors standpoint. For one-time ~179~4 transfers (e.g. image retrieval) the delay implied by a long cycle may be an issue from a human factors standpoint. For instance, if a user is interactively traversing hypermedia links, latency less than 200 milliseconds would be more suitable. The real-time sporadic server research and slack stealing approach suggest moving one-time jobs ahead in the schedule, slack permitting, and suggests the insertion of rescheduling points within the cycle to reduce startup latency:
The maximum read size is bounded by the bandwidth per cycle. If reads are large by comparison with the cycle length, utilization will suffer because a large slack must accumulate before an additional read can fit into the schedule. A compensating technique is to utilize idle slack at the end of each cycle by starting the next cycle early to work ahead. In this case, a limitation on buffer space per stream will bound how far ahead that stream is fetched. Fragmenting requests into smaller pieces can improve schedulability, but adds overhead.
At the beginning of a cycle, the transfer requests in the queue are processed by hierarchical resource ~1~~8~
scheduling. The resource hierarchy consists of the memory bandwidth, the bandwidth for each disk controller and network controller, and each disk drive's bandwidth, forming the resource tree depicted in Figure 3.
5 Hierarchical resource scheduling for a cycle is a culling out process. First the memory bandwidth is checked, and the lowest priority transfer requests are removed until the total bandwidth demand is within the resource limit. The list of transfer requests passing 10 this filter is split into lists for each disk controller and network interface. These lists are filtered by the respective bandwidths of those busses and controllers.
Then the list for a disk controller is split into lists for each disk, which are again culled out based on a 15 conservative estimate of the disk access and transfer times for each request. Transfers that have not been culled out by the above process are said to have been admitted to the current cycle. These resource filters are conservative so that jobs not culled out will 20 complete without cycle fault.
Other important resources are CPU cycles, buffer space, and disk space. As discussed previously, the CPU

' is assumed not to be the bottleneck, so beyond the use of a real-time priority class for continuous media processes, no CPU management is performed. Buffer space management is by allocating a pool per stream, granted at job admission (not cycle admission). Disk space is allocated at job admission for jobs that perform recording. Bandwidth for any streams that are recording must be obtained from the scheduler. Resources must also be reserved to handle control messages from the clients so that streams are suitably responsive to commands such as skip, pause, abort, etc. Additional time in the cycle, proportional to the number of items in that cycle's job queue, is reserved for scheduling and disposition processing.
For simplicity, the preferred embodiment is presented as if each job has only one stream. Multiple streams for one job are scheduled independently during a cycle, but they are treated as a single entity at the end of the cycle for disposition and scheduling of the next cycle's transfers.
The method to schedule jobs at the beginning of a cycle is described in terms of resource consumption ~~7~~~~

functions. This generates admit list or wait queue entries on all resources for all jobs that want service during this cycle. For a cycle of length T, the initial batch of k admitted jobs has the property that the time predicted by all resource consumption functions to serve all k j obs is less than T.
For job J, the consumption functions are denoted CR(J, LR), where resource R is one of the following:
memory read bandwidth (memr), memory write bandwidth (memw), a network controller's bandwidth (n), a disk controller's bandwidth (c), or a disk's bandwidth (d).
LR is a list of jobs already admitted to this cycle for resource R. A consumption function returns a conservative estimate (upper bound) of the incremental time added by job J to a list of jobs LR previously admitted to the resource R in a given cycle. Define CR(nil, LR) to be the total estimated time for all jobs in LR and CR(J, empty) , to be the time estimated for job J alone. The resource consumption functions must be conservative so that the algorithm only admits jobs that can in fact be served by that resource during the cycle.
To make the equations operate correctly, CR(J, LR) should 21~198~'~

be commutative and monotonic with respect to LR.
The following description as depicted in Fig. 4, involves cycle time accumulators denoted AdmittedR for each resource R listed above, except memory read and write are aggregated into one resource, denoted mem. The accumulators contain the total estimated time of jobs admitted to each resource for this cycle. A resource saturation flag, denoted SaturatedR, becomes TRUE when the algorithm refuses admission to that resource for a job request this cycle.
1. Initialize all the cycle time accumulators to 0 and all the saturation flags to FALSE 60.
2. For each job J in the priority queue of jobs for this cycle 62, 64 in decreasing order of importance, do the following steps: Let n denote the network controller that will transmit the data for job J
c denote the disk controller that will retrieve the data for job J
d denote the disk that will retrieve the data for job J.
( a ) Let M = C'memw ( Jr Lmemw) + Cmemr ( Jr Lmemr) If T - Admittedmem < M 66 then append job J
to the wait queue for the memory subsystem 68, otherwise job J is admitted for the memory subsystem 70 : Admi ttedmem+ = M;
Lmemr+ = J; Lmemw+ = J.
(b) If Saturatedn or if T - Admittedn < Cn(J, Ln) 72 then set Saturatedn = TRUE and append job J to the wait queue for network controller n 74, otherwise job J is admitted for network controller n 76:
Admi. t tedn+ = Cn ( J, Ln ) ; Ln+ = J.
(c) If Saturated or if T - Admitted < C~(J, L~) 78 then set Saturated = TRUE and append job J to the wait queue for disk controller c 80, otherwise job J is admitted for disk controller c 82:
Admi tted~+ = C~ (J, L~) ; L~+ = J.
(d) If Saturatedd or if T - Admittedd < Cd(J, Ld) 84 then set Saturateda = TRUE and append job J to the wait queue for disk d 86, otherwise job J is admitted to the ready queue for disk d 88: Admittedd+ _ ~~~~4 Ca C J, La) ~ La+ = J.
(e) If job J has been admitted for memory, disk controller, and disk, then add it to the initial batch of disk requests 90.
5 Note that all resources for a job are reserved (or an entry is put on appropriate wait queue) before the next less important job is considered. This is to maintain the property that a less important job will not be handled if a more important one could have been. It 10 is quite possible that a job that cannot fit in the initial batch of disk requests will subsequently be able to be scheduled into disk slack time during the execution of the cycle. Therefore the scheduling is designed to prevent less important jobs from saturating the schedule 15 for the network or memory subsystems.
When the cycle begins, all the disk requests in the initial batch are issued to the operating system. There is a tradeoff involving the number of outstanding disk I/Os in the kernel. More outstanding I/Os should produce 20 a more efficient schedule, but it incurs a loss of control over the response time to any particular request.

The initial batch size is the largest that can be reliably predicted by the resource consumption functions to complete all its transfers in time to meet the application deadlines.
Given large transfers, the disk bus and controller may be more of a bottleneck than the disks. For instance, a SCSI bus can handle seven or more devices, but a SCSI bus and controller typically saturate at the bandwidth of two fast disks performing large transfers.
So this may make it unnecessary to have a good disk model; the bottleneck may be the SCSI controller.
As a first cut at simple consumption functions, the simple linear approximation CR (J, LR) - bytes (J) bandwidthR + overheadR is used. Conservative values for the bandwidths and overheads for a particular system can be determined by running small programs that exercise and measure the resources. In particular, the sustained transfer bandwidth as a function of the number of bytes is measured, and the overhead for memory is 0, the overhead for a disk controller is the response time of a 1-byte read that hits in the on-disk track cache, the overhead for a network is the time to read or write a 1-~1'~98~2 byte message, and the overhead for a disk is the full stroke seek plus maximum rotational latency.
Transfers that are not admitted at the beginning of a cycle may still be served during that cycle. When a disk or net transfer finishes, the actual resource consumption, based on completion time, is compared with the predictions at each level of the resource hierarchy.
Since the predictions are conservative, the actual times should be smaller. In this case slack time has been released, so the highest priority transfer that has not yet been admitted is checked to see whether it can now be admitted to the current cycle. This process is termed "slack filling".
Conservative admission at the beginning of a cycle, coupled with slack filling to serve additional streams, automatically provides robustness. If streams start slipping their schedules for any reason, whether the fault of the server or a result of some external trouble, less slack will become available during the cycle, effectively degrading the "least worthy" streams (according to the prioritization policy as discussed above) to preserve proper service to as many streams as . can be handled by the available resources. As an example, ideally, a l00 loss of resources on a fully loaded machine would only impact 10% of the clients; the other 90o would be unaware of the problem. Furthermore, effective streams are selected for degradation. The shortage of slack from a particular resource, e.g. an overloaded disk drive, will block the least important transfers that use that resource, without impairing transfers that are independent of that resource. The more specific and accurate the resource models are, the better the confinement of effects of resource shortages.
This protection works even if job admission erroneously admits more jobs than can be served within the resource bounds.
Because of the slack filling during the disk and network cycles, potential cycle overruns can be detected before transfers are actually late. At the start of a cycle, the jobs not in the initial batch are at risk of missing their deadlines. Jobs further down the wait list are at greater risk, quantified by the bandwidth requirement stated in each job's descriptor.
Compensating mechanisms can engage before any stream ~~~.'~98~~

degradation is observed at the client side. This straightforward support for performance surveillance is a valuable feature. In a highly unpredictable environment another step is taken as an enhancement to the preferred embodiment. The progress of transfers during the cycle is monitored and if a severe lack of progress is observed, victims are chosen to be aborted from among the least important transfers already in progress.
The slack-filling technique is described in the context of copy through memory architectures (the server reads from disk to buffer, sends from buffer to network).
It will also work with network-attached disks and desk area network organizations that use high bandwidth networking such as a fibre channel, and that may support bandwidth allocation. If the network is not a bottleneck, transfer scheduling is unnecessary for the network side. The server schedules the disk I/Os and data from disk is immediately dumped through the network channel to the client.
During a cycle, whenever a disk read finishes, the filled data buffer is handed off to the network manager for transmission in accordance with the network schedule.

~1~984~
The network manager can dynamically estimate the desired bandwidth associated with this buffer as the ratio of buffer size to remaining time in this network cycle. The difference between the conservative predicted disk read 5 time and the actual completion time is additional slack that can be released to the disk, disk controller, and memory write schedules. Given additional slack, each resource attempts to admit additional high priority jobs from the resource wait queue. If a job becomes admitted 10 to disk, disk controller, memory read, and memory write, its disk request is issued to the operating system.
The method to calculate the slack that is freed in one disk's schedule by the completion of a read uses four variables:
15 Admitted: The list of requests for this disk that have been admitted to this cycle;
Completed: The list of requests for this disk that have completed this cycle;
Slack: The accumulated available slack for this 20 cycle; and Prev done: The time at which the previous request completed.

21'~9~4~

At the start of a cycle, the variables are initialized to:
Admi t ted = Ld Completed = empty Slack = T - Cd (nil, Admi tted) Prev done = current time When the request for job J completes, the following steps are performed:
1. Calculate the slack released by this job and update the variables. The slack is the time it was predicted to add to the partial schedule, minus the time it actually added.
(a) Slack+ = Cd (J, Completed) - (current time -Prev done) (b) Prev done = current time (c) Completed = Completed + J
2. Check admission for the highest priority job J' in the disk's wait queue. If Cd(J', Admitted) <= Slack then (a) Slack- - Cd (J' , Admited) t1'~~~~

~ (b) Admitted+ = J' (c) If J' is not on wait lists for disk controller or memory then issue the disk read to the operating system.
(d) Iterate step 2 to check the next highest priority job.
When the disk cycle finishes early because all the transfers have completed, the next cycle is scheduled without delay. The new cycle now has extra time by starting immediately but ending at the proper time to maintain the correct pacing of the periodic schedule.
Although the cycle can start early, the amount of work ahead is constrained by buffer limits. With respect to network work ahead, ready buffers that belong to future cycles have lower network scheduling priority than any buffer belonging to this cycle. This prevents work ahead from preempting the slack backfilling that enlarges the number of streams the server can concurrently sustain.
In essence, the network doesn't work ahead, although as with the disk, the network may start its next cycle prematurely if it runs out of work for the current cycle.

~1~~~~~~

The network controller has a priority queue of transfers for this cycle. This cycle has the same duration as the disk cycle, but is phase shifted. The minimum phase shift is the time actually needed to complete the first disk read for this cycle. The maximum phase shift is the full cycle duration. This is what it takes to finish all disk reads then hand them over as a complete batch to the network scheduler. A small phase difference implies a small server query/response latency, but a large phase difference is good for network bandwidth because a larger number of buffers are available for concurrent transmission, so many channels can be serviced between calls. If the first buffer for a cycle arrives late, the phase difference is increased to allow a full cycle period for the network transmissions.
If a network cycle finishes all its scheduled transmissions before the deadline, and if a buffer for the next network cycle is available for transmission, the phase difference will be decreased, but only by a small amount. That is, transmission for the next network cycle will commence immediately to avoid wasting network bandwidth, but the end time of the next network cycle will only be advanced by a small amount to protect the network bandwidth.
Because the disk and network cycles don't exactly coincide, the simple memory bandwidth check described earlier may need refinement in an alternate embodiment.
This is unimportant if the memory bandwidth is not the system bottleneck, or if the load from cycle to cycle is relatively constant so coincident load on the memory from the previous network cycle and the current overlapping disk cycle doesn't exceed the memory bandwidth. If the network is relatively fast then, on a server with copy--through-memory architecture having many disks, the memory bandwidth will likely be a bottleneck. In this case it will be necessary to schedule and allocate memory bandwidth each time a new network or disk cycle begins, by reserving a portion for system overhead and allocating the remainder to serve the network and disk traffic, favoring whichever of the two is more of a system bottleneck.
Disk throughput has been improved by issuing an "initial batch" of requests to a disk so I/O scheduling in the operating system could reduce the seek overhead.

' An analogous technique applies to network transmission from server to client. The "initial batch" of k jobs from the priority queue is the largest set of most important jobs that have aggregate bandwidth less than X%
of the recent observed network bandwidth, where X is a tunable parameter set to 100% for reservation networks, and less than 1000 to provide a safety factor for networks such as Ethernet that can suffer sudden loss of bandwidth because of congestion.
The network "inner loop" is (1) determine the set of communication channels that can accept an asychronous write without blocking, and (2) if any job in the initial batch can accept an asynchronous write without blocking then do an asynchronous write for every such job in the initial batch, else do an asynchronous write for the first such job in the priority queue. But a write is initiated only if, based on recently observed network bandwidth, it is predicted that (1) the write will complete by the end time of this network cycle, and (2) if the write is not from the initial batch, it will leave enough bandwidth in the cycle to transmit the remaining data for the initial batch.

Slack freeing when a network transfer completes is similar to that described in the disk case above. Slack is freed down the resource tree, admitting additional jobs from resource wait lists when possible. If a job becomes admitted everywhere, issue its disk request to the operating system. When a job completes all its network transfers for a cycle, if the job has transfers for any future cycles, it is placed into the job queue of the nearest such cycle.
As described above, the initial batch of jobs for concurrent service at the beginning of a network cycle is the first k jobs on the priority queue, such that their aggregate bandwidth demand is safely within the available network bandwidth. For networks like Ethernet that can suffer sudden and prolonged loss of bandwidth, it may be necessary to initially focus on a smaller number of the most important jobs, and only start to serve others as it becomes increasingly likely that the first jobs will finish before the cycle end. In such a case, it is desirable to derate k, and then start serving additional jobs as the first k make progress, but before any of the ~ first k completes. In this case, k is an adaptive function of the following four parameters:
1. The bandwidth required to complete the transmission of the initial batch by the end of this cycle.
2. The recent observed network throughput.
3. The derating factor that reduces to an acceptable level the potential impact of future bandwidth loss, should it occur during the remainder of the cycle.
4. The amount of time remaining in the cycle.
A disk or network cycle is terminated when all outstanding jobs have completed, and the slack is insufficient to issue the next job in the priority queue;
or the duration of the cycle time has been reached.
The scheduling is intended to prevent the second case from occurring. If it should happen anyway, e.g. if a disk goes into a recalibration cycle for 3/4 seconds, so transfers that were issued have not completed by cycle end, then the disposition policies are applied to all transfers that did not complete.

To support the canceling of asynchronous network transmissions, the bulk data of a transmission is fragmented. Each fixed-length fragment has a small header that conveys indications to the client such as abandon the current in-progress transfer, or this transfer is slipping and will finish later than scheduled. Because some asynchronous mechanisms, e.g. in UNIX, will complete a read or write with a partial packet, it is possible to request the transmission of a large block with scatter/gather to insert small fragment headers indicating proper completion, and between asynchronous reads/writes change plans and alter the next fragment header to indicate a drop or slip. This obtains the approximate throughput of large block transmissions in the normal case, but short latency that is proportional to the fragment size, in case of abandonment.
Canceling of in-progress transfers may also be needed if the prioritization policy contains a category of high priority jobs that are permitted to barge in during a cycle, displacing some currently scheduled and running transfers.

~lf~~~2 ' Each job that has not completed at the end of the cycle, i.e., remains on a wait queue or is canceled while in progress, has its disposition policy applied.
Examples of disposition policies include:
- Pause the schedule and just slip the entire transfer schedule for this stream into the future.
- Try to catch up by transmitting both this cycle's and the next cycle's frames during the next cycle.
- Drop frames to maintain the presentation time schedule.
- Reduce the frame rate to maintain the presentation time schedule.
- Reduce the frame resolution to maintain the presentation time schedule.
- Kill the job, which stated that it is unwilling to adapt to resource reduction.
The disposition policy for a stream can change. For example, a stream having the "drop frames" policy during normal display may change to "pause the schedule" if the application does the "pause" VCR operation. Then the server and client buffers for that stream can continue to fill up as work ahead, until buffer limits apply back pressure.
Although the subject invention has been described with respect to preferred embodiments, it will be readily apparent to those having ordinary skill in the art to which it appertains that changes and modifications may be made thereto without departing from the spirit or scope of the subject invention as defined by the appended claims.

Claims (16)

CLAIMS:
1. A method of playing back continuous media data comprising the steps of:
performing job admission based on loading of a server;
performing hierarchically scheduling of a plurality of resources based on an estimate of consumption of a plurality of data streams from each of said plurality of resources with respect to available time during a single schedule cycle of a plurality of schedule cycles substantially ensuring completion of at least one of said plurality of data streams within a particular time frame of said single schedule cycle;
dynamically monitoring actual resource consumption to improve utilization of said plurality of resources with conservative admission at beginning of said single cycle and slack filling additional available time during said particular time frame of said single cycle;
degrading a first part of one of said plurality of data streams with respect to a second part of one of said plurality of data streams deemed less important according to an application specified prioritization policy of said server during periods of resource insufficiency.
2. The method of claim 1 wherein said job admission further comprises the steps of:
trivially admitting said at least one of said plurality of data streams when said server is underloaded;
trivially rejecting said at least one of said plurality of data streams when said server is overloaded; and conditionally admitting said at least one of said plurality of data streams when said server is in a normal load condition.
3. The method of claim 1 wherein said hierarchical scheduling further comprises the step of generating a first batch of data streams from said plurality of data streams that are to complete within said time frame of said single schedule cycle.
4. The method of claim 3 wherein said hierarchical scheduling further comprises the step of generating a plurality of waiting queues on said resources of said plurality of data streams that are not members of said first batch of data streams.
5. The method of claim 4 wherein said improving utilization of said plurality of resources by slack filling further comprises the steps of comparing actual resource consumption with predictions of said hierarchical resource scheduling and conditionally admitting a second batch of data streams from said plurality of waiting queues when said actual resource consumption is smaller.
6. The method of claim 2 wherein the step of trivially admitting said at least one data stream further comprises the steps of estimating the resource consumption and determining that said at least one data stream will fit within said slack.
7. The method of claim 1 wherein said plurality of resources includes a memory subsystem.
8. The method of claim 1 wherein said plurality of resources includes a network controller.
9. The method of claim 1 wherein said plurality of resources includes a disk controller.
10. The method of claim 1 wherein said plurality of resources includes a disk.
11. The method of claim 1 wherein said performing hierarchical scheduling is done based on a plurality of network and disk cycles.
12. The method of claim 11 wherein said plurality of cycles includes a first cycle and a second cycle, said second cycle having extra time when said first cycle finishes early.
13. The method of claim 1 wherein said specified prioritization policy increases protection from degradation of said at least one of said plurality of data streams in proportion to said plurality of schedule cycles of which said at least one of said plurality of data streams has been served.
14. A method of playing beck continuous media comprising the steps of:
performing hierarchical scheduling of a plurality of resources based on estimating the resource consumption and determining that at least one data stream will fit within a schedule cycle among a collection of data streams for each of said plurality of resources;
dynamically monitoring actual resource consumption to improve utilization of said plurality of resources with conservative admission at beginning of said schedule cycle and by comparing actual resource consumption with predictions of hierarchical resource scheduling and serving additional data streams from said collection of data streams from a plurality of waiting queues when said actual resource consumption is smaller as a means of slack filling any available time during said schedule cycle; and degrading parts of said at least one data stream deemed less important, than remaining data streams of said collection of data streams according to an application specified prioritization policy during periods of resource insufficiency.
15. An apparatus to play back continuous media comprising:
schedule means for performing hierarchical scheduling of a plurality of resources based on estimating resource consumption for determining that at least one data stream will fit within a schedule cycle of a plurality of schedule cycles among a collection of data streams for each of said plurality of resources;
means for dynamically monitoring actual resource consumption to improve utilization of said plurality of resources with conservative admission at beginning of said schedule cycle and for comparing actual resource consumption with predictions of hierarchical resource scheduling and serving additional data streams from said collection of data streams from a plurality of waiting queues when said actual resource consumption is smaller as a means of slack falling any available time during said schedule cycle; and degrading means for degrading parts of said at least one data stream not fully served and deemed less important than remaining data streams of said collection of data streams according to an application specified prioritization policy during periods of resource insufficiency.
16. The apparatus of claim 15 wherein said specified prioritization policy increases protection from degradation of said at least one data stream in proportion to said plurality of schedule cycles of which said at least one data stream has been served.
CA002179842A 1995-09-08 1996-06-25 Dynamic hierarchical resource scheduling for continuous media Expired - Fee Related CA2179842C (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US525,937 1990-05-18
US08/525,937 US6041354A (en) 1995-09-08 1995-09-08 Dynamic hierarchical network resource scheduling for continuous media

Publications (2)

Publication Number Publication Date
CA2179842A1 CA2179842A1 (en) 1997-03-09
CA2179842C true CA2179842C (en) 2001-05-01

Family

ID=24095237

Family Applications (1)

Application Number Title Priority Date Filing Date
CA002179842A Expired - Fee Related CA2179842C (en) 1995-09-08 1996-06-25 Dynamic hierarchical resource scheduling for continuous media

Country Status (5)

Country Link
US (1) US6041354A (en)
EP (1) EP0762275A3 (en)
JP (1) JPH09152977A (en)
KR (1) KR970017012A (en)
CA (1) CA2179842C (en)

Families Citing this family (120)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7424731B1 (en) * 1994-10-12 2008-09-09 Touchtunes Music Corporation Home digital audiovisual information recording and playback system
EP0786121B1 (en) 1994-10-12 2000-01-12 Touchtunes Music Corporation Intelligent digital audiovisual playback system
US7188352B2 (en) 1995-07-11 2007-03-06 Touchtunes Music Corporation Intelligent digital audiovisual playback system
US8661477B2 (en) 1994-10-12 2014-02-25 Touchtunes Music Corporation System for distributing and selecting audio and video information and method implemented by said system
FR2753868A1 (en) 1996-09-25 1998-03-27 Technical Maintenance Corp METHOD FOR SELECTING A RECORDING ON AN AUDIOVISUAL DIGITAL REPRODUCTION SYSTEM AND SYSTEM FOR IMPLEMENTING THE METHOD
US6317774B1 (en) * 1997-01-09 2001-11-13 Microsoft Corporation Providing predictable scheduling of programs using a repeating precomputed schedule
US6772284B2 (en) * 1997-03-18 2004-08-03 Kabushiki Kaisha Toshiba Disk apparatus capable of continuous display of data using a single recording head
FR2769165B1 (en) 1997-09-26 2002-11-29 Technical Maintenance Corp WIRELESS SYSTEM WITH DIGITAL TRANSMISSION FOR SPEAKERS
FI105749B (en) * 1998-06-12 2000-09-29 Ericsson Telefon Ab L M Data Communications Network
US6182197B1 (en) * 1998-07-10 2001-01-30 International Business Machines Corporation Real-time shared disk system for computer clusters
FR2781582B1 (en) * 1998-07-21 2001-01-12 Technical Maintenance Corp SYSTEM FOR DOWNLOADING OBJECTS OR FILES FOR SOFTWARE UPDATE
FR2781580B1 (en) 1998-07-22 2000-09-22 Technical Maintenance Corp SOUND CONTROL CIRCUIT FOR INTELLIGENT DIGITAL AUDIOVISUAL REPRODUCTION SYSTEM
US8028318B2 (en) 1999-07-21 2011-09-27 Touchtunes Music Corporation Remote control unit for activating and deactivating means for payment and for displaying payment status
FR2781591B1 (en) 1998-07-22 2000-09-22 Technical Maintenance Corp AUDIOVISUAL REPRODUCTION SYSTEM
US6622164B1 (en) * 1998-09-11 2003-09-16 Quantum Corp. Mass storage device with network interface
US6381647B1 (en) * 1998-09-28 2002-04-30 Raytheon Company Method and system for scheduling network communication
US6360270B1 (en) * 1998-11-16 2002-03-19 Hewlett-Packard Company Hybrid and predictive admission control strategies for a server
US6611872B1 (en) * 1999-01-11 2003-08-26 Fastforward Networks, Inc. Performing multicast communication in computer networks by using overlay routing
US6282562B1 (en) * 1999-01-14 2001-08-28 Net Reality Method for economically sub-optimizing interactions in data-communications network environments, and a device according to the method
US8726330B2 (en) * 1999-02-22 2014-05-13 Touchtunes Music Corporation Intelligent digital audiovisual playback system
US6584191B1 (en) * 1999-08-27 2003-06-24 Aspect Communications Corporation Staffing-based percentage-allocation routing using real-time data
US6763519B1 (en) * 1999-05-05 2004-07-13 Sychron Inc. Multiprogrammed multiprocessor system with lobally controlled communication and signature controlled scheduling
US6351783B1 (en) * 1999-05-20 2002-02-26 Intel Corporation Method and apparatus for isochronous data transport over an asynchronous bus
KR100727901B1 (en) * 1999-07-10 2007-06-14 삼성전자주식회사 Micro scheduling method and operating system kernel device therefrom
FR2796482B1 (en) 1999-07-16 2002-09-06 Touchtunes Music Corp REMOTE MANAGEMENT SYSTEM FOR AT LEAST ONE AUDIOVISUAL INFORMATION REPRODUCING DEVICE
JP3636948B2 (en) * 1999-10-05 2005-04-06 株式会社日立製作所 Network system
US6889257B1 (en) * 1999-12-03 2005-05-03 Realnetworks, Inc. System and method of transmitting data packets
US6938256B2 (en) 2000-01-18 2005-08-30 Galactic Computing Corporation System for balance distribution of requests across multiple servers using dynamic metrics
US6928646B1 (en) 2000-02-02 2005-08-09 Sony Corporation System and method for efficiently performing scheduling operations in an electronic device
FR2805377B1 (en) 2000-02-23 2003-09-12 Touchtunes Music Corp EARLY ORDERING PROCESS FOR A SELECTION, DIGITAL SYSTEM AND JUKE-BOX FOR IMPLEMENTING THE METHOD
FR2805060B1 (en) 2000-02-16 2005-04-08 Touchtunes Music Corp METHOD FOR RECEIVING FILES DURING DOWNLOAD
FR2805072B1 (en) 2000-02-16 2002-04-05 Touchtunes Music Corp METHOD FOR ADJUSTING THE SOUND VOLUME OF A DIGITAL SOUND RECORDING
US6842783B1 (en) * 2000-02-18 2005-01-11 International Business Machines Corporation System and method for enforcing communications bandwidth based service level agreements to plurality of customers hosted on a clustered web server
US7054948B2 (en) * 2000-03-07 2006-05-30 Opcoast Llc Collaborative host masquerading system
US6792433B2 (en) * 2000-04-07 2004-09-14 Avid Technology, Inc. Indexing interleaved media data
FR2808906B1 (en) 2000-05-10 2005-02-11 Touchtunes Music Corp DEVICE AND METHOD FOR REMOTELY MANAGING A NETWORK OF AUDIOVISUAL INFORMATION REPRODUCTION SYSTEMS
US7188188B1 (en) * 2000-05-12 2007-03-06 Webtv Networks, Inc. Methods and computer program products for providing network quality of service for World Wide Web applications
FR2811175B1 (en) 2000-06-29 2002-12-27 Touchtunes Music Corp AUDIOVISUAL INFORMATION DISTRIBUTION METHOD AND AUDIOVISUAL INFORMATION DISTRIBUTION SYSTEM
FR2811114B1 (en) 2000-06-29 2002-12-27 Touchtunes Music Corp DEVICE AND METHOD FOR COMMUNICATION BETWEEN A SYSTEM FOR REPRODUCING AUDIOVISUAL INFORMATION AND AN ELECTRONIC ENTERTAINMENT MACHINE
US7062557B1 (en) * 2000-07-10 2006-06-13 Hewlett-Packard Development Company, L.P. Web server request classification system that classifies requests based on user's behaviors and expectations
US8538843B2 (en) 2000-07-17 2013-09-17 Galactic Computing Corporation Bvi/Bc Method and system for operating an E-commerce service provider
US6816905B1 (en) * 2000-11-10 2004-11-09 Galactic Computing Corporation Bvi/Bc Method and system for providing dynamic hosted service management across disparate accounts/sites
US7016412B1 (en) 2000-08-29 2006-03-21 Koninklijke Philips Electronics N.V. System and method for dynamic adaptive decoding of scalable video to balance CPU load
FR2814085B1 (en) 2000-09-15 2005-02-11 Touchtunes Music Corp ENTERTAINMENT METHOD BASED ON MULTIPLE CHOICE COMPETITION GAMES
US6785756B2 (en) * 2001-05-10 2004-08-31 Oracle International Corporation Methods and systems for multi-policy resource scheduling
US7047308B2 (en) * 2001-08-31 2006-05-16 Sharp Laboratories Of America, Inc. System and method for simultaneous media playout
US7020797B2 (en) * 2001-09-10 2006-03-28 Optimyz Software, Inc. Automated software testing management system
US20030069917A1 (en) * 2001-10-04 2003-04-10 Miller Larry J. Balanced client/server mechanism in a time-partitioned real-time operting system
EP1459549A2 (en) * 2001-12-12 2004-09-22 Koninklijke Philips Electronics N.V. Processing a media signal on a media system
US7093257B2 (en) * 2002-04-01 2006-08-15 International Business Machines Corporation Allocation of potentially needed resources prior to complete transaction receipt
US7076781B2 (en) * 2002-05-31 2006-07-11 International Business Machines Corporation Resource reservation for large-scale job scheduling
US7330480B2 (en) * 2002-08-26 2008-02-12 Telefonaktiebolaget Lm Ericcson Adaptive network resource control
US7822687B2 (en) 2002-09-16 2010-10-26 Francois Brillon Jukebox with customizable avatar
US10373420B2 (en) 2002-09-16 2019-08-06 Touchtunes Music Corporation Digital downloading jukebox with enhanced communication features
US9646339B2 (en) 2002-09-16 2017-05-09 Touchtunes Music Corporation Digital downloading jukebox system with central and local music servers
US8332895B2 (en) 2002-09-16 2012-12-11 Touchtunes Music Corporation Digital downloading jukebox system with user-tailored music management, communications, and other tools
US8151304B2 (en) 2002-09-16 2012-04-03 Touchtunes Music Corporation Digital downloading jukebox system with user-tailored music management, communications, and other tools
US8584175B2 (en) 2002-09-16 2013-11-12 Touchtunes Music Corporation Digital downloading jukebox system with user-tailored music management, communications, and other tools
US11029823B2 (en) 2002-09-16 2021-06-08 Touchtunes Music Corporation Jukebox with customizable avatar
US8103589B2 (en) 2002-09-16 2012-01-24 Touchtunes Music Corporation Digital downloading jukebox system with central and local music servers
US8145759B2 (en) * 2002-11-04 2012-03-27 Oracle America, Inc. Dynamically configurable resource pool
US9027063B2 (en) * 2002-11-27 2015-05-05 Deluxe Digital Distribution Inc. Video-on-demand (VOD) management system and methods
US7797064B2 (en) 2002-12-13 2010-09-14 Stephen Loomis Apparatus and method for skipping songs without delay
US7493289B2 (en) * 2002-12-13 2009-02-17 Aol Llc Digital content store system
US7912920B2 (en) 2002-12-13 2011-03-22 Stephen Loomis Stream sourcing content delivery system
US7412532B2 (en) * 2002-12-13 2008-08-12 Aol Llc, A Deleware Limited Liability Company Multimedia scheduler
US20040177115A1 (en) * 2002-12-13 2004-09-09 Hollander Marc S. System and method for music search and discovery
DE10260126A1 (en) * 2002-12-19 2004-07-15 Db Systems Gmbh Communication architecture station
JP4077352B2 (en) * 2003-03-31 2008-04-16 株式会社日立製作所 Load balancing method, execution system thereof, and processing program thereof
US7366975B1 (en) * 2003-04-05 2008-04-29 Apple Inc Method and apparatus for allowing a media client to obtain media data from a media server
US7610305B2 (en) 2003-04-24 2009-10-27 Sun Microsystems, Inc. Simultaneous global transaction and local transaction management in an application server
US7743083B2 (en) 2003-04-24 2010-06-22 Oracle America, Inc. Common transaction manager interface for local and global transactions
US8935401B2 (en) * 2003-06-20 2015-01-13 Hewlett-Packard Development Company, L.P. Method and system using admission control in interactive grid computing systems
US20040267897A1 (en) * 2003-06-24 2004-12-30 Sychron Inc. Distributed System Providing Scalable Methodology for Real-Time Control of Server Pools and Data Centers
US7739252B2 (en) * 2003-07-14 2010-06-15 Oracle America, Inc. Read/write lock transaction manager freezing
US7640545B2 (en) * 2003-07-14 2009-12-29 Sun Microsytems, Inc. Transaction manager freezing
US20050033625A1 (en) * 2003-08-06 2005-02-10 International Business Machines Corporation Method, apparatus and program storage device for scheduling the performance of maintenance tasks to maintain a system environment
US8521875B2 (en) * 2003-09-04 2013-08-27 Oracle America, Inc. Identity for data sources
US20050086356A1 (en) * 2003-10-15 2005-04-21 Shah Mehul Y. Systems and methods for scheduled recording of multimedia content streams
JP2005191933A (en) * 2003-12-25 2005-07-14 Funai Electric Co Ltd Transmitter and transceiver system
US20050149940A1 (en) * 2003-12-31 2005-07-07 Sychron Inc. System Providing Methodology for Policy-Based Resource Allocation
US20050192937A1 (en) * 2004-02-26 2005-09-01 International Business Machines Corporation Dynamic query optimization
US20050198636A1 (en) * 2004-02-26 2005-09-08 International Business Machines Corporation Dynamic optimization of batch processing
CA2559584A1 (en) * 2004-03-13 2005-09-29 Cluster Resources, Inc. System and method of providing a self-optimizing reservation in space of compute resources
US20070195883A1 (en) * 2004-03-19 2007-08-23 Koninklijke Philips Electronics, N.V. Media signal processing method, corresponding system, and application thereof in a resource-scalable motion estimator
US8856793B2 (en) 2004-05-11 2014-10-07 International Business Machines Corporation System, method and program for scheduling computer program jobs
US7752629B2 (en) * 2004-05-21 2010-07-06 Bea Systems Inc. System and method for application server with overload protection
JP2006174309A (en) * 2004-12-17 2006-06-29 Ricoh Co Ltd Animation reproducing apparatus, program, and record medium
US8438297B1 (en) 2005-01-31 2013-05-07 At&T Intellectual Property Ii, L.P. Method and system for supplying media over communication networks
US7870552B2 (en) * 2005-02-09 2011-01-11 Adaptive Computing Enterprises, Inc. System and method of providing a fixed time offset based dedicated co-allocation of a common resource set
US7493346B2 (en) * 2005-02-16 2009-02-17 International Business Machines Corporation System and method for load shedding in data mining and knowledge discovery from stream data
JP4301516B2 (en) * 2005-03-08 2009-07-22 インターナショナル・ビジネス・マシーンズ・コーポレーション Method for restricting use of file, information processing apparatus, and program
US20060288184A1 (en) * 2005-06-17 2006-12-21 Seagate Technology Llc Admission control in data storage devices
US9654383B2 (en) 2005-08-17 2017-05-16 Avaya Inc. Route optimization using measured congestion
US8369220B1 (en) 2005-08-17 2013-02-05 Avaya Inc. Routing a flow of elastic traffic
JP4795183B2 (en) * 2006-09-26 2011-10-19 キヤノン株式会社 Processing apparatus, control method therefor, and program
US9330529B2 (en) 2007-01-17 2016-05-03 Touchtunes Music Corporation Game terminal configured for interaction with jukebox device systems including same, and/or associated methods
US9171419B2 (en) 2007-01-17 2015-10-27 Touchtunes Music Corporation Coin operated entertainment system
US7840676B2 (en) * 2007-01-30 2010-11-23 Hewlett-Packard Development Company, L.P. Method and system for shedding load in physiological signals processing
US20080195447A1 (en) * 2007-02-09 2008-08-14 Eric Bouillet System and method for capacity sizing for computer systems
US9953481B2 (en) 2007-03-26 2018-04-24 Touchtunes Music Corporation Jukebox with associated video server
US10290006B2 (en) 2008-08-15 2019-05-14 Touchtunes Music Corporation Digital signage and gaming services to comply with federal and state alcohol and beverage laws and regulations
US8332887B2 (en) 2008-01-10 2012-12-11 Touchtunes Music Corporation System and/or methods for distributing advertisements from a central advertisement network to a peripheral device via a local advertisement server
US8849435B2 (en) 2008-07-09 2014-09-30 Touchtunes Music Corporation Digital downloading jukebox with revenue-enhancing features
US10564804B2 (en) 2009-03-18 2020-02-18 Touchtunes Music Corporation Digital jukebox device with improved user interfaces, and associated methods
CN102449658A (en) 2009-03-18 2012-05-09 踏途音乐公司 Entertainment server and associated social networking services
US9292166B2 (en) 2009-03-18 2016-03-22 Touchtunes Music Corporation Digital jukebox device with improved karaoke-related user interfaces, and associated methods
US10719149B2 (en) 2009-03-18 2020-07-21 Touchtunes Music Corporation Digital jukebox device with improved user interfaces, and associated methods
KR101446403B1 (en) 2010-01-26 2014-11-04 터치튠즈 뮤직 코포레이션 Digital jukebox device with improved user interfaces, and associated methods
GB2522772B (en) 2011-09-18 2016-01-13 Touchtunes Music Corp Digital jukebox device with karaoke and/or photo booth features, and associated methods
US11151224B2 (en) 2012-01-09 2021-10-19 Touchtunes Music Corporation Systems and/or methods for monitoring audio inputs to jukebox devices
US8949841B2 (en) * 2012-12-27 2015-02-03 Nvidia Corporation Approach for a configurable phase-based priority scheduler
US9921717B2 (en) 2013-11-07 2018-03-20 Touchtunes Music Corporation Techniques for generating electronic menu graphical user interface layouts for use in connection with electronic devices
JP6777545B2 (en) 2014-03-25 2020-10-28 タッチチューンズ ミュージック コーポレイションTouchtunes Music Corporation Digital jukebox devices with an improved user interface and related methods
US10038616B2 (en) 2014-09-25 2018-07-31 Microsoft Technology Licensing, Llc Managing classified network streams
US9766960B2 (en) * 2015-01-30 2017-09-19 Salesforce.Com, Inc. Workload-driven techniques for providing biased service level guarantees
US10055137B2 (en) * 2016-06-29 2018-08-21 Intel Corporation Method, system, and apparatus for nested suspend and resume in a solid state drive
US20180150331A1 (en) * 2016-11-30 2018-05-31 International Business Machines Corporation Computing resource estimation in response to restarting a set of logical partitions
US10805382B2 (en) 2018-01-29 2020-10-13 International Business Machines Corporation Resource position planning for distributed demand satisfaction
US20190268283A1 (en) * 2018-02-23 2019-08-29 International Business Machines Corporation Resource Demand Prediction for Distributed Service Network

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4635187A (en) * 1983-12-19 1987-01-06 At&T Bell Laboratories Control for a multiprocessing system program process
JPS63136140A (en) * 1986-11-27 1988-06-08 Fujitsu Ltd Optimum job scheduling system
US5303369A (en) * 1990-08-31 1994-04-12 Texas Instruments Incorporated Scheduling system for multiprocessor operating system
US5406476A (en) * 1991-04-11 1995-04-11 Sun Microsystems, Inc. Method and apparatus for resource constraint scheduling
JP3198604B2 (en) * 1992-04-17 2001-08-13 横河電機株式会社 Continuous schedule management system
US5528513A (en) * 1993-11-04 1996-06-18 Digital Equipment Corp. Scheduling and admission control policy for a continuous media server
US5532937A (en) * 1994-01-31 1996-07-02 International Business Machines Corporation Switching of multiple multimedia data streams
US5633859A (en) * 1994-09-16 1997-05-27 The Ohio State University Method and apparatus for congestion management in computer networks using explicit rate indication
US5708796A (en) * 1994-11-18 1998-01-13 Lucent Technologies Inc. Method of retrieving continuous and non-continuous media data from a file system
US5659790A (en) * 1995-02-23 1997-08-19 International Business Machines Corporation System and method for globally scheduling multimedia stories

Also Published As

Publication number Publication date
EP0762275A3 (en) 1997-07-09
KR970017012A (en) 1997-04-28
US6041354A (en) 2000-03-21
JPH09152977A (en) 1997-06-10
CA2179842A1 (en) 1997-03-09
EP0762275A2 (en) 1997-03-12

Similar Documents

Publication Publication Date Title
CA2179842C (en) Dynamic hierarchical resource scheduling for continuous media
EP0759676B1 (en) Scheduling videos in a video-on-demand system and video-on-demand system for applying the same
US6691208B2 (en) Queuing architecture including a plurality of queues and associated method for controlling admission for disk access requests for video content
Chen et al. A scalable video-on-demand service for the provision of VCR-like functions
Rajkumar et al. Resource kernels: A resource-centric approach to real-time and multimedia systems
CA2362727C (en) Queuing architecture with multiple queues and method for statistical disk scheduling for video servers
JP3338451B2 (en) Staggered stream support for video on demand
EP0696872B1 (en) Return based scheduling to support video-on-demand applications
CA2142380C (en) Buffer management policy for an on-demand video server
CA2155353C (en) Digital media data stream network management system
Nakajima et al. A continuous media application supporting dynamic QoS control on real-time mach
Ramakrishnan et al. Operating system support for a video-on-demand file service
Feng et al. Providing VCR functionality in a constant quality video-on-demand transportation service
CHIUEH et al. Design and implementation of the stony brook video server
Kim et al. A reliable statistical admission control strategy for interactive video-on-demand servers with interval caching
Mercer Operating system resource reservation for real-time and multimedia applications
KR100471746B1 (en) A soft real-time task scheduling method and the storage media thereof
Tezuka et al. Experiences with building a continuous media application on Real-Time Mach
Ranjan et al. Operating System Concerns for Multimedia
Nang et al. An efficient buffer management scheme for multimedia file system
Rohrer Buffer sharing for video on demand servers: an implementation and evaluation
Cha et al. A real-time resource management system for video server
Jansen et al. Early quantum task scheduling
Kim et al. Priority-driven scheduling and bandwidth allocation for MPEG-2 decoding
Taranovsky CPU Scheduling in Multimedia Operating Systems

Legal Events

Date Code Title Description
EEER Examination request
MKLA Lapsed
MKLA Lapsed

Effective date: 20090625