CA2430796C - Systems and methods for controlling flow and access in multilateral completions - Google Patents

Systems and methods for controlling flow and access in multilateral completions Download PDF

Info

Publication number
CA2430796C
CA2430796C CA2430796A CA2430796A CA2430796C CA 2430796 C CA2430796 C CA 2430796C CA 2430796 A CA2430796 A CA 2430796A CA 2430796 A CA2430796 A CA 2430796A CA 2430796 C CA2430796 C CA 2430796C
Authority
CA
Canada
Prior art keywords
tubular string
flow
interior
junction device
flow passage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CA2430796A
Other languages
French (fr)
Other versions
CA2430796A1 (en
Inventor
Joseph Eli Hess
Benji L. Smith
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Halliburton Energy Services Inc
Original Assignee
Halliburton Energy Services Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Halliburton Energy Services Inc filed Critical Halliburton Energy Services Inc
Publication of CA2430796A1 publication Critical patent/CA2430796A1/en
Application granted granted Critical
Publication of CA2430796C publication Critical patent/CA2430796C/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B41/00Equipment or details not covered by groups E21B15/00 - E21B40/00
    • E21B41/0035Apparatus or methods for multilateral well technology, e.g. for the completion of or workover on wells with one or more lateral branches
    • E21B41/0042Apparatus or methods for multilateral well technology, e.g. for the completion of or workover on wells with one or more lateral branches characterised by sealing the junction between a lateral and a main bore
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B41/00Equipment or details not covered by groups E21B15/00 - E21B40/00
    • E21B41/0035Apparatus or methods for multilateral well technology, e.g. for the completion of or workover on wells with one or more lateral branches
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/12Methods or apparatus for controlling the flow of the obtained fluid to or in wells

Abstract

Systems and methods for controlling flow and access in multilateral completions provide for controlling rates of flow from intersecting wellbores. In a described embodiment, flow from a branch wellbore and flow from a lower parent wellbore are controlled by respective remotely actuated flow control devices interconnected in a production tubing string in the parent wellbore. Access is provided to both of the wellbores below an intersection of the wellbores.

Description

SYSTEMS AND METHODS FOR CONTROLLING FLOW AND
ACCESS IN MULTILATERAL COMPLETIONS
BACKGROUND

The present invention relates generally to operations performed and equipment utilized in conjunction with subterranean wells and, in an embodiment described herein, more particularly provides systems and methods for controlling flow and access in multilateral completions.

Multilateral wells typically have one or more branch or "lateral" wellbore branching off from a main or "parent" wellbore. An intersection between main and io branch wellbores is known as a "wellbore junction." Completion equipment positioned at a wellbore junction for controlling access and/or flow between the wellbores may also be referred to as a "junction."

Various methods of completing wellbore junctions provide for access and/or flow between the wellbores, but do not include provisions for remotely varying the rate of fluid produced from each of the wellbores. Other methods of completing wellbore junctions provide for remotely varying the rate of fluid produced from each of the wellbores, but do not permit access between the wellbores. In some such completions, the entire completion string must be retrieved from the well in order to gain access to the branch wellbore, or to the main wellbore below the junction.

In view of the above, it will be readily appreciated that it would be highly desirable to provide a method wherein flow and access are permitted between main and branch wellbores, and wherein a rate of fluid produced from each of the wellbores may be remotely regulated. It would also be desirable to provide completion apparatus which permits remotely operated flow control devices thereof to be retrieved from the well separate from the remainder of the junction. It would further be desirable to otherwise provide improved systems and methods for controlling flow and access in multilateral completions.
SUMMARY
In carrying out the principles of the present invention, in accordance with particular embodiments thereof, systems and methods are provided for controlling flow and access in multilateral completions. These embodiments utilize multiple flow control devices to regulate flow between a tubular sting and respective intersecting wellbores. The tubular string is engaged with a junction device, which provides separate passages for flow between the flow control devices and the respective wellbores.

In one aspect of the invention, a method of controlling flow in a well having intersecting first and second wellbores is provided. The method includes the steps of positioning a junction device in the well, the junction device having first and second separate flow passages formed therethrough, and engaging a tubular string with the junction device. The first flow passage communicates with an interior of the tubular string, and the second flow passage communicates with an annulus formed between the tubular string and the first wellbore, when the engaged tubular string and junction device are positioned in the well.

Fluid produced into the first wellbore through the first flow passage is flowed to an exterior of the tubular string, and then into the tubular string via a first flow control device. Fluid produced into the second wellbore is flowed through the second flow passage, then into the annulus, and then into the tubular string via a second flow control device.
In another aspect of the invention, another method of controlling flow in a well having intersecting first and second wellbores is provided. The method includes the steps of positioning a junction device in the well, the junction device having first and second flow passages formed therein, and engaging a tubular string with the junction device, the tubular string having a first flow control device interconnected therein operative to regulate flow between the first flow passage and an interior of the tubular string, and the tubular string having a second flow control device interconnected therein operative to regulate flow between the second flow passage and the tubular string interior. Fluid flowing between an interior of the tubular io string and the first flow passage is isolated, external to the tubular string, from fluid flowing between the interior of the tubular string and the second flow passage.

In yet another aspect of the invention, a system for controlling flow in a well having an intersection between first and second wellbores is provided. The system includes a tubular string positioned in the first wellbore, the tubular string having first and second flow control devices interconnected therein. A junction device is engaged with the tubular string and has first and second flow passages therein.

The first flow passage provides fluid communication between the first flow control device and the first wellbore below the intersection. The second flow passage provides fluid communication between the second flow control device and the second wellbore below the intersection. A window is formed in the junction device, thereby providing access between the first and second flow passages.

In a further aspect of the invention, another system for controlling flow in a well having an intersection between first and second wellbores is provided.
The system includes a junction device having first and second flow passages formed therein, the first flow passage being in fluid communication with the first wellbore below the intersection, and the second flow passage being in fluid communication with the second wellbore below the intersection. A tubular string has first and second flow control devices interconnected therein. The first flow control device regulates flow between the first flow passage and an interior of the tubular string.
The second flow control device regulates flow between the second flow passage and the tubular string interior.

These and other features, advantages, benefits and objects of the present invention will become apparent to one of ordinary skill in the art upon careful 1o consideration of the detailed description of representative embodiments of the invention hereinbelow and the accompanying drawings.

BRIEF DESCRIPTION OF THE DRAWINGS

FIG. 1 is a cross-sectional view of a first method and apparatus embodying principles of the present invention;

FIG. 2 is a cross-sectional view of a second method and apparatus embodying principles of the present invention;

FIG. 3 is a side elevational view of a deflector which may be used in the first and second methods.

DETAILED DESCRIPTION

Representatively illustrated in FIG. 1 is a method io which embodies principles of the present invention. In the following description of the method 10 and other systems and methods described herein, directional terms, such as "upper", "lower", etc., are used only for convenience in referring to the accompanying drawings. Additionally, it is to be understood that the various embodiments of the present invention described herein may be utilized in various orientations, such as inclined, inverted, horizontal, vertical, etc., and in various configurations, without departing from the principles of the present invention.

The method io utilizes a completion system 12 which includes a tubular string 14 engaged with a junction device 16 in a well. Preferably, the junction device 16 is positioned at an intersection between a parent wellbore 18 and a branch wellbore 20 prior to conveying the tubular string 14 into the well, but the junction device and tubular string could be conveyed into the well together, if desired. A lower end of the tubular string 14 is releasably sealingly received in a seal bore 26 formed in the io junction device 16.

As depicted in FIG. 1, the parent wellbore 18 is cased both above and below its intersection with the branch wellbore 20. The branch wellbore 20 is depicted as being unlined. However, none, all or any portions of the parent and branch wellbores 18, 20 may be cased or lined in keeping with the principles of the invention.

The junction device 16 is secured in the parent wellbore 18 by packers or other anchoring devices 28, 3o above and below the junction device, respectively. As used herein, the term "above" means in a direction toward the earth's surface along a wellbore, and the term "below" means in a direction away from the earth's surface along a wellbore, regardless of actual depth beneath the earth's surface. Note that the packers 28, 30 seal between the junction device 16 and the parent wellbore above and below the intersection between the wellbores 18, 20, respectively.
The junction device 16 has flow passages 22, 24 formed therein. The flow passage 22 communicates with the parent wellbore 18 below the lower packer 30.
The flow passage 24 communicates with the branch wellbore 20. In a producing well, fluid produced into the parent wellbore 18 below the lower packer 30 will flow into the passage 22 and upward into the lower end of the tubular string 14.
Fluid produced into the branch wellbore 20 will flow into the passage 24 and upward into an annulus 32 between the tubular string 14 and the parent wellbore 18. Of course, if the well is an injection well, these flow directions would be reversed. For convenience, the remainder of this detailed description will be given as if the well is a 1o producing well, but it is to be understood that the principles of the invention may be applied to injection wells, also.

The junction device 16 has a window or other opening 34 formed therein between the first and second flow passages 22, 24. The window 34 permits access between the first and second passages 22, 24 when it is desired to convey equipment, such as logging tools, screens, perforating guns, tubing strings, various items of stimulation and completion equipment, etc. into the branch wellbore 20. During normal production operations, however, the window 34 is blocked by a sleeve or other closure member 36 sealingly received in the junction device 16.

The sleeve 36 isolates fluid in the passage 22 from fluid in the passage 24 by preventing fluid flow through the window 34. The passage 22 extends through an interior of the sleeve 36. Other types of closure members may be utilized without departing from the principles of the invention, for example, a closure member which rotates within the junction device 16 rather than displacing axially within the junction device.
Preferably, the sleeve 36 is retrievable from the well through the interior of the tubular string 14. Thus, it is not necessary for the tubular string 14 to be retrieved from the well in order to provide access to the branch wellbore 20. After such access is no longer needed, or it is otherwise desired to isolate the flow passages 22, 24 from each other, the sleeve 36 may be installed in the junction device 16 by conveying it through the tubular string 14.

As described above, fluid flowed into the passage 22 from the parent wellbore 18 below the lower packer 30 then flows through the sleeve 36 and into the interior of the tubular string 14. A retrievable plug 38 isolates a lower portion of the tubular io string interior from an upper portion. However, openings 40 formed through a sidewall of the tubular string 14 permit the fluid to flow out of the tubular string 14 and into the interior of an enclosure, housing or shroud 42 outwardly surrounding the openings and a flow control device 44 interconnected in the tubular string.

The enclosure 42 isolates the fluid flowing therein from fluid in the annulus 32. The flow control device 44 regulates the flow of fluid from the interior of the enclosure 42 to the interior of the tubular string 14. Preferably, the flow control device 44 is a remotely actuatable choke. Electrical, hydraulic and/or fiber optic lines 46 extend to a remote location, such as the earth's surface or another position in the well, for transmitting signals and/or power to actuate the flow control device 44.

Other means of actuating the flow control device 44, such as via acoustic or electromagnetic telemetry, may be used in keeping with the principles of the invention.
Preferably, the flow control device 44 has a relatively large internal bore therethrough, so that the plug 38 and/or sleeve 36 may be retrieved and installed through the flow control device. However, such an internal bore through the flow control device 44 is not necessary. One acceptable remotely actuatable choke which may be used for the flow control device 44 is the Interval Control Valve available from WellDynamics, Inc. of Houston, Texas.

Another flow control device 48 regulates the flow of fluid from the annulus 32 to the interior of the tubular string 14. The flow control device 48 may be similar or identical to the flow control device 44 described above, or it may be different.

1o Preferably, the flow control device 48 is a remotely actuatable choke controlled via the lines 46, similar to the flow control device 44.

If the tubular string 14 is conveyed into the well after the junction device 16 is positioned at the wellbore intersection, then the lower end of the tubular string is sealingly received in the seal bore 26 of the junction device. An upper packer or other anchoring device 50 interconnected in the tubular string 14 is then set in the parent wellbore 18 above the upper flow control device 48. In this manner, the tubular string 14 is secured in engagement with the junction device 16, and the annulus 32 between the packers 30, 50 is isolated from other portions of the parent wellbore 18.

It will be readily appreciated by one skilled in the art that the method 1o and system 12 provide substantial benefits in multilateral completions. The flow control devices 44, 48 permit independent remote control of the respective rates of flow from the parent wellbore 18 below the lower packer 3o and from the branch wellbore 20.
If the flow control devices 44, 48 require maintenance, or if for any other reason it is desired to pull the tubular string 14 from the well, the flow control devices and associated lines 46 may be conveniently retrieved together, rather than having to disconnect and later reconnect lines in the well if the flow control devices were not retrieved with the tubular string. However, the flow control devices 44, 48 could be retrieved from the well separate from the remainder of the tubular string 14 without departing from the principles of the invention.

The plug 38 and the sleeve 36 may be conveniently retrieved from the well through the tubular string 14. Thus, it is not necessary for the tubular string 14 to be 1o pulled from the well in order to provide access to the branch wellbore 20.
When such access is no longer needed, the sleeve 36 and plug 38 may be reinstalled through the tubular string 14 to again isolate the flow passages 22, 24 from each other.
However, it should be understood that retrieval or installation of the plug 38 and/or sleeve 36 through the tubular string 14 is not necessary in keeping with the principles of the invention.

Referring additionally now to FIG. 2, another method 6o embodying principles of the invention is representatively illustrated. The method 6o is similar in many respects to the method 1o described above. For convenience, elements of the method 6o which are similar to those described above for the method 1o are indicated in FIG. 2 using the same reference numbers.

The method 6o differs from the method 1o in substantial part in that a completion system 62 is utilized which includes a junction device 64 having individual tubing strings or other conduits 66, 68 connected at a lower end thereof.
When the junction device 64 is conveyed into the well, the tubing string 68 (which is preferably, although not necessarily, longer than the tubing string 66) is deflected by a whipstock or other deflector 70 into the branch wellbore 20. The lower end of the tubing string 68 is eventually sealingly received in a seal bore of a packer 72 set in the branch wellbore 20. The lower end of the tubing string 66 is received in a seal bore of the deflector 70.

The packer 72 isolates the branch wellbore 20 below the packer from the intersection of the wellbores 18, 20. Another packer 74 attached to the deflector 70 isolates the wellbore intersection from the parent wellbore 18 below the packer. Yet to another packer 76 attached to the junction device 64 isolates the wellbore junction from the parent wellbore 18 above the packer.

Thus, the multilateral completion achieved by the method 6o is of the type known to those skilled in the art as a "level 5" completion. The method to described above achieves a multilateral completion of the type known as a "level 4"
completion, since the wellbore intersection is not isolated from the branch wellbore 20 below the intersection. Any level of multilateral completion, such as a level 3 or a level 6 completion, may be achieved in keeping with the principles of the invention.

The tubing string 66 provides a conduit for flow of fluid from the parent wellbore 18 below the packer 74 to a flow passage 78 formed in the junction device 64. The tubing string 68 provides a conduit for flow of fluid from the branch wellbore 20 below the packer 72 to a flow passage 8o formed in the junction device 64. A window 82 is formed in the junction device 64 between the passages 78, 80.
The window 82 is normally blocked by the sleeve 36, thereby preventing access and fluid flow between the passages 78, 80. However, when the sleeve 36 is retrieved from the junction device 64, equipment may be conveyed through the tubular string 14, into the passage 78, deflected through the window 82 into the passage 80, into the tubing string 68, and into the branch wellbore 20. This may be conveniently accomplished without pulling the tubular string 14 from the well.

The passage 78 communicates with the interior of the tubular string 14, similar to the manner in which the passage 22 communicates with the interior of the tubular string in the method 10. Fluid flows from the passage 78 to the interior of 1o the tubular string, out through the openings 40 into the interior of the enclosure 42, and then into the tubular string via the flow control device 44.

The passage 8o communicates with the annulus 32 above the packer 76. Fluid flows from the passage 8o to the annulus 32, and then into the tubular string via the flow control device 48. Note that the enclosure 42 isolates fluid in the annulus 32 from fluid in the interior of the enclosure, thereby permitting flow of these respective fluids to be independently regulated by the flow control devices 44, 48.

Referring additionally now to FIG. 3, a deflector 9o is representatively illustrated. The deflector 9o may be used in the methods 10, 6o when it is desired to deflect equipment through the respective windows 34, 82. Specifically, the sleeve 36 may be retrieved from the junction device 16 or 64, and replaced with the deflector 9o. As with the sleeve 36, the deflector 9o is preferably retrievable and installable through the tubular string 14.
The deflector 9o includes an upper inclined surface 92 for laterally deflecting equipment which contacts the surface. The deflector 9o may also include an internal passage 94, so that the junction device passages 22, 78 may extend therethrough when the deflector is installed in the respective junction devices 16, 64. The deflector passage 94 may be dimensioned so that larger equipment is deflected off of the surface 92, while smaller equipment is permitted to pass through the passage, thereby enabling equipment to be selectively conveyed into the branch wellbore 20, or into the parent wellbore 18 below the junction device as desired.

Thus have been described the methods 10, 6o and completion systems 12, 62 1o which provide improved control of access and flow in multilateral completions. The methods 10, 6o and systems 12, 62 permit independent control of flow from each of intersecting wellbores 18, 20 using remotely actuatable flow control devices 44, 48, which may be retrieved from the well with the tubular string 14 without also retrieving the junction devices 16, 64. Access to the branch wellbore 20 and to the parent wellbore 18 below the wellbore intersection may be conveniently obtained without retrieving the tubular string 14 from the well.

Of course, a person skilled in the art would, upon a careful consideration of the above description of representative embodiments of the invention, readily appreciate that many modifications, additions, substitutions, deletions, and other changes may be made to these specific embodiments, and such changes are contemplated by the principles of the present invention. Accordingly, the foregoing detailed description is to be clearly understood as being given by way of illustration and example only, the spirit and scope of the present invention being limited solely by the appended claims and their equivalents.

Claims (56)

1. A method of controlling flow in a well having intersecting first and second wellbores, the method comprising the steps of:

positioning a junction device in the well, the junction device having first and second separate flow passages formed therethrough;

engaging a tubular string with the junction device, so that the first flow passage communicates with an interior of the tubular string, and the second flow passage communicates with an annulus formed between the tubular string and the first wellbore, when the engaged tubular string and junction device are positioned in the well;

flowing fluid produced into the first wellbore through the first flow passage to an exterior of the tubular string, and then into the tubular string via a first flow control device;

flowing fluid produced into the second wellbore through the second flow passage, then into the annulus, and then into the tubular string via a second flow control device; and providing access between the first and second flow passages within the junction device via a window formed within the junction device between the first and second separate flow passages.
2. The method according to claim 1, further comprising the step of blocking access through the window by displacing a closure member in the junction device.
3. The method according to claim 2, wherein the displacing step is performed by installing the closure member into the junction device while the junction device is positioned in the well.
4. The method according to claim 2, wherein the access blocking step further comprises preventing fluid flow through the window between the first and second flow passages.
5. The method according to claim 1, wherein in the step of flowing fluid produced into the first wellbore, the fluid is flowed out of the tubular string into an interior of an enclosure isolated from the annulus, and then the fluid is flowed from the interior of the enclosure and through the first flow control device into the tubular string.
6. The method according to claim 1, wherein in the step of flowing fluid produced into the second wellbore, a tubing string is interconnected between the junction device and a sealing device in the second wellbore, the tubing string providing a conduit for flow between the second flow passage and the second wellbore below the sealing device.
7. The method according to claim 1, wherein the step of flowing fluid produced into the first wellbore further comprises remotely actuating the first flow control device to regulate flow therethrough.
8. The method according to claim 1, wherein the step of flowing fluid produced into the second wellbore further comprises remotely actuating the second flow control device to regulate flow therethrough.
9. The method according to claim 1, wherein in the steps of flowing fluid produced into the first and second wellbores, the first and second flow control devices are each remotely actuated to regulate flow therethrough.
10. The method according to claim 1, wherein in the step of flowing fluid produced into the first wellbore, a tubing string is interconnected between the junction device and a sealing device in the first wellbore, the tubing string providing a conduit for flow between the first flow passage and the first wellbore below the sealing device.
11. A method of controlling flow in a well having intersecting first and second wellbores, the method comprising the steps of:

positioning a junction device in the well, the junction device having first and second flow passages formed therethrough;

engaging a tubular string with the junction device, so that the first flow passage communicates with an interior of the tubular string, and the second flow passage communicates with an annulus formed between the tubular string and the first wellbore, when the engaged tubular string and junction device are positioned in the well;

flowing fluid produced into the first wellbore through the first flow passage to an exterior of the tubular string, and then into the tubular string via a first flow control device; and flowing fluid produced into the second wellbore through the second flow passage, then into the annulus, and then into the tubular string via a second flow control device, the engaging step further comprising sealingly engaging the tubular string with the junction device after the positioning step.
12. A method of controlling flow in a well having intersecting first and second wellbores, the method comprising the steps of:

positioning a junction device in the well, the junction device having first and second flow passages formed therethrough;

engaging a tubular string with the junction device, so that the first flow passage communicates with an interior of the tubular string, and the second flow passage communicates with an annulus formed between the tubular string and the first wellbore, when the engaged tubular string and junction device are positioned in the well;

flowing fluid produced into the first wellbore through the first flow passage to an exterior of the tubular string, and then into the tubular string via a first flow control device;

flowing fluid produced into the second wellbore through the second flow passage, then into the annulus, and then into the tubular string via a second flow control device the engaging step further comprises sealingly engaging the tubular string with the junction device after the positioning step; and disengaging the tubular string from the junction device and retrieving the first and second flow control devices with the tubular string from the well separate from the junction device.
13. A method of controlling flow in a well having intersecting first and second wellbores, the method comprising the steps of:

positioning a junction device in the well, the junction device having first and second separate flow passages formed therethrough;

engaging a tubular string with the junction device, so that the first flow passage communicates with an interior of the tubular string, and the second flow passage communicates with an annulus formed between the tubular string and the first wellbore, when the engaged tubular string and junction device are positioned in the well;

flowing fluid produced into the first wellbore through the first flow passage to an exterior of the tubular string, and then into the tubular string via a first flow control device;

flowing fluid produced into the second wellbore through the second flow passage, then into the annulus, and then into the tubular string via a second flow control device, the engaging step further comprising sealingly engaging the tubular string with the junction device after the positioning step; and installing a deflector in the junction device to thereby deflect equipment from the first separate flow passage into the second separate flow passage via a window formed therebetween.
14. A method of controlling flow in a well having intersecting first and second wellbores, the method comprising the steps of:

positioning a junction device in the well, the junction device having first and second separate flow passages formed therein;

engaging a tubular string with the junction device, the tubular string having a first flow control device interconnected therein operative to regulate flow between the first flow passage and an interior of the tubular string, and the tubular string having a second flow control device interconnected therein operative to regulate flow between the second flow passage and the tubular string interior;
isolating, external to the tubular string, fluid flowing between an interior of the tubular string and the first flow passage from fluid flowing between the interior of the tubular string and the second flow passage; and providing access between the first and second separate flow passages within the junction device via a window formed between the first and second separate flow passages.
15. The method according to claim 14, further comprising the step of blocking access through the window by displacing a closure member in the junction device.
16. The method according to claim 15, wherein the displacing step is performed by installing the closure member into the junction device while the junction device is positioned in the well.
17. The method according to claim 15, wherein the access blocking step further comprises preventing fluid flow through the window between the first and second flow passages.
18. The method according to claim 14, wherein the isolating step further comprises flowing fluid through the first flow control device between an interior of an enclosure and the interior of the tubular string, the enclosure interior being isolated from an annulus between the tubular string and the first wellbore, and the enclosure interior being in fluid communication with the first flow passage.
19. The method according to claim 18, wherein the isolating step further comprises providing fluid communication between the second flow passage and the annulus.
20. The method according to claim 14, further comprising the step of interconnecting a tubing string between the junction device and a sealing device in the second wellbore, the tubing string providing a conduit for flow between the second flow passage and the second wellbore below the sealing device.
21. The method according to claim 14, further comprising the step of remotely actuating the first flow control device to regulate flow therethrough.
22. The method according to claim 14, further comprising the step of remotely actuating the second flow control device to regulate flow therethrough.
23. The method according to claim 14, wherein in the engaging step, each of the first and second flow control devices is remotely actuated.
24. The method according to claim 14, further comprising the step of interconnecting a tubing string between the junction device and a sealing device in the first wellbore, the tubing string providing a conduit for flow between the first flow passage and the first wellbore below the sealing device.
25. A method of controlling flow in a well having intersecting first and second wellbores, the method comprising the steps of:

positioning a junction device in the well, the junction device having first and second flow passages formed therein;

engaging a tubular string with the junction device, the tubular string having a first flow control device interconnected therein operative to regulate flow between the first flow passage and an interior of the tubular string, and the tubular string having a second flow control device interconnected therein operative to regulate flow between the second flow passage and the tubular string interior; and isolating, external to the tubular string, fluid flowing between an interior of the tubular string and the first flow passage from fluid flowing between the interior of the tubular string and the second flow passage, the engaging step further comprising sealingly engaging the tubular string with the junction device after the positioning step.
26. A method of controlling flow in a well having intersecting first and second wellbores, the method comprising the steps of:

positioning a junction device in the well, the junction device having first and second flow passages formed therein;

engaging a tubular string with the junction device, the tubular string having a first flow control device interconnected therein operative to regulate flow between the first flow passage and an interior of the tubular string, and the tubular string having a second flow control device interconnected therein operative to regulate flow between the second flow passage and the tubular string interior;

isolating, external to the tubular string, fluid flowing between an interior of the tubular string and the first flow passage from fluid flowing between the interior Of the tubular string and the second flow passage; and disengaging the tubular string from the junction device and retrieving the first and second flow control devices with the tubular string from the well separate from the junction device.
27. A method of controlling flow in a well having intersecting first and second wellbores, the method comprising the steps of:

positioning a junction device in the well, the junction device having first and second separate flow passages formed therein and communicated by a window extending therebetween;

engaging a tubular string with the junction device, the tubular string having a first flow control device interconnected therein operative to regulate flow between the first flow passage and an interior of the tubular string, and the tubular string having a second flow control device interconnected therein operative to regulate flow between the second flow passage and the tubular string interior;

isolating, external to the tubular string, fluid flowing between an interior of the tubular string and the first flow passage from fluid flowing between the interior of the tubular string and the second flow passage; and installing a deflector in the junction device to thereby deflect equipment from the first flow passage into the second flow passage via the window.
28. A system for controlling flow in a well having an intersection between first and second wellbores, the system comprising:

a tubular string positioned in the first wellbore, the tubular string having first and second flow control devices interconnected therein; and a junction device engaged with the tubular string and having first and second separate flow passages therein, the first flow passage providing fluid communication between the first flow control device and the first wellbore below the intersection, the second flow passage providing fluid communication between the second flow control device and the second wellbore below the intersection, and wherein a window formed in the junction device provides access between the first and second separate flow passages.
29. The system according to claim 28, wherein each of the first and second flow control devices regulates flow between an interior and an exterior of the tubular string.
30. The system according to claim 28, wherein the first flow control device regulates flow between an interior of the tubular string and an interior of an enclosure external to the tubular string.
31. The system according to claim 30, wherein the interior of the enclosure is isolated from an annulus between the tubular string and the first wellbore.
32. The system according to claim 31, wherein fluid flows in the annulus between the second flow passage and the second flow control device.
33. The system according to claim 30, wherein the enclosure externally surrounds the first flow control device.
34. The system according to claim 28, wherein each of the first and second flow control devices is remotely actuated.
35. The system according to claim 28, wherein the tubular string is releasably sealingly engaged with the junction device, the first flow passage being in fluid communication with an interior of the tubular string.
36. The system according to claim 35, wherein the second flow passage is in fluid communication with an annulus between the tubular string and the first wellbore.
37. The system according to claim 36, wherein the first flow passage is isolated from the annulus.
38. The system according to claim 28, wherein the tubular string is retrievable from the well separate from the junction device.
39. The system according to claim 28, further comprising a closure member blocking access through the window between the first and second flow passages.
40. The system according to claim 39, wherein the closure member is sealed within the junction device so that fluid flow through the window between the first and second flow passages is prevented.
41. A system for controlling flow in a well having an intersection between first and second wellbores, the system comprising:

a junction device having first and second separate flow passages formed therein, the first flow passage being in fluid communication with the first wellbore below the intersection, and the second flow passage being in fluid communication with the second wellbore below the intersection, the junction device including a window formed between the first and second separate flow passages; and a tubular string having first and second flow control devices interconnected therein, the first flow control device regulating flow between the first flow passage and an interior of the tubular string, and the second flow control device regulating flow between the second flow passage and the tubular string interior.
42. The system according to claim 41, wherein fluid flowing between the first flow passage and the tubular string interior is isolated, external to the tubular string, from fluid flowing between the second flow passage and the tubular string interior.
43. The system according to claim 41, further comprising a deflector installed in the junction device, the deflector deflecting equipment through the window between the first and second flow passages.
44. The system according to claim 43, wherein the deflector is retrievable from the well through the tubular string.
45. The system according to claim 41, further comprising a closure member blocking access through the window between the first and second flow passages.
46. The system according to claim 45, wherein the closure member is retrievable from the well through the tubular string.
47. The system according to claim 45, wherein the closure member further prevents fluid flow through the window between the first and second flow passages.
48. The system according to claim 41, further comprising an enclosure having an interior in direct communication with an exterior of the first flow control device, the interior of the enclosure being in communication with the first flow passage, and the first flow control device regulating flow between the interior of the enclosure and the tubular string interior.
49. The system according to claim 48, wherein the enclosure interior is isolated from an annulus between the tubular string and the first wellbore.
50. The system according to claim 49, wherein fluid flows in the annulus between the second flow passage and the second flow control device.
51. The system according to claim 41, wherein each of the first and second flow control devices is actuated to regulate flow therethrough from a remote location.
52. A system for controlling flow in a well having an intersection between first and second wellbores, the system comprising:

a junction device having first and second flow passages formed therein, the first flow passage being in fluid communication with the first wellbore below the intersection, and the second flow passage being in fluid communication with the second wellbore below the intersection; and a tubular string having first and second flow control devices interconnected therein, the first flow control device regulating flow between the first flow passage and an interior of the tubular string, and the second flow control device regulating flow between the second flow passage and the tubular string interior, the tubular string being releasably sealingly engaged with the junction device, the tubular string being retrievable from the well separate from the junction device.
53. The system according to claim 52, wherein the first flow passage is placed in direct fluid communication with a first portion of the tubular string interior when the tubular string is engaged with the junction device.
54. The system according to claim 53, wherein each of the first and second flow control devices regulates fluid flow between a respective one of the first and second flow passages and a second portion of the tubular string interior.
55. The system according to claim 54, wherein the tubular string interior first portion is isolated from the tubular string interior second portion by a plug positioned in the tubular string interior.
56. The system according to claim 55, wherein the plug is retrievable from the well through the tubular string.
CA2430796A 2002-06-04 2003-06-03 Systems and methods for controlling flow and access in multilateral completions Expired - Lifetime CA2430796C (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US10/162,183 2002-06-04
US10/162,183 US6789628B2 (en) 2002-06-04 2002-06-04 Systems and methods for controlling flow and access in multilateral completions

Publications (2)

Publication Number Publication Date
CA2430796A1 CA2430796A1 (en) 2003-12-04
CA2430796C true CA2430796C (en) 2011-08-16

Family

ID=22584514

Family Applications (1)

Application Number Title Priority Date Filing Date
CA2430796A Expired - Lifetime CA2430796C (en) 2002-06-04 2003-06-03 Systems and methods for controlling flow and access in multilateral completions

Country Status (5)

Country Link
US (1) US6789628B2 (en)
BR (1) BR0301441A (en)
CA (1) CA2430796C (en)
GB (1) GB2389600B (en)
NO (2) NO335241B1 (en)

Families Citing this family (60)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7000695B2 (en) * 2002-05-02 2006-02-21 Halliburton Energy Services, Inc. Expanding wellbore junction
US7370705B2 (en) * 2002-05-06 2008-05-13 Baker Hughes Incorporated Multiple zone downhole intelligent flow control valve system and method for controlling commingling of flows from multiple zones
US6951252B2 (en) * 2002-09-24 2005-10-04 Halliburton Energy Services, Inc. Surface controlled subsurface lateral branch safety valve
US6840321B2 (en) * 2002-09-24 2005-01-11 Halliburton Energy Services, Inc. Multilateral injection/production/storage completion system
US6863126B2 (en) * 2002-09-24 2005-03-08 Halliburton Energy Services, Inc. Alternate path multilayer production/injection
US20050103497A1 (en) * 2003-11-17 2005-05-19 Michel Gondouin Downhole flow control apparatus, super-insulated tubulars and surface tools for producing heavy oil by steam injection methods from multi-lateral wells located in cold environments
US7159661B2 (en) * 2003-12-01 2007-01-09 Halliburton Energy Services, Inc. Multilateral completion system utilizing an alternate passage
US20050121190A1 (en) * 2003-12-08 2005-06-09 Oberkircher James P. Segregated deployment of downhole valves for monitoring and control of multilateral wells
US7409999B2 (en) * 2004-07-30 2008-08-12 Baker Hughes Incorporated Downhole inflow control device with shut-off feature
US7497264B2 (en) * 2005-01-26 2009-03-03 Baker Hughes Incorporated Multilateral production apparatus and method
US7942206B2 (en) 2007-10-12 2011-05-17 Baker Hughes Incorporated In-flow control device utilizing a water sensitive media
US8096351B2 (en) 2007-10-19 2012-01-17 Baker Hughes Incorporated Water sensing adaptable in-flow control device and method of use
US8312931B2 (en) 2007-10-12 2012-11-20 Baker Hughes Incorporated Flow restriction device
US8069921B2 (en) 2007-10-19 2011-12-06 Baker Hughes Incorporated Adjustable flow control devices for use in hydrocarbon production
US8544548B2 (en) 2007-10-19 2013-10-01 Baker Hughes Incorporated Water dissolvable materials for activating inflow control devices that control flow of subsurface fluids
US7913765B2 (en) 2007-10-19 2011-03-29 Baker Hughes Incorporated Water absorbing or dissolving materials used as an in-flow control device and method of use
US7793714B2 (en) * 2007-10-19 2010-09-14 Baker Hughes Incorporated Device and system for well completion and control and method for completing and controlling a well
US7775271B2 (en) * 2007-10-19 2010-08-17 Baker Hughes Incorporated Device and system for well completion and control and method for completing and controlling a well
US7891430B2 (en) * 2007-10-19 2011-02-22 Baker Hughes Incorporated Water control device using electromagnetics
US7784543B2 (en) 2007-10-19 2010-08-31 Baker Hughes Incorporated Device and system for well completion and control and method for completing and controlling a well
US7775277B2 (en) 2007-10-19 2010-08-17 Baker Hughes Incorporated Device and system for well completion and control and method for completing and controlling a well
US7789139B2 (en) * 2007-10-19 2010-09-07 Baker Hughes Incorporated Device and system for well completion and control and method for completing and controlling a well
US7918272B2 (en) 2007-10-19 2011-04-05 Baker Hughes Incorporated Permeable medium flow control devices for use in hydrocarbon production
US7913755B2 (en) * 2007-10-19 2011-03-29 Baker Hughes Incorporated Device and system for well completion and control and method for completing and controlling a well
US7918275B2 (en) 2007-11-27 2011-04-05 Baker Hughes Incorporated Water sensitive adaptive inflow control using couette flow to actuate a valve
NO337784B1 (en) * 2008-03-12 2016-06-20 Statoil Petroleum As System and method for controlling the fluid flow in branch wells
US8839849B2 (en) 2008-03-18 2014-09-23 Baker Hughes Incorporated Water sensitive variable counterweight device driven by osmosis
US7992637B2 (en) 2008-04-02 2011-08-09 Baker Hughes Incorporated Reverse flow in-flow control device
US8931570B2 (en) 2008-05-08 2015-01-13 Baker Hughes Incorporated Reactive in-flow control device for subterranean wellbores
US8171999B2 (en) * 2008-05-13 2012-05-08 Baker Huges Incorporated Downhole flow control device and method
US20090283256A1 (en) * 2008-05-13 2009-11-19 Baker Hughes Incorporated Downhole tubular length compensating system and method
US8113292B2 (en) 2008-05-13 2012-02-14 Baker Hughes Incorporated Strokable liner hanger and method
US7762341B2 (en) 2008-05-13 2010-07-27 Baker Hughes Incorporated Flow control device utilizing a reactive media
US8555958B2 (en) 2008-05-13 2013-10-15 Baker Hughes Incorporated Pipeless steam assisted gravity drainage system and method
US7789152B2 (en) * 2008-05-13 2010-09-07 Baker Hughes Incorporated Plug protection system and method
US8056627B2 (en) 2009-06-02 2011-11-15 Baker Hughes Incorporated Permeability flow balancing within integral screen joints and method
US8151881B2 (en) 2009-06-02 2012-04-10 Baker Hughes Incorporated Permeability flow balancing within integral screen joints
US8132624B2 (en) 2009-06-02 2012-03-13 Baker Hughes Incorporated Permeability flow balancing within integral screen joints and method
US8893809B2 (en) 2009-07-02 2014-11-25 Baker Hughes Incorporated Flow control device with one or more retrievable elements and related methods
US8550166B2 (en) 2009-07-21 2013-10-08 Baker Hughes Incorporated Self-adjusting in-flow control device
US9016371B2 (en) 2009-09-04 2015-04-28 Baker Hughes Incorporated Flow rate dependent flow control device and methods for using same in a wellbore
US8967277B2 (en) * 2011-06-03 2015-03-03 Halliburton Energy Services, Inc. Variably configurable wellbore junction assembly
US9200482B2 (en) 2011-06-03 2015-12-01 Halliburton Energy Services, Inc. Wellbore junction completion with fluid loss control
WO2015012821A1 (en) * 2013-07-24 2015-01-29 Halliburton Energy Services, Inc. Production filtering systems and methods
WO2015012847A1 (en) * 2013-07-25 2015-01-29 Halliburton Energy Services, Inc. Expandable and variable-length bullnose assembly for use with a wellbore deflector assembly
AU2013394891B2 (en) * 2013-07-25 2016-05-26 Halliburton Energy Services, Inc. Adjustable bullnose assembly for use with a wellbore deflector assembly
AU2013394890B2 (en) * 2013-07-25 2016-05-19 Halliburton Energy Services, Inc. Deflector assembly for a lateral wellbore
CN105358788B (en) * 2013-07-25 2018-07-17 哈里伯顿能源服务公司 With the inflatable outer circle angular component that well bore deflector is used together
WO2017074733A1 (en) * 2015-10-26 2017-05-04 Halliburton Energy Services, Inc. Junction isolation tool for fracking of wells with multiple laterals
CA3012987C (en) 2016-03-15 2019-08-27 Halliburton Energy Services, Inc. Dual bore co-mingler with multiple position inner sleeve
US10557331B2 (en) 2016-06-02 2020-02-11 Halliburton Energy Services, Inc. Multilateral intelligent completion with stackable isolation
GB2566900B (en) 2016-09-16 2021-09-01 Halliburton Energy Services Inc Casing exit joint with guiding profiles and methods for use
CA3029191C (en) 2016-09-19 2020-08-18 Halliburton Energy Services, Inc. Expandable reentry completion device
US11499423B2 (en) 2019-05-16 2022-11-15 Saudi Arabian Oil Company Automated production optimization technique for smart well completions using real-time nodal analysis including comingled production calibration
US11326423B2 (en) 2019-05-16 2022-05-10 Saudi Arabian Oil Company Automated production optimization technique for smart well completions using real-time nodal analysis including recommending changes to downhole settings
US11441395B2 (en) 2019-05-16 2022-09-13 Saudi Arabian Oil Company Automated production optimization technique for smart well completions using real-time nodal analysis including real-time modeling
US11821289B2 (en) 2019-11-18 2023-11-21 Saudi Arabian Oil Company Automated production optimization technique for smart well completions using real-time nodal analysis
NO20220849A1 (en) * 2020-02-03 2022-08-03 Schlumberger Technology Bv Multilateral intelligent well completion methodology and system
US11725485B2 (en) 2020-04-07 2023-08-15 Halliburton Energy Services, Inc. Concentric tubing strings and/or stacked control valves for multilateral well system control
US11492881B2 (en) 2020-10-09 2022-11-08 Saudi Arabian Oil Company Oil production optimization by admixing two reservoirs using a restrained device

Family Cites Families (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4807704A (en) * 1987-09-28 1989-02-28 Atlantic Richfield Company System and method for providing multiple wells from a single wellbore
US5474131A (en) * 1992-08-07 1995-12-12 Baker Hughes Incorporated Method for completing multi-lateral wells and maintaining selective re-entry into laterals
US5566763A (en) 1994-08-26 1996-10-22 Halliburton Company Decentralizing, centralizing, locating and orienting subsystems and methods for subterranean multilateral well drilling and completion
US5564503A (en) * 1994-08-26 1996-10-15 Halliburton Company Methods and systems for subterranean multilateral well drilling and completion
US5732776A (en) 1995-02-09 1998-03-31 Baker Hughes Incorporated Downhole production well control system and method
US5715891A (en) 1995-09-27 1998-02-10 Natural Reserves Group, Inc. Method for isolating multi-lateral well completions while maintaining selective drainhole re-entry access
US5651415A (en) 1995-09-28 1997-07-29 Natural Reserves Group, Inc. System for selective re-entry to completed laterals
US5918669A (en) * 1996-04-26 1999-07-06 Camco International, Inc. Method and apparatus for remote control of multilateral wells
US6237683B1 (en) * 1996-04-26 2001-05-29 Camco International Inc. Wellbore flow control device
US5875852A (en) 1997-02-04 1999-03-02 Halliburton Energy Services, Inc. Apparatus and associated methods of producing a subterranean well
US5884704A (en) 1997-02-13 1999-03-23 Halliburton Energy Services, Inc. Methods of completing a subterranean well and associated apparatus
US6125937A (en) * 1997-02-13 2000-10-03 Halliburton Energy Services, Inc. Methods of completing a subterranean well and associated apparatus
US5975208A (en) 1997-04-04 1999-11-02 Dresser Industries, Inc. Method and apparatus for deploying a well tool into a lateral wellbore
US6019173A (en) * 1997-04-04 2000-02-01 Dresser Industries, Inc. Multilateral whipstock and tools for installing and retrieving
US5957207A (en) 1997-07-21 1999-09-28 Halliburton Energy Services, Inc. Flow control apparatus for use in a subterranean well and associated methods
US5957208A (en) 1997-07-21 1999-09-28 Halliburton Energy Services, Inc. Flow control apparatus
US5979558A (en) 1997-07-21 1999-11-09 Bouldin; Brett Wayne Variable choke for use in a subterranean well
US6079494A (en) * 1997-09-03 2000-06-27 Halliburton Energy Services, Inc. Methods of completing and producing a subterranean well and associated apparatus
US5992525A (en) 1998-01-09 1999-11-30 Halliburton Energy Services, Inc. Apparatus and methods for deploying tools in multilateral wells
US6009949A (en) * 1998-01-27 2000-01-04 Halliburton Energy Services, Inc. Apparatus and methods for sealing a wellbore junction
GB2342665B (en) * 1998-10-13 2000-08-30 Mark Buyers Production optimisation tool
US6209648B1 (en) * 1998-11-19 2001-04-03 Schlumberger Technology Corporation Method and apparatus for connecting a lateral branch liner to a main well bore
US6311776B1 (en) * 1999-04-19 2001-11-06 Camco International Inc. Dual diverter and orientation device for multilateral completions and method
GB0002531D0 (en) * 2000-02-04 2000-03-29 Omega Completion Technology Li Method of controlling access between a main boreand a lateral bore in a production system
GB2365947B (en) * 2000-06-24 2004-09-08 Roger Keith Todd A triple action vacuum valve
US6561277B2 (en) * 2000-10-13 2003-05-13 Schlumberger Technology Corporation Flow control in multilateral wells

Also Published As

Publication number Publication date
US20030221834A1 (en) 2003-12-04
GB0312313D0 (en) 2003-07-02
NO20140103L (en) 2003-12-05
GB2389600B (en) 2005-11-30
US6789628B2 (en) 2004-09-14
NO336272B1 (en) 2015-07-06
GB2389600A (en) 2003-12-17
CA2430796A1 (en) 2003-12-04
NO20032031L (en) 2003-12-05
NO20032031D0 (en) 2003-05-06
NO335241B1 (en) 2014-10-27
BR0301441A (en) 2004-08-17

Similar Documents

Publication Publication Date Title
CA2430796C (en) Systems and methods for controlling flow and access in multilateral completions
US7191832B2 (en) Gravel pack completion with fiber optic monitoring
US6561277B2 (en) Flow control in multilateral wells
US7165892B2 (en) Downhole fiber optic wet connect and gravel pack completion
US6840321B2 (en) Multilateral injection/production/storage completion system
CA2246186C (en) Methods of completing and producing a subterranean well and associated apparatus
CA2252728C (en) Method and apparatus for remote control of multilateral wells
CA2229091C (en) Methods of completing a subterranean well and associated apparatus
US5845710A (en) Methods of completing a subterranean well
US5884704A (en) Methods of completing a subterranean well and associated apparatus
US6513599B1 (en) Thru-tubing sand control method and apparatus
US6209648B1 (en) Method and apparatus for connecting a lateral branch liner to a main well bore
US6830106B2 (en) Multilateral well completion apparatus and methods of use
US7159661B2 (en) Multilateral completion system utilizing an alternate passage
US20050121190A1 (en) Segregated deployment of downhole valves for monitoring and control of multilateral wells
US20090090499A1 (en) Well system and method for controlling the production of fluids
EP0900911B1 (en) Methods of completing and producing a subterranean well and associated apparatus
CA2521139C (en) Methods of completing and producing a subterranean well and associated apparatus
GB2440232A (en) Multilateral completion system utilizing an alternative passage
GB2440233A (en) Multilateral completion system utilizing an alternative passage

Legal Events

Date Code Title Description
EEER Examination request
MKEX Expiry

Effective date: 20230605