CA2222674C - Control method and apparatus for power distribution network - Google Patents
Control method and apparatus for power distribution network Download PDFInfo
- Publication number
- CA2222674C CA2222674C CA002222674A CA2222674A CA2222674C CA 2222674 C CA2222674 C CA 2222674C CA 002222674 A CA002222674 A CA 002222674A CA 2222674 A CA2222674 A CA 2222674A CA 2222674 C CA2222674 C CA 2222674C
- Authority
- CA
- Canada
- Prior art keywords
- control apparatus
- sectionalizing
- fault condition
- switch
- fault
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02H—EMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
- H02H7/00—Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions
- H02H7/26—Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured
- H02H7/261—Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured involving signal transmission between at least two stations
- H02H7/262—Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured involving signal transmission between at least two stations involving transmissions of switching or blocking orders
Abstract
A control method and apparatus is provided for isolating network faults via the communication between neighboring network locations and the control of sectionalizing switches at the network locations. Control apparatus is provided at particular network locations which responds to detected fault conditions and communicates the detected fault condition to the control apparatus at neighboring network locations. The appropriate control apparatus, in response to the information received from neighboring network locations, opens a sectionalizing switch to isolate the fault condition. In one particular arrangement, each control apparatus that detects a fault condition sends a signal to appropriate source-side, neighboring control apparatus to inhibit the source-side control apparatus from opening their respective sectionalizing switches.
Further, any control apparatus that detected a fault condition and that does not receive an inhibiting signal, controls its sectionalizing switch to open. In a specific arrangement, the control apparatus that opens its sectionalizing switch also sends a signal to predetermined neighboring load-side control apparatus to open their sectionalizing switches, so as to prevent feeding into a fault condition after network restoration via a different path or source.
Further, any control apparatus that detected a fault condition and that does not receive an inhibiting signal, controls its sectionalizing switch to open. In a specific arrangement, the control apparatus that opens its sectionalizing switch also sends a signal to predetermined neighboring load-side control apparatus to open their sectionalizing switches, so as to prevent feeding into a fault condition after network restoration via a different path or source.
Description
CONTROL METHOD AND APPARATUS FOR POWER DISTRIBUTION NETWORK
BACKGROUND OF THE INVENTION
1. Field of the Invention The present invention relates generally to the control of power distribution networks and more particularly to a control method and apparatus for isolating network faults via the communication between neighboring network locations and the control of sectionalizing switches at the network locations.
BACKGROUND OF THE INVENTION
1. Field of the Invention The present invention relates generally to the control of power distribution networks and more particularly to a control method and apparatus for isolating network faults via the communication between neighboring network locations and the control of sectionalizing switches at the network locations.
2. Description of Related Art In electrical power distribution systems, customers and users are supplied with electricity via a distribution network. The network is commonly configured such that power may be provided to the users from more than one system network path or more than one source. This is done so that the loss of one source does not disable the entire network.
Further, if a fault condition occurs anywhere in the network, the fault may be isolated via sectionalizing while maintaining power delivery to the users who are not in the immediate vicinity of the location of the fault, i.e. the faulted section.
In one arrangement, communications is provided between a master station and particular points in the network. In this way, information can be obtained corresponding to fault location, the lockout condition of particular breakers, and the voltage and current at the particular locations. Control of the system network is possible via the remote operation of sectionalizing devices (distribution switches) by the master station. A fault detection method and apparatus for the remote locations that is useful with a master station is shown in U.S.
Patent No. 5,303,112.
In an arrangement without a master station, reclosing into faults and sectionalizing is accomplished via the counting of reclosing cycles. For example, sectionalizing devices are arranged such that each device has one less count to open the device than the adjacent upstream sectionalizing device. Obviously, this limits the number of sectionalizing devices and also requires a large number of reclosing cycles for the main line protection device such as a circuit breaker with recloser.
In the arrangement illustrated in U.S. Patent No. 5,341,268, a main controller at a substation of a network sends a request signal to each of various section controllers located throughout the network when the main controller detects a fault. Each of the section controllers individually performs fault detection and judges whether its associated section switch is dividing the distribution line between faulty and normal line sections on the basis of fault detection signals from other section controllers. If the section controller decides that it is dividing the line between faulty and normal line sections, the section controller opens its associated section switch. In one embodiment, the individual section controllers receive fault detection information from the power-supply side section controller and the load side section controller, the section controller maintaining its respective section switch closed if it receives a fault detection signal from its power-supply side section controller and its load side section controller, or opening its respective section switch if it receives a fault detection from its power-supply side section controller and a non-fault detection from its load side section controller. The communication between the section controllers is synchronized by the main controller. Specifically, the main controller sends out the request signal after a fault is detected at the substation, whereupon each of the section controllers responds by sequentially outputting a fault detection signal.
In the network system available from Kearney (a Kearney-National Company, Tucker GA), FILS (Fault Interrupting Line Sectionalizer) network circuitry automatically finds the faulted section of the feeder/line and then isolates it (via use of directional fault-indicating relays).
Specifically, two switches that share a common section of the feeder/line communicate with one another via a low-voltage control cable. If both ends of the feeder/line have current flowing in the same direction, the two switches stay closed. If the feeder/line has current flowing into it from both directions, then both switches open simultaneously. The network circuitry controls fault interrupter switches to interrupt the fault current and isolate the bad section of feeder/line. In another network arrangement of this FILS system, operation is described as two adjacent sets of FII,S switches determining if the fault is between them or not, opening if it is, and remaining closed if it is not.
Thus, while the prior art arrangements may be generally useful to detect faults, where a master station and remote terminal units are utilized with fault detection logic, the communications and protocol to restore a network after a fault are complicated and dependent on the number of sources and circuit configuration at the time of the fault.
Also, where a master station is not utilized, the arrangements of the prior art to accomplish sectionalizing and restoration of a network are complicated and time consuming, requiring sequential closing of the various devices at timed intervals, or being inapplicable to all but the very simplest of circuit network configurations.
SUMMARY OF THE INVENTION
Accordingly, it is a principal object of the present invention to provide an efficient control method and apparatus for isolating network faults via the communication between neighboring network locations and the control of sectionalizing switches at the network locations, the communication entailing the sending of open inhibit signals to upstream (source-side) neighbor network locations by each network location that detects a fault.
It is another object of the present invention to provide control apparatus at particular points in a distribution network that detect fault conditions and inhibit the opening of appropriate neighboring control apparatus so as to control sectionalizing switches at the particular locations to isolate the detected fault conditions.
It is a further object of the present invention to provide a method for isolating fault conditions that are detected in an electrical power distribution network via the inhibiting of upstream (source-side) sectionalizing switch locations and the opening of sectionalizing switch locations that sense a fault and do not receive inhibiting signals and the opening of sectionalizing switch locations that are identified as downstream (load-side) neighbors to the opening sectionalizing switch locations.
These and other objects of the present invention are efficiently achieved by the provision of a control method and apparatus for isolating network faults via the communication between neighboring network locations and the control of sectionalizing switches at the network locations.
Control apparatus is provided at particular network locations which responds to detected fault conditions and communicates the detected fault condition to the control apparatus at neighboring network locations. The appropriate control apparatus, in response to the information received from neighboring network locations, opens a sectionalizing switch to isolate the fault condition.
In one particular arrangement, each control apparatus that detects a fault condition sends a signal to appropriate source-side, neighboring control apparatus to inhibit the source-side control apparatus from opening their respective sectionalizing switches. Further, any control apparatus that detected a fault condition and that does not receive an inhibiting signal, controls its sectionalizing switch to open. In a specific arrangement, the control apparatus that opens its sectionalizing switch also sends a signal to predetermined neighboring load-side control apparatus to open their sectionalizing switches, so as to prevent feeding into a fault condition after network restoration via a diil'erent path or source.
BRIEF DESCRIPTION OF THE DRAWING
The invention, both as to its organization and method of operation, together with fi~rther objects and advantages thereof, will best be understood by reference to the specification taken in conjunction with the accompanying drawing in which:
FIG. 1 is a block diagram representation of control apparatus in accordance with the principles of the present invention illustrated with an electrical power distribution system;
Further, if a fault condition occurs anywhere in the network, the fault may be isolated via sectionalizing while maintaining power delivery to the users who are not in the immediate vicinity of the location of the fault, i.e. the faulted section.
In one arrangement, communications is provided between a master station and particular points in the network. In this way, information can be obtained corresponding to fault location, the lockout condition of particular breakers, and the voltage and current at the particular locations. Control of the system network is possible via the remote operation of sectionalizing devices (distribution switches) by the master station. A fault detection method and apparatus for the remote locations that is useful with a master station is shown in U.S.
Patent No. 5,303,112.
In an arrangement without a master station, reclosing into faults and sectionalizing is accomplished via the counting of reclosing cycles. For example, sectionalizing devices are arranged such that each device has one less count to open the device than the adjacent upstream sectionalizing device. Obviously, this limits the number of sectionalizing devices and also requires a large number of reclosing cycles for the main line protection device such as a circuit breaker with recloser.
In the arrangement illustrated in U.S. Patent No. 5,341,268, a main controller at a substation of a network sends a request signal to each of various section controllers located throughout the network when the main controller detects a fault. Each of the section controllers individually performs fault detection and judges whether its associated section switch is dividing the distribution line between faulty and normal line sections on the basis of fault detection signals from other section controllers. If the section controller decides that it is dividing the line between faulty and normal line sections, the section controller opens its associated section switch. In one embodiment, the individual section controllers receive fault detection information from the power-supply side section controller and the load side section controller, the section controller maintaining its respective section switch closed if it receives a fault detection signal from its power-supply side section controller and its load side section controller, or opening its respective section switch if it receives a fault detection from its power-supply side section controller and a non-fault detection from its load side section controller. The communication between the section controllers is synchronized by the main controller. Specifically, the main controller sends out the request signal after a fault is detected at the substation, whereupon each of the section controllers responds by sequentially outputting a fault detection signal.
In the network system available from Kearney (a Kearney-National Company, Tucker GA), FILS (Fault Interrupting Line Sectionalizer) network circuitry automatically finds the faulted section of the feeder/line and then isolates it (via use of directional fault-indicating relays).
Specifically, two switches that share a common section of the feeder/line communicate with one another via a low-voltage control cable. If both ends of the feeder/line have current flowing in the same direction, the two switches stay closed. If the feeder/line has current flowing into it from both directions, then both switches open simultaneously. The network circuitry controls fault interrupter switches to interrupt the fault current and isolate the bad section of feeder/line. In another network arrangement of this FILS system, operation is described as two adjacent sets of FII,S switches determining if the fault is between them or not, opening if it is, and remaining closed if it is not.
Thus, while the prior art arrangements may be generally useful to detect faults, where a master station and remote terminal units are utilized with fault detection logic, the communications and protocol to restore a network after a fault are complicated and dependent on the number of sources and circuit configuration at the time of the fault.
Also, where a master station is not utilized, the arrangements of the prior art to accomplish sectionalizing and restoration of a network are complicated and time consuming, requiring sequential closing of the various devices at timed intervals, or being inapplicable to all but the very simplest of circuit network configurations.
SUMMARY OF THE INVENTION
Accordingly, it is a principal object of the present invention to provide an efficient control method and apparatus for isolating network faults via the communication between neighboring network locations and the control of sectionalizing switches at the network locations, the communication entailing the sending of open inhibit signals to upstream (source-side) neighbor network locations by each network location that detects a fault.
It is another object of the present invention to provide control apparatus at particular points in a distribution network that detect fault conditions and inhibit the opening of appropriate neighboring control apparatus so as to control sectionalizing switches at the particular locations to isolate the detected fault conditions.
It is a further object of the present invention to provide a method for isolating fault conditions that are detected in an electrical power distribution network via the inhibiting of upstream (source-side) sectionalizing switch locations and the opening of sectionalizing switch locations that sense a fault and do not receive inhibiting signals and the opening of sectionalizing switch locations that are identified as downstream (load-side) neighbors to the opening sectionalizing switch locations.
These and other objects of the present invention are efficiently achieved by the provision of a control method and apparatus for isolating network faults via the communication between neighboring network locations and the control of sectionalizing switches at the network locations.
Control apparatus is provided at particular network locations which responds to detected fault conditions and communicates the detected fault condition to the control apparatus at neighboring network locations. The appropriate control apparatus, in response to the information received from neighboring network locations, opens a sectionalizing switch to isolate the fault condition.
In one particular arrangement, each control apparatus that detects a fault condition sends a signal to appropriate source-side, neighboring control apparatus to inhibit the source-side control apparatus from opening their respective sectionalizing switches. Further, any control apparatus that detected a fault condition and that does not receive an inhibiting signal, controls its sectionalizing switch to open. In a specific arrangement, the control apparatus that opens its sectionalizing switch also sends a signal to predetermined neighboring load-side control apparatus to open their sectionalizing switches, so as to prevent feeding into a fault condition after network restoration via a diil'erent path or source.
BRIEF DESCRIPTION OF THE DRAWING
The invention, both as to its organization and method of operation, together with fi~rther objects and advantages thereof, will best be understood by reference to the specification taken in conjunction with the accompanying drawing in which:
FIG. 1 is a block diagram representation of control apparatus in accordance with the principles of the present invention illustrated with an electrical power distribution system;
sc-s266-c FIGS. 2 and 3 are diagrammatic representations of electrical power distribution networks illustrating the use and operation of the present invention of FIG. 1; and FIG. 4 is a flow diagram illustrating operation of the control apparatus of FIG. 1.
s DETAILED DESCRIPTION
Referring now to FIG. 1, an illustrative control apparatus 10 in accordance with the principles and features of the present invention is utilized in conjunction with other control apparatus such as 10' in a power distribution network, portions of which are illustrated generally at 20, to isolate fault conditions as will be explained in more detail hereinafter. The control apparatus includes a fault detection unit 12, a controller 14, and a communications unit 16. In a specific embodiment, the fault detection unit 12 operates to detect faults in accordance with the method and apparatus as set forth in U.S. Patent No. 5,303,112.
The control apparatus 10 selectively controls the opening and closing of a switch 18 which is utilized as a sectionalizing switch in the power distribution network 20.
The communications is unit 16 ofthe control apparatus 10 communicates with other control apparatus (e.g. 10') located at particular points in the power distribution network 20 via a suitable communications link such as the illustrative radio link 22. It should be understood, however, that the radio link 22 is illustrative only and that other communications links are also suitable such as fiber-optics, land lines, power-line carrier, etc. Additionally, in specific embodiments and in accordance with the particular operating practices of the particular power distribution network, the control apparatus 10 also communicates with a master station 30 via the radio link 22 or other communications link, e.g. for remote supervisory control, reconfiguring of the network, monitoring of local parameters, updating of network configuration information, etc. However, it should be realized that the master station 30 is not required to practice the present invention and perform the fault-isolating 2s fiznction.
In accordance with important aspects of the present invention, the control apparatus 10 is responsive to sense fault conditions and communicate the existence of the fault condition to other control apparatus in the network, the plurality of control apparatus determining the appropriate sectionalizing switches to be operated to isolate the fault condition. With additional reference to FIG. 2, a plurality of control apparatus 10, designated CA1-CA8 are located at particular points in the network 20, each controlling a respective sectionalizing switch 18, designated SW1-SWB.
If a fault condition occurs at F1, the fault is sensed by the control apparatus CA1, CA2, and CAS. Each of the control apparatus CAl, CA2, and CAS communicates the detection of the fault condition F 1 to its respective network neighbors. For example, a map of the network neighbors for each of the control apparatus 10 is stored within the control apparatus 10 (or otherwise provided thereto, e.g. via the communication link 22). In a specific embodiment, the neighbors are defined as source-side and load-side neighbors for various configurations of sources and direction of power flow. For example, a "source-side" neighbor is defined as one that detects the overcurrent followed by a loss of voltage. Thus, in the illustrative example, the stored map of neighbors for CAS would be source-side neighbors CA2 and CA3 and load-side neighbor CA6.
For a reverse direction of current flow, the load-side neighbors to CAS would be CAZ and CA3, while the source-side neighbor would be CA6.
In one specific embodiment, the control apparatus 10 that detects the fault condition, CAl, CA2, and CAS in the illustration, communicates an opening inhibit ("block open") signal to each of its source-side (upstream) neighbors, e.g. CA2 sends this inhibit signal to CA1, and CAS
sends the inhibit signal to CA2. In this way, CA1 and CA2 are inhibited from opening their respective sectionalizing switches SW1 and SW2, since this would not be desirable from a sectionalizing philosophy, i.e. this would not serve to isolate the faulted section in a desired manner so as to deenergize the smallest possible number of users and portions of the network. If a second source S2 were connected in the network 20, the control apparatus CA3 and CA4 would also detect the fault at F1. In that case, CA3 would send an inhibit signal to CA4, and CAS would send an inhibit signal to CA3. Further, each of the control apparatus 10 that detected the fault and does not receive an inhibit signal is arranged to open its respective sectionalizing switch, e.g. CAS opens its respective sectionalizing switch SWS (during a sensed zero voltage condition, e.g. during the open time of the recloser) so as to appropriately isolate the faulted section around F 1 from the source S 1.
In accordance with important aspects of the present invention, in a specific arrangement which is preferred for most network configurations, each control apparatus that detects the fault and does not receive an inhibit signal is also arranged to send an open signal to its load-side neighbors. Thus, in the illustrative example, CAS does not receive an inhibit signal and sends an open signal to CA6, since CA6 is the load-side neighbor of CAS. Accordingly, both CAS and CA6 open their respective sectionalizing switches. In this manner, if restoration of the circuit following the fault is via a network configuration that utilizes di~'erent sources and power flow directions as compared to the original configuration, the faulted section is properly isolated via the additional opening of SW6 (which also prevents any backfeed into the faulted section regardless of the source). If source S2 were feeding the network and source S 1 was not connected, then with a fault at F1, control apparatus CA6 would detect the fault, inhibit opening of CA7, send an open signal to CAS, and both CAS and CA6 would open their switches SWS and SW6.
s DETAILED DESCRIPTION
Referring now to FIG. 1, an illustrative control apparatus 10 in accordance with the principles and features of the present invention is utilized in conjunction with other control apparatus such as 10' in a power distribution network, portions of which are illustrated generally at 20, to isolate fault conditions as will be explained in more detail hereinafter. The control apparatus includes a fault detection unit 12, a controller 14, and a communications unit 16. In a specific embodiment, the fault detection unit 12 operates to detect faults in accordance with the method and apparatus as set forth in U.S. Patent No. 5,303,112.
The control apparatus 10 selectively controls the opening and closing of a switch 18 which is utilized as a sectionalizing switch in the power distribution network 20.
The communications is unit 16 ofthe control apparatus 10 communicates with other control apparatus (e.g. 10') located at particular points in the power distribution network 20 via a suitable communications link such as the illustrative radio link 22. It should be understood, however, that the radio link 22 is illustrative only and that other communications links are also suitable such as fiber-optics, land lines, power-line carrier, etc. Additionally, in specific embodiments and in accordance with the particular operating practices of the particular power distribution network, the control apparatus 10 also communicates with a master station 30 via the radio link 22 or other communications link, e.g. for remote supervisory control, reconfiguring of the network, monitoring of local parameters, updating of network configuration information, etc. However, it should be realized that the master station 30 is not required to practice the present invention and perform the fault-isolating 2s fiznction.
In accordance with important aspects of the present invention, the control apparatus 10 is responsive to sense fault conditions and communicate the existence of the fault condition to other control apparatus in the network, the plurality of control apparatus determining the appropriate sectionalizing switches to be operated to isolate the fault condition. With additional reference to FIG. 2, a plurality of control apparatus 10, designated CA1-CA8 are located at particular points in the network 20, each controlling a respective sectionalizing switch 18, designated SW1-SWB.
If a fault condition occurs at F1, the fault is sensed by the control apparatus CA1, CA2, and CAS. Each of the control apparatus CAl, CA2, and CAS communicates the detection of the fault condition F 1 to its respective network neighbors. For example, a map of the network neighbors for each of the control apparatus 10 is stored within the control apparatus 10 (or otherwise provided thereto, e.g. via the communication link 22). In a specific embodiment, the neighbors are defined as source-side and load-side neighbors for various configurations of sources and direction of power flow. For example, a "source-side" neighbor is defined as one that detects the overcurrent followed by a loss of voltage. Thus, in the illustrative example, the stored map of neighbors for CAS would be source-side neighbors CA2 and CA3 and load-side neighbor CA6.
For a reverse direction of current flow, the load-side neighbors to CAS would be CAZ and CA3, while the source-side neighbor would be CA6.
In one specific embodiment, the control apparatus 10 that detects the fault condition, CAl, CA2, and CAS in the illustration, communicates an opening inhibit ("block open") signal to each of its source-side (upstream) neighbors, e.g. CA2 sends this inhibit signal to CA1, and CAS
sends the inhibit signal to CA2. In this way, CA1 and CA2 are inhibited from opening their respective sectionalizing switches SW1 and SW2, since this would not be desirable from a sectionalizing philosophy, i.e. this would not serve to isolate the faulted section in a desired manner so as to deenergize the smallest possible number of users and portions of the network. If a second source S2 were connected in the network 20, the control apparatus CA3 and CA4 would also detect the fault at F1. In that case, CA3 would send an inhibit signal to CA4, and CAS would send an inhibit signal to CA3. Further, each of the control apparatus 10 that detected the fault and does not receive an inhibit signal is arranged to open its respective sectionalizing switch, e.g. CAS opens its respective sectionalizing switch SWS (during a sensed zero voltage condition, e.g. during the open time of the recloser) so as to appropriately isolate the faulted section around F 1 from the source S 1.
In accordance with important aspects of the present invention, in a specific arrangement which is preferred for most network configurations, each control apparatus that detects the fault and does not receive an inhibit signal is also arranged to send an open signal to its load-side neighbors. Thus, in the illustrative example, CAS does not receive an inhibit signal and sends an open signal to CA6, since CA6 is the load-side neighbor of CAS. Accordingly, both CAS and CA6 open their respective sectionalizing switches. In this manner, if restoration of the circuit following the fault is via a network configuration that utilizes di~'erent sources and power flow directions as compared to the original configuration, the faulted section is properly isolated via the additional opening of SW6 (which also prevents any backfeed into the faulted section regardless of the source). If source S2 were feeding the network and source S 1 was not connected, then with a fault at F1, control apparatus CA6 would detect the fault, inhibit opening of CA7, send an open signal to CAS, and both CAS and CA6 would open their switches SWS and SW6.
Referring now to FIG. 3, a network 3 S is illustrated including control apparatus CD 1 to CD8 with the network 3 5 being fed by the source S 1. If a fault occurs at F2, control apparatus CD 1 and CD2 detect the fault. Control apparatus CD2 sends an inhibit signal to its source-side neighbor, CD1, and proceeds to open its sectionalizing switch SW-2 when the voltage is zero.
Additionally, CD2 sends an open signal to its downstream neighbors CD3, CDS, and CD7, which respond to open their respective sectionalizing switches SW3, SWS, and SW7.
Further, CD1 did not open its switch since it received the inhibit signal from CD2. Thus, the fault F2 is then isolated. Accordingly, if circuit restoration occurs via energizing of such sources as S2, S3, and/or S4, the fault is isolated.
With reference now to FIG. 4, a flow diagram is shown that is suitable for the practice of the present invention to control the control apparatus 10 and to accomplish the isolation of the fault conditions in the network. The flow diagram remains in the Normal condition or state at 50 until an overcurrent is detected. When an overcurrent condition is detected, program flow continues from an Overcurrent block 52 to a Fault decision block 54 where the determination is made as to whether or not the overcurrent satisfies predetermined criteria that define a fault condition. If a fault is detected, program flow proceeds to a function block 56 which starts an opening timer and senses the inhibit ("block open") signal to upstream neighbors. If a fault is not detected in decision block 54, program flow then proceeds to a no response state at 57 with a return to the Normal block S0. Continuing with the program flow for a detected fault, from function block 56, the program flow proceeds to a decision block 58 wherein the determination is made as to whether or not the opening timer duration has expired. If the determination is yes, program flow proceeds to a function block 60 to perform the sending of the open signal to downstream neighbors, and then to open the switch when the voltage is zero, as represented by the program flow through decision block 68 and an open switch function block 70. When the switch is opened in function block 70, the program flow awaits further instruction (via either manual input or input from the communication link) to reset via the reset function 62. On the other hand, if the opening timer did not expire, the program flow returns to the Normal state at 50 via a Reset function block 62 by one of two paths. A first path results when a block open signal is received via decision block 64. A second path to the Reset fiznction block 62 can result when the return of three-phase voltage is detected via a decision block 66.
While there have been illustrated and described various embodiments of the present invention, it will be apparent that various changes and modifications will occur to those skilled in the art. Thus, the present invention encompasses other specific implementations to achieve opening of the appropriate sectionalizing switches in a network in response to a fault via the communication between control apparatus at neighboring switch locations.
Accordingly, it is intended in the appended claims to cover all such changes and modifications that fall within the true spirit and scope of the present invention.
Additionally, CD2 sends an open signal to its downstream neighbors CD3, CDS, and CD7, which respond to open their respective sectionalizing switches SW3, SWS, and SW7.
Further, CD1 did not open its switch since it received the inhibit signal from CD2. Thus, the fault F2 is then isolated. Accordingly, if circuit restoration occurs via energizing of such sources as S2, S3, and/or S4, the fault is isolated.
With reference now to FIG. 4, a flow diagram is shown that is suitable for the practice of the present invention to control the control apparatus 10 and to accomplish the isolation of the fault conditions in the network. The flow diagram remains in the Normal condition or state at 50 until an overcurrent is detected. When an overcurrent condition is detected, program flow continues from an Overcurrent block 52 to a Fault decision block 54 where the determination is made as to whether or not the overcurrent satisfies predetermined criteria that define a fault condition. If a fault is detected, program flow proceeds to a function block 56 which starts an opening timer and senses the inhibit ("block open") signal to upstream neighbors. If a fault is not detected in decision block 54, program flow then proceeds to a no response state at 57 with a return to the Normal block S0. Continuing with the program flow for a detected fault, from function block 56, the program flow proceeds to a decision block 58 wherein the determination is made as to whether or not the opening timer duration has expired. If the determination is yes, program flow proceeds to a function block 60 to perform the sending of the open signal to downstream neighbors, and then to open the switch when the voltage is zero, as represented by the program flow through decision block 68 and an open switch function block 70. When the switch is opened in function block 70, the program flow awaits further instruction (via either manual input or input from the communication link) to reset via the reset function 62. On the other hand, if the opening timer did not expire, the program flow returns to the Normal state at 50 via a Reset function block 62 by one of two paths. A first path results when a block open signal is received via decision block 64. A second path to the Reset fiznction block 62 can result when the return of three-phase voltage is detected via a decision block 66.
While there have been illustrated and described various embodiments of the present invention, it will be apparent that various changes and modifications will occur to those skilled in the art. Thus, the present invention encompasses other specific implementations to achieve opening of the appropriate sectionalizing switches in a network in response to a fault via the communication between control apparatus at neighboring switch locations.
Accordingly, it is intended in the appended claims to cover all such changes and modifications that fall within the true spirit and scope of the present invention.
Claims (7)
1. An arrangement for isolating a faulted section of a power distribution network comprising:
a plurality of control apparatus located at particular points in the distribution network, each of said plurality of control apparatus comprising detecting means for detecting fault conditions, first means responsive to said detecting means for communicating with predetermined source-side and load-side control apparatus in the power distribution network, and second means responsive to said detecting means and communications received from other of said plurality of control apparatus for providing a sectionalizing switch-opening signal to an associated sectionalizing switch and adjacent load-side control apparatus, said second means further comprising third means for providing an inhibit signal to the predetermined source-side control apparatus so as to prevent the predetermined source-side control apparatus from providing the sectionalizing switch-opening signal.
a plurality of control apparatus located at particular points in the distribution network, each of said plurality of control apparatus comprising detecting means for detecting fault conditions, first means responsive to said detecting means for communicating with predetermined source-side and load-side control apparatus in the power distribution network, and second means responsive to said detecting means and communications received from other of said plurality of control apparatus for providing a sectionalizing switch-opening signal to an associated sectionalizing switch and adjacent load-side control apparatus, said second means further comprising third means for providing an inhibit signal to the predetermined source-side control apparatus so as to prevent the predetermined source-side control apparatus from providing the sectionalizing switch-opening signal.
2. The method of claim 1 wherein the control apparatus is responsive to the direction of current through its associated sectionalizing switch.
3. A method for isolating a faulted section of an electrical power distribution network which includes a plurality of control apparatus at predetermined locations along the power distribution network each of which includes provisions for detecting fault conditions and selectively controlling the opened or closed status of a respective sectionalizing switch, the method comprising the steps of:
detecting a fault condition by each of the control apparatus on the source side of the fault condition;
each of the control apparatus that detects a fault condition communicating an inhibit signal to predetermined source-side control apparatus so as to prevent the source-side control apparatus from opening the sectionalizing switch; and each of the control apparatus that detects a fault condition and that does not receive an inhibit signal controlling the opening of its respective sectionalizing switch.
detecting a fault condition by each of the control apparatus on the source side of the fault condition;
each of the control apparatus that detects a fault condition communicating an inhibit signal to predetermined source-side control apparatus so as to prevent the source-side control apparatus from opening the sectionalizing switch; and each of the control apparatus that detects a fault condition and that does not receive an inhibit signal controlling the opening of its respective sectionalizing switch.
4. The method of claim 3 further comprising the step of sensing by each control apparatus the direction of current through its respective sectionalizing switch.
5. The method of claim 4 further comprising the step of sending a sectionalizing switch-opening signal to predetermined load-side control apparatus by the control apparatus that detects a fault condition and that does not receive an inhibit signal.
6. The method of claim 5 further comprising the step of storing within each control apparatus information representing the predetermined source-side and load-side control apparatus.
7. A method of isolating a faulted section of a power distribution network having sectionalizing apparatus with a respective associated switch at predetermined locations in the power distribution network, each of the sectionalizing apparatus detecting fault conditions including the direction of current, being capable of communicating with one or more predetermined neighboring sectionalizing apparatus, and being responsive to received open and open-inhibit signals, the method comprising the steps of:
sending an open-inhibit signal by each sectionalizing apparatus that detects a fault condition to its respective predetermined neighbors that are determined to be upstream of the fault condition;
each sectionalizing apparatus that detects a fault condition opening its respective associated switch a predetermined time interval after the detection of a fault condition unless an open-inhibit signal is received; and each sectionalizing apparatus that detects a fault condition and does not receive an open-inhibit signal sending an open signal to the predetermined neighbors that are determined to be downstream of the fault condition.
sending an open-inhibit signal by each sectionalizing apparatus that detects a fault condition to its respective predetermined neighbors that are determined to be upstream of the fault condition;
each sectionalizing apparatus that detects a fault condition opening its respective associated switch a predetermined time interval after the detection of a fault condition unless an open-inhibit signal is received; and each sectionalizing apparatus that detects a fault condition and does not receive an open-inhibit signal sending an open signal to the predetermined neighbors that are determined to be downstream of the fault condition.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US08/758,406 US5784237A (en) | 1996-11-29 | 1996-11-29 | Control method and apparatus for power distribution network |
US08/758,406 | 1996-11-29 |
Publications (2)
Publication Number | Publication Date |
---|---|
CA2222674A1 CA2222674A1 (en) | 1998-05-29 |
CA2222674C true CA2222674C (en) | 2006-11-07 |
Family
ID=25051630
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CA002222674A Expired - Lifetime CA2222674C (en) | 1996-11-29 | 1997-11-26 | Control method and apparatus for power distribution network |
Country Status (2)
Country | Link |
---|---|
US (1) | US5784237A (en) |
CA (1) | CA2222674C (en) |
Families Citing this family (43)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6018449A (en) | 1996-12-04 | 2000-01-25 | Energyline Systems, L.P. | Method for automated reconfiguration of a distribution system using distributed control logic and communications |
US6347027B1 (en) * | 1997-11-26 | 2002-02-12 | Energyline Systems, Inc. | Method and apparatus for automated reconfiguration of an electric power distribution system with enhanced protection |
US6341054B1 (en) | 1998-12-23 | 2002-01-22 | Mcgraw-Edison Company | Intelligent power distribution network |
DE60044455D1 (en) * | 1999-02-12 | 2010-07-08 | S & C Electric Corp | METHOD AND DEVICE FOR AUTOMATICALLY RECONFIGURING AN ELECTRICAL ENERGY DISTRIBUTION SYSTEM WITH IMPROVED PROTECTION |
JP2001023058A (en) * | 1999-07-09 | 2001-01-26 | Fujitsu Ltd | Failure display circuit for system including plural circuit blocks |
CA2317995C (en) * | 2000-06-30 | 2011-11-15 | S&C Electric Company | Methods and arrangements to detect and respond to faults in electrical power distribution equipment and systems |
US6778370B1 (en) | 2001-03-16 | 2004-08-17 | Abb Technology Ag | Adaptive recloser/sectionalizer |
GB0120748D0 (en) | 2001-08-25 | 2001-10-17 | Lucas Aerospace Power Equip | Generator |
US7747356B2 (en) | 2002-02-25 | 2010-06-29 | General Electric Company | Integrated protection, monitoring, and control system |
US6892115B2 (en) | 2002-02-25 | 2005-05-10 | General Electric Company | Method and apparatus for optimized centralized critical control architecture for switchgear and power equipment |
US6952785B1 (en) * | 2002-03-04 | 2005-10-04 | Cisco Technology, Inc. | Methods and apparatus for powering a data communications port |
US6972936B2 (en) * | 2002-03-29 | 2005-12-06 | Robert Allan Morris | Pre-emptive circuit breaker with arc fault and fault lockout short circuit protection |
US7110231B1 (en) | 2002-08-30 | 2006-09-19 | Abb Inc. | Adaptive protection system for a power-distribution network |
US6816757B1 (en) | 2002-09-19 | 2004-11-09 | Abb Technology Ag | Control unit for a power-distribution network |
JP4129381B2 (en) * | 2002-09-25 | 2008-08-06 | 株式会社ルネサステクノロジ | Nonvolatile semiconductor memory device |
JP4213941B2 (en) * | 2002-10-11 | 2009-01-28 | シャープ株式会社 | Output control method for a plurality of distributed power supplies and distributed power management system |
NZ539409A (en) * | 2002-10-25 | 2007-01-26 | S & C Elctric Co | Method and apparatus for control of an electric power system in response to circuit abnormalities |
EP1559178B1 (en) * | 2002-11-04 | 2013-09-18 | Raytheon Company | Intelligent power system |
US7039822B2 (en) * | 2003-02-27 | 2006-05-02 | Promos Technologies Inc. | Integrated circuit memory architecture with selectively offset data and address delays to minimize skew and provide synchronization of signals at the input/output section |
US7353407B2 (en) * | 2004-05-20 | 2008-04-01 | Cisco Technology, Inc. | Methods and apparatus for provisioning phantom power to remote devices |
US7265957B2 (en) * | 2004-06-18 | 2007-09-04 | Cooper Technologies Company | Restoring electrical load to distribution feeder circuits |
US20060114642A1 (en) * | 2004-11-30 | 2006-06-01 | Yan Liu | Systems and methods for integrated VAR compensation and hydrogen production |
US7472290B2 (en) * | 2004-12-23 | 2008-12-30 | Cisco Technology, Inc. | Methods and apparatus to maintain and utilize mobile power profile information |
US7478251B1 (en) | 2004-12-23 | 2009-01-13 | Cisco Technology, Inc. | Methods and apparatus for provisioning uninterruptible power for power over Ethernet applications |
US7509505B2 (en) * | 2005-01-04 | 2009-03-24 | Cisco Technology, Inc. | Method and system for managing power delivery for power over Ethernet systems |
US7451329B2 (en) | 2005-09-08 | 2008-11-11 | Cisco Technology, Inc. | Techniques for measuring network resistive loss within a power-sourcing apparatus |
ITTO20050712A1 (en) | 2005-10-07 | 2007-04-08 | Ansaldo Ricerche S P A | ELECTRICITY GENERATION SYSTEM |
ITTO20050711A1 (en) * | 2005-10-07 | 2007-04-08 | Ansaldo Ricerche S P A | RECONFIGURABLE ENERGY DISTRIBUTION NETWORK |
US7262974B2 (en) * | 2005-10-28 | 2007-08-28 | Cisco Technology, Inc. | Techniques for alleviating the need for DC blocking capacitors in high-speed differential signal pairs |
US7397228B2 (en) * | 2006-01-12 | 2008-07-08 | International Business Machines Corporation | Programmable on-chip sense line |
US7818591B2 (en) * | 2007-04-11 | 2010-10-19 | Cisco Technology, Inc. | Techniques for measuring network channel resistive loss between a power-sourcing apparatus and a powered device |
CN100581020C (en) * | 2007-04-24 | 2010-01-13 | 北京四方继保自动化股份有限公司 | Method for realizing line high-resistance fast trip using zero-sequence loop fuction |
US9917436B2 (en) * | 2007-10-30 | 2018-03-13 | General Electric Company | System and method for control of power distribution |
CN101911421B (en) * | 2007-12-12 | 2015-05-06 | Abb研究有限公司 | Method for electric power rehabilitation in electric power distribution systems |
US8068937B2 (en) * | 2008-02-09 | 2011-11-29 | Stephen Spencer Eaves | Power distribution system with fault protection using energy packet confirmation |
US8180481B2 (en) * | 2008-08-06 | 2012-05-15 | Consolidated Edison Company Of New York, Inc. | Autoloop system and method of operation |
US7893563B2 (en) * | 2008-10-07 | 2011-02-22 | Consolidated Edison Company Of New York, Inc. | Electrical distribution feeder system and method of operation |
US8730837B2 (en) | 2010-06-21 | 2014-05-20 | General Electric Company | System and method for control of power distribution networks |
CN102496915B (en) * | 2011-11-29 | 2014-05-28 | 航天科工深圳(集团)有限公司 | Power distribution network fault processing method and system thereof |
CN103022991A (en) * | 2012-11-20 | 2013-04-03 | 山东电力集团公司 | Power distribution network fault quick response method based on controller area network (CAN) bus expansion |
CN104426142B (en) * | 2013-09-10 | 2018-05-01 | 西门子公司 | There is the protective device of directional zone select interlock |
CN104991628B (en) * | 2015-06-30 | 2020-05-26 | 北京百度网讯科技有限公司 | Intelligent power monitoring system and monitoring method for data center |
RU2018103236A (en) * | 2015-07-22 | 2019-08-22 | Гринстар Ресерч Энд Девелопмент Индиа Прайвит Лимитед | INTELLIGENT DIAGRAM AND METHOD OF PROTECTION AGAINST VOLTAGE |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5341268A (en) * | 1991-12-16 | 1994-08-23 | Kabushiki Kaisha Toshiba | Method of and system for disconnecting faulty distribution line section from power distribution line |
-
1996
- 1996-11-29 US US08/758,406 patent/US5784237A/en not_active Expired - Lifetime
-
1997
- 1997-11-26 CA CA002222674A patent/CA2222674C/en not_active Expired - Lifetime
Also Published As
Publication number | Publication date |
---|---|
US5784237A (en) | 1998-07-21 |
CA2222674A1 (en) | 1998-05-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA2222674C (en) | Control method and apparatus for power distribution network | |
US10418804B2 (en) | Fault protection system and method for an electrical power distribution system | |
US5940260A (en) | Apparatus and method for distributing electrical power | |
EP0482767B1 (en) | Fault detection arrangement | |
CA2677330C (en) | Fuse saving power distribution system fault protection | |
US6347027B1 (en) | Method and apparatus for automated reconfiguration of an electric power distribution system with enhanced protection | |
US6816757B1 (en) | Control unit for a power-distribution network | |
EP1151517B1 (en) | Method and apparatus for automated reconfiguration of an electric power distribution system with enhanced protection | |
Roberts et al. | Trip and restore distribution circuits at transmission speeds | |
JPH11299087A (en) | Bus protecting system for spot network power receiving equipment | |
JP4018497B2 (en) | Accident line selection relay device | |
JPH1014100A (en) | Ground self-breaking type automatic section switch | |
JPH06311655A (en) | Single operation detector | |
JPH09233685A (en) | Distribution line section switch controller | |
Zimmerman et al. | Trip and restore distribution circuits at transmission speeds | |
JPH0421317A (en) | Detecting and disconnecting method for predictive ground-fault section of high voltage power distribution line | |
JPH02299423A (en) | Control device of distribution line | |
JPH07274375A (en) | Protective relay with automatic setting function and setting method of protective coordination |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
EEER | Examination request | ||
MKEX | Expiry |
Effective date: 20171127 |
|
MKEX | Expiry |
Effective date: 20171127 |