CA2432119C - Drilling system and method - Google Patents

Drilling system and method Download PDF

Info

Publication number
CA2432119C
CA2432119C CA002432119A CA2432119A CA2432119C CA 2432119 C CA2432119 C CA 2432119C CA 002432119 A CA002432119 A CA 002432119A CA 2432119 A CA2432119 A CA 2432119A CA 2432119 C CA2432119 C CA 2432119C
Authority
CA
Canada
Prior art keywords
fluid
drilling
pressure
actual
signal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CA002432119A
Other languages
French (fr)
Other versions
CA2432119A1 (en
Inventor
Christian Leuchtenberg
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Secure Drilling International LP
Original Assignee
Secure Drilling International LP
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=24965564&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=CA2432119(C) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Secure Drilling International LP filed Critical Secure Drilling International LP
Publication of CA2432119A1 publication Critical patent/CA2432119A1/en
Application granted granted Critical
Publication of CA2432119C publication Critical patent/CA2432119C/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B44/00Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/08Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/08Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure
    • E21B21/085Underbalanced techniques, i.e. where borehole fluid pressure is below formation pressure

Abstract

A closed-loop circulating system for drilling wells has control of the flow rates in and out of the wellbore. Kicks and fluid loses are quickly controll ed by adjusting the backpressure. Kick tolerance and tripping margin are eliminated by real-time determination of pore and fracture pressure. The system can incorporate a rotating BOP and can be used with underbalanced drilling.

Description

DRILLING SYSTEM AND METHOD
FIELD OF THE INVENTION

The present invention deals with a closed-loop system for drilling wells where a series of equipment, for the monitoring of the flow rates in and out of the well, as well as for adjusting the back pressure, allows the regulation of the out flow so that the out flow is constantly adjusted to the expected value at all times. A pressure containment device keeps the well closed at all times. Since this provides a much safer operation, its application for exploratory wells will greatly reduce the risk of blow-outs. In environrnents with narrow margin between the pore and fracture pressure, it will create a step change compared to conventional drilling practice. In this context, applications in deep and ultra-deep water are included. A method for drilling, using said system, is also disclosed. The drilling system and method are suited for alltypes of wells, onshore and offshore, using a conventional drilling fluid or a lightweight drilling fluid, more particularly a substantially incompressible conventional or lightweight drilling fluid.

BACKGROUND INFORMATION

Drilling oil/gas/geothermal wells has been done in a similar way for decades.
Basically, a drilling fluid with a density high enough to counter balance the pressure of the fluids in the reservoir rock, is used inside the wellbore to avoid uncontrolled production of such fluids. However, in many situations, it can happen that the bottomhole pressure is reduced below the reservoir fluid pressure. At this moment, an influx of gas, oil, or water occurs, named a kick.
If the kick is detected in the early stages, it is relatively simple and safe to circulate the invaded fluid out of the well. Afler the original situation is restored, the drilling activity can proceed. However, if, by any means, the detection of such a kick takes a long time, the situation can become out of control leading to a blowout. According to Skalle, P. and Podio, A. L. in "Trends extracted from 800 Gulf Coast blow-outs during 1960-1996"
IADC/SPE 39354, Dallas, Texas, March 1998, nearly 0.16% of the kicks lead to a blowout, due to several causes, including equipment failures and human errors.

On the other hand, if the wellbore pressure is excessively high, it overcomes the fracture strength of the rock. In this case loss of drilling fluid to the formation is observed, causing potential danger due to the reduction in hydrostatic head inside the wellbore. This reduction can lead to a subsequent kick.

In the traditional drilling practice, the well is open to the atmosphere, and the drilling fluid pressure (static pressure plus dynamic pressure when the fluid is circulating) at the bottom of the hole is the sole factor for preventing the formation fluids from entering the well. This induced well pressure, which by default, is greater than the reservoir pressure causes a lot of damage, i.e., reduction of near wellbore permeability, through fluid loss to the formation, reducing the productivity of the reservoir in the majority of cases.

Since among the most dangerous events while drilling conventionally is to take a kick, there have been several methods, equipment, procedures, and techniques documented to detect a kick as early as possible. The easiest and most popular method is to compare the injection flow rate to the return flow rate. Disregarding the drilled cuttings and any loss of fluid to the formation, the return flow rate should be the same as the injected one. If there are any significant discrepancies, drilling is stopped to check if the well is flowing Y r i r .
with the mud pumps off. If the well is flowing, the next action to take is to close the blow-out preventer equipment (BOP), check the pressures developed without circulation, and then circulate the kick out, adjusting the mud weight accordingly to prevent further influx. Some companies do not check flow if there is an indication that an influx may have occurred, closing the BOP as the first step.

This procedure takes time and increases the risk of blow-out, if the rig crew does not quickly suspect and react to the occurrence of a kick. Procedure to shut-in the well can fail at some point, and the kick can be suddenly out of control. In addition to the time spent to control the kicks and to adjust drilling parameters, the risk of a blow-out is significant when drilling conventionally, with the well open to the atmosphere at all times.

The patent literature includes several exarn.ples of inethods for lcick detection, including US 4,733,233 (Grosso) which discloses a method for kick detection using a downhole device, known as an MWD, instead of.detecting by fluid flow. An MVWD measures gas kick only, by wave perturbations which are created ahead of the influx and detected. This method does not detect liquid (water or oil) kicks.

Among the methods available to quickly detect a kick the most recent ones are presented by Hutchinson, M and Rezmer-Cooper, I. in "Using Downhole Annular Pressure Measurements to Anticipate Drilling Problems", SPE 49114, SPE Annual Technical Conference and Exhibition, New Orleans, Louisiana, 27-30 September, 1998. Measurement of different parameters, such as downhole annular pressure in conjunction with special control systems, adds more safety to the whole procedure. The paper discusses such important parameters as the influence of ECD (Equivalent Circulating Density, which is AMENDED SHEET
the. hydrostatic pressure plus the friction losses while circulating the fluid, converted to equivalent mud density at the bottom of the well) on the annular pressure. It is also pointed out that if there is a tight margin between the pore pressure and fracture gradients, then annular pressure data can be used to make adjustments to mud weight. But, essentially, the drilling method is the conventional one, with some more parameters being recorded and controlled.
Sonietimes, calculations with these parameters are necessary to define the mud weight required to kill the well. However, annular pressure data recorded during kill operations have also revealed that conventional killing procedures do not always succeed in keeping the bottomhole pressure constant.

In some methods it is conventional to estimate pore pressure on detection of a kick in order to circulate the kick out of the well. US 5,115,871 (McCann) discloses a method to estimate pore pressure while drilling by monitoring two parameters and monitoring respective change therein. GB 2 290 330 (Baroid Technology Inc) discloses a method of controlling drilling by estimating pore pressure from continually evaluated parameters, to take into account wear of drill bit.

Other publications deal with methods to circulate the ki.ck out of the well.
For example, US patent 4,867,254 teaches a method of real time control of fluid influxes into an oil well from an underground formation during drilling. The injection pressure pi and return pressure pr and the flow rate Q of the drilling mud circulating in the well are measured. From the pressure and flo-w rate values, the value of the mass of gas Mg in the annulus is determined, and the changes in this value monitored in order to determine either a fresh gas entry into the annulus or a drilling mud loss into the formation being drilled.
AMENDED SHEET

US patent 5;080,182 teaches a method of real time analysis and control of a fluid influx from an underground formation into a wellbore being drilled with a drill string while drilling and circulating from the surface down to the bottom of the hole into the drill string and flowing back to the surface in the 5 annulus defined between the wall of the wellbore and the drillstring, the method comprising the steps of shutting-in the well, when the influx is detected; measuring the inlet pressure P; or outlet pressure Po of the drilling mud as a function of time at the surface; determining from the increase of the mud pressure measurement, the time t, corresponding to the minimum gradient in the increase of the mud pressure and controlling the well from the time t..

US 3,470,971 (Dower) and US 5,070,949 (Gavignet) are further examples of kick circulation methods. Dower discloses an automated method for kick circulation, intended to keep weilbore pressure constant by adjusting back pressure by means of a choke during circulation. Gavignet discloses a method which comprises measuring gas in the annulus as the fluid influx travels upwards during circulation.

It is observed that in all the cited literature where the drilling method is the conventional one, the shut-in procedure is carried out in the same way. That is, literature methods are directed to the detection and correction of a problem (the kick), while there are no known methods directed to eliminating said problem, by changing or improving the conventional method of drilling wells.
Thus, according to drilling methods cited in the literature, the kicks are merely controlled.

In the last 10 years, a new drilling technique, underbalanced drilling (UBD) is becoming more and more popular. This technique implies a concomitant AMENDED SHEET
production of the reservoir 'fluids while drilling the well. Special equipment has been developed to keep the well closed at all times, as the welihead pressure in this case is not atmospheric, as in the traditional drilling method.
Also, special separation equipment must be provided to properly separate the 5. drilling fluid from the gas, and/or oil, and/or water and drilled cuttings.

EP 1 048 819 (Baker-Hughes) discloses an UBD method, and regulates injection of different fluid types to maintain a downhole pressure which ensures underbalance condition. - US 5,975,219 (Sprehe) is not as such designed as an UBD method, rather as a method which operates with a closed well head when drilling with a gas drilling fluid only, in order to contain the gas. However there are similarities to the UBD method. Sprehe in addition to operating with a closed well head by means of a BOP, comprises fluid flow meters, and pressure and temperature sensors for sensing pressure and temperature to determine need for pressure flow of fire extinguishing chemicals or water, and a control and recording system to record flow rate of drilling fluid and rate of any fluids into the weilbore from the formation.
Sprehe however estimates quantity of fluid flowing from the well based on reservoir conditions and well dimension characteristics, in the event only of a blow out, in addition to determining forces at the point of well blow out and the temperature profile of a burning well stream. Moreover Sprehe enters predetermined flowline rates pump rates, pressures etc into a suitable program operating on a digital computer or CPU connected to circuits for receiving control signals and transmitting to an actuator to slow down drillstem insertion and avoid surges in the wellbore.

The UBD technique has been developed initially to overcome severe problems faced while drilling, such as massive loss of circulation, stuck pipe due to differential pressure when drilling depleted reservoirs, as well as to increase AMENDED SHEET
the rate of penetration. In many situations, however, it will not be possible to drill a well in the underbalanced mode, e.g., in regions where to keep the wellbore walls stable a high pressure inside the welibore is needed. In this case, if the wellbore pressure is reduced to low levels to allow production of fluids the wall collapses and drilling cannot proceed.

Accordingly, the present application relates to a new concept of drilling whereby a method and corresponding instrumentation allows that kicks may be detected early and controlled much quicker and safer or even eliminated/mitigated than in prior art methods.

Further, it should be noted that the present method operates with the well closed at all times. That is why it can be said that the method, herein disclosed and claimed, is much safer than conventional ones.

In wells with severe loss of circulation, there is no possibility to detect an influx by observing the return flow rate. Schubert, I. J. and Wright, J. C. in "Early kick detection through liquid level monitoring in the wellbore", IADC/SPE 39400, Dallas, Texas, March 1998 propose a method of early detection of a kick through liquid level monitoring in the welibore. Having the wellbore open to atmosphere, here again the immediate step after detecting a lcick is to close the BOP and contain the well.

The excellent review of 800 blow-outs occurred in Alabama, Texas, Louisiana; Mississipi, and offshore in the Gulf of Mexico cited hereinbefore by Slcalle, P. and Podio, A. L. in "Trends extracted from 800 Gulf Coast blow-outs during 1960-1996" IADC/SPE 39354, Dallas, Texas, March 1998 shows that the main cause of blow-outs is human error and equipment failure.

AMENDED SHEET
Nowadays, more and more oil exploration and production is moving towards challenging environments, such as deep and ultra-deepwater. Also, wells are now drilled in areas with increasing environmental and technical risks. In this context, one of the big problems today, in many locations, is the narrow margin between the pore pressure (pressure of the fluids - water, gas, or oil -inside the pores of the rock) and the fracture pressure of the formation (pressure that causes the rock to fracture). The well is designed based on these two curves, used to define the extent of the wellbore that can be left exposed, i.e., not cased off with pipe or other form of isolation, which prevents the direct transmission of fluid pressure to the formation. The period or interval between isolation implementation is known as a phase.

In some situations a collapse pressure (pressure that causes the wellbore wall to fall into the well) curve is the lower liniit, rather than the pore pressure curve. But, for the sake of simplicity, just the two curves should be considered, the pore pressure and fracture pressure one. A phase of the well is defined by the maximum and minimum possible mud weight, considering the curves mentioned previously and some design criteria that varies among the operators, such as kick tolerance and tripping margin. In case of a kick of gas, the movement of the gas upward the well causes changes in the bottomhole pressure. The bottomhole pressure increases when the gas goes up with the well closed. Kick tolerance is the change in this bottomhole pressure for a certain volume of gas kiclc taken.

Tripping margin, on the other hand, is the value that the operators use to allow for pressure swab when -tripping out of the hole, to change a bit, for example.
In this sitaation, a reduction in bottomhole pressure, caused by the upward movement of the drill string can lead to an influx.

AMENDED SHEET
According to FIGURE 1 attached, based on prior art designing of wells for drilling, typically a margin of 0.3 pound per gallon (ppg) is added to the pore pressure to allow a safety factor when stopping circulation of the fluid and subtracted from the fracture pressure, reducing even more the narrow margin, as shown by the dotted lines. Since the plot shown in FIGURE 1 is always referenced to the static mud pressure, the compensation of 0.3 ppg allows for the-dynamic effect while drilling also. The compensation varies from scenario to scenario but typically lies between 0.2 and 0.5 ppg.

From FIGURE 1, it can be seen that the last phase of the well can only have a maximum length of 3,000 ft, since the mud weight at this point starts to fracture the rock, causing mud losses. If a lower mud weight is used, a kick will happen at the lower portion of the well. It is not difficult to imagine the problems created by drilling in a narrow margin, with the requirement of several casing strings, increasing tremendously the cost of the well. In some critical cases, a difference as small as 0.2 ppg is found between the pore and fracture pressures. Moreover, the current well design shown in FIGURE 1 does not allow to reach the total depth required, since the bit size is continuously reduced to install the several casing strings needed. In most of these wells, drilling is interrupted to check if the well is flowing, and frequent mud losses are also encountered. In many cases wells need to be abandoned, leaving the operators with huge losses.

These problems are further compounded and complicated by the density variations caused by temperature changes along the wellbore, especially in deepwater wells. This can lead to significant problems, relative to the narrow margin, when wells are shut in to detect kicks/fluid losses. The cooling effect and subsequent density changes can modify the ECD due to the temperature effect on mud viscosity, and due to the density increase leading to further AMENDED SHEET

03-02-2003 . GB0105593 complications on resuming circulation. Thus using the conventional method for wells in ultra deep water is rapidly reaching technical limits.

On the contrary, in the present application the 0.3 ppg margins referred to in 5 FIGURE 1 are dispensed with during the planning of the well since the actual required values of pore and fracture pressures will be determined during drilling. Thus, the phase of the well can be further extended and consequently the number of casing strings required is greatly reduced, with significant savings. If the case of FIGIJRE 1 is considered, the illustrated number of 10 casings is 10, while by graphically applying the method of the invention this number is reduced to 6, according to FIGURE 2 attached. This may be readily seen by considering only the solid lines of pore and fracture gradient to define the. extent of each phase, rather than the dotted lines denoting the limits that are in conventional use.

In order to overcome these problems, the industry has devoted a lot of time and resources to develop alternatives. Most of these alternatives deal with the dual-densi concept, which implies a variable pressure profile along the well, making it possible to reduce the number of casing strings required. In some drilling scenarios, such as in areas where higher than normal pore pressure is found in deepwater locations, the dual density drilling system is the only one that may render the drilling economical.

The idea is to have a curved pressure profile, following the pore pressure = curve. There are two basic options:

- injection of a lower density fluid (oil, gas, liquid. with hollow glass spheres) at some point for example WO 00/75477 (Exxon Mobil) which operates with injection of a gas phase lightweight fluid in a system having pressure control devices at the wellhead and at the seabed and detects changes in seabed pressure at the wellhead and compensates accordingly);
AMENDED SHEET
- placement of a pump at the bottom of the sea to lift the fluid up to the surface installation for example WO 00/49172 (Hydril Co) which uses a choke to regulate the return flow and the well bore pressure to a pre-selected level.

There are advantages and disadvantages of each system proposed above. The industry has mainly taken the direction of the second alternative, due to arguments that well control and understanding of two-phase flow complicates the whole drilling operation with gas injection.

Thus, according to the. IADC/SPE 59160 paper "Reeled Pipe Technology for Deepwater Drilling Utilizing a Dual Gradient Mud System", by P. Fontana and G. Sjoberg, it is possible to reduce casing strings required to achieve the final depth of the well by returning the drilling fluid to the vessel with the use of a subsea pumping system. The combination of seawater gradient at the mud line and drilling fluid in the wellbore results in a bottomhole equivalent density that can be increased as illustrated in FIGURE 2 of the paper. The result is a greater depth for each casing string and reduction in total number of casing strings. It is alleged that larger casing can then be set in the producing formation and deeper overall well depths can be achieved. The mechanism used to create a dual gradient system is based on a pump located at the sea bottom.

However, there are several technical issues to be overcome with this option, which will delay field application for some years. The cost of such systems is also another negative aspect. Potential problems with subsea equipment will make any repair or problem turn into a long down-time for the rig, increasing even further the cost of exploration.

AMENDED SHEET
Another method currently under development by the industry is the injection of liquid slurry containing lightweight spheres at the bottom of the ocean, in the annulus, and injecting conventional fluid through the drillstring. The combination of the light slurry and the conventional fluid coming up the annulus creates a lighter fluid above the bottom of the ocean, and a denser fluid below the bottom of the ocean. This method creates also a dual-density gradient drilling or DGD. This alternative is much simpler than the expensive mud lift methods, but there are still some problems and limitations, such as the separation of the spheres from the liquid coming up the riser, so that they can be injected again at the bottom of the ocean. The slurry injected at the bottom of the ocean has a high concentration of spheres, whereas the drilling fluid being injected through the. drillstring does not have any sphere, therefore the requirement for separation of the spheres at the surface.

One approach in DGD is currently being developed by Maurer Technology using oilfield mud pumps to pump hollow spheres to the seafloor and inject the lightweight spheres into the riser to reduce the density of the drilling mud in the riser to that of the seawater. It is alleged that the use of oilfield mud pumps instead of the subsea pumping DGD systems currently being developed will significantly reduce operational costs.

A safety requirement for offshore drilling with a floating drilling unit is to have inside -the well, below the mud line, a drilling fluid having sufficient weight to balance the highest pore pressure of an exposed drilled section of the well. This requirement stems from the fact that an emergency disconnection might happen, and all of a sudden, the hydrostatic column provided by the mud inside the marine riser is abruptly lost. The pressure provided by the mud weight is suddenly replaced by seawater. If the weight of the fluid remaining inside the well after the disconnection of the riser is not high enough to AMENDED SHEET

12a balance the pore pressure of the exposed formations, a blowout might occur.
This safety guard is called Riser Margin, and currently there are several wells being drilled without this Riser Margin, since there is no dual-density method commercially available so far.

There are three other main methods of closed system drilling: a) underbalanced flow drilling, which involves flowing fluids from the reservoir continuously into the wellbore is described and documented in the literature;
b) mud-cap drilling, which involves continuous loss of drilling fluid to the formation, in which fluid can be overbalanced, balanced or underbalanced is also documented; c) air drilling, where air or other gas phase is used as the drilling fluid. These methods have limited application, i.e., underbalanced and air drilling are limited to formations with stable wellbores, and there are significant equipment and procedural limitations in handling produced effluent rom the wellbore. The underbalanced method is used for limited sections of = f the wellbore, typically the reservoir section. This limited application makes it a specialist alternative to conventional drilling under the right conditions and design criteria. Air drilling is limited to, dry formations due to its limited capability to handle fluid influxes. Similarly Mud-Cap drilling is limited to specific reservoir sections (typically highly fractured vugular carbonates).

Thus, the open literature is extremely rich in pointing out methods for detecting kicks, and then methods for circulating kicks out of the wellbore.
Generally all references teach methods that operate under conventional drilling conditions, that is, with the well being open to the atmosphere.
However, there is no suggestion nor description of a modified drilling method and system, which, by operating with the well closed, controlling the flow rates in and out of the wellbore, and adjusting the pressure inside the wellbore as required, causing that influxes (kicks) and fluid losses do not occur or are AMENDED SHEET

12b extremely rninimized, such method and system being. described and claimed in the present application.

Moreover for offshore drilling, the present method and system employing back pressures can also be used with lightweight fluids so that the equivalent drilling fluid weight above the mud line can be set lower than the equivalent fluid weight inside the wellbore, with increasing safety and low cost relative to drilling with conventional fluids.

SUMMARY OF THE INVENTION

In its broadest aspect the present invention is directed to a system for operating a well having a drilling fluid circulating - therethrough comprising means for monitoring the flow rates in and out and means to predict a calculated value of flow out at any given time to obtain real time information on discrepancy between predicted and monitored flow out, thereby producing an early defection of influx or loss of drilling fluid, the well being closed with a pressure containment device at all times.

AMENDED SHEET
The pressure/containment device may be a rotating blow out preventer (BOP) or a rotating control head, but is not limited to it. The location of the device is not critical. It may be located at the surface or at some point further down e.g.
on the sea floor, inside the wellbore, or at any other suitable location. The type and design of device is not critical and depends on each well being drilled. It may be standard equipment that is commercially available or readily adapted from existing designs.

The function of the rotating pressure containment device is to allow the drill string to pass through it and rotate, if a rotating drilling activity is carried on, with the device closed, thereby creating a back pressure in the well. Thus, the drill string is stripped through the rotating pressure containment device which closes the annulus between the outside of the drill pipe and the inside of the wellbore/casing/riser. A simplified pressure containment device may be a BOP

designed to allow continuous passage of non-jointed pipe such as the stripper(s) on coiled tubing operations.

The well preferably comprises a pressure containment device which is closed at all times, and a reserve BOP which can be closed as a safety measure in case of any uncontrolled event occurring.

Reference herein to a well is to an oil, gas or geothermal well which may be onshore, offshore, deepwater or ultra-deepwater or the like. Reference herein to circulating drilling fluid is to what is commonly termed the mud circuit, the circulation of the drilling fluid down the wellbore may be through a drill string and the return through an annulus, as in state-of-the-art methods, but not limited to it. As a matter of fact, any way of circulation of the drilling fluid may be successfully employed in the practice of the present system and method, no matter where the fluids are injected or returned.

As regards the drilling fluid, according to one embodiment of the invention, conventional drilling fluids may be used, selected typically from oil and/or water liquid phase fluids, and optionally additionally gas phase fluid. When the liquid phase is oil, the oil can be diesel, synthetic, mineral, or vegetable oil, the advantage being the reduced density of oil compared to water, and the disadvantage being the strong negative effect on the environment.
Means for monitoring of flow rates may be for monitoring of mass and/or volume flow. In a particularly preferred embodiment the system and method of the invention comprises monitoring the mass flow in and out of the well, optionally together with other parameters that produce an early detection of influx or loss independent of the mass flow in and out at that point in time. Preferably monitoring means are operated continuously throughout a given operation.
Preferably monitoring is with commercially available mass and flow meters, which, may be standard or multiphase. Meters are located on lines in and out.

The system may be for actively drilling a well or for related inactive operation, for example the real time determination of the pore pressure or fracture pressure of a well by means of a direct reading of parameters relating to a fluid influx or loss respectively; alternatively or additionally the system is for detecting an influx and sampling to analyse the nature of the fluid which can be produced by the well.

In a further aspect of the invention there is provided a system for operating a well having a drilling fluid circulating therethrough comprising in response to detection of an influx or loss of drilling fluid, means for pre-emptively adjusting back pressure in the wellbore based on influx or loss indication before surface system detection, the well being closed with a pressure containment device at all times.

In this system an influx may be detected by means as hereinbefore defined comprising detecting a real time discrepancy between predicted and monitored flow out as hereinbefore defined, or by means such as downhole temperature sensors, downhole hydrocarbon sensors, -pressure change sensors and pres sure 10 pulse sensors or by any other real time means.

In this, aspect of the invention the well comprises additionally one or more pressure/flow control devices and means for adjustment thereof to regulate fluid out flow to the predicted ideal value at all times, or to preemptively adjust the 15 backpressure to change the ECD (Equivalent Circulating Density) instantaneously in response to an early detection of influx or fluid loss.

Means for adjustment of the pressure/flow control device suitably comprises means for closing or opening thereof, to the extent required to increase or reduce respectively the backpressure, adjusting the ECD.

Preferably pressure/flow control devices are located anywhere suited for the purpose of creating or maintaining a backpressure on the well, for example on a return line for recovering fluid from the well.

Reference herein to ECD is to the hydrostatic pressure plus friction losses occurring while circulating fluid, converted to equivalent mud density at the bottom of the well.
Preferably adjustment is instantaneous and may be manual or automatic.
Pressure/flow control devices The level of adjustment may be estimated, calculated or simply a trial adjustment to observe the response and may comprise opening or closing the control device for a given period, aperture and intervals.
Preferably adjustment is calculated based on assumptions relating to the nature of the fluid influx or loss.

The pressure/flow control device may be any suitable devices for the purpose such as restrictions, chokes and the like having means for regulation thereof and may be commercially available or may be specifically designed for the required purpose and chosen or designed according to the well parameters such as diameter of the return line, pressure and flow requirements.

In a very broad way, the system and method of the invention comprises adjusting the wellbore pressure with the aid of a pressure/flow control device to correct the bottomhole pressure to prevent fluid influx or losses in a pro-active as opposed to the state-of-the-art reactive manner.

Closing or opening the pressure/flow control device restores the balance of flow and the predicted value, the bottomhole pressure regaining a value that avoids any further influx or loss, whereafter the fluid that has entered the well is circulated out or lost fluid is replaced.

Running the fluid (mud) density at a value slightly lower than that required to control the formation pressure and adjusting backpressure on the well by means of the flow, exerts an extremely controllable ECD at the bottomhole that has the flexibility to be adjusted up or down.
Preferably the one or more pressure/flow control devices are controlled by a central means which calculates adjustment.

Adjustment of the pressure/flow control device is suitably by closing or opening to the extent required to increase or reduce respectively the backpressure, adjusting the ECD.

In this case the system may be used as a,system for controlling the ECD in any desired operation and continuously or intermittently drilling a gas, oil or geothermal well wherein drilling is carried out with bottom hole pressure controlled between the pore pressure and the fracture pressure of the well, being able to directly determine both values if desired, or drilling with the exact bottom hole pressure needed, with a direct determination of the pore pressure, or drilling with bottom hole pressure regulated to be just less than the pore pressure thus generating a controlled influx, which may be momentary in order to sample the well fluid in controlled manner, or may be continuous in order to produce well fluid in controlled manner.

Preferably therefore the system of the present invention is for drilling a well while injecting a drilling fluid through an injection line of said well and recovering through a return line of said well where the well is closed at all times, and comprises a pressure containment device and pressure/flow control device to a wellbore to establish and/or maintain a back pressure on the well, means to monitor the fluid flow in and out, means to monitor flow of any other material in and out, means to monitor parameters affecting the monitored flow value and means to predict a calculated value of flow out at any given time and to obtain real time information on discrepancy between predicted and monitored flow out and converting to a value for adjusting the pressure/flow control device and restoring the predicted flow value.

The system and corresponding method of drilling oil, gas and geothermal wells according to the present invention is based on the principle of mass conservation, a universal law. Measurements are effected under the same dynamic conditions as those when the actual events occur.

While drilling a well, loss of fluid to the rock or influx from the reservoir is common, and should be avoided to eliminate several problems. Bv applying the principle of mass conservation, the difference in mass being injected and returned from the well, compensated for increase in hole volume, additional mass of rock returning and other relevant factors, including but not limited to thermal expansion/contraction and compressibility changes, is a clear indication of what is happening downhole.

Preferably therefore, the expression "mass flow" as used herein means the total mass flow being injected and returned, comprised of liquid, solids, and possibly gas.

In order to increase the accuracy of the method and to expedite detection of any undesired event, the flow rates in and out of the well are also monitored at all times. This way, the calculation of the predicted, ideal return flow of the well can be done with a certain redundancy and the detection of any discrepancy can be made with reduced risks.

In some cases measurement of the flow rate only is not accurate enough to provide a clear indication of losses or gains while drilling. Preferably therefore the present system envisages the addition of an accurate mass flow metering means that allows the present drilling method to be much safer than state-of-the-art drilling methods.

We have found by means of the system and method of the invention that the generation of real time metering using a full mass balance and time compensation as a dynamic predictive tool, which can be compensated also for any operational pause in drilling or fluid injection enables for the first time an adjustment of fluid return rate while continuing normal operations. This is in contrast to known open well systems which require pausing fluid injection and drilling to unload excess fluid, and add additional fluid, by trial and error until pressure is restored, which can take a matter of hours of fluid circulation to restore levels. Moreover the system provides for the first time a means fo r immediate restoration of pressure, bv virtue of the use of a closed system whereby addition or unloading of fluid immediately affects the well backpressure.

The speed of adjustment is much greater in the present method, as opposed to the conventional situation, where increasing the mud density (weighting up) or decreasing the mud density (cutting back) is a very time consuming process.
The ECD is the actual pressure that needs to overcome the formation pressure to avoid influx while drilling. However, when the circulation is stopped to make a connection, for example, the friction loss is zero and thus the ECD reduces to the hydrostatic value of the mud weight. In scenarios of very narrow mud window, the margin can be as low as 0.2 ppg. In these cases, it is common to observe influxes when circulation is interrupted, increasing substantially the risks of drilling with the conventional drilling system.

On the contrary, since the present method operates with the well closed at all times which implies a back pressure at all times, means for adjusting the back pressure compensate for dynamic friction losses when the mud circulation is interrupted, avoiding the influx of reservoir fluids (kick). Thus the improved 5 safety of the method of the invention relative to the state-of-the-art drilling methods may be clearly seen.

Replacement of the dynamic friction loss when the circulation stops can be accomplished by slowly reducing the circulation rate through the normal flow 10 path and simultaneously closing the pressure flow/control device and trapping a backpressure that compensates for the loss in friction head.

Alternatively or additionally the back pressure adjustment can be applied by pumping fluid, independent of the normal circulating flow path, into the wellbore, 15 to compensate for the loss in friction head, and effecting a continuous flow that allows easy control of the back pressure by adjustment of the pressure/flow control device. This fluid flow may be achieved completely independent of the normal circulating path by means of a mud pump and injection line.
20 Preferably the system therefore comprises additional means to pressurize the wellbore, more preferably through the annulus, independently of the current fluid injection path. This system enables changing temperature and fluid densities at any time whilst drilling or otherwise, and enables injecting fluid into the annulus while not drilling, keeping a desired bottom hole pressure during circulation stops, and continuously detecting and changes indicative of an influx or fluid loss.
The system may comprise at least one circulation bypass comprised of a pump and a dedicated fluid injection line for injecting fluid direct to the annulus or a zone thereof, and optionally a dedicated return line, together with dedicated flow meters and additional means such as pressure/flow control devices, pressure and temperature sensors and the like. This allows keeping a desired pressure downhole during circulation stops and continuously detecting any changes in the mass balance indicative of an influx or loss during a circulation stop.

Preferably the system for -drilling a well while injecting a drilling fluid through an injection line of said well and recovering through a return line of said well where the well being drilled is closed at all times comprises:

a) a pressure containment device;

b) a pressure/flow control device for the outlet stream, on the return line;

c) means for measuring mass and/or volumetric flow and flow rate for the inlet and outlet streams on the injection and return lines to obtain real time mass and/or volumetric flow signals;

d) means for measuring mass and/or volumetric flow and flow rate of any other materials in and out;

e) means for directing all the flow and pressure signals so obtained to a central data acquisition and control system; and g) a central data acquisition and control system programmed with a software that can determine a real time predicted out flow and compare it to the actual out flow estimated from the mass and volumetric flow rate values and other relevant parameters.

Preferably the means c) for measuring mass flow comprises a volume flow meter and at least one pressure sensor to obtain pressure signals and optionally at least one temperature sensor to obtain temperature signals; and may be a mass flow meter comprising integral pressure and optional temperature sensors to compensate for changes in density and temperature; and the means c) for measuring flow rate comprises means for assessing the volume of the hole at any given time, as a dynamic value llaving regard to the continuous drilling of the hole. At least one additional pressure and optional temperature sensor may be provided to monitor other parameters that produce an early detection of influx or loss independent of the mass flow in and out at that point in time.

Means d) comprises means for measuring flow rate of all materials in and out.
Thereby the mass flow metering principle is extended to include other subcomponents of the system where accuracy can be improved, such as, but not limited to means for measuring solids and gas volume/mass out, in particular for measuring the mass flux of cuttings. Preferably the system comprises additionally providing a means of measurement of drill cuttings rate, mass or volume, when required, to measure the rate of cuttings being produced from the well.

Means d) for measuring cuttings volume/mass out is any commercially available or other equipment to verify that the mass of cuttings being received back at the surface is correlated with the rate of penetration and wellbore geometcy. This data allows correction of the mass flow data and allows identification of trouble events.

Commercially available apparatus for separating and measuring cuttings volume/mass out comprises a shale shaker preferably in combination with a degasser. In a more appropriate configuration, a closed 3-phase separator (liquid, solid and gas) could be installed replacing the degasser. In this case a fully closed system is achieved. This may be desirable when dealing with hostile fluids or fluids posing environmentally risks.
The central data acquisition and control system is provided with a soittivare designed to predict an expected, ideal value for the outflow,, said value being based on calculations taking into account several parameters including but not restricted to rate of penetration, rock and drilling fluid density, well diameter, in and out flow rates, cuttings return rate, bottomhole and wellhead pressures and temperatures, also rotary torque and rpm, top drive torque and rpm, rotation of drill string, mud-pit volumes, drilling depth, pipe velocity, mud temperature, mud weight, hookload, weight on bit, pump pressure, pumpstrokes, mud flows, calculated gallons/minute, gas detection and analysis, resistivity and conductivity.
Most preferably the system comprises:

a) a pressure containment device;

b) a pressure/flow control device on the outlet stream;

c) means for measuring mass flow rate on the inlet and outlet streams;

d) means for measuring volumetric flow rate on the inlet and outlet streams;

e) at least one pressure sensor to obtain pressure data;

f) optionally at least one temperature sensor to obtain temperature data;
g) a central data acquisition and control system that sets a value for an expected out flow and compares it to the actual out flow estimated from data gathered by the mass and volumetric flow rate meters as well as from pressure and temperature data, and in case of a discrepancy between the expected and actual flow values, adjusting the said pressure/flow control device to restore the outflow to the expected value.
The at least one pressure sensor may be located at any convenient location such as at the wellhead and/or at the bottom hole.

Further, by using at least two pressure/flow control devices to apply back pressure it is possible to establish a situation of dual density gradient drilling. If more than two of these devices are used, multiple-density gradient drilling conditions are created, this inventive feature being not suggested nor described in the literature.

The system may comprise two or more pressure containment devices in series throughout the welibore whereby a pressure profile may be established throughout the well and two or more pressure control devices in series or parallel.
In the system comprising more than two pressure/flow control devices in series, the pressure profile is established in independent pressure zones created throughout the length of the well, wherein restrictions or pressure/flow control devices define the interfaces of each zone. Preferably each zone is provided with a circulation bypass comprising a pump, dedicated injection line and optional return lines.

This system is preferably used in combination with a conventional or a lightweight fluid, as hereinbefore defined. Preferably lightweight drilling fluids are employed whenever a scenario of dual density drilling is considered. Using a light fluid with the applied back pressures enables the equivalent drilling fluid weight above the mud line to be set lower than the equivalent fluid weight inside the wellbore.

Whenever a lightweight drilling fluid is used, it may be one of the well-known lightweight fluids, that is, the drilling fluid is made up of a liquid phase, either water or oil, plus the addition of gas, hollow spheres, plastic spheres, or any other light material that can be added to the liquid phase to reduce the overall weight. According to a preferred embodiment of the invention lightweight drilling fluids may be advantageously employed even in the absence of a dual-5 density drilling system.

Preferably the system comprises the said central data acquisition and control system which is provided with a time-based software to allow for lag time between in and out flux. The software is preferably provided with detection filters 10 and/or processing filters to eliminate/reduce false indications on the received mass and fluid flow data, and any other measured or detected parameters.
Preferably the system is a closed loop system, whereby monitoring means continuously provide data to the central data acquisition and control system 15 whereby predicted flow out is continuously revised in response to any adjustment of pressure/flow control, adjusting ECD.

In a particular advantage the system of the invention comprises three safety barriers, the drilling fluid, the blow-out preventer (BOP) equipment and the 20 pressure containment device.

In a further aspect of the invention there is provided the corresponding method for operating a well having a drilling fluid circulating therethrough comprising monitoring the flow rates of fluid in and out and predicting a calculated value of 25 flow out at any given time to obtain real time information on discrepancy between predicted and monitored flow out, thereby producing an early detection of influx or loss of drilling fluid, the well being closed with a pressure containment device at all times.
Preferably monitoring is of mass and/or volume flow. Preferably monitoring is continuous throughout a given operation.

In this case the method may be for actively drilling a well or for related inactive operation, for example the real time determination of the pore pressure or fracture pressure of a well by means of a direct reading of parameters relating to a fluid influx or loss respectively; alternatively or additionally the system is for detecting a controlled influx and sampling to analyse the nature of fluid which can be produced by the well.

In a further aspect of the invention there is provided a method for operating a well having a drilling fluid circulating therethrough comprising detecting an influx or loss of drilling fluid and pre-emptively adjusting back pressure in the wellbore based on influx or loss indication before surface system detection, the well being closed with a pressure containment device at all times.

An influx may be detected by any known or novel methods, particularly by novel methods selected from the method as hereinbefore defined or by downhole temperature detection, downhole hydrocarbon detection, detecting pressure changes and pressure pulses.

In a further embodiment the method comprises adjusting pressure/flow to regulate fluid outflow to the expected value at all times and control ECD at all times or to pre-emptively adjust the back pressure to change the equivalent circulating density (ECD) instantaneously in response to an early detection of influx or fluid loss.
As hereinbefore defined with reference to the corresponding system of the invention, the ECD is the actual pressure that needs to overcome the formation pressure to avoid influx while drilling. However, when the circulation is stopped to make a connection, for example, the friction loss is zero and thus the ECD
reduces to the hydrostatic value of the mud weight.

Preferably the adjustment is instantaneous and may be manual or automatic.
Level of adjustment may be estimated, calculated or simply a trial adjustment to observe the response, and may be staged,,prolonged, intermittent, rapid or finite.

Preferably adjustment is calculated based on assumptions relating to the nature of the influx or loss. Preferably adjustment is controlled by a central control device.
Preferably where the discrepancy between actual and predicted out flows is a fluid loss, the adjustment comprises iricreasing fluid flow to the extent required to reduce backpressure and counteract fluid loss; or where the discrepancy between actual and predicted out flows is a fluid gain, the adjustment comprises reducing fluid flow to the extent required to increase backpressure and counteract fluid gain to the extent required to reduce or increase respectively the backpressure, adjusting the ECD.

Increasing or reducing the flow restores the balance of flow and the predicted value, the bottomhole pressure regaining a value that avoids any further influx or loss, whereafter the fluid that has entered the well is circulated out or lost fluid is replaced.

In this case the method may be for controlling the ECD in any desired operation and continuously or intermittently drilling a gas, oil or geothermal well wherein drilling is carried out with bottom hole pressure controlled between the pore pressure and the fracture pressure of the well, or drilling with the exact bottom hole pressure needed, with a direct determination of the pore pressure, or drilling with bottom hole pressure regulated to be just less than the pore pressure thus generating a controlled influx, which may be momentary in order to sample the well fluid in controlled manner, or may be continuous in order to produce well fluid in controlled manner.

In a fiirther aspect the corresponding method of the present invention comprises, in relation to the system of the invention- as hereinbefore defined, the following steps of injecting drilling fluid through said injection line through which said fluid is made to contact said means for monitoring flow and recovering drilling fluid through said return line; collecting any other material at the surface;
measuring the flow in and out of the well and collecting flow and flow rate signals; measuring parameters affecting the monitored flow value and means;

directing all the collected flow, correction and flow rate signals to the said central data acquisition and control system; monitoring parameters affecting the monitored flow value and means to predict a calculated value of flow out at any given time and to obtain real time information on discrepancy between predicted and monitored flow out and converting to a value for adjusting the pressure/flow control device and restoring the predicted flow value.

Since the present method operates with the well closed at all times which implies a back pressure at all times, this back pressure may be adjusted to compensate for dynamic friction losses when the mud circulation is interrupted, avoiding the influx of reservoir fluids (kick). Thus the improved safety of the method of the invention relative to the state-of-the-art drilling methods may be clearly seen.
For operation during a stop in fluid circulation, replacement of the dynamic friction loss when the circulation stops can be accomplished by slowly reducing the circulation rate through the normal flow path and simultaneously closing the pressure flow/control device and trapping a backpressure that compensates for the loss in friction head.

Alternatively or additionally the method comprises a step wherein fluid may be additionally injected directly to the annulus or a pressure zone thereof, and optionally returned from the annulus, thereby pressurising the wellbore through the annulus, independently of the current fluid injection path, and monitoring flow, pressure and optionally temperature.

Moreover it is possible according to the invention to run the fluid (mud) density at a value slightly lower than that required to control the formation pressure and adjust baclcpressure on the well by means of the flow to exert an extremely controllable ECD at the bottomhole that has the flexibility to be adjusted up or down.

Preferably the method includes monitoring values such as rate of penetration, rock and drilling fluid density, well diameter, in and out flow rates, cuttings return rate, bottomhole and wellhead pressures and temperatures, torque and drag, among other parameters and calculates the predicted ideal value for the outflow.
Therefore, the present invention provides a safe method for drilling wells, since not only is the well being drilled closed at all times, but also any fluid loss or influx that occurs is more accurately and faster determined and subsequently controlled than in state-of-the-art methods.

One advantage of the present method over state-of-the-art methods is that it is able to instantly change the ECD (Equivalent Circulating Density) by adjusting the backpressure on the wellbore by closing or opening the pressure/flow control device. In this manner the method herein described and claimed incorporates 5 earlv detection methods of influx/loss that are existing or yet to be developed as part of the method herein described and claimed, e.g., tools under development or that may be developed that can detect trace hydrocarbon influx, small temperature variations, pressure pulses etc. The output of these tools or technology that indicates a kick or fluid loss can be used as a feedback parameter to yield an 10 instant reaction to the detected kick or fluid loss, thus controlling the drilling operation at all times.

As a consequence, in a patentably distinguishing manner, the method of the invention allows that drilling operations be carried out in a contim.ious manner, 15 while in state-of-the-art methods drilling is stopped and mud weight is corrected in a lengthy, time-consuming step, before drilling can be resumed, after a kick or fluid loss is detected.

This leads to significant time savings as the traditional approach to dealing with 20 influxes is very time-consuming: stopping drilling, shutting in the well, observing, measuring pressures, circulating out the influx by the accepted methods, and adjusting the mud weight. Similarly a loss of drilling fluid to the formation leads to analogous series of time-consuming events.

25 We have also found that the system and method of the invention provide additional advantages in terms of allowing operation with a reduced reservoir, by virtue of closed operation under back pressure. Moreover the system and method can be operated efficiently, without the need for repeated balancing of the system after any operational pause in drilling.

Preferably the method for drilling a well while injecting a drilling fluid through an injection line of said well and recovering through a return line of said well where the well being drilled is closed at all times comprising the following steps:
a) providing a pressure containment device, suitably of a type that allows passage of pipe under pressure, to a wellbore;

b) providing a pressure/flow control device to control the flow out of the well and to keep a back pressure on the well;

c) providing a central data acquisition and control system and related software;
d) providing mass flow meters in both injection and return lines;

e) providing flow rate meters in both injection and return lines;
f) providing at least one pressure sensor;

g) providing at least one temperature sensor;

h) injecting drilling fluid through said injection line through which said fluid is made to contact said mass flow meters, said fluid flow meters and said pressure and temperature sensors, and recovering drilling fluid through said return line;

i) collecting drill cuttings at the surface;

j) measuring the mass flow in and out of the well and collecting mass flow signals;

k) measuring the fluid flow rates in and out of the well and collecting fluid flow signals;

1) measuring pressure and temperature of fluid and collecting pressure and temperature signals;

m) directing all the collected flow, pressure and temperature signals to the said central data acquisition and control system;

n) the software of the central data acquisition and control system considering, at each time, the predicted flow out of the well taking into account several parameters;

o) having the actual and predicted out flows compared and checked for any discrepancy, compensated for time lags in between input and output;

p) in case of a discrepancy, having a signal sent by the central data acquisition and control system to adjust the pressure/flow control device and restore the predicted out flow rate, without interruption of the drilling operation.

Preferably the mass flow metering according to the method comprises any subcomponents designed to improve accuracy of the measurement, preferably comprises measuring the mass flux of cuttings, produced at shaker(s) and mass outflow of gas, from degasser(s), and comprise measuring the mass flow and fluid flow into the well bore through the annulus, independently of the current fluid injection path.

Preferably the method comprises additionally at i), measuring drill cuttings rate, mass or volume, when required, to measure the rate of cuttings being produced from the well.

The method comprises measuring pressure at least at the well head and/or at the bottom hole.

The invention contemplates also the use of more than one location for pressure/flow control device at different locations inside the well to apply back pressure. The method may include containing pressure at two or more locations in series, and controlling pressure/flow at two or more locations in series or parallel inside the well, to apply back pressure. Preferably the method comprises controlling pressure/flow at two or more locations in the well in series, whereby a pressure profile is established throughout the well. Preferably controlling pressure/flow at more than two locations in the well enable independent zones to be created throughout the length of the well, wherein the locations for the pressure/flow control define zone interfaces. Preferably fluid is additionally injected directly to each pressure zone of the annulus, and optionally returned from each pressure zone thereof.

The drilling fluid may be selected from water, gas, oil and combinations thereof or their lightweight fluids. Preferably a lightweight fluid comprises added hollow glass spheres or other weight reducing material. Preferably, in scenarios where the pore pressure is normal, below normal or slightly above normal, a lightweight fluid is used.

Whenever such more than one pressure/flow control devices are combined with using lightweight fluids it is possible to broaden the pressure profiles contemplated by the method, for example, locations where the fracture gradients are low and there is a narrow margin between pore and fracture pressure.

20- According to this embodiment of the invention, which contemplates the use of a lightweight fluid, combined with the use of two or more restrictions to apply back pressure, a huge variety of pressure profiles may be envisaged for the well.
Thus, by a continuous adjustment of the back pressure it is possible to change the density of the light fluid to optimize each pressure scenario.

The main advantage of using a lightweight fluid is the possibility of starting drilling with a fluid weight less than water. This is especially important in zones with normal or below normal pressure, normal pore pressure being the pressure exerted by a column of water. In these cases, if a conventional drilling fluid is used, the initial bottomhole pressure might be already high enough to fracture the formation and cause mud losses. By starting with a lightweight fluid, the back pressure can be applied to achieve the balance required to avoid an influx, but being controlled at all times as to avoid an excessive value to cause the losses.
The present invention provides also a method of drilling where the bottomhole pressure can be very close to the pore pressure, thus reducing the overbalanced pressure usually applied on the reservoir; and consequently reducing the risk of fluid losses and subsequent contamination of the wellbore causing damage, the overall effect being that the well productivity is increased. Drilling with the bottomhole pressure close to the pore pressure also increases the rate of penetration, reducing the overall time needed to drill the well, incurrin(".
in substantial savings.

The present invention provides further a method to drill with the exact bottomhole pressure needed, with a direct determination of the pore pressure.

The present invention provides also a method for the direct determination of the fracture pressure if needed.

In a further aspect of the invention there is provided a method for the real time determination of the fracture pressure of a. well being drilled with a drill string and drilling fluid circulated therethrough, while the well is kept closed at all times, said method comprising the steps of:

a) providing a pressure sensor at the bottom of the drill string;

b) having fluid and mass flow data generated collected and directed to a central data acquisition and control device that sets an expected value for fluid and mass flow;

c) the said central data acquisition and control device continuously 5 comparing the said expected fluid and mass flow to the actual fluid and mass flow;

d) in case of a discrepancy between the expected and actual value, the said central data acquisition and control device activating a pressure/flow control device;

10 e) the detected discrepancy being a fluid loss, the value of the fracture pressure being obtained from a direct reading of the bottomhole pressure.

In a further aspect of the invention there is provided a method for the real-time determination of the pore pressure of a well being drilled with a drill string and 15 drilling fluid circulated therethrough, while the well is kept closed at all times, said method comprising the steps of:

a) providing a pressure sensor at the bottom of the drill string;

b) having fluid and mass flow data generated collected and directed to a 20 central data acquisition and control device that sets an expected value for fluid and mass flow;

c) the said central data acquisition and control device continuously comparing the said expected fluid and mass flow to the actual fluid and mass flow;

25 d) in case of a discrepancy between the expected and actual value, the said central data acquisition and control device activating a pressure/flow control device;

e) the detected discrepancy being an influx, the value of the pore pressure being obtained from a direct reading of the bottomhole pressure provided by the said pressure sensor.

Since both the fracture and pore pressure curves are estimated and usually are not accurate, the present invention allows a significant reduction of risk by determining either the pore pressure or the fracture pressure, or, in more critical situations, both the pore and fracture pressure curves in a very accurate mode while drilling the well. Therefore by eliminating uncertainties from pore and fracture pressures and being able to quickly react to correct any undesired event, the present method is consequently much safer than state-of-the-art drilling methods.

The present invention provides further a drilling method where the elimination of the kick tolerance and tripping margin on the design of the well is made possible, since the pore and fracture pressure will be determined in real time while drilling the well, and, therefore, no safety margin or only a small one is necessary when designing the well. The kick tolerance is not needed since there will be no interruption in the drilling operation to circulate out any gas that might have entered into the well. Also, the tripping margin is not necessary because it will be replaced by the back pressure on the well, adjusted automatically when stopping circulation.

Also, the invention provides a drilling method where a closed-loop system allowing the balance of the in and out flows may be used with a lightweight fluid as the drilling fluid.

The invention provides further a drilling method where the use of a lightweight fluid together with the closed-loop system renders the drilling safer and cheaper, besides other technical advantages in deepwater scenarios where the pore pressure is normal, below normal, or slightly above normal, being normal the pore pressure equivalent to the sea water column.

The invention provides still a drilling method of high flexibility in zones of normal or below normal pore pressure, by creating either a dual density gradient drilling in deepwater or just a single variable density gradient drilling. in zones of normal or below normal pore pressure.

The invention provides still a drilling method which combines the generation of a dual density gradient drilling and a lightweight drilling fluid, this allowing it to be applied to pressure profiles where the fracture gradients are low and there are nar-row margins between pore and fracture pressure.

The invention provides further a drilling method which combines the generation of a dual density gradient drilling and a lightweight drilling fluid, this allowing the density of the light fluid to be changed to optimize each pressure scenario, since the back pressure to be applied will also be continuously adjusted.

By the fast detection of any influx and by having the well closed and under pressure at all times while drilling, the present invention allows the well control procedure to be much simpler, faster, and safer, since no time is wasted in checking the flow, closing the well, measuring the pressure, changing the mud weight if needed, and circulating the kick out of the well.

In a further aspect of the invention there is provided a method for designing a system as hereinbefore defined having regard to the intended location geology and the like comprising designing parameters relating to a wellbore, sealing means, drill string, drill casing, fluid injection means at the surface and annulus evacuation means in manner to determine mass and dynamic flow by means of designing the location and nature of means to monitor fluid flow and flow rate and designing location and nature of means to adjust fluid flow, close the well, and acquire all the relevant parameters that might be available while drilling the well, and direct the acquired parameters to any means of predicting the ideal outflow to adjust the actual outflow to the predicted value.
In a further aspect of the invention there is provided control software for a system or method as hereinbefore defined, designed to predict an expected, ideal value for outflow, based on calculations taking into account several parameters, and compare the predicted ideal value with the actual, return value as measured by flow meters, said comparison yielding any discrepancies, said software also receiving as input any early detection parameters, which input triggers a chain of investigation of probable scenarios, checking of actual other parameters and other means to ascertain that an influx/loss event has occurred. Preferably the said software utilizes all parameters being acquired during the drilling operation to enhance the prediction of the predicted flow.

The software determines that, in the case that the fluid volume from the well is increasing or decreasing, after compensating for all possible factors, it is a sign that an influx or loss is happening.

Preferably the software is provided with detection filters and/or processing filters to eliminate/reduce false indications on the received mass and fluid flow data, and any other measured or detected parameters. The software preferably provides a predicted ideal value of the outflow based on calculations taking into account among others rate of penetration, rock and drilling fluid density, well diameter, in and out flow rates, cuttings return rate, bottomhole and wellhead pressures and temperatures, torque and drag, weight on bit, hook load, and injection pressures.

The software as hereinbefore defined acts on the principle of mass conservation, to determine the difference in mass being injected and returned from the well, compensates for increase in hole volume, additional mass of rock returning and other factors as an indication of the nature of the fluid event occurring downhole.
Suitably the software compensates for relevant factors such as thermal expansion/contraction and compressibility changes, solubility effects, blend and mixture effects as an indication of the nature of fluid in a fluid influx event.

Preferably in the software of the invention, detection of an influx or loss by means of the System or Method of the invention as hereinbefore defined or by any conventional system or method triggers a chain of investigation of probable influx events, starting with an assumption of fluid phase, comparing to the observation of discrepancy to check for behavioural agreement and in the event of disagreement repeating the assumption for different phases until agreement is reached.

Preferably the software of the invention, after identification of influx event, calculates the amount, location and timing of the influx or influxes and calculates an adjusted return flow rate required to circulate the fluid out and prevent further influx.

The software as hereinbefore defined includes all the necessary algorithms, empirical calculations or other method to allow accurate estimation of the hydrostatic head and friction losses including any transient effects such as 5 changing temperature profile along the well.

Preferably the software as hereinbefore defined on identifying an influx or loss event, automatically sends a command to a pressure/flow control device designed to adjust the return flow rate so as to restore the said return flow to the predicted 10 ideal value, thereby preemptively adjusting backpressure to immediately control the event.

Preferably the software as hereinbefore defined generates a command relating to an adjustment to the back pressure to compensate for dynamic friction losses 15 when mud circulation is interrupted, avoiding influx of reservoir fluids.

Preferably the software as hereinbefore defined is coupled with a feedback loop to constantly monitor the reaction to each action, as well as the necessary software design, and any necessary decision system to ensure consistent 20 operation.

In a fiirther aspect of the invention there is provided a method of controlling a well embodied in suitable software and suitably programmed computers.

25 In a further aspect of the invention there is provided a module for use in association with a conventional system for operating a well which provides the essential components of the system as hereinbefore defined.

In one embodiment the module is for use in a return line of a system as hereinbefore defined comprising one or more return line segments in parallel each comprising a pressure/flow control device, optional sensors for flow out, and a degasser which is suited for insertion in a return line to operate in a desired pressure range.

The module may be for location at the ground surface or at the seabed.

In a further embodiment a module is foruse in an injection line of a system as hereinbefore defined comprising a pump and optional sensors for fluid flow, and means for sealingly engaging with the well for injection into the annulus thereof.
It should be understood that all the devices used in the present system and method, such as flow metering system, pressure containment device, pressure and temperature sensors, pressure/flow control device are commercial devices and as such do not constitute an object of the invention.

Further, it is within the scope of the application that any improvements in mass/flow rate measurements or any other measuring device can be incorporated into the method. Also comprised within the scope of the application are any improvements in the accuracy and time lag to detect influx or fluid losses as well as any improvements in the system to manipulate the data and make decisions related to restore the predicted flow value.

Thus, improved detection, measurement or actuation tools are all comprised within the scope of the application.

BRIEF DESCRIPTION OF THE DRAWINGS

The method and system of the invention will now be described in more detail based on the appended FIGURES wherein FIGURE 1 attached is a state-of-the-art log of pore and fracture pressure curves indicated hereinbefore. Included in this figure are the kick tolerance and tripping margin, used for designing the casing setting points, in this case taken as 0.3 ppg below the fracture pressure and above the pore pressure, respectively. This value is commonly used in the industry. On- the right hand side the number and diameter of the casing strings required to safely drill this well using the current conventional drilling method is shown. As pointed out before, the two curves shown are estimated before drilling. Actual values might never be determined by the current conventional drilling method.

FIGURE 2 attached is a log of the same curves according to the invention, without the kick tolerance and tripping margin of 0.3 ppg included. On the right hand side the number of casing strings required can be seen. With the drilling method described in the present application the elimination of the kick tolerance and tripping margin on the design of the well is made possible, since the pore and fracture pressure will be determined in real time while drilling the well, with the well being drilled closed at all times, and, therefore, no safety margin is necessary when desigaing the well.

FIGURE 3 attached is a state-of-the-art schematics of the circulating system of a standard rig, with the return flow open to the atmosphere.

FIGURES 4 to 6 attached are schematics of the circulating system of a rig with the drilling method described in the application. A pressure containment device located at the wellhead, fluid flow meters on the inlet and outlet streams, and other pieces of equipment have been added to the standard drilling rig configuration. Means is illustrated which receives all the data gathered and identifies a fluid influx or loss.

Additionally in FIGURES 5 and 6, fluid flow meters include mass flow and fluid flow rate meters, also pressure and temperature sensors, cuttings mass/volume measurement device and pressure/flow control device have been added to the standard drilling rig configuration and a control system has been added to receive data gathered and actuate the pressure/flow control device on the outlet stream.
Additionally in FIGURE 6, additional pressure/flow control device(s) have been added to create distinct pressure zones.

FIGURE 7 attached is a general block diagram of the method described in the present invention for the early detection of influx or loss of fluid, direct determination of pore and fracture pressure and regulating ECD
instantaneously.
FIGURE 8 attached is a flowsheet that schematically illustrates the method of the invention.

As pointed out hereinbefore, the present system and method of drilling wells is based on a closed-loop system. The inventive method and system is applied to oil and gas wells, as well as to geothermal wells.

While several of the devices being described have been used in some configuration or combination, and several of the parameter measurements have been included in descriptive methods on patents or literature, none have ever:

1. Simultaneously combined the measurement of all critical parameters to ensure the necessary accuracy required allowing such a system to effectively function as a whole method;

2. Utilized mass flow meters simultaneously on inlet and outlet flows;

3. Utilized mass measurement of cuttings in conjunction with mass flow measurement on inlet and outlet;

4. Utilized a pressure/flow control device as an instant control of ECD during drilling for the purpose of preventing and controlling influx or losses;

5. Defined the use of a pressure/flow control device as a pro-active method for adjusting ECD based on early detection of influx/loss events; or 6. Defined the use of more than one pressure/flow control device combined to a lightweight drilling fluid to make that the equivalent drilling fluid weight above the mud line is lower than the equivalent fluid weight inside the wellbore.

FIGURE 3 illustrates a drilling method according to state-of-the-art techniques.
Thus, a drilling fluid is injected through the drill string (1), down the wellbore through the bit (2) and up the annulus (3). At the surface the fluid that is under atmospheric pressure is directed to the shale shaker (4) for solid/liquid separation.
The liquid is directed to the mud tank (5) from where the mud pumps (6) suck the fluid to inject it through the drill string (1) and close the circuit. In case of a kick, normally detected by mud tank volume variation indicated by level sensors (7), the BOP (8) must be closed to allow kick control. At this point the drilling operation is stopped to check pressure and adjust the mud weight to avoid further influxes. Improvements in state-of-the- art drilling methods are generally directed to, for example, improve the measurement of volume increase or decrease in tank (5). However, such improvements bring only minor changes to the kick detection procedure; furthermore, no fundamental modifications are 5 known directed to the improvement of safety and/or to keeping the drilling method continuous, this modification being only brought about by the present invention.

On the contrary, according to FIGURE 4 that illustrates the system of the 10 invention, the drilling fluid is injected through the drill string (1), going down towards the bottom hole through the bit (2) and up the annulus (3) and is diverted by a pressure containment device (26) through a closed return line (27) under pressure. BOP (8) remains open during drilling. The fluid is made to contact flow meter (11) and degasser (13) then to the shale shaker (4).

The shale shaker (4) separates the cuttings (drill solids) from the liquid.
The mass/volume of gas separated in degasser (13) is measured by a device (25).

The drilling fluid is injected with the aid of pump (6) through an injection line (14) through which said fluid is made to contact flow meter (15). Devices (7), (11), (15) and (25) all acquire data which is directed to a central data point (18) and used to obtain real time values for flow rates, and compared with predicted values and identify any discrepancy. A discrepancy is evaluated initially as any event other than influx or fluid loss which might cause the observed discrepancy and a determination is made whether the discrepancy indicates a malfunctioning or other system event or is an early detection of influx or loss of drilling fluid.
This early detection is important to a number of subsequent operations which may be performed in relation to the well, since the detection may be as much as several hours in advance of the consequence of such an influx or loss being apparent at the surface in the form of a kick. Operations include direct determination of pore or fracture pressure, controlling ECD to restore predicted values etc. Safety features present in the system and method include closing BOP
(8) thereby closing the well to contain a kick.

An embodiment of the system of FIGURE 4 is shown in FIGURE 5. In this case the fluid is made to contact pressure and temperature sensors (9), fluid flow meter (10), mass flow meter (11) and flow/pressure control device (12) then degasser (13 ) and then to the shale shaker (4).

The shale shaker (4) separates the cuttings (drill solids) from the liquid and the solids have their mass/volume determined (19) while the liquid is directed to the mud tank (5) having the mass/volume determined as well (20). All standard drilling parameters are acquired by a device (21) normally called mud logging.
Downhole parameters are acquired by a device (24) located close to the bit (2).
The mass/volume of gas separated in degasser (13) is measured by a device (25).
The drilling fluid is injected with the aid of pump (6) through an injection line (14) through which said fluid is made to contact mass flow meter (15), fluid flow meter (16), pressure and temperature sensors (17). Devices (7), (9), (10), (11), (15), (16), (17), (19), (20), (21), (24), (25) all acquire data as signals that are directed to a central data acquisition and control system (18). System (18) sends a signal to the pressure/flow control device (12) to open or close it. Whenever it is deemed necessary, a pump (23) may send fluid directly to the annulus (3) through a dedicated injection line (22) via a mass flow meter (28), fluid flow meter (28) and pressure and temperature sensors (28). For figure simplification these three devices are shown in just one piece of equipment. This injection line may be incorporated as part of the standard circulation system, or embodied in other ways, the purpose being to provide an independent, of normal drilling circulation, means of flow into wellbore. The central data acquisition and control system (18) acquires data from device (28).

A further embodiment of the system of FIGURE 4 is shown in FIGURE 6. In this case it is desired to combine lightweight drilling fluid and back pressures so that the equivalent drilling fluid weight above the mud line is lower than the equivalent fluid weight inside the wellbore. To achieve this, at least two pressure/flow control devices (12) are used. The devices (12) may be placed, one at the bottom of the ocean and the other at the surface, or at any other convenient location. On using a lightweight fluid, it is injected and returned the same way as the conventional fluid, that is, injected through the drillstring and returned through the annulus. In this case more than one dedicated injection line (22) may be used each with a pump (23) to send fluid directly to the annulus (3) through a mass flow meter (28), fluid flow meter (28) and pressure and temperature sensors (28).

According to the concept of the present invention, as illustrated in FIGURES 4 to 6, a pressure containment device (26) diverts the drilling fluid and keeps it under pressure. Device (26) is a rotating BOP and is located at the surface or the sea floor. The drilling fluid is diverted to a closed pipe (27) and then to a surface system. The device (26) is a standard equipment that is commercially available or readily adapted from existing designs.

As described hereinbefore, upon a signal received from control system (18) the pressure/flow control device (12) opens or closes to allow decrease or increase of the backpressure at the well head so that the outflow can be restored to the predicted value determined by system (18). Two or more of these pressure/flow control devices (12) can be installed in parallel with isolation valves to allow redundant operation. Devices (12) can be positioned downstream of the pressure containment device (26) at any suitable point in the surface system. Some surface systems may incorporate two or more of such devices (12) at different nodes.

One critical aspect of the present method is the accurate measurement of the injected and returned mass and fluid flow,rates. The equipment used to carry out such measurement is mass flow meters (11,15) and fluid flow meters (10,16).

The equipment is installed in the injected (14) and return (27) fluid lines.
These meters may also be installed at the gas outlet (25) of the degasser (13) and somewhere (20) on the fluid line between shale shaker (4) and tank (5). Also they may be installed on the independent injection line (22). The mass and fluid flow meters are commercially available equipment. Multi-phase meters are also commercially available and may be used. The precision of this equipment, allows accurate measurement, subsequent control and safer drilling.

To fi.irther improve the accuracy of the method the cuttings mass/volume rate can be measured by commercially available equipment (19) to verify that the mass of cuttings being received back at the surface is correlated with the rate of penetration and wellbore geometry. This data allows correction of the mass flow data and allows identification of trouble events.

The measurements of mass and fluid flow rates provide data that are collected and directed to a central data acquisition and control system (18).

The central data acquisition and control system (18) is provided with a software designed to predict an expected, ideal value for the outflow, said value being based on calculations taking into account several parameters including but not restricted to rate of penetration, rock and drilling fluid density, well diameter, in and out flow rates, cuttings return rate, bottomhole and wellhead pressures and temperatures.

Said software compares the said predicted ideal value with the actual, return flow rate value as measured by the mass flow meters (11,15) and fluid flow meters (10,16). If the comparison yields any discrepancy, the software automatically sends a command to a pressure/flow control device (12) designed to adjust the return flow rate so as to restore the said return flow rate to the predicted, ideal value.

Said software can also receive as input any early detection parameters available or being developed or capable of being developed. Such input will trigger a chain of investigation of probable scenarios, checking of actual other parameter and any other means (databased or software or mathematical) to ascertain that an influx/loss event has occurred. Said software will in such cases pre-emptively adjust backpressure to immediately control the event.

Said software will allow for override of the standard detection (state-of-the-art) by the early detection system of the invention and will compensate and filter for any conflict in fluid/mass flow indication.

Said software may have filters, databases, historical learning and/or any other mathematical methods, fuzzy logic or other software means to optimize control of the system.

The pressure/flow control device (12) used to restore the ideal flow is standard, commercially available equipment or is specifically designed for the required purpose chosen according to the well parameters such as diameter of the return 5 line, pressure and flow requirements.

According to the present method, the flow rates in and out of the wellbore are controlled, and the pressure inside the wellbore is adjusted by the pressure/flow control device (12) installed on the return. line (27) or further downstream in the 10 surface system.

Thus, if the drilling fluid volume returning from the wellbore is increasing, after compensating for all possible factors it is a sign that an influx is happening. In this case the surface pressure should be increased to restore the bottomhole 15 pressure in such a way as to overcome the reservoir pressure.

On the other hand, if the fluid volume returning is decreasing, after compensating for all possible factors it means the pressure inside the wellbore is higher than the fracture pressure of the rock, or that the sealing of the drilling mud is not 20 effective. Therefore, it is necessary to reduce the wellbore pressure, and the reduction will take place by lowering the surface back pressure sufficiently to restore the normal condition.

If an early detection signal is confirmed, control system (18) will proactively 25 adjust the backpressure by opening or closing pressure/flow control device (12) to suit the occurred event.

Thus, upon any undesired event, the system acts in order to adjust the rate of return flow and/or pressure thus increasing or decreasing the backpressure, while creating the desired condition downhole of no inflow from the exposed formation or no loss of fluid to the same exposed formation. This is coupled with a feedback loop to constantly monitor the reaction to each action, as well as the necessary software design, and any necessary decision system including but not limited to databases and fuzzy logic filters to ensure consistent operation.

Another very important device used in the method and system of this invention is the pressure containment equipment (26), to keep the well flowing under pressure at all times. By controlling the pressure inside the well with a pressure/flow control device (12) on the return line (27) the bottomhole pressure can be quickly adjusted to the desired value so as to eliminate the losses or gains being detected.

By having a pressure sensor (24) at the bottom of the string (1) and another one (9) at the surface, the pore and fracture pressures of the formations can be directly determined, dramatically improving the accuracy of such pressure values.

The assessment of the pore and fracture pressures according to the method of the invention is carried out in the following way: if the central data acquisition and control system (18) detects any discrepancy and a decision to actuate the pressure/flow control device (12) is made, it is a sign that either a fluid loss or influx is occurring. The Applicant has thus ascertained that if there is a fluid loss this means that the bottomhole pressure being recorded is equivalent to the fracture pressure of the formation.

On the contrary, if an influx is detected, this means that the bottomhole pressure being recorded is equivalent to the pore pressure of the formation.

Further, in case of the absence of the pressure sensor in the bottomhole, the variables pore pressure and fracture pressure can be estimated. Thus, the bottomhole pressure is not one of the variables being recorded and only the wellhead or surface pressure is the pressure variable being acquired. The pore pressure and the fracture pressure can then be indirectly estimated by adding to the obtained value the hydrostatic head and friction losses within the wellbore.
The software pertaining to the central data and control system (18) would include all the necessary algorithms, empirical correlations or other method to allow accurate estimation of the hydrostatic head and friction losses including any transient effects like, but not limited to, changing temperature profile along the wellbore.

A circulation bypass composed of a pump (23) and a dedicated injection line (22) to the weilbore annulus allows keeping a constant pressure downhole during circulation stops and continuously detecting any changes in the mass balance indicative of an influx or loss during the circulation stop.

By using the method and system of the invention, the errors from estimating the required mud weight based on static conditions are avoided since the measurements are effected under the same dynamic conditions as those when the actual events occur.

This method also renders possible to run the mud density at a value slightly lower than that required to balance the formation pressure and using the backpressure on the well to exert an extremely controllable ECD at the bottomhole that has the flexibility to be instantaneously adjusted up or down. This will be the preferred method in wells with very narrow pore pressure/fracture pressure margins as occur in some drilling scenarios.

In this case one of the parameters mentioned in Table 1, which is the advantage of having three safety barriers is negated. However, the current technical limit on some ultra-deep water wells, due to the narrow margin, when drilling with the state-of-the art method, leads to a sequence of fluid influxes/losses due to the inaccuracies in manually controlling the mud density and subsequent ECD as described above, that can lead to loss of control of the drilling situation and has resulted in the abandonment of such wells due to the safety risks and technical inability to recover from the situation.

However, the method of the invention allows, by creating an instant control mud weight window, controlling the ECD by increasing or decreasing the backpressure, controlled by the positioning of the pressure/flow control device, to create the conditions for staying within the narrow margin. This results in the technical ability to drill wells in very adverse conditions as in narrow mud weight window, under full control with the consequent improvement in safety as the well is at all times in a stable circulating condition, while still retaining two barriers i.e. the BOP (blow-out preventer), and the pressure containment device.

The central data acquisition and control system (18) has a direct output for actuation of the pressure/flow control device(s) (12) downstream the wellhead opening or closing the flow out of the well to restore the expected value. At this point, if an action is needed, the bottomhole pressure is recorded and associated to the pore or fracture pressure, if a gain or loss is being observed, respectively.

In case an influx of gas occurs, the circulation of the gas out of the well is immediately effected. By closing the pressure/flow control device (12) to restore the balance of flow and the predicted value, the bottomhole pressure regains a value that avoids any further influx. At this point no more gas will enter the well and the problem is limited to circulating out the small amount of gas that might have entered the well. Since the well that is being drilled is closed at all times, there is no need to stop circulation, check if the well is flowing, shut-in the BOP, measure the pressures, adjust the mud weight, and then circulate the kick out of the well as in standard methods. The mass flow together with the flow rate measurements provide a very efficient and fast way of detecting an inflow of gas.
Also, the complete removal of the gas from the well is easily determined by the combination of the mass flow and flow rates in and out of the well.

Also the incorporation of early detection of influx/loss devices, which can pre-emptively result in opening or closing the pressure/flow control device (12), as part of the system, will allow pro-active reaction to influx/losses not achieved by state-of the-art systems.

The function of the rotating pressure containment device (26) is to allow the drill string (1) to pass through it and rotate, if a rotating drilling activity is carried on.
Thus, the drill string (1) is stripped through the rotating pressure containment device; the annulus between the outside of the drill pipe and the inside of the wellbore/casing/riser is closed by this equipment. The rotating pressure containment device (26) can be replaced by a simplified pressure containment device such as the stripper(s) (a type of BOP designed to allow continuous passage of non-jointed pipe) on coiled tubing operations. The return flow of drilling fluid is, therefore, diverted to a closed pipe (27) to the surface treatment package. This surface package should be composed of at least a degasser (13) and shale shaker (4) for solids separation. This way the influxes can be automatically handled.

The central data acquisition and control system (18) receives all the signals of 5 different drilling parameters, including but not limited to injection and return flow rates, injection and return mass flow rates, back-pressure at the surface, down-hole pressure, cuttings mass rates, rate of penetration, mud density, rock lithology, and weilbore diameter. It is not necessary to use all these parameters with the drilling method herein proposed. 10 The central data acquisition and control system (18) processes the signals received and looks for any deviation from expected behavior. If a deviation is detected, the central data acquisition and control system (18) activates the flow pressure/flow control device (12) to adjust the back-pressure on the return line 15 (27). This is coupled with a feedback loop to constantly monitor the reaction to each action, as well as the necessary software design, and any necessary decision system including but not limited to databases and fuzzy logic filters to ensure consistent operation.

20 In spite of the fact that some early-detection means have been described, it should be understood that the present method and system is not limited to the described items. Thus, an influx may be detected by other means including but not limited to downhole temperature effects, downhole hydrocarbon detection, pressure changes, pressure pulses; said system pre-emptively adjusting backpressure on 25 the wellbore based on influx or loss indication before surface system detection.
The drilling of the well is done with the rotating pressure containment device (26) closed against the drill string. If a deviation outside the predicted values of the return flow and mass ' flow rates is observed, the control system (18) sends a signal either to open the flow, reducing the back-pressure or restricting the flow, increasing the back-pressure.

This deviation may also be a signal from an early detection device.

The first option (flow opening) is applied in case a fluid loss is detected and the second one (flow restriction), if a fluid gain is observed. The changes in flow are done in steps previously defined. These step changes can be adjusted as the well is drilled and the effective pore and fracture pressures are determined.

The whole drilling operation is continuously monitored so that a switch to a manual control can be implemented, if anything goes wrong. Any adjustments and modifications can also be implemented as the drilling progresses. If at all desired, restoring to the state-of-the-art drilling method is easily done, by not using anymore the rotating pressure containment device (26) against the drill string (1), allowing the annulus to be open to the atmosphere again.

A block diagram of the method described in the present invention is shown in FIGURE 7.

In fact, the present system and method implies many variations and modifications within its scope and as such it can be applied to all kinds of wells, onshore as well as offshore, and the equipment location and distribution can vary according to the well, risks, application and restrictions of each case.

EXAMPLES

The invention is now illustrated in non- limiting manner with reference to the following Examples and Figures EXAMPLE 1 - identifying and controlling influx or fluid loss Usually, in the prior art methods and systems indirect estimation made before drilling, based on correlations from logs, or during drilling using drilling parameters are the best alternatives to determine the pore pressure.
Similarly, fracture pressure is also indirectly estimated from logs before drilling. In some situations the fracture pressure is determined at certain points while drilling, usually when a casing shoe is set, not along the whole well.

Advantageously, when using the method and system of the invention the pore and fracture pressure may be directly determined while drilling the well. This entails great savings as regards safety and time, two parameters of utmost importance in drilling operations.

In state-of-the-art methods, the bottomhole pressure is adjusted by increasing or reducing the mud weight. The increase or reduction in mud weight is most of the time effected based on quasi-empirical methods, which by definition implies inaccuracies, which are handled by an iterative process of: -adjusting mud weight, measuring mud weight- this process being repeated until the desired value is reached. To further complicate the matter, due to the time lag, caused by the circulation time (i.e., time for a full loop movement of a unit element of mud), the adjustments must be made in stages, e.g., in order to quickly contain an influx, a higher density mud is introduced into the system to produce an increase in ECD (Equivalent Circulating Density). At the point where additional hydrostatic head of this higher density mud, coupled with the hydrostatic head of lower density mud, initially in circulation, becomes close to being sufficient to contain the influx, another variation in density of mud must be executed in order not to increase the ECD to the point of creating losses.
This is further complicated by the fact that such density adjustments affect the rheology (viscosity, yield point, etc.) of the mud system leading to changes in the friction component, which in turn has a direct effect on the ECD. So, in practice, the adjustment of mud weight is not always successful in restoring the desired equilibrium of fluid circulation in the system. Inaccuracy, depending on its extent, may lead to hazardous situations such as blowouts.

On the contrary, the method and system of the invention allows for a precise adjustment of increase or reduction in bottomhole pressure. By using the pressure/flow control device (12) to restore the equilibrium and pressures inside the wellbore, the adjustment is much faster achieved, avoiding the hazardous situation of well-known methods.

Also, by using more than two pressure/flow control devices and a lightweight drilling fluid, it is possible to make that the equivalent drilling fluid weight above the mud line may be set lower than the equivalent fluid weight inside the wellbore, this creating a dual-density gradient, which in some situations is absolutely necessary to accomplish the objectives of the well.

It should also be pointed out that in state-of-the-art methods the required bottomhole pressures needed to restore the equilibrium are estimated under static conditions, since these determinations are made without fluid circulation.

However, the influxes or fluid losses are events that occur under dynamic conditions. This implies in even more errors and inaccuracies.

FIGURE 8 is a flowchart illustrating the drilling method of the invention in a schematic mode, with the decision-making process that identifies an influx or loss and/or leads to the restoration of the predicted flow as determined by the central data acquisition and control system. A further decision makinQ loop is incorporated at "discrepancy" and applies scenarios to the observed discrepancy, such as sensor malfunction, fluid loss to the shaker with formation changes, ECD
gain, fluid addition rate exceeding the programmed rate for a predicted fluid flow and the like. If the discrepancy is found to be caused by such a scenario, the system generates a sensor alert, or restore a malfunctioning or malcontrolled parameter or resets predicted values to the deviant parameter. If the discrepancy is found not to be caused by such a scenario, it is identified as an influx or fluid loss.

A further decision making loop is then incorporated at "fluid loss" and "fluid gain" and applies loss or gain events to the observed discrepancy to identify the nature of fluid, whereupon by applying the principle of mass conservation, the influx or loss can be fully characterised by amount and location(s), and change in baclcpressure calculated to contain the influx or loss event.

Table A shows such a decision making process applied after identifying an influx or fluid loss, either by conventional method such as downhole temperature effects, hydrocarbon detection, change in pressure, pressure pulse and the like, or bv the method of the invention comparing predicted and actual flow out.

Discrepancy Event Regulate fluid out value and recompare -discrepancy remains?

increase in fluid is gas, yes - go back to Event fluid out expands fluid is water, yes - go back to Event 5 no expansion fluid is oil, gas no - event identified, calculate is soluble in oil required backpressure 10 In Figure 9 is shown the predicted ECD with time against the actual value.
A
discrepancy is observed at A. which is contained at B. and circulated out at C.
Containment of influx occurs after influx event analysis to identify nature of fluid, whereupon location and amount of influx is determined. In the case of a soluble fluid influx, shown by the dotted line, the influx increase as it rises up the 15 well, and circulation out is only complete as the solubility is identified in a second influx event analysis at D. A control loop continuously checks predicted and actual ECD values and revises adjustment required to restore the predicted ECD, or in the case of a change in formation or the like, sets a new predicted ECD. It will therefore be apparent that in some cases the influx or loss is 20 contained and new ECD levels are set. In some cases the discrepancy is not in fact an influx or loss but is a change in formation whereby the predicted values are not effective and a parameter relating to the well has changed, and revision of predicted values is necessary. This is shown at E.

25 EXAiYIPLE 2 - comparison with conventional methods It has been mentioned before that in the conventional drilling methods the hydrostatic pressure exerted by the mud column is responsible for keeping the reservoir fluids from flowing into the well. This is called a primary safety barrier. All drilling operations should have two safety barriers, the second one usually being the blow-out preventer equipment, which can be closed in case an influx occurs. The drilling method and system herein described introduces for the first time three safety barriers during drilling, these being the drilling fluid, the blow-out preventer equipment, and the rotating pressure containment device.

In underbalanced drilling (UBD) operations, there are just two barriers, the rotating pressure containment device and the blow-out preventer, since the drilling fluid inside the wellbore must exert a bottomhole pressure smaller than the reservoir pressure to allow production while drilling.

As noted before, there are three other main methods of closed system drilling, known as underbalanced drilling (UBD), mud-cap drilling, and air drilling. All three methods have restricted operating scenarios applicable to small portions of the wellbore, with mud-cap drilling and air drilling only usable under very specific conditions, whereas the method herein described is applicable to the entire length of the wellbore.

TABLE 1 below shows the key differences among the traditional drilling system (Conv.), compared with the underbalanced drilling system (UBD) and the present drilling method herein proposed. It can be seen that the key points addressed by the present application are not covered or considered by either the traditional conventional drilling system or by the underbalanced drilling method currently used by the industry.

Feature UBD Conv. INVENTION
Well closed at all times Yes No Yes Production of reservoir fluids while drilling Yes No No Flow rates measured in and out Yes Yes Yes Mass flow measured in No No Yes Mass flow measured out Yes No Yes Prediction of expected outflow No No Yes Pressure/flow control device on the return line Yes No Yes Return flow adjusted automatically according to mass balance No No Yes Degasser device on the return line Yes No Yes Kick detection accurate and fast N/A No Yes Real time' kick/loss detection while drilling No No Yes Can instantly utilize input from early detection of kick/loss N/A No Yes Bottom-hole pressure instantly2 adjusted from surface with small action No No Yes Three safety barriers while drilling No No Yes Accurate pore and fracture pressure determination while drilling No No Yes Can keep a constant pressure at bottom hole during connections and trips No No Yes Immediate control of the well in case of kick N/A No Yes Can be used to drill the entire well No Yes Yes Can be used to drill safely within a very narrow pore/fracture pressure margin No No Yes Where N/A = not applicable 1- real time is the determination of the pore and fracture pressure at the moment the influx of fluid loss occurs, rather than by means of calculation after some period of time.

2 - the underbalanced drilling case here considers a two-phase flow, the most common application of this type of drilling system.

The present method is applicable to the- whole wellbore from the first casing string with a BOP connection, and to any type of well (gas, oil or geothermal), and to any environment (land, offshore, deep offshore, ultra-deep offshore).
It can be implemented and adopted to any rig or drilling installation that uses the conventional method with very few exceptions and limitations.

Further, the proposed closed-loop drilling method combined with the injection of lightweight fluids to produce dual-density gradient drilling is distinguished from the state-of-the-art mud-lift systems by the features listed in TABLE 2 below.

FEATURE DUAL DENSITY
INVENTION STATE-OF-THE-ART
Equipment location Surface except RBOP and Mud Line choke Operational procedures Simple Complex Well control Standard Totally new Failure potential Low High Time/Conditions to repair Quick and cheap Very expensive Restore to conventional Easy and Immediate Not simple drilling Method It should be understood that the mode of the invention using conventional drilling fluid and at least two pressure/flow control devices to apply back pressure is equally able to generate dual density gradient effect. However, this will be usefiil only to specific pressure profiles, not contemplating deepwater locations where the fracture gradients are low.

Thus the present method can be called INTELLIGENT SAFE DRILLING, since the response to influx or losses is nearly immediate and so smoothly done that the drilling can go on without any break in the normal course of action, this representing an unusual and unknown feature in the technique.

Therefore, the present system and method of drilling makes possible:

i) accurate and fast determination of any difference between the in and out flow, detecting any fluid losses or influx;

ii) easy and fast control of the influx or losses;

iii) strong increase of drilling operations safety in challenging environments, such as when drilling in narrow margin between pore and fracture pressures;

iv) strong increase of drilling operations safety when drilling in locations with pore pressure uncertainty, such as exploration wells;

v) strong increase of drilling operations safety when drilling in locations with high pore pressure;

vi) easy switch to underbalanced or conventional drilling modes;

vii) drilling with minimum overbalance, increasing the productivity of the wells, increasing the rate of penetration and thus reducing the overall drilling time;

viii) direct determination of both the pore and fracture pressures;

5 ix) a large reduction in time and therefore cost spent weighting (increasing density) and cutting back (decreasing density) mud systems;
x) .a large reduction in the cost of wells by reduction in the number of necessary casing strings;

xi) a significant reduction in the cost of wells by significantly reducing or 10 eliminating completely the time spent on the problems of differential sticking, lost circulation;

xii) significantly reducing the risk of underground blow-outs;

xiii) a significant reduction of risk to personnel compared to conventional drilling due to the fact that the wellbore is closed at all times, e.g., 15 exposure to sour gas;

xiv) a significant cost reduction due to lowering quantities of mud lost to formations;

xv) a significant improvement in productivity of producing horizons by reduction of fluid loss and consequential permeability reduction 20 (damage);

xvi) a significant improvement in exploration success as fluid invasion due to overweighted mud is limited. Such fluid invasion can mask the presence of hydrocarbons during evaluation by electric logs;

xv) to drill wells in ultra deep water that are reaching technical limit with 25 conventional state-of-the art method;

xvi) to economically drill ultra-deep wells onshore and offshore by increasing the reach of casing strings.

Example 3 - Design of modules For a well determining number and location of pressure/flow control devices (chokes) required and required operating pressure range. Skid comprising eg 3 parallel injection lines each having sensors, and a common degasser is designed for eg 5000 psi in 3 chokes, or greater pressure tolerance in 10 chokes etc.
Skid can be simply installed in any conventional system. A further skid may comprise one or more chokes with a bypass for adjustment. A further skid may comprise a dedicated circulating system for injection direct into the annulus

Claims (40)

The embodiments of the invention in which an exclusive property or privilege is claimed are defined as follows:
1. System for operating a well having an injection line through which an inlet stream flows and a return line through which an outlet stream flows, wherein the system comprises:
a pressure containment device (26) applied to the wellbore so that while the well is being drilled with a drill string (1) having a drilling fluid circulated therethrough, the well is kept closed from atmosphere at all times;
meters (10, 11, 15, 16, 28a, 28b) for measuring at least one of actual mass and actual fluid flow rate of the inlet and outlet streams;

at least one pressure sensor (9, 17, 24, 28c) to obtain actual pressure signals;
a central data acquisition and control system (18);
means (6, 23) for injecting drilling fluid through said injection line (14, 22) through which said fluid is made to contact at least one of said mass and fluid flow meters and said pressure sensor, and recovering drilling fluid through said return line (27);
means (4) for collecting drill cuttings at the surface;

means (10, 11, 15, 16, 28a, 28b) for collecting at least one of a mass signal and a fluid flow signal;

means (9, 17, 24, 28c) for collecting pressure signals;
means for directing all the collected signals of different drilling parameters to said central data acquisition and control system (18);

the central data acquisition and control system (18) having software installed therein; said software determining in real time, during the drilling of the well a predicted signal;
characterised in that the system also comprises:
a pressure/flow control device (12) acting on the outlet stream of the return line (27) to control the flow out of the well and to keep a back pressure on the well;
means to send a command from the central data acquisition and control system (18) to the pressure/flow control device (12) designed to adjust the return flow rate or pressure inside the wellbore, said central data acquisition and control system also programmed to make a comparison between said real time predicted signal and an actual signal, said comparison yielding any discrepancy between said real time predicted signal and said actual signal, said software converting said discrepancy to a value for adjusting the pressure/flow control device and restoring the predicted signal value, said software also seeking identification of an influx or loss event by acting on the principle of mass or volume conservation, to determine the difference in mass or volume being injected and returned from the well, while compensating for factors including increase in hole volume, mass of rock returning as an indication of the nature of the fluid event occurring downhole, said software also receiving as input any early detection parameters, which input triggers a chain of investigation of probable scenarios, to ascertain that an influx/loss event has occurred, and wherein the software after identifying that an influx or loss event has been ascertained, automatically sends a command to the pressure/flow control device designed to adjust the return flow rate or pressure inside the wellbore so as to restore said signal value to the predicted signal value, thereby pre-emptively adjusting backpressure to immediately control the event.
2. The system of claim 1 wherein, said software also compensates for at least one of borehole pressure and borehole temperature.
3. The system of claim 1 wherein, said actual signal is actual pressure as a function of time P actual(t), and said corresponding predicted signal is predicted pressure as a function of time P predicted(t).
4. The system of claim 1 wherein, said actual signal is actual mass or actual fluid flow rate of the outlet stream as a function of time F outactual(t) and said corresponding predicted signal is predicted mass or predicted fluid flow rate of the outlet stream as a function of time F outpredicted(t).
5. A drilling system for drilling a well comprising:
a tubular drill string (1) having an upper and lower end and with a drill bit (2) at its lower end;
a drive mechanism arranged and designed to turn said drill bit (2) in a borehole where a borehole annulus (3) is defined between an outer diameter of said tubular drill string (1) and an inner diameter of said borehole;

a drilling fluid pump (6) in fluid communication with a drilling fluid reservoir (5);
a drilling fluid injection line (14) extending between said pump (6) and said upper end of said drill string (1) and providing fluid communication between said pump (6) and said drill string (1);

a fluid return line (27) extending between an outlet of said borehole annulus (3) and said drilling fluid reservoir (5);
a pressure container device (26) arranged and designed to keep said borehole closed from the atmosphere at all times while said well is being drilled with said drill string (1) having drilling fluid circulating therethrough;
said injection line (14), drill string (1), borehole annulus (3) and return line (27) defining a flow path;
an output flow measurement device (10, 11) in said fluid return line (27) arranged and designed to generate an actual drilling signal F outactual(t) representative of actual flow rate of fluid in said fluid return line (27) as a function of time (t);

a pressure measurement device (9, 17, 24) arranged and designed for generating an actual drilling signal P actual(t) representative of actual pressure at a point in said flow path as a function of time (t);

a central data acquisition and control system (18) arranged and designed, to receive at least one of said actual drilling signals, to determine in real time during drilling of said well an ideal drilling signal corresponding to said at least one of said actual drilling signals, to determine a differential drilling signal ~(t) representative of the difference between said at least one of said actual drilling signals and said corresponding ideal drilling signal, a pressure/flow control device (12) in said fluid return line (27) responsive to said differential drilling signal ~(t) and arranged and designed to adjust backpressure to said borehole annulus (3) of said well, thereby controlling said at least one actual drilling signal and restoring said at least one actual drilling signal to said ideal drilling signal; and said central data acquisition and control system (18) is further arranged and designed, to provide identification of an influx or loss event and based on such identification, to pre-emptively send a signal to said pressure/flow control device (12), thereby pre-emptively adjusting backpressure to immediately control the event while drilling continues.
6. The system of claim 5 further comprising:

an input flow measurement device (15, 16) in said drilling fluid injection line (14) arranged and designed to generate an actual drilling signal F inactual(t) representative of actual flow rate of fluid in said fluid injection line (14), wherein said central data acquisition and control system (18) is further arranged and designed to identify a fluid influx event or a fluid loss event by acting on the principle of mass conservation to determine difference between said actual flow rate F
inactual(t) in said fluid injection line (14) and said actual flow rate F outactual(t) in said flow return line (27) while compensating for one or more drilling factors, and to receive as input any early detection parameters, said input triggering a chain of investigation of probably scenarios to confirm that an influx or loss event has occurred, and after confirming that an influx or loss event has occurred, to automatically send a command to said pressure/flow control device (12) in said fluid return line (27) to change flow restriction thereby pre-emptively adjusting said backpressure to said borehole annulus (3) of said well, to control said downhole event.
7. The system of claim 6 wherein, said drilling factors comprise borehole pressure, borehole temperature, increase in volume of said borehole, and mass of rock returning from said borehole through fluid return line (27).
8. The system of claim 5 wherein, said at least one of said actual drilling signals is P actual(t), and said corresponding ideal drilling signal is P ideal(t).
9. The system of claim 5 wherein, said at least one of said actual drilling signals is F outactual(t), and said corresponding ideal drilling signal is F outideal(t).
10. The system of claim 9 wherein said central data acquisition and control system (18) further comprises:
an input flow measurement device (15, 16) in said drilling fluid injection line (14) arranged and designed to generate an actual drilling parameter signal F
inactual(t) representative of actual flow rate of drilling fluid applied to said drill string (1) through said fluid injection line (14) as a function of time (t), and said signal F outideal(t) is generated as a function of at least said signal F
inactual(t).
11. The system of claim 10 further comprising:

an apparatus (4, 19) for generating a signal F cuttings(t) representative of mass of cuttings flow rate returning via said fluid return line (27) as a function of time (t), wherein said central data acquisition and control system (18) is further arranged and designed to receive said signal F cuttings(t) and to generate said signal F
outideal(t) as a function of at least said signals F inactual(t) and F cuttings(t).
12. The system of claim 5 further comprising:
a second pressure containment device (26) arranged and designed to keep said borehole thereunder closed at all times while said well is being drilled, said second pressure containment device (26) disposed within said borehole between said upper end and said lower end of said drill string (1), thereby defining a first pressure zone of said borehole annulus (3) below said second pressure containment device (26) and a second pressure zone of said borehole annulus (3) above said second pressure containment device (26);

a second fluid return line extending between an outlet of said first pressure zone and an inlet of said second pressure zone; and a second pressure/flow control device (12) in said second fluid return line responsive to signals from said central data acquisition and control system (18) and arranged and designed to change flow restriction in said second fluid return line and apply backpressure to the well.
13. The system of claim 5 further comprising:

a drilling fluid pump (23) in fluid communication with said drilling fluid reservoir (5);
and a drilling fluid injection line (22) extending between said drilling fluid pump (23) and said borehole annulus (3) and providing fluid communication between said pump (23) and said annulus (3).
14. The system of claim 5 wherein, said pressure measurement device (9, 17, 24) is disposed at a position in said flow path and is arranged and designed for determining a downhole pressure signal P
actual(t) as a function of time (t), and said central data acquisition and control system (18) is further arranged and designed to determine that, if said fluid loss event is identified, said pressure signal P
actual(t) generated by said pressure measurement device (9, 17, 24) is representative of fracture pressure of the formation.
15. The system of claim 5 wherein, said pressure measurement device (9, 17, 24) is disposed at a position in said flow path and is arranged and designed for determining a downhole pressure signal P
actual(t) as a function of time (t), and said central data acquisition and control system (18) is further arranged and designed to determine that, if a fluid influx is identified, said pressure signal P
actual(t) generated by said pressure measurement device (9, 17, 24) is representative of pore pressure of the formation.
16. A system for drilling a well having a fluid flow path defined by an injection channel (1), 14, 22) through which an inlet stream flows and a return channel (3, 27) through which an outlet stream flows, the system comprising:
a rotating blowout preventer (26) applied to the wellbore so that while the well is being drilled with a drill string having a drilling liquid circulated therethrough, the well is kept closed from atmosphere at all times;
means (10, 11, 15, 16, 28a, 28b) in said injection channel (1, 14, 22) and said return channel (3, 27) for measuring actual mass or actual fluid flow rate of liquid in the inlet and outlet streams to obtain actual mass or fluid flow signals;

a central data acquisition and control system (18) which receives said actual mass or fluid flow signals;
software installed in said central data acquisition and control system (18) which determines a real time ideal signal during drilling of the well;
a control device (12) arranged and designed to apply backpressure to the wellbore, said software further arranged and designed to make a comparison between said real time ideal signal and a corresponding actual signal, said comparison yielding any discrepancy between said real time ideal signal and said actual signal, said software converting said discrepancy to a command value signal, and means for applying said command value signal to said control device (12) to adjust backpressure in the wellbore so that said actual signal is restored to said ideal signal.
17. The system of claim 16 wherein, said software is further arranged and designed to identify a downhole fluid influx event and a downhole fluid loss event by acting on the principle of mass conservation to determine a difference in said actual mass of actual fluid flow rate in said injection channel (1, 14, 22) and said actual mass or actual fluid flow rate in said return channel (3, 27) while compensating for drilling factors affecting said actual flow rates, and after confirming that at least one of the downhole fluid events has occurred, to automatically send a command to said control device (12) in said fluid return channel (3, 27) to change flow restriction thereby that occurred pre-emptively adjusting backpressure to said borehole to control the downhole event.
18. A drilling system for drilling a well into a subterranean formation comprising:

a tubular drill string (1) having an upper and lower end and with a drill bit (2) at its lower end;

a drive mechanism arranged and designed to turn said drill bit (2) in a borehole where a borehole annulus (3) is defined between an outer diameter of said tubular drill string (1) and an inner diameter of said borehole;

a drilling fluid pump (6) in fluid communication with a drilling fluid reservoir (5);
a drilling fluid injection line (14) extending between said pump (6) and said upper end of said drill string (1) and providing fluid communication between said pump (6) and said drill string (1);

a fluid return line (27) extending between an outlet of said borehole annulus (3) and said drilling fluid reservoir (5);

a pressure containment device (26) arranged and designed to keep said borehole closed from the atmosphere at all times while said well is being drilled with said drill string (1) having drilling fluid circulating therethrough, said injection line (14), drill string (1), borehole annulus (3) and return line (27) defining a flow path;

an output flow measurement device (10, 11) in said fluid return line (27) arranged and designed to generate an actual drilling signal F outactual(t) representative of actual flow rate of fluid in said fluid return line (27) as a function of time (t);

a pressure measurement device (9, 17, 24) disposed at a position in said flow path and arranged and designed for determining a downhole pressure signal P actual(t) as a function of time (t); and a central data acquisition and control system (18) arranged and designed, to receive at least one of said actual drilling signals, said central data acquisition and control system (18) having software responsive to said F outactual(t) signal and other drilling signals to identify a loss event at a drilling time and depth of the well and to record said P actual(t) signal at the fracture pressure of said formation at said depth.
19. A drilling system for drilling a well into a subterranean formation comprising:
a tubular drill string (1) having an upper and lower end and with a drill bit (2) at its lower end;

a drill mechanism arranged and designed to turn said drill bit (2) in a borehole where a borehole annulus (3) is defined between an outer diameter of said tubular drill string (1) and an inner diameter of said borehole;

a drilling fluid pump (6) in fluid communication with a drilling fluid reservoir (5);

a drilling fluid injection line (14) extending between said pump (6) and said upper end of said drill string (1) and providing fluid communication between said pump (6) and said drill string (1);

a fluid return line (27) extending between an outlet of said borehole annulus (3) and said drilling fluid reservoir (5);
a pressure containment device (26) arranged and designed to keep said borehole closed from the atmosphere at all times while said well is being drilled with said drill string (1) having drilling fluid circulating therethrough, said injection line (14), drill string (1), borehole annulus (3) and return line (27) defining a flow path;
an output flow measurement device (10, 11) in said fluid return line (27) arranged and designed to generate an actual drilling signal F outactual(t) representative of actual flow rate of fluid in said fluid return line (27) as a function of time (t);
a pressure measurement device (9, 17, 24) disposed at a position in said flow path and arranged and designed for determining a downhole pressure signal P actual(1) as a function of time (t); and a central data acquisition and control system (18) arranged and designed, to receive at least one of said actual drilling signals, said central data acquisition and control system (18) having software responsive to said F outactual(t) signal and other drilling signals to identify an influx event at a drilling time and depth of the well and to record said P actual(t) signal as the pore pressure of said formation at said depth.
20. A method for drilling a well comprising the steps of turning a drill string (1) that extends into a borehole, the drill string (1) having an upper and lower end and a drill bit (2) at said lower end;
operating a primary pump (6) to selectively pump a drilling fluid from a drilling fluid source (5), through a fluid injection conduit (14), into and through said drill string (1), out said drill bit (2), and into an annulus (3) created as said drill string penetrates said formation, said drilling fluid in said annulus (3) flowing from said annulus (3) through a fluid discharge conduit (27) to a reservoir (5) for reuse, said fluid injection conduit (4), said drill string (1), said annulus (3), and said fluid discharge conduit (27) defining a flow path;

employing a pressure constraint device (26) around said drill string (1) so that said annulus (3) is closed from atmospheric pressure while said drill string (1) is turning;
storing an ideal pressure signal P ideal(t) in a central data acquisition and control system (18), where P ideal(t) represents an expected or ideal pressure parameter of the flow path;
operating a pressure measurement device (24) disposed in said flow path to generate a pressure signal P meas(t) which is representative of a measured pressure parameter in the flow path;
transmitting said signal P meas(t) to said central data acquisition and control system (18);
converting said signal P meas(t) in said central data acquisition and control system (18) to a signal P actual(t) that corresponds to said signal P ideal(t);
comparing said actual pressure signal P actual(t) with said ideal pressure signal P ideal(t) in said central data acquisition and control system (18) and generating a differential drilling signal .DELTA.(t) representative of a difference between P actual(t) and P ideal(t); and controlling a pressure/flow control device (12) in said flow path with said differential drilling signal .DELTA.(t) to restore said actual signal to said ideal pressure signal.
21. The method of claim 20 wherein, said ideal pressure signal represents downhole pressure, and said measured pressure signal is downhole pressure.
22. The method of claim 20 wherein, said ideal pressure signal represents pressure at said fluid discharge conduit (27) and said measured pressure signal is measured at said fluid discharge conduit (27).
23. The method of claim 20 further comprising the steps of:
measuring fluid flow rate pumped through said fluid injection conduit (14) using an input flow measurement device (15, 16) arranged and designed to generate an actual drilling signal F inactual(t) representative of actual flow rate of fluid pumped through said fluid injection conduit (14);

measuring fluid flow rate flowing from said annulus (3) through said fluid discharge conduit (27) using an output flow measurement device (10, 11) arranged and designed to generate an actual drilling parameter signal F outactual(t) representative of actual flow rate of fluid flowing through said fluid discharge conduit (27);
transmitting said flow rate signals F inactual(t) and F outactual(t) to said central data acquisition and control system (18), said central data acquisition and control system (18) further arranged and designed to identify a fluid influx or loss event by acting on the principle of mass conservation to determine the difference between said actual flow rate F inactual(t) in said fluid injection conduit (14) and said actual flow rate F outactual(t) in said fluid discharge conduit (27) while compensating for one or more drilling factors;

receiving said actual drilling parameter signals F inactual(t) and F
outactual(t) in said central data acquisition and control system (18);
identifying a fluid influx or loss event by acting on the principle of mass conservation to determine the difference between said actual flow rate F inactual(t) in said fluid injection conduit (14) and said actual flow rate F outactual(t) in said fluid discharge conduit (27) while compensating for one or more drilling factors, and after confirming that a fluid influx or loss event has occurred;
automatically adjusting said pressure flow control device (12) in said flow path to pre-emptively adjust annular space drilling fluid pressure thereby controlling said fluid influx or loss event.
24. The method of claim 23 wherein, said drilling factors comprise borehole pressure, borehole temperature, increase in volume of said borehole, and mass of rock returning from said borehole through fluid discharge conduit (27).
25. The method of claim 23 further comprising the steps of:
receiving as input into said central data acquisition and control system (18) any early detection influx or loss parameters, said input triggering a chain of investigation probable scenarios to confirm that a fluid influx or loss event has occurred, and after confirming that a fluid influx or loss event has occurred;
automatically adjusting said pressure flow control device (12) in said flow path to pre-emptively adjust annular space drilling fluid pressure thereby controlling said fluid influx or loss event.
26. A method for drilling a well in a subterranean formation comprising the steps of:
turning a drill string (1) that extends into a borehole, the drill string (1) having an upper and lower end and a drill bit (2) at said lower end;
applying a pressure containment device (26) to the borehole so that while the well is being drilled with said drill string (1) having a drilling fluid circulated therethrough, the well is kept closed from atmosphere at all times;
operating a drilling fluid pump (6) to selectively pump a drilling fluid from a drilling fluid reservoir (5) through a fluid injection line (14), into and through said drill string (1), out said drill bit (2), and into an annular space (3) created as said drill string (1) penetrates said formation, said drilling fluid in said annular space (3) flowing from said annular space (3) through a fluid return line (27) to said drilling fluid reservoir (5) for reuse, said fluid injection line (14), said drill string (1), said annular space (3), and said fluid return line (27) defining a flow path;
disposing a pressure/flow control device (12) in said fluid return line (27) arranged and designed to adjust back pressure to said annular space (3) of said well;
measuring actual mass or actual fluid flow rate of fluid flowing through said fluid return line (27) using an output flow measurement device (10, 11) arranged and designed to generate an actual mass or actual fluid flow signal F outactual(t) representative of actual mass or actual fluid flow rate of fluid flowing through said fluid return line (27) as a function of time (t);

operating at least one pressure measurement device (9, 17, 24) arranged and designed to obtain an actual pressure signal and to generate an actual drilling signal P
actual) representative of actual pressure at a point in said flow path as a function of time (t);

transmitting said actual mass or actual fluid flow signal F outactual(t) and said actual pressure signal P actual(t) to a central data acquisition and control system (18), said central data acquisition and control system (18) arranged and designed to receive at least one of said actual drilling signals, to determine in real time during drilling of said well an ideal drilling signal corresponding to said at least one of said actual drilling signals, and to determine a differential drilling signal .DELTA.(t) representative of the difference between said at least one of said actual drilling signals and said corresponding ideal drilling signal;
receiving said actual mass or actual fluid flow signals and said actual pressure signals in said central data acquisition and control system (18);
determining in real time during drilling of said well said ideal drilling signal corresponding to said at least one of said actual drilling signals;
determining said differential drilling signal .DELTA.(t) representative of the difference between said at least one of said actual drilling signals and said corresponding ideal drilling signal as a function of time (t);
adjusting said pressure/flow control device (12) in said fluid return line (27) to control backpressure to said annular space (3) of said well in response to said differential drilling signal .DELTA.(t) thereby controlling said at least one actual drilling signal and causing said at least one actual drilling signal to be forced toward said ideal drilling signal; and said method further comprises the steps of:
identifying an influx or loss event using said central data acquisition and control system (18), and after identifying that an influx or loss event has occurred;
and pre-emptively sending a signal to said pressure/flow control device (12), thereby pre-emptively adjusting backpressure to immediately control the event while drilling continues.
27. The method of claim 26 further comprising the steps of:
measuring actual mass or actual fluid flow rate of fluid flowing through said fluid injection line (14) using an input flow measurement device (15, 16) arranged and designed to generate an actual mass or actual fluid flow signal F inactual (t) representative of actual mass or actual fluid flow rate of fluid flowing through said fluid injection line (14) as a function of time (t), wherein said step of identifying an influx or loss event using said central data acquisition and control system (18) is accomplished by acting on the principle of mass conservation to determine the difference between said actual flow rate F inactual (t) in said fluid injection line (14) and said actual flow rate F outactual (t) in said fluid return line (27) while compensating for one or more drilling factors; and receiving as input into said central data acquisition and control system (18) any early detection parameters, said input triggering a chain of investigation of probable scenarios to confirm that an influx or loss event has occurred, and after confirming that an influx or loss event has occurred, automatically sending a command to said pressure/flow control device (12) in said fluid return line (27) to change flow restriction thereby pre-emptively adjusting said backpressure to said annular space (3) of said well to control said downhole event.
28. The method of claim 27 wherein, said drilling factors comprise borehole pressure, borehole temperature, increase in volume of said borehole, and mass of rock returning from said borehole through fluid return line (27).
29. The method of claim 26 wherein, said at least one of said actual drilling signals is P actual (t), and said corresponding ideal drilling signal is P ideal (t).
30. The method of claim 26 wherein, said at least one of said actual drilling signals is F outactual (t), and said corresponding ideal drilling signal is F outideal (t).
31. The method of claim 30 further comprising the steps of:
measuring actual mass or actual fluid flow rate of fluid flowing through said fluid injection line (14) using an input flow measurement device (15, 16) arranged and designed to generate an actual mass or actual fluid flow signal F inactual (t) representative of actual mass or actual fluid flow rate of fluid flowing through said fluid injection line (14) as a function of time (t), and wherein, said central data acquisition and control system (18) is further arranged and designed to generate said signal F outideal (t) as a function of at least said signal F
inactual (t).
32. The method of claim 31 further comprising the step of:
measuring mass of cuttings flow rate returning via said fluid return line (27) using an apparatus (4, 19) arranged and designed to generate a signal F cuttings (t) representative of mass of cuttings flow rate returning via said fluid return line (27) as a function of time (t), and wherein, said central data acquisition and control system (18) is further arranged an designed to receive said signal F cuttings (t) and to generate said signal F outideal (t) as a function of at least said signals F inactual (t) and F cuttings (t).
33. The method of claim 26 further comprising the steps of:
applying a second pressure containment device (26) to the borehole so that while the well is being drilled, the well is kept closed at all times, said second pressure containment device (26) being disposed within said borehole between said upper end and said lower end of said drill string (1), thereby defining a first pressure zone of said annular space (3) below said second pressure containment device (26) and a second pressure zone of said annular space (3) above said second pressure containment device (26);
providing a second fluid return line extending between an outlet of said first pressure zone and an inlet of said second pressure zone; and disposing a second pressure/flow control device (12) in said second fluid return line responsive to signals from said central data acquisition and control system (18) and arranged and designed to change flow restriction in said second fluid return line and apply backpressure to the well.
34. The method of claim 26 further comprising the step of:
injecting drilling fluid into said annular space (3) through a drilling fluid injection line (22) that extends between said annular space (3) and a drilling fluid pump (23) in fluid communication with said drilling fluid reservoir (5).
35. The method of claim 26 wherein, said pressure measurement device (9, 17, 24) is disposed at a position in said flow path and is arranged and designed for determining a downhole pressure signal P
actual (t) as a function of time (t); and said method further comprising the step of determining that, if said fluid loss event is identified, said pressure signal P actual (t) generated by said pressure measurement device (9, 17, 24) is representative of fracture pressure of the formation.
36. The method of claim 26 wherein, said pressure measurement device (9, 17, 24) is disposed at a position in said flow path and is arranged and designed for determining a downhole pressure signal P
actual (t) as a function of time (t), and said method further comprising the step of determining that, if said fluid influx event is identified, said pressure signal P actual (t) generated by said pressure measurement device (9, 17, 24) is representative of pore pressure of the formation.
37. A method for drilling a well by employing a drilling system comprising:
a fluid flow path defined by an injection channel (1, 14, 22) through which an inlet stream flows and a return channel (3, 27) through which an outlet stream flows;
a rotating blowout preventer (26) applied to the wellbore so that while the well is being drilled with a drill string having a drilling liquid circulated therethrough, the well is kept closed from atmosphere at all times;
means (10, 11, 15, 16, 28a, 28b) in said injection channel (1, 14, 22) and said return channel (3, 27) for measuring actual mass or actual fluid flow rate of liquid in the inlet and outlet streams to obtain actual mass or fluid flow signals;
a central data acquisition and control system (18) which receives said actual mass or actual fluid flow signals;
software installed in said central data acquisition and control system (18) which determines a real time ideal signal during drilling of the well;
a control device (12) arranged and designed to apply backpressure to the wellbore, wherein said method of drilling said well comprises the steps of:
making a comparison between said real time ideal signal and a corresponding actual signal using said software, said comparison yielding any discrepancy between said real time ideal signal and said actual signal;
converting said discrepancy to a command value signal using said software, and applying said command value signal to said control device (12) to adjust backpressure in the wellbore so that said actual signal is restored to said ideal signal.
38. The method of claim 37 further comprising the steps of:
employing said software installed in said central data acquisition and control system (18) to identify a fluid influx event and a fluid loss event by acting on the principle of mass conservation to determine a difference in said actual mass or actual fluid flow rate in said injection channel (1, 14, 22) and said actual mass or actual fluid flow rate in said return channel (3, 27) while compensating for drilling factors affecting said actual flow rates, and after identifying that an downhole fluid event has occurred, automatically sending a command to said control device (12) in said return channel (3, 27) to change flow restriction thereby pre-emptively adjusting backpressure to said wellbore to control said downhole event.
39. A method for determining the fracture pressure of a well at a depth in a subterranean formation by employing a drilling system comprising:
a tubular drill string (1) having an upper and lower end and with a drill bit (2) at its lower end;
a drive mechanism arranged and designed to turn said drill bit (2) in a borehole where a borehole annulus (3) is defined between an outer diameter of said tubular drill string (1) and an inner diameter of said borehole;
a drilling fluid pump (6) in fluid communication with a drilling fluid reservoir (5);
a drilling fluid injection line (14) extending between said pump (6) and said upper end of said drill string (1) and providing fluid communication between said pump (6) and said drill string (1);
a fluid return line (27) extending between an outlet of said borehole annulus (3) and said drilling fluid reservoir (5);
a pressure containment device (26) arranged and designed to keep said borehole closed from the atmosphere at all times while said well is being drilled with said drill string (1) having drilling fluid circulating therethrough, said injection line (14) drill string (1), borehole annulus (3) and return line (27) defining a flow path;
an output flow measurement device (10, 11) in said fluid return line (27) arranged and designed to generate an actual drilling signal F outactual (t) representative of actual flow rate of fluid in said fluid return line (27) as a function of time (t);
a pressure measurement device (9, 17, 24) disposed at a position in said flow path and arranged and designed for determining a downhole pressure signal P actual (t) as a function of time (t); and a central data acquisition and control system (18) arranged and designed to receive at least one of said actual drilling signals, wherein said method for determining the fracture pressure of said well at said depth comprises the steps of:
employing said central data acquisition and control system (18), having software responsive to said F outactual (t) signal and other drilling signals, to identify a loss event at a drilling time and depth of the well, and recording said P actual (t) signal at said drilling time as the fracture pressure of said formation at said depth.
40. A method for determining the pore pressure of a well at a depth in a subterranean formation by employing a drilling system comprising:
a tubular drill string (1) having an upper and lower end and with a drill bit (2) at its lower end;
a drive mechanism arranged and designed to turn said drill bit (2) in a borehole where a borehole annulus (3) is defined between an outer diameter of said tubular drill string (1) and an inner diameter of said borehole;
a drilling fluid pump (6) in fluid communication with a drilling fluid reservoir (5);
a drilling fluid injection line (14) extending between said pump (6) and said upper end of said drill string (1) and providing fluid communication between said pump (6) and said drill string (1);

a fluid return line (27) extending between an outlet of said borehole annulus (3) and said drilling fluid reservoir (5);
a pressure containment device (26) arranged and designed to keep said borehole closed from the atmosphere at all times while said well is being drilled with said drill string (1) having drilling fluid circulating therethrough, said injection line (14), drill string (1), borehole annulus (3) and return line (27) defining a flow path;

an output flow measurement device (10, 11) in said fluid return line (27) arranged and designed to generate an actual drilling signal F outactual (t) representative of actual flow rate of fluid in said fluid return line (27) as a function of time (t);
a pressure measurement device (9, 17, 24) disposed at a position in said flow path and arranged and designed for determining a downhole pressure signal P actual (t) as a function of time (t); and a central data acquisition and control system (18) arranged and designed to receive at least one of said actual drilling signals, wherein said method for determining the pore pressure of said well at said depth comprises the steps of:
employing said central data acquisition and control system (18), having software responsive to said F outactual (t) signal and other drilling signals, to identify an influx event at a drilling time and depth of the well, and recording said P actual (t) signal at said drilling time as the pore pressure of said formation at said depth.
CA002432119A 2000-12-18 2001-12-14 Drilling system and method Expired - Lifetime CA2432119C (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
US09/737,851 US20020112888A1 (en) 2000-12-18 2000-12-18 Drilling system and method
US09/737,851 2000-12-18
PCT/GB2001/005593 WO2002050398A1 (en) 2000-12-18 2001-12-14 Cloded loop fluid-handing system for well drilling

Publications (2)

Publication Number Publication Date
CA2432119A1 CA2432119A1 (en) 2002-06-27
CA2432119C true CA2432119C (en) 2009-07-28

Family

ID=24965564

Family Applications (1)

Application Number Title Priority Date Filing Date
CA002432119A Expired - Lifetime CA2432119C (en) 2000-12-18 2001-12-14 Drilling system and method

Country Status (13)

Country Link
US (5) US20020112888A1 (en)
EP (1) EP1356186B1 (en)
AT (1) ATE298835T1 (en)
AU (4) AU2002219322B2 (en)
BR (1) BR0116306B1 (en)
CA (1) CA2432119C (en)
DE (1) DE60111781T2 (en)
DK (1) DK1356186T3 (en)
EA (1) EA006054B1 (en)
ES (1) ES2244554T3 (en)
MX (1) MXPA03005396A (en)
NO (1) NO326132B1 (en)
WO (1) WO2002050398A1 (en)

Families Citing this family (292)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080262737A1 (en) * 2007-04-19 2008-10-23 Baker Hughes Incorporated System and Method for Monitoring and Controlling Production from Wells
US8682589B2 (en) * 1998-12-21 2014-03-25 Baker Hughes Incorporated Apparatus and method for managing supply of additive at wellsites
US20020112888A1 (en) 2000-12-18 2002-08-22 Christian Leuchtenberg Drilling system and method
US7529742B1 (en) * 2001-07-30 2009-05-05 Ods-Petrodata, Inc. Computer implemented system for managing and processing supply
US7185719B2 (en) * 2002-02-20 2007-03-06 Shell Oil Company Dynamic annular pressure control apparatus and method
US6904981B2 (en) * 2002-02-20 2005-06-14 Shell Oil Company Dynamic annular pressure control apparatus and method
CN100535380C (en) * 2002-02-20 2009-09-02 @平衡有限公司 Dynamic annular pressure control apparatus and method
US6926081B2 (en) * 2002-02-25 2005-08-09 Halliburton Energy Services, Inc. Methods of discovering and correcting subterranean formation integrity problems during drilling
WO2004022905A1 (en) * 2002-04-10 2004-03-18 Schlumberger Technology Corporation Method, apparatus and system for pore pressure prediction in presence of dipping formations
US6810960B2 (en) * 2002-04-22 2004-11-02 Weatherford/Lamb, Inc. Methods for increasing production from a wellbore
US7331469B2 (en) 2004-04-29 2008-02-19 Varco I/P, Inc. Vibratory separator with automatically adjustable beach
US7278540B2 (en) * 2004-04-29 2007-10-09 Varco I/P, Inc. Adjustable basket vibratory separator
US20050242003A1 (en) * 2004-04-29 2005-11-03 Eric Scott Automatic vibratory separator
US6739414B2 (en) * 2002-04-30 2004-05-25 Masi Technologies, L.L.C. Compositions and methods for sealing formations
US6745852B2 (en) * 2002-05-08 2004-06-08 Anadarko Petroleum Corporation Platform for drilling oil and gas wells in arctic, inaccessible, or environmentally sensitive locations
US6892812B2 (en) 2002-05-21 2005-05-17 Noble Drilling Services Inc. Automated method and system for determining the state of well operations and performing process evaluation
US8955619B2 (en) 2002-05-28 2015-02-17 Weatherford/Lamb, Inc. Managed pressure drilling
WO2004005667A1 (en) * 2002-07-08 2004-01-15 Shell Internationale Research Maatschappij B.V. Choke for controlling the flow of drilling mud
US6820702B2 (en) 2002-08-27 2004-11-23 Noble Drilling Services Inc. Automated method and system for recognizing well control events
US7255173B2 (en) * 2002-11-05 2007-08-14 Weatherford/Lamb, Inc. Instrumentation for a downhole deployment valve
US7350590B2 (en) * 2002-11-05 2008-04-01 Weatherford/Lamb, Inc. Instrumentation for a downhole deployment valve
US7836946B2 (en) 2002-10-31 2010-11-23 Weatherford/Lamb, Inc. Rotating control head radial seal protection and leak detection systems
US7413018B2 (en) * 2002-11-05 2008-08-19 Weatherford/Lamb, Inc. Apparatus for wellbore communication
US7571817B2 (en) * 2002-11-06 2009-08-11 Varco I/P, Inc. Automatic separator or shaker with electromagnetic vibrator apparatus
US20060113220A1 (en) * 2002-11-06 2006-06-01 Eric Scott Upflow or downflow separator or shaker with piezoelectric or electromagnetic vibrator
US8312995B2 (en) 2002-11-06 2012-11-20 National Oilwell Varco, L.P. Magnetic vibratory screen clamping
US6868920B2 (en) * 2002-12-31 2005-03-22 Schlumberger Technology Corporation Methods and systems for averting or mitigating undesirable drilling events
US7950463B2 (en) * 2003-03-13 2011-05-31 Ocean Riser Systems As Method and arrangement for removing soils, particles or fluids from the seabed or from great sea depths
NO318220B1 (en) * 2003-03-13 2005-02-21 Ocean Riser Systems As Method and apparatus for performing drilling operations
ES2664602T3 (en) 2003-04-08 2018-04-20 Anadarko Petroleum Corporation Procedure to remove a platform support pile
US6973977B2 (en) * 2003-08-12 2005-12-13 Halliburton Energy Systems, Inc. Using fluids at elevated temperatures to increase fracture gradients
EP1664478B1 (en) * 2003-08-19 2006-12-27 Shell Internationale Researchmaatschappij B.V. Drilling system and method
US7320370B2 (en) * 2003-09-17 2008-01-22 Schlumberger Technology Corporation Automatic downlink system
MY137430A (en) * 2003-10-01 2009-01-30 Shell Int Research Expandable wellbore assembly
US20050092523A1 (en) * 2003-10-30 2005-05-05 Power Chokes, L.P. Well pressure control system
CN100353027C (en) * 2003-10-31 2007-12-05 中国石油化工股份有限公司 Under balance drilling bottom pressure automatic control system and method
US7422076B2 (en) * 2003-12-23 2008-09-09 Varco I/P, Inc. Autoreaming systems and methods
US7100708B2 (en) 2003-12-23 2006-09-05 Varco I/P, Inc. Autodriller bit protection system and method
CA2457329A1 (en) * 2004-02-10 2005-08-10 Richard T. Hay Downhole drilling fluid heating apparatus and method
US7416026B2 (en) * 2004-02-10 2008-08-26 Halliburton Energy Services, Inc. Apparatus for changing flowbore fluid temperature
US7946356B2 (en) * 2004-04-15 2011-05-24 National Oilwell Varco L.P. Systems and methods for monitored drilling
US7337660B2 (en) * 2004-05-12 2008-03-04 Halliburton Energy Services, Inc. Method and system for reservoir characterization in connection with drilling operations
US20060033638A1 (en) 2004-08-10 2006-02-16 Hall David R Apparatus for Responding to an Anomalous Change in Downhole Pressure
JP4960238B2 (en) 2004-09-21 2012-06-27 ベンシック・ジオテック・プロプライエタリー・リミテッド Remote gas monitoring device for seabed drilling
EA010191B1 (en) * 2004-09-22 2008-06-30 Шелл Интернэшнл Рисерч Маатсхаппий Б.В. Method of drilling a lossy formation
US7926593B2 (en) 2004-11-23 2011-04-19 Weatherford/Lamb, Inc. Rotating control device docking station
US8826988B2 (en) 2004-11-23 2014-09-09 Weatherford/Lamb, Inc. Latch position indicator system and method
US7548068B2 (en) 2004-11-30 2009-06-16 Intelliserv International Holding, Ltd. System for testing properties of a network
US7407019B2 (en) * 2005-03-16 2008-08-05 Weatherford Canada Partnership Method of dynamically controlling open hole pressure in a wellbore using wellhead pressure control
US8344905B2 (en) 2005-03-31 2013-01-01 Intelliserv, Llc Method and conduit for transmitting signals
US20070235223A1 (en) * 2005-04-29 2007-10-11 Tarr Brian A Systems and methods for managing downhole pressure
US7444242B2 (en) * 2005-06-13 2008-10-28 Halliburton Energy Services, Inc. Method and system for statistical pressure gradient and fluid contact analysis
JP2009503306A (en) * 2005-08-04 2009-01-29 シュルンベルジェ ホールディングス リミテッド Interface for well telemetry system and interface method
US9109439B2 (en) * 2005-09-16 2015-08-18 Intelliserv, Llc Wellbore telemetry system and method
US7836973B2 (en) 2005-10-20 2010-11-23 Weatherford/Lamb, Inc. Annulus pressure control drilling systems and methods
EP2813664B1 (en) * 2005-10-20 2018-08-22 Transocean Sedco Forex Ventures Ltd. Apparatus and method for managed pressure drilling
US7836949B2 (en) * 2005-12-01 2010-11-23 Halliburton Energy Services, Inc. Method and apparatus for controlling the manufacture of well treatment fluid
US7841394B2 (en) * 2005-12-01 2010-11-30 Halliburton Energy Services Inc. Method and apparatus for centralized well treatment
US7740072B2 (en) * 2006-10-10 2010-06-22 Halliburton Energy Services, Inc. Methods and systems for well stimulation using multiple angled fracturing
US7946340B2 (en) 2005-12-01 2011-05-24 Halliburton Energy Services, Inc. Method and apparatus for orchestration of fracture placement from a centralized well fluid treatment center
US7711487B2 (en) * 2006-10-10 2010-05-04 Halliburton Energy Services, Inc. Methods for maximizing second fracture length
CA2635097C (en) 2006-01-05 2011-08-09 At Balance Americas Llc Method for determining formation fluid entry into or drilling fluid loss from a borehole using a dynamic annular pressure control system
US7610251B2 (en) * 2006-01-17 2009-10-27 Halliburton Energy Services, Inc. Well control systems and associated methods
US20070201305A1 (en) * 2006-02-27 2007-08-30 Halliburton Energy Services, Inc. Method and apparatus for centralized proppant storage and metering
US20070227774A1 (en) * 2006-03-28 2007-10-04 Reitsma Donald G Method for Controlling Fluid Pressure in a Borehole Using a Dynamic Annular Pressure Control System
US20070246263A1 (en) * 2006-04-20 2007-10-25 Reitsma Donald G Pressure Safety System for Use With a Dynamic Annular Pressure Control System
US20070261888A1 (en) * 2006-04-29 2007-11-15 Richard Urquhart Mud pump systems for drilling operations
US7644611B2 (en) * 2006-09-15 2010-01-12 Schlumberger Technology Corporation Downhole fluid analysis for production logging
US8190369B2 (en) 2006-09-28 2012-05-29 Baker Hughes Incorporated System and method for stress field based wellbore steering
US20080083566A1 (en) 2006-10-04 2008-04-10 George Alexander Burnett Reclamation of components of wellbore cuttings material
US8149133B2 (en) * 2006-10-20 2012-04-03 Hydril Usa Manufacturing Llc MUX BOP database mirroring
CA2667199C (en) * 2006-10-23 2014-12-09 M-I L.L.C. Method and apparatus for controlling bottom hole pressure in a subterranean formation during rig pump operation
US9435162B2 (en) 2006-10-23 2016-09-06 M-I L.L.C. Method and apparatus for controlling bottom hole pressure in a subterranean formation during rig pump operation
US8145464B2 (en) * 2006-11-02 2012-03-27 Schlumberger Technology Corporation Oilfield operational system and method
EP2079896A4 (en) 2006-11-07 2015-07-22 Halliburton Energy Services Inc Offshore universal riser system
NO325521B1 (en) * 2006-11-23 2008-06-02 Statoil Asa Assembly for pressure control during drilling and method for pressure control during drilling in a formation with unforeseen high formation pressure
WO2008106544A2 (en) * 2007-02-27 2008-09-04 Precision Energy Services, Inc. System and method for reservoir characterization using underbalanced drilling data
US7711486B2 (en) * 2007-04-19 2010-05-04 Baker Hughes Incorporated System and method for monitoring physical condition of production well equipment and controlling well production
US7805248B2 (en) * 2007-04-19 2010-09-28 Baker Hughes Incorporated System and method for water breakthrough detection and intervention in a production well
US20080257544A1 (en) * 2007-04-19 2008-10-23 Baker Hughes Incorporated System and Method for Crossflow Detection and Intervention in Production Wellbores
US8073663B2 (en) * 2007-04-20 2011-12-06 The Permedia Research Group Inc. Method and system for modelling petroleum migration
US7542853B2 (en) * 2007-06-18 2009-06-02 Conocophillips Company Method and apparatus for geobaric analysis
US7596452B2 (en) 2007-06-28 2009-09-29 Baker Hughes Incorporated Compensated caliper using combined acoustic and density measurements
US8622220B2 (en) 2007-08-31 2014-01-07 Varco I/P Vibratory separators and screens
US7931082B2 (en) * 2007-10-16 2011-04-26 Halliburton Energy Services Inc., Method and system for centralized well treatment
US7997345B2 (en) 2007-10-19 2011-08-16 Weatherford/Lamb, Inc. Universal marine diverter converter
US8286734B2 (en) 2007-10-23 2012-10-16 Weatherford/Lamb, Inc. Low profile rotating control device
US8844652B2 (en) 2007-10-23 2014-09-30 Weatherford/Lamb, Inc. Interlocking low profile rotating control device
US9299480B2 (en) * 2007-11-13 2016-03-29 Chevron U.S.A. Inc. Subsea power umbilical
US7949470B2 (en) * 2007-11-21 2011-05-24 Westerngeco L.L.C. Processing measurement data in a deep water application
US7963325B2 (en) * 2007-12-05 2011-06-21 Schlumberger Technology Corporation Method and system for fracturing subsurface formations during the drilling thereof
US20090178847A1 (en) * 2008-01-10 2009-07-16 Perry Slingsby Systems, Inc. Method and Device for Subsea Wire Line Drilling
US8033338B2 (en) * 2008-01-22 2011-10-11 National Oilwell Varco, L.P. Wellbore continuous circulation systems and method
RU2015105531A (en) * 2008-03-03 2015-11-10 Интеллизерв Интернэшнл Холдинг, Лтд MONITORING OF WELLBEING INDICATORS BY MEASURING A MEASURING SYSTEM DISTRIBUTED BY A DRILL RING
US8307913B2 (en) * 2008-05-01 2012-11-13 Schlumberger Technology Corporation Drilling system with drill string valves
US7886847B2 (en) * 2008-05-23 2011-02-15 Tesco Corporation Monitoring flow rates while retrieving bottom hole assembly during casing while drilling operations
US8061445B2 (en) * 2008-08-13 2011-11-22 National Oilwell Varco L.P. Drilling fluid pump systems and methods
US9073104B2 (en) 2008-08-14 2015-07-07 National Oilwell Varco, L.P. Drill cuttings treatment systems
US9097085B2 (en) * 2008-08-15 2015-08-04 Lubrizol Oilfield Solutions, Inc. Multiphase drilling systems and methods
US8556083B2 (en) 2008-10-10 2013-10-15 National Oilwell Varco L.P. Shale shakers with selective series/parallel flow path conversion
US9079222B2 (en) 2008-10-10 2015-07-14 National Oilwell Varco, L.P. Shale shaker
US7984770B2 (en) * 2008-12-03 2011-07-26 At-Balance Americas, Llc Method for determining formation integrity and optimum drilling parameters during drilling
US8281875B2 (en) * 2008-12-19 2012-10-09 Halliburton Energy Services, Inc. Pressure and flow control in drilling operations
WO2010071656A1 (en) * 2008-12-19 2010-06-24 Halliburton Energy Services, Inc. Pressure and flow control in drilling operations
US9359853B2 (en) 2009-01-15 2016-06-07 Weatherford Technology Holdings, Llc Acoustically controlled subsea latching and sealing system and method for an oilfield device
US8322432B2 (en) 2009-01-15 2012-12-04 Weatherford/Lamb, Inc. Subsea internal riser rotating control device system and method
US7823656B1 (en) 2009-01-23 2010-11-02 Nch Corporation Method for monitoring drilling mud properties
MX2011007561A (en) * 2009-02-11 2011-08-12 Mi Llc Apparatus and process for wellbore characterization.
GB0905633D0 (en) 2009-04-01 2009-05-13 Managed Pressure Operations Ll Apparatus for and method of drilling a subterranean borehole
CN101586452B (en) * 2009-06-17 2011-09-14 中国矿业大学 Method of monitoring coal mining solid pack pressure
US9567843B2 (en) * 2009-07-30 2017-02-14 Halliburton Energy Services, Inc. Well drilling methods with event detection
US9528334B2 (en) 2009-07-30 2016-12-27 Halliburton Energy Services, Inc. Well drilling methods with automated response to event detection
US8347983B2 (en) 2009-07-31 2013-01-08 Weatherford/Lamb, Inc. Drilling with a high pressure rotating control device
US8757254B2 (en) * 2009-08-18 2014-06-24 Schlumberger Technology Corporation Adjustment of mud circulation when evaluating a formation
BR112012005623A2 (en) * 2009-09-15 2016-06-21 Managed Pressure Operations method for drilling an underground wellbore.
GB2473672B (en) * 2009-09-22 2013-10-02 Statoilhydro Asa Control method and apparatus for well operations
US9328573B2 (en) * 2009-10-05 2016-05-03 Halliburton Energy Services, Inc. Integrated geomechanics determinations and wellbore pressure control
US8899348B2 (en) * 2009-10-16 2014-12-02 Weatherford/Lamb, Inc. Surface gas evaluation during controlled pressure drilling
AU2010246382A1 (en) * 2009-11-23 2011-06-09 The University Of Manchester Method and apparatus for valuation of a resource
WO2011066024A1 (en) 2009-11-30 2011-06-03 Exxonmobil Upstream Research Company Systems and methods for forming high performance compressible objects
AU2015200308B2 (en) * 2010-01-05 2017-03-02 Halliburton Energy Services, Inc. Well control systems and methods
NO346117B1 (en) * 2010-01-05 2022-02-28 Halliburton Energy Services Inc Well control systems and procedures
WO2011100002A1 (en) 2010-02-12 2011-08-18 Exxonmobil Upstream Research Company Method and system for partitioning parallel simulation models
EP2483513B1 (en) * 2010-02-25 2015-08-12 Halliburton Energy Services, Inc. Pressure control device with remote orientation relative to a rig
US8528660B2 (en) * 2010-03-05 2013-09-10 Safekick Americas Llc System and method for safe well control operations
US9367564B2 (en) 2010-03-12 2016-06-14 Exxonmobil Upstream Research Company Dynamic grouping of domain objects via smart groups
CA3013281C (en) 2010-04-12 2020-07-28 Shell Internationale Research Maatschappij B.V. Method of steering a drill bit
US8347982B2 (en) 2010-04-16 2013-01-08 Weatherford/Lamb, Inc. System and method for managing heave pressure from a floating rig
US8201628B2 (en) 2010-04-27 2012-06-19 Halliburton Energy Services, Inc. Wellbore pressure control with segregated fluid columns
US8820405B2 (en) 2010-04-27 2014-09-02 Halliburton Energy Services, Inc. Segregating flowable materials in a well
SI2568798T1 (en) * 2010-05-11 2016-03-31 Autoagronom Israel Ltd. Oxygen availability-based irrigation system
US9284799B2 (en) * 2010-05-19 2016-03-15 Smith International, Inc. Method for drilling through nuisance hydrocarbon bearing formations
NO338372B1 (en) * 2010-06-03 2016-08-15 Statoil Petroleum As System and method for passing matter in a flow passage
US8240398B2 (en) 2010-06-15 2012-08-14 Halliburton Energy Services, Inc. Annulus pressure setpoint correction using real time pressure while drilling measurements
US9175542B2 (en) 2010-06-28 2015-11-03 Weatherford/Lamb, Inc. Lubricating seal for use with a tubular
CN103109040B (en) * 2010-07-30 2015-12-02 国际壳牌研究有限公司 Drillng operation is monitored with flow and density measurements
US8469116B2 (en) * 2010-07-30 2013-06-25 National Oilwell Varco, L.P. Control system for mud cleaning apparatus
EP2609282A4 (en) * 2010-08-26 2015-11-04 Halliburton Energy Services Inc System and method for managed pressure drilling
GB2483671B (en) 2010-09-15 2016-04-13 Managed Pressure Operations Drilling system
US8448711B2 (en) 2010-09-23 2013-05-28 Charles J. Miller Pressure balanced drilling system and method using the same
US8684109B2 (en) 2010-11-16 2014-04-01 Managed Pressure Operations Pte Ltd Drilling method for drilling a subterranean borehole
US9163473B2 (en) 2010-11-20 2015-10-20 Halliburton Energy Services, Inc. Remote operation of a rotating control device bearing clamp and safety latch
US8739863B2 (en) 2010-11-20 2014-06-03 Halliburton Energy Services, Inc. Remote operation of a rotating control device bearing clamp
WO2012102784A1 (en) 2011-01-26 2012-08-02 Exxonmobil Upstream Research Company Method of reservoir compartment analysis using topological structure in 3d earth model
US20120232705A1 (en) * 2011-03-10 2012-09-13 Mesquite Energy Partners, LLC Methods and apparatus for enhanced recovery of underground resources
US9016381B2 (en) 2011-03-17 2015-04-28 Hydril Usa Manufacturing Llc Mudline managed pressure drilling and enhanced influx detection
BR112013024462B8 (en) 2011-03-24 2022-05-17 Prad Res & Development Ltd Method of maintaining pressure in a wellbore drilled from a floating drilling rig, and method of controlling wellbore pressure while performing drilling operations on a floating drilling rig
US8775086B2 (en) 2011-03-30 2014-07-08 Weatherford/Lamb, Inc. Lag calculation with caving correction in open hole
MY168333A (en) 2011-04-08 2018-10-30 Halliburton Energy Services Inc Automatic standpipe pressure control in drilling
US9249638B2 (en) 2011-04-08 2016-02-02 Halliburton Energy Services, Inc. Wellbore pressure control with optimized pressure drilling
US20120278053A1 (en) * 2011-04-28 2012-11-01 Baker Hughes Incorporated Method of Providing Flow Control Devices for a Production Wellbore
US9080407B2 (en) 2011-05-09 2015-07-14 Halliburton Energy Services, Inc. Pressure and flow control in drilling operations
US9222350B2 (en) 2011-06-21 2015-12-29 Diamond Innovations, Inc. Cutter tool insert having sensing device
NO20110918A1 (en) * 2011-06-27 2012-12-28 Aker Mh As Fluid diverter system for a drilling device
US9512708B2 (en) 2011-06-29 2016-12-06 Halliburton Energy Services, Inc. System and method for automatic weight-on-bit sensor calibration
US20130008654A1 (en) * 2011-07-05 2013-01-10 Halliburton Energy Services, Inc. Method for Drilling and Completion Operations with Settable Resin Compositions
US8783381B2 (en) 2011-07-12 2014-07-22 Halliburton Energy Services, Inc. Formation testing in managed pressure drilling
US9134451B2 (en) 2011-08-26 2015-09-15 Schlumberger Technology Corporation Interval density pressure management methods
US9394783B2 (en) 2011-08-26 2016-07-19 Schlumberger Technology Corporation Methods for evaluating inflow and outflow in a subterranean wellbore
EP2753787A4 (en) 2011-09-08 2016-07-13 Halliburton Energy Services Inc High temperature drilling with lower temperature rated tools
US8965703B2 (en) * 2011-10-03 2015-02-24 Schlumberger Technology Corporation Applications based on fluid properties measured downhole
US9677337B2 (en) 2011-10-06 2017-06-13 Schlumberger Technology Corporation Testing while fracturing while drilling
US9429009B2 (en) * 2011-10-25 2016-08-30 Halliburton Energy Services, Inc. Methods and systems for providing a package of sensors to enhance subterranean operations
WO2013070193A1 (en) * 2011-11-08 2013-05-16 Halliburton Energy Services, Inc. Preemptive setpoint pressure offset for flow diversion in drilling operations
US9447647B2 (en) 2011-11-08 2016-09-20 Halliburton Energy Services, Inc. Preemptive setpoint pressure offset for flow diversion in drilling operations
US9243489B2 (en) 2011-11-11 2016-01-26 Intelliserv, Llc System and method for steering a relief well
CA2795818C (en) 2011-11-16 2015-03-17 Weatherford/Lamb, Inc. Managed pressure cementing
EP2785971B1 (en) 2011-11-30 2018-10-10 Halliburton Energy Services, Inc. Use of downhole pressure measurements while drilling to detect and mitigate influxes
US9593567B2 (en) 2011-12-01 2017-03-14 National Oilwell Varco, L.P. Automated drilling system
US9080427B2 (en) 2011-12-02 2015-07-14 General Electric Company Seabed well influx control system
US9033048B2 (en) 2011-12-28 2015-05-19 Hydril Usa Manufacturing Llc Apparatuses and methods for determining wellbore influx condition using qualitative indications
US9268057B2 (en) * 2011-12-31 2016-02-23 Saudi Arabian Oil Company Real-time dynamic data validation apparatus and computer readable media for intelligent fields
WO2013105930A1 (en) 2012-01-09 2013-07-18 Halliburton Energy Services Inc. System and method for improved cuttings measurements
AU2012368354B2 (en) * 2012-01-30 2015-08-27 Landmark Graphics Corporation Systems and methods for modeling and triggering safety barriers
US9328575B2 (en) * 2012-01-31 2016-05-03 Weatherford Technology Holdings, Llc Dual gradient managed pressure drilling
AU2012370472B2 (en) * 2012-02-24 2015-10-01 Halliburton Energy Services, Inc. Well drilling systems and methods with pump drawing fluid from annulus
US9157313B2 (en) 2012-06-01 2015-10-13 Intelliserv, Llc Systems and methods for detecting drillstring loads
CN103470201B (en) * 2012-06-07 2017-05-10 通用电气公司 Fluid control system
US9494033B2 (en) 2012-06-22 2016-11-15 Intelliserv, Llc Apparatus and method for kick detection using acoustic sensors
AU2012384530B2 (en) * 2012-07-02 2016-09-22 Halliburton Energy Services, Inc Pressure control in drilling operations with offset applied in response to predetermined conditions
US20140012506A1 (en) * 2012-07-05 2014-01-09 Intelliserv, Llc Method and System for Measuring and Calculating a Modified Equivalent Circulating Density (ECDm) in Drilling Operations
US9151126B2 (en) * 2012-07-11 2015-10-06 Landmark Graphics Corporation System, method and computer program product to simulate drilling event scenarios
MX2015001362A (en) * 2012-08-01 2015-09-16 Schlumberger Technology Bv Assessment, monitoring and control of drilling operations and/or geological-characteristic assessment.
US20140048331A1 (en) 2012-08-14 2014-02-20 Weatherford/Lamb, Inc. Managed pressure drilling system having well control mode
US20140076632A1 (en) * 2012-09-20 2014-03-20 Baker Hughes Incoroporated Method to predict overpressure uncertainty from normal compaction trendline uncertainty
GB2506400B (en) * 2012-09-28 2019-11-20 Managed Pressure Operations Drilling method for drilling a subterranean borehole
US20140090888A1 (en) * 2012-10-02 2014-04-03 National Oilwell Varco, L.P. Apparatus, System, and Method for Controlling the Flow of Drilling Fluid in a Wellbore
WO2014055090A1 (en) 2012-10-05 2014-04-10 Halliburton Energy Services, Inc. Detection of influxes and losses while drilling from a floating vessel
WO2014066430A2 (en) 2012-10-22 2014-05-01 Safekick Ltd Method and system for identifying a self-sustained influx of formation fluids into a wellbore
US20140209384A1 (en) * 2013-01-31 2014-07-31 Chevron U.S.A. Inc. Method and system for detecting changes in drilling fluid flow during drilling operations
US9643111B2 (en) 2013-03-08 2017-05-09 National Oilwell Varco, L.P. Vector maximizing screen
WO2014137356A1 (en) * 2013-03-08 2014-09-12 Halliburton Energy Services, Inc. Systems and methods for optimizing analysis of subterranean well bores and fluids using noble gases
AU2013204013B2 (en) * 2013-03-15 2015-09-10 Franklin Electric Company, Inc. System and method for operating a pump
CN105143600B (en) 2013-05-31 2018-11-16 哈利伯顿能源服务公司 Well monitoring, sensing, control and well fluid logging about double-gradient well drilling
CA2907728C (en) 2013-06-10 2021-04-27 Exxonmobil Upstream Research Company Interactively planning a well site
CA2868309A1 (en) 2013-06-14 2014-12-14 Kenneth Miller Multiple gamma controller assembly
NO345522B1 (en) 2013-08-13 2021-03-29 Intelligent Mud Solutions As SYSTEM AND PROCEDURE FOR INCREASED CONTROL OF A DRILLING PROCESS
US9664003B2 (en) 2013-08-14 2017-05-30 Canrig Drilling Technology Ltd. Non-stop driller manifold and methods
EA201690615A1 (en) * 2013-09-19 2016-12-30 Шлюмбергер Текнолоджи Б.В. HYDRAULIC SUPPORT WELLS
US9650884B2 (en) * 2013-09-20 2017-05-16 Weatherford Technology Holdings, Llc Use of downhole isolation valve to sense annulus pressure
US9864098B2 (en) 2013-09-30 2018-01-09 Exxonmobil Upstream Research Company Method and system of interactive drill center and well planning evaluation and optimization
RU2539089C1 (en) * 2013-10-11 2015-01-10 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Уфимский государственный нефтяной технический университет" Method and system of automated determination and recording of hardness of mine rock of working face during well drilling
MX2016004408A (en) * 2013-11-12 2016-10-31 Halliburton Energy Services Inc Systems and methods for optimizing drilling operations using transient cuttings modeling and real-time data.
US10248920B2 (en) * 2013-11-13 2019-04-02 Schlumberger Technology Corporation Automatic wellbore activity schedule adjustment method and system
US10787900B2 (en) 2013-11-26 2020-09-29 Weatherford Technology Holdings, Llc Differential pressure indicator for downhole isolation valve
GB2521404C (en) 2013-12-18 2021-03-24 Managed Pressure Operations Connector assembly for connecting a hose to a tubular
US10711605B2 (en) * 2014-04-04 2020-07-14 Halliburton Energy Services, Inc. Isotopic analysis from a controlled extractor in communication to a fluid system on a drilling rig
US10062044B2 (en) * 2014-04-12 2018-08-28 Schlumberger Technology Corporation Method and system for prioritizing and allocating well operating tasks
GB2526255B (en) 2014-04-15 2021-04-14 Managed Pressure Operations Drilling system and method of operating a drilling system
US11802480B2 (en) * 2014-04-15 2023-10-31 Halliburton Energy Services, Inc. Determination of downhole conditions using circulated non-formation gasses
GB2525396B (en) * 2014-04-22 2020-10-07 Managed Pressure Operations Method of operating a drilling system
US10227836B2 (en) 2014-04-25 2019-03-12 Weatherford Technology Holdings, Llc System and method for managed pressure wellbore strengthening
CA2945619C (en) * 2014-05-15 2017-10-17 Halliburton Energy Services, Inc. Monitoring of drilling operations using discretized fluid flows
AU2015264330C1 (en) 2014-05-19 2019-09-12 Power Chokes A system for controlling wellbore pressure during pump shutdowns
CN104533407A (en) * 2014-07-10 2015-04-22 中国石油天然气集团公司 Underground state determination method and device and state control method and device
EP2985408A1 (en) * 2014-08-11 2016-02-17 Services Petroliers Schlumberger Apparatus and methods for well cementing
EP3194903B8 (en) * 2014-09-19 2021-10-20 Weatherford Technology Holdings, LLC Coriolis flow meter having flow tube with equalized pressure differential
US9500035B2 (en) * 2014-10-06 2016-11-22 Chevron U.S.A. Inc. Integrated managed pressure drilling transient hydraulic model simulator architecture
US9995098B2 (en) 2014-10-08 2018-06-12 Weatherford Technology Holdings, Llc Choke control tuned by flow coefficient for controlled pressure drilling
CA2972462C (en) 2015-01-05 2019-12-10 Weatherford Technology Holdings, Llc Control of multiple hydraulic chokes in managed pressure drilling
WO2016153636A1 (en) * 2015-02-17 2016-09-29 Board Of Regents, The University Of Texas System Method and apparatus for early detection of kicks
US10060208B2 (en) * 2015-02-23 2018-08-28 Weatherford Technology Holdings, Llc Automatic event detection and control while drilling in closed loop systems
WO2016167841A1 (en) * 2015-04-14 2016-10-20 Bp Corporation North America Inc. System and method for drilling using pore pressure
WO2016210398A1 (en) * 2015-06-25 2016-12-29 Schlumberger Technology Corporation Fluid loss and gain for flow, managed pressure and underbalanced drilling
US20170037690A1 (en) * 2015-08-06 2017-02-09 Schlumberger Technology Corporation Automatic and integrated control of bottom-hole pressure
WO2017039652A1 (en) 2015-09-02 2017-03-09 Halliburton Energy Services, Inc. Wrinkled capsules for treatment of subterranean formations
WO2017053833A1 (en) * 2015-09-23 2017-03-30 Covar Applied Technologies, Inc. Ballooning diagnostics
US20170122092A1 (en) 2015-11-04 2017-05-04 Schlumberger Technology Corporation Characterizing responses in a drilling system
US20170138168A1 (en) * 2015-11-13 2017-05-18 Baker Hughes Incorporated Apparatus and related methods to determine hole cleaning, well bore stability and volumetric cuttings measurements
US10316618B2 (en) * 2015-12-14 2019-06-11 Bj Services, Llc System and method of customizable material injection for well cementing
US10591101B2 (en) * 2016-01-23 2020-03-17 Ronald E. Smith Pulsation dampening system for high-pressure fluid lines
US11384886B2 (en) * 2016-01-23 2022-07-12 Ronald E. Smith Pulsation dampening system for high-pressure fluid lines
WO2017129523A1 (en) * 2016-01-25 2017-08-03 Shell Internationale Research Maatschappij B.V. Method and system for automated adjustment of drilling mud properties
US10107052B2 (en) 2016-02-05 2018-10-23 Weatherford Technology Holdings, Llc Control of hydraulic power flowrate for managed pressure drilling
RU2624472C1 (en) * 2016-04-12 2017-07-04 Федеральное государственное бюджетное образовательное учреждение высшего образования "Уфимский государственный нефтяной технический университет" Method of "chisel-face" system transformation coefficient determination
US10533548B2 (en) * 2016-05-03 2020-01-14 Schlumberger Technology Corporation Linear hydraulic pump and its application in well pressure control
US11242744B1 (en) 2016-05-06 2022-02-08 WellWorc, Inc. Real time flow analysis methods and continuous mass balance and wellbore pressure calculations from real-time density and flow measurements
US10738551B1 (en) * 2016-05-06 2020-08-11 WellWorc, Inc Real time flow analysis methods and continuous mass balance and wellbore pressure calculations from real-time density and flow measurements
US10227838B2 (en) 2016-05-10 2019-03-12 Weatherford Technology Holdings, Llc Drilling system and method having flow measurement choke
EP3455456B1 (en) * 2016-05-12 2021-11-17 Enhanced Drilling AS System and methods for controlled mud cap drilling
GB2551141B (en) 2016-06-07 2020-05-13 Equinor Energy As Method and system for managed pressure drilling
US10443328B2 (en) 2016-06-13 2019-10-15 Martin Culen Managed pressure drilling system with influx control
US10648315B2 (en) * 2016-06-29 2020-05-12 Schlumberger Technology Corporation Automated well pressure control and gas handling system and method
US10452794B2 (en) * 2016-08-25 2019-10-22 Baker Hughes, A Ge Company, Llc Generating a script for performing a well operation job
US10655455B2 (en) * 2016-09-20 2020-05-19 Cameron International Corporation Fluid analysis monitoring system
US10415333B2 (en) * 2017-05-02 2019-09-17 Schlumberger Technology Corporation Reversing differential pressure sticking
US11422999B2 (en) 2017-07-17 2022-08-23 Schlumberger Technology Corporation System and method for using data with operation context
EP3685003B1 (en) 2017-09-19 2022-11-02 Noble Drilling Services, Inc. Method for detecting fluid influx or fluid loss in a well and detecting changes in fluid pump efficiency
US10648259B2 (en) * 2017-10-19 2020-05-12 Safekick Americas Llc Method and system for controlled delivery of unknown fluids
CA3072887C (en) 2017-11-10 2023-06-27 Landmark Graphics Corporation Automatic abnormal trend detection of real time drilling data for hazard avoidance
US11378506B2 (en) 2017-12-12 2022-07-05 Baker Hughes, A Ge Company, Llc Methods and systems for monitoring drilling fluid rheological characteristics
US20190309614A1 (en) * 2018-01-19 2019-10-10 Motive Drilling Technologies, Inc. System and Method for Well Drilling Control Based on Borehole Cleaning
US10988997B2 (en) * 2018-01-22 2021-04-27 Safekick Americas Llc Method and system for safe pressurized mud cap drilling
US10883357B1 (en) 2018-01-24 2021-01-05 ADS Services LLC Autonomous drilling pressure control system
WO2019183412A1 (en) * 2018-03-21 2019-09-26 Massachusetts Institute Of Technology Systems and methods for detecting seismo-electromagnetic conversion
US10845354B2 (en) 2018-05-21 2020-11-24 Newpark Drilling Fluids Llc System for simulating in situ downhole drilling conditions and testing of core samples
BR112020026105A2 (en) 2018-06-20 2021-03-16 David Alan McBay METHOD, SYSTEM AND APPARATUS TO EXTRACT THERMAL ENERGY FROM THE GEOTHERMAL SALINE FLUID
US10890060B2 (en) 2018-12-07 2021-01-12 Schlumberger Technology Corporation Zone management system and equipment interlocks
US10907466B2 (en) 2018-12-07 2021-02-02 Schlumberger Technology Corporation Zone management system and equipment interlocks
WO2020122945A1 (en) * 2018-12-14 2020-06-18 Halliburton Energy Services, Inc. System and method to optimize pumping
WO2020132545A1 (en) 2018-12-21 2020-06-25 Terra Sonic International, LLC Drilling rig and methods using multiple types of drilling for installing geothermal systems
CN109854194A (en) * 2019-01-29 2019-06-07 长江大学 Drilling-fluid circulation system, the method and apparatus for reducing drilling well trip-out swabbing pressure
BR112019027015A2 (en) 2019-02-12 2021-08-24 Halliburton Energy Services, Inc. Method, system, and, machine readable medium
WO2020231996A1 (en) 2019-05-16 2020-11-19 Ameriforge Group Inc. Improved closed-loop hydraulic drilling
WO2021029874A1 (en) * 2019-08-12 2021-02-18 Halliburton Energy Services, Inc. Determining the volume of cuttings
US11280190B2 (en) 2019-10-30 2022-03-22 Baker Hughes Oilfield Operations Llc Estimation of a downhole fluid property distribution
CN111364978B (en) * 2020-03-02 2022-06-14 中国海洋石油集团有限公司 Well kick and leakage monitoring device and monitoring method
US20210293130A1 (en) * 2020-03-19 2021-09-23 Exebenus AS System and method to predict value and timing of drilling operational parameters
US20210317714A1 (en) * 2020-04-09 2021-10-14 Opla Energy Ltd. Monobore Drilling Methods with Managed Pressure Drilling
CN111502640B (en) * 2020-04-22 2022-11-15 中国海洋石油集团有限公司 Device and method for measuring formation pore pressure and leakage pressure
CN111456654B (en) * 2020-04-30 2023-01-31 中国石油天然气集团有限公司 Continuous drilling grouting device and method
CN111721615B (en) * 2020-07-10 2023-04-07 中国石油天然气集团有限公司 Device and method for evaluating stress corrosion cracking sensitivity of pipe in oil casing annular pollution environment
CN111927439A (en) * 2020-09-03 2020-11-13 中国石油天然气集团有限公司 Bottom hole pressure control method
CN111997544B (en) * 2020-10-22 2022-08-02 中国电建集团河南工程有限公司 Sedimentary potted landscape ultra-deep layer heat storage geothermal well drilling construction method
US11028648B1 (en) 2020-11-05 2021-06-08 Quaise, Inc. Basement rock hybrid drilling
US20220155117A1 (en) * 2020-11-16 2022-05-19 Sensia Llc System and method for quantitative verification of flow measurements
BR112023019916A2 (en) * 2021-04-01 2023-11-14 Opla Energy Ltd CONTROL SYSTEM AND METHODS
CN113135304B (en) * 2021-04-26 2022-08-12 上海卫星工程研究所 Fluid circuit filling method for calculating return displacement of liquid reservoir
CN113385309B (en) * 2021-04-29 2022-05-31 浙江大学 Liquid discharge control device and method for supergravity centrifugal model
CN113468646B (en) * 2021-07-07 2024-03-15 常州大学 Geomechanical model and machine learning-based method for detecting geothermal well risk
CN113605878B (en) * 2021-08-09 2023-05-26 中国石油大学(华东) Stratum information inversion system and method in pressure control drilling process
US11834931B2 (en) * 2021-08-20 2023-12-05 Schlumberger Technology Corporation Wellbore planner
US11746648B2 (en) 2021-11-05 2023-09-05 Saudi Arabian Oil Company On demand annular pressure tool
US20230175393A1 (en) * 2021-12-08 2023-06-08 Halliburton Energy Services, Inc. Estimating composition of drilling fluid in a wellbore using direct and indirect measurements
CN114352269B (en) * 2021-12-17 2023-06-13 核工业北京地质研究院 Dividing method for Tian Rechu layer positions of high-temperature geothermal heat
CN114482885B (en) * 2022-01-25 2024-03-29 西南石油大学 Intelligent control system for pressure-controlled drilling
CN114893327B (en) * 2022-04-15 2023-12-26 西安航天动力研究所 Method for detecting uniformity of liquid film on outer ring of pintle injector
US20240035362A1 (en) * 2022-07-28 2024-02-01 Baker Hughes Oilfield Operations Llc Closed loop monitoring and control of a chemical injection system
US20240076946A1 (en) * 2022-09-01 2024-03-07 Schlumberger Technology Corporation Approaches to drilling fluid volume management
CN116733396B (en) * 2023-08-11 2023-10-31 四川奥达测控装置有限公司 Drilling outlet flow monitoring and well control overflow and leakage early warning system and method
CN116974312B (en) * 2023-09-22 2023-12-12 广东海洋大学深圳研究院 Method for controlling pressure of drilling and production shaft of natural gas hydrate
CN116971770B (en) * 2023-09-22 2023-11-28 西南石油大学 Well site carbon emission monitoring system

Family Cites Families (69)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3443643A (en) 1966-12-30 1969-05-13 Cameron Iron Works Inc Apparatus for controlling the pressure in a well
US3429385A (en) 1966-12-30 1969-02-25 Cameron Iron Works Inc Apparatus for controlling the pressure in a well
US3470971A (en) 1967-04-28 1969-10-07 Warren Automatic Tool Co Apparatus and method for automatically controlling fluid pressure in a well bore
US3470972A (en) 1967-06-08 1969-10-07 Warren Automatic Tool Co Bottom-hole pressure regulation apparatus
US3552502A (en) 1967-12-21 1971-01-05 Dresser Ind Apparatus for automatically controlling the killing of oil and gas wells
US3550696A (en) 1969-07-25 1970-12-29 Exxon Production Research Co Control of a well
US3677353A (en) 1970-07-15 1972-07-18 Cameron Iron Works Inc Apparatus for controlling well pressure
US3827511A (en) 1972-12-18 1974-08-06 Cameron Iron Works Inc Apparatus for controlling well pressure
US4440239A (en) * 1981-09-28 1984-04-03 Exxon Production Research Co. Method and apparatus for controlling the flow of drilling fluid in a wellbore
US4527425A (en) * 1982-12-10 1985-07-09 Nl Industries, Inc. System for detecting blow out and lost circulation in a borehole
US4733233A (en) 1983-06-23 1988-03-22 Teleco Oilfield Services Inc. Method and apparatus for borehole fluid influx detection
US4733232A (en) 1983-06-23 1988-03-22 Teleco Oilfield Services Inc. Method and apparatus for borehole fluid influx detection
NO162881C (en) 1983-06-23 1990-02-28 Teleco Oilfield Services Inc PROCEDURE AND APPARATUS FOR DETECTION OF FLUIDUM FLOW DRAWINGS IN DRILL.
US4570480A (en) 1984-03-30 1986-02-18 Nl Industries, Inc. Method and apparatus for determining formation pressure
US4577689A (en) 1984-08-24 1986-03-25 Completion Tool Company Method for determining true fracture pressure
US4606415A (en) * 1984-11-19 1986-08-19 Texaco Inc. Method and system for detecting and identifying abnormal drilling conditions
DK150665C (en) * 1985-04-11 1987-11-30 Einar Dyhr THROTTLE VALVE FOR REGULATING THROUGH FLOW AND THEN REAR PRESSURE I
US4630675A (en) * 1985-05-28 1986-12-23 Smith International Inc. Drilling choke pressure limiting control system
US4700739A (en) * 1985-11-14 1987-10-20 Smith International, Inc. Pneumatic well casing pressure regulating system
US4653597A (en) 1985-12-05 1987-03-31 Atlantic Richfield Company Method for circulating and maintaining drilling mud in a wellbore
FR2618181B1 (en) * 1987-07-15 1989-12-15 Forex Neptune Sa METHOD FOR DETECTING A VENT OF FLUID WHICH MAY PREDICT AN ERUPTION IN A WELL DURING DRILLING.
FR2619156B1 (en) 1987-08-07 1989-12-22 Forex Neptune Sa PROCESS FOR CONTROLLING VENUES OF FLUIDS IN HYDROCARBON WELLS
FR2619155B1 (en) 1987-08-07 1989-12-22 Forex Neptune Sa PROCESS OF DYNAMIC ANALYSIS OF THE VENUES OF FLUIDS IN THE WELLS OF HYDROCARBONS
GB2212611B (en) * 1987-11-14 1991-08-14 Forex Neptune Sa A method of monitoring the drilling operations by analysing the circulating drilling mud
GB2226412B (en) * 1988-12-21 1993-04-28 Forex Neptune Sa Monitoring drilling mud compositions using flowing liquid junction electrodes
FR2641320B1 (en) 1988-12-30 1991-05-03 Inst Francais Du Petrole REMOTE EQUIPMENT OPERATION DEVICE COMPRISING A NEEDLE-NEEDLE SYSTEM
US5006845A (en) * 1989-06-13 1991-04-09 Honeywell Inc. Gas kick detector
GB2237305B (en) * 1989-10-28 1993-03-31 Schlumberger Prospection Analysis of drilling solids samples
US5063776A (en) * 1989-12-14 1991-11-12 Anadrill, Inc. Method and system for measurement of fluid flow in a drilling rig return line
GB2239279B (en) 1989-12-20 1993-06-16 Forex Neptune Sa Method of analysing and controlling a fluid influx during the drilling of a borehole
FR2659387A1 (en) 1990-03-12 1991-09-13 Forex Neptune Sa Method for estimating the pore pressure of an underground formation
US5010966A (en) * 1990-04-16 1991-04-30 Chalkbus, Inc. Drilling method
US5154078A (en) 1990-06-29 1992-10-13 Anadrill, Inc. Kick detection during drilling
US5275040A (en) 1990-06-29 1994-01-04 Anadrill, Inc. Method of and apparatus for detecting an influx into a well while drilling
GB9016272D0 (en) * 1990-07-25 1990-09-12 Shell Int Research Detecting outflow or inflow of fluid in a wellbore
US5144589A (en) 1991-01-22 1992-09-01 Western Atlas International, Inc. Method for predicting formation pore-pressure while drilling
EP0498128B1 (en) 1991-02-07 1995-02-22 Sedco Forex Technology Inc. Method for determining fluid influx or loss in drilling from floating rigs
US5205166A (en) 1991-08-07 1993-04-27 Schlumberger Technology Corporation Method of detecting fluid influxes
US5200929A (en) 1992-03-31 1993-04-06 Exxon Production Research Company Method for estimating pore fluid pressure
US5305836A (en) 1992-04-08 1994-04-26 Baroid Technology, Inc. System and method for controlling drill bit usage and well plan
GB2290330B (en) * 1992-04-08 1996-06-05 Baroid Technology Inc Methods for controlling the execution of a well drilling plan
FR2699222B1 (en) * 1992-12-14 1995-02-24 Inst Francais Du Petrole Device and method for remote actuation of equipment comprising timing means - Application to a drilling rig.
US5474142A (en) * 1993-04-19 1995-12-12 Bowden; Bobbie J. Automatic drilling system
US5857522A (en) 1996-05-03 1999-01-12 Baker Hughes Incorporated Fluid handling system for use in drilling of wellbores
EP1048819B1 (en) * 1996-05-03 2004-02-25 Baker Hughes Incorporated Closed loop fluid-handling system for use during drilling of wellbores
US6035952A (en) 1996-05-03 2000-03-14 Baker Hughes Incorporated Closed loop fluid-handling system for use during drilling of wellbores
US5635636A (en) * 1996-05-29 1997-06-03 Alexander; Lloyd G. Method of determining inflow rates from underbalanced wells
US5890549A (en) * 1996-12-23 1999-04-06 Sprehe; Paul Robert Well drilling system with closed circulation of gas drilling fluid and fire suppression apparatus
US6434435B1 (en) * 1997-02-21 2002-08-13 Baker Hughes Incorporated Application of adaptive object-oriented optimization software to an automatic optimization oilfield hydrocarbon production management system
US6148912A (en) 1997-03-25 2000-11-21 Dresser Industries, Inc. Subsurface measurement apparatus, system, and process for improved well drilling control and production
US6176323B1 (en) 1997-06-27 2001-01-23 Baker Hughes Incorporated Drilling systems with sensors for determining properties of drilling fluid downhole
US6119772A (en) * 1997-07-14 2000-09-19 Pruet; Glen Continuous flow cylinder for maintaining drilling fluid circulation while connecting drill string joints
CA2231947C (en) * 1998-03-12 2006-05-30 Lloyd G. Alexander Method of determining fluid inflow rates
US6325159B1 (en) * 1998-03-27 2001-12-04 Hydril Company Offshore drilling system
FR2778428B1 (en) * 1998-05-07 2000-08-04 Geoservices DEVICE AND METHOD FOR MEASURING THE FLOW OF DRILL CUTTINGS
US6234030B1 (en) * 1998-08-28 2001-05-22 Rosewood Equipment Company Multiphase metering method for multiphase flow
EG22117A (en) * 1999-06-03 2002-08-30 Exxonmobil Upstream Res Co Method and apparatus for controlling pressure and detecting well control problems during drilling of an offshore well using a gas-lifted riser
GC0000342A (en) * 1999-06-22 2007-03-31 Shell Int Research Drilling system
GB9916022D0 (en) * 1999-07-09 1999-09-08 Sensor Highway Ltd Method and apparatus for determining flow rates
US6412554B1 (en) * 2000-03-14 2002-07-02 Weatherford/Lamb, Inc. Wellbore circulation system
US6374925B1 (en) * 2000-09-22 2002-04-23 Varco Shaffer, Inc. Well drilling method and system
US6394195B1 (en) 2000-12-06 2002-05-28 The Texas A&M University System Methods for the dynamic shut-in of a subsea mudlift drilling system
US20020112888A1 (en) * 2000-12-18 2002-08-22 Christian Leuchtenberg Drilling system and method
US6484816B1 (en) 2001-01-26 2002-11-26 Martin-Decker Totco, Inc. Method and system for controlling well bore pressure
AU2002253976A1 (en) 2001-02-23 2002-09-12 Exxonmobil Upstream Research Company Method and apparatus for controlling bottom-hole pressure during dual-gradient drilling
US6575244B2 (en) 2001-07-31 2003-06-10 M-I L.L.C. System for controlling the operating pressures within a subterranean borehole
US6904981B2 (en) * 2002-02-20 2005-06-14 Shell Oil Company Dynamic annular pressure control apparatus and method
US6755261B2 (en) * 2002-03-07 2004-06-29 Varco I/P, Inc. Method and system for controlling well fluid circulation rate
US6820702B2 (en) * 2002-08-27 2004-11-23 Noble Drilling Services Inc. Automated method and system for recognizing well control events

Also Published As

Publication number Publication date
AU2009222591A1 (en) 2009-10-29
EP1356186B1 (en) 2005-06-29
DE60111781T2 (en) 2006-05-18
US20060113110A1 (en) 2006-06-01
US20060037781A1 (en) 2006-02-23
US20030079912A1 (en) 2003-05-01
AU1932202A (en) 2002-07-01
US7044237B2 (en) 2006-05-16
US20080041149A1 (en) 2008-02-21
EP1356186A1 (en) 2003-10-29
ES2244554T3 (en) 2005-12-16
DE60111781D1 (en) 2005-08-04
NO326132B1 (en) 2008-10-06
BR0116306B1 (en) 2014-04-22
CA2432119A1 (en) 2002-06-27
NO20032655D0 (en) 2003-06-12
MXPA03005396A (en) 2004-10-14
AU2006252289B2 (en) 2009-11-12
WO2002050398A1 (en) 2002-06-27
AU2009222591B2 (en) 2012-01-19
US20020112888A1 (en) 2002-08-22
BR0116306A (en) 2004-03-02
NO20032655L (en) 2003-08-11
US7278496B2 (en) 2007-10-09
AU2006252289A1 (en) 2007-01-25
US7650950B2 (en) 2010-01-26
AU2002219322B2 (en) 2006-10-05
ATE298835T1 (en) 2005-07-15
DK1356186T3 (en) 2005-10-24
US7367411B2 (en) 2008-05-06
EA006054B1 (en) 2005-08-25
EA200300693A1 (en) 2004-02-26
WO2002050398B1 (en) 2002-09-06

Similar Documents

Publication Publication Date Title
CA2432119C (en) Drilling system and method
US11035184B2 (en) Method of drilling a subterranean borehole
US7562723B2 (en) Method for determining formation fluid entry into or drilling fluid loss from a borehole using a dynamic annular pressure control system
US20070227774A1 (en) Method for Controlling Fluid Pressure in a Borehole Using a Dynamic Annular Pressure Control System
US9650884B2 (en) Use of downhole isolation valve to sense annulus pressure
US11643891B2 (en) Drilling system and method using calibrated pressure losses
Elliott et al. Managed pressure drilling erases the lines
WO2016195674A1 (en) Automatic managed pressure drilling utilizing stationary downhole pressure sensors
Chopty et al. Managed pressure drilling as a tool to reduce risks and non-productive time: an update on field experience
Bybee Managed-Pressure Drilling: Kick Detection and Well Control

Legal Events

Date Code Title Description
EEER Examination request
MKEX Expiry

Effective date: 20211214