CA2560275A1 - Method and system for automatic well planning - Google Patents

Method and system for automatic well planning Download PDF

Info

Publication number
CA2560275A1
CA2560275A1 CA002560275A CA2560275A CA2560275A1 CA 2560275 A1 CA2560275 A1 CA 2560275A1 CA 002560275 A CA002560275 A CA 002560275A CA 2560275 A CA2560275 A CA 2560275A CA 2560275 A1 CA2560275 A1 CA 2560275A1
Authority
CA
Canada
Prior art keywords
task
bit
casing
sets
input data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CA002560275A
Other languages
French (fr)
Other versions
CA2560275C (en
Inventor
Hans Eric Klumpen
Daan Veeningen
Kris Givens
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Schlumberger Canada Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of CA2560275A1 publication Critical patent/CA2560275A1/en
Application granted granted Critical
Publication of CA2560275C publication Critical patent/CA2560275C/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM]
    • G05B19/41885Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM] characterised by modeling, simulation of the manufacturing system
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06312Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Abstract

A method of well planning in an automatic well planning system comprises the steps of: selecting one or more tasks in a task manager; verifying by a task dependency a proper order of the one or more tasks; retrieving by the task manager from a task base one or more sets of instructions associated with the one or more tasks selected in the task manager and verified by the task dependency; retrieving by the task manager from an access manager one or more sets of input data associated with the one or more sets of instructions retrieved by the task manager from the task base; verifying that each set of input data of the one or more sets of input data retrieved by the task manager from the access manager is received by a corresponding one of the one or more sets of instructions retrieved by the task manager from the task base;
executing, by the task manager, the one or more sets of instructions and using, by the task manager, the one or more sets of input data during the executing step thereby generating a set of results; and recording or displaying, by a task view base, the set of results on a recorder or display device.

Claims (58)

1. A method of well planning in an automatic well planning system, comprising the steps of selecting one or more tasks in a task manager;
verifying by a task dependency a proper order of said one or more tasks;
retrieving by said task manager from a task base one or more sets of instructions associated with said one or more tasks selected in the task manager and verified by said task dependency;

retrieving by said task manager from an access manager one or more sets of input data associated with said one or more sets of instructions retrieved by said task manager from said task base;

verifying that each set of input data of said one or more sets of input data retrieved by said task manager from said access manager is received by a corresponding one of said one or more sets of instructions retrieved by said task manager from said task base;

executing, by said task manager, said one or more sets of instructions and using, by said task manager, said one or more sets of input data during the executing step thereby generating a set of results; and recording or displaying, by a task view base, said set of results on a recorder or display device.
2. The method of claim 1, wherein said one or more tasks selected in said task manager is selected from a group consisting of risk assessment, bit selection, and drillstring design.
3. The method of claim 2, wherein said one or more sets of instructions retrieved by said task manager from said task base is selected from a group consisting of risk assessment logical expressions and risk assessment algorithms, bit selection logical expressions and bit selection algorithms, and drillstring design logical expressions and drillstring design algorithms.
4. The method of claim 3, wherein said one or more sets of input data retrieving by said task manager from said access manager is selected from a group consisting of input data provided to the risk assessment logical expressions and the risk assessment algorithms, input data provided to the bit selection logical expressions and the bit selection algorithms, and input data provided to the drillstring design logical expressions and the drillstring design algorithms.
5. The method of claim 4, wherein said set of results is selected from a group consisting of risk assessment output data, bit selection output data, and drillstring design output data.
6. The method of claim 1, further comprising the step of:

changing, by a navigation control in response to a user input, said one or more sets of input data retrieved by said task manager from said access manager thereby generating one or more sets of changed input data;

re-executing, by said task manager, at least a portion of said one or more sets of instructions and using, by said task manager, said one or more sets of changed input data during the re-executing step thereby generating a second set of results; and recording or displaying, by a task view base, said second set of results on said recorder or display device.
7. The method of claim 6, wherein said one or more tasks selected in said task manager is selected from a group consisting of risk assessment, bit selection, and drillstring design.
8. The method of claim 7, wherein said at least a portion of said one or more sets of instructions retrieved by said task manager from said task base is selected from a group consisting of risk assessment logical expressions and risk assessment algorithms, bit selection logical expressions and bit selection algorithms, and drillstring design logical expressions and drillstring design algorithms.
9. The method of claim 8, wherein said one or more sets of input data retrieving by said task manager from said access manager is selected from a group consisting of input data provided to the risk assessment logical expressions and the risk assessment algorithms, input Data provided to the bit selection logical expressions and the bit selection algorithms, and input data provided to the drillstring design logical expressions and the drillstring design algorithms.
10. The method of claim 9, wherein said second set of results is selected from a group consisting of risk assessment output data, bit selection output data, and drillstring design output data.
11. A program storage device readable by a machine tangibly embodying a program of instructions executable by the machine to perform method steps adapted for well planning in an automatic well planning system, said method steps comprising:

selecting one or more tasks in a task manager;

verifying by a task dependency a proper order of said one or more tasks;

retrieving by said task manager from a task base one or more sets of instructions associated with said one or more tasks selected in the task manager and verified by said task dependency;

retrieving by said task manager from an access manager one or more sets of input data associated with said one or more sets of instructions retrieved by said task manager from said task base;
verifying that each set of input data of said one or more sets of input data retrieved by said task manager from said access manager is received by a corresponding one of said one or more sets of instructions retrieved by said task manager from said task base;
executing, by said task manager, said one or more sets of instructions and using, by said task manager, said one or more sets of input data during the executing step thereby generating a set of results; and recording or displaying, by a task view base, said set of results on a recorder or display device.
12. The program storage device of claim 11, wherein said one or more tasks selected in said task manager is selected from a group consisting of risk assessment, bit selection, and drillstring design.
13. The program storage device of claim 12, wherein said one or more sets of instructions retrieved by said task manager from said task base is selected from a group consisting of risk assessment logical expressions and risk assessment algorithms, bit selection logical expressions and bit selection algorithms, and drillstring design logical expressions and drillstring design algorithms.
14. The program storage device of claim 13, wherein said one or more sets of input data retrieving by said task manager from said access manager is selected from a group consisting of input data provided to the risk assessment logical expressions and the risk assessment algorithms, input Data provided to the bit selection logical expressions and the bit selection algorithms, and input data provided to the drillstring design logical expressions and the drillstring design algorithms.
15. The program storage device of claim 14, wherein said set of results is selected from a group consisting of risk assessment output data, bit selection output data, and drillstring design output data.
16. The program storage device of claim 11, further comprising the step of:
changing, by a navigation control in response to a user input, said one or more sets of input data retrieved by said task manager from said access manager thereby generating one or more sets of changed input data;
re-executing, by said task manager, at least a portion of said one or more sets of instructions and using, by said task manager, said one or more sets of changed input data during the re-executing step thereby generating a second set of results; and recording or displaying, by a task view base, said second set of results on said recorder or display device.
17. The program storage device of claim 16, wherein said one or more tasks selected in said task manager is selected from a group consisting of risk assessment, bit selection, and drillstring design.
18. The program storage device of claim 17, wherein said at least a portion of said one or more sets of instructions retrieved by said task manager from said task base is selected from a group consisting of: risk assessment logical expressions and risk assessment algorithms, bit selection logical expressions and bit selection algorithms, and drillstring design logical expressions and drillstring design algorithms.
19. The program storage device of claim 18, wherein said one or more sets of input data retrieving by said task manager from said access manager is selected from a group consisting of input data provided to the risk assessment logical expressions and the risk assessment algorithms, input Data provided to the bit selection logical expressions and the bit selection algorithms, and input data provided to the drillstring design logical expressions and the drillstring design algorithms.
20. The program storage device of claim 19, wherein said second set of results is selected from a group consisting of risk assessment output data, bit selection output data, and drillstring design output data.
21. An automatic well planning system, comprising:
task manager apparatus adapted for receiving one or more tasks selected by a user;
task dependency apparatus adapted for verifying a proper order of said one or more tasks, said task manager apparatus retrieving from a task base one or more sets of instructions associated with said one or more tasks received in said task manager apparatus and verified by said task dependency apparatus, said task manager apparatus retrieving from an access manager one or more sets of input data associated with said one or more sets of instructions retrieved by said task manager from said task base;
translator apparatus adapted for verifying that each set of input data of said one or more sets of input data retrieved by said task manager apparatus from said access manager is received by a corresponding one of said one or more sets of instructions retrieved by said task manager apparatus from said task base, said task manager executing said one or more sets of instructions and using said one or more sets of input data during the execution of said one or more sets of instructions thereby generating a set of results; and task view base apparatus adapted for recording or display said set of results on a recorder or display device.
22. The system of claim 21, wherein said one or more tasks selected in said task manager by said user is selected from a group consisting of risk assessment, bit selection, and drillstring design.
23. The system of claim 22, wherein said one or more sets of instructions retrieved by said task manager apparatus from said task base is selected from a group consisting of risk assessment logical expressions and risk assessment algorithms, bit selection logical expressions and bit selection algorithms, and drillstring design logical expressions and drillstring design algorithms.
24. The system of claim 23, wherein said one or more sets of input data retrieving by said task manager apparatus from said access manager is selected from a group consisting of input data provided to the risk assessment logical expressions and the risk assessment algorithms, input Data provided to the bit selection logical expressions and the bit selection algorithms, and input data provided to the drillstring design logical expressions and the drillstring design algorithms.
25. The system of claim 24, wherein said set of results is selected from a group consisting of:
risk assessment output data, bit selection output data, and drillstring design output data.
26. The system of claim 21, further comprising:
navigation control apparatus, responsive to a user input, adapted for changing said one or more sets of input data retrieved by said task manager apparatus from said access manager thereby generating one or more sets of changed input data, said task manager apparatus re-executing at least a portion of said one or more sets of instructions and using said one or more sets of changed input data during the re-execution of said at least a portion of said one or more sets of instructions thereby generating a second set of results, said task view base apparatus recording or displaying said second set of results on said recorder or display device.
27. The system of claim 26, wherein said one or more tasks selected in said task manager by said user is selected from a group consisting of risk assessment, bit selection, and drillstring design.
28. The system of claim 27, wherein said at least a portion of said one or more sets of instructions retrieved by said task manager apparatus from said task base is selected from a group consisting of risk assessment logical expressions and risk assessment algorithms, bit selection logical expressions and bit selection algorithms, and drillstring design logical expressions and drillstring design algorithms.
29. The system of claim 28, wherein said one or more sets of input data retrieving by said task manager apparatus from said access manager is selected from a group consisting of input data provided to the risk assessment logical expressions and the risk assessment algorithms, input Data provided to the bit selection logical expressions and the bit selection algorithms, and input data provided to the drillstring design logical expressions and the drillstring design algorithms.
30. The system of claim 29, wherein said second set of results is selected from a group consisting of risk assessment output data, bit selection output data, and drillstring design output data.
31. The method of claim 1, wherein said one or more tasks selected in said task manager comprises a risk assessment task adapted for generating risk information in response to said one or more sets of input data.
32. The method of claim 31, wherein said set of results for said risk assessment task that is recorded or displayed by said task view base on said recorder or display device comprises said risk information, said risk information including individual risks, subcategory risks, and risk categories.
33. The method of claim 32, wherein said individual risks are selected from a group consisting of H2S and CO2, Hydrates, Well water depth, Tortuosity, Dogleg severity, Directional Drilling Index, Inclination, Horizontal displacement, Casing Wear, High pore pressure, Low pore pressure, Hard rock, Soft Rock, High temperature, Water-depth to rig rating, Well depth to rig rating, mud weight to kick, mud weight to losses, mud weight to fracture, mud weight window, Wellbore stability window, wellbore stability, Hole section length, Casing design factor, Hole to casing clearance, casing to casing clearance, casing to bit clearance, casing linear weight, Casing maximum overpull, Low top of cement, Cement to kick, cement to losses, cement to fracture, Bit excess work, Bit work, Bit footage, bit hours, Bit revolutions, Bit Rate of Penetration, Drillstring maximum overputt, Bit compressive strength, Kick tolerance, Critical flow rate, Maximum flow rate, Small nozzle area, Standpipe pressure, ECD to fracture, ECD to losses, Gains, Gains Average, Losses, Losses average, Stuck, Stuck average, Mechanical, Mechanical average, Risk Average, Subsea BOP, Large Hole, Small Hole, Number of casing strings, Drillstring parting, and Cuttings.
34. The method of claim 32, wherein said subcategory risks of said risk categories are selected from a group consisting of: gains risks, losses risks, stuck pipe risks, and mechanical risks.
35. The method of claim 32, wherein said risk categories are selected from a group consisting of an average individual risk, an average subcategory risk, a total risk, an average total risk, a potential risk for each design task, and an actual risk for each design task.
36. The method of claim 32, wherein said one or more sets of input data for said risk assessment task is selected from a group consisting of: Casing Point Depth, Measured Depth, True Vertical Depth, Mud Weight, Measured Depth, ROP, Pore Pressure, Static Temperature, Pump Rate, Dog Leg Severity, ECD, Inclination, Hole Size, Casing Size, Fasting-westing, Northing-Southing, Water Depth, Maximum Water Depth, Maximum well Depth, Dick Tolerance, Drill Collar 1 Weight, Drill Collar 2 Weight, Drill Pipe Weight, Heavy Weight Weight, Drill Pipe Tensile Rating, Upper Wellbore Stability Limit, Lower Wellbore Stability Limit, Unconfined Compressive Strength, Bit Size, Mechanical drilling energy (UCS integrated over distance drilled by the bit), Ratio of footage drilled compared to statistical footage, Cumulative UCS, Cumulative Excess UCS, Cumulative UCS
Ratio, Average UCS of rock in section, Bit Average UCS of rock in section, Statistical Bit Hours, Statistical Drilled Footage for the bit, RPM, On Bottom Hours, Calculated Total Bit Revolutions, Time to Trip, Critical Flow Rate, Maximum Flow Rate in hole section, Minimum Flow Rate in hole section, Flow Rate, Total Nozzle Flow Area of bit, Top Of Cement, Top of Tail slurry, Length of Lead slurry, Length of Tail slurry, Cement Density Of Lead, Cement Density Of Tail slurry, Casing Weight per foot, Casing Burst Pressure, Casing Collapse Pressure, Casing Type Name, Hydrostatic Pressure of Cement column, Start Depth, End Depth, Conductor, Hole Section Begin Depth, Openhole Or Cased hole completion, Casing Internal Diameter, Casing Outer Diameter, Mud Type, Pore Pressure without Safety Margin, Tubular Burst Design Factor, Casing Collapse Pressure Design Factor, Tubular Tension Design Factor, Derrick Load Rating, Drawworks Rating, Motion Compensator Rating, Tubular Tension rating, Statistical Bit ROP, Statistical Bit RPM, Well Type, Maximum Pressure, Maximum Liner Pressure Rating, Circulating Pressure, Maximum UCS
of bit, Air Gap, Casing Point Depth, Presence of H2S, Presence of CO2, Offshore Well, and Flow Rate Maximum Limit.
37. The method of claim 1, wherein said one or more tasks selected in said task manager comprises a bit selection task adapted for generating a sequence of drill bits and other associated data in response to said one or more sets of input data.
38. The method of claim 37, wherein said set of results for said bit selection task that are recorded or displayed by said task view base on said recorder or display device comprise said sequence of drill bits and other associated data.
39. The method of claim 38, wherein said set of results for said bit selection task that are recorded or displayed by said task view base on said recorder or display device is selected from a group consisting of Measured Depth, Cumulative Unconfined Compressive Strength (UCS), Cumulative Excess UCS, Bit Size, Bit Type, Start Depth, End Depth, Hole Section Begin Depth, Average UCS of rock in section, Maximum UCS of bit, Bit Average UCS of rock in section, Footage, Statistical Drilled Footage for the bit, Ratio of footage drilled compared to statistical footage, Statistical Bit Hours, On Bottom Hours, Rate of Penetration (ROP), Statistical Bit Rate of Penetration (ROP), Mechanical drilling energy (UCS integrated over distance drilled by the bit),Weight On Bit, Revolutions per Minute (RPM), Statistical Bit RPM, Calculated Total Bit Revolutions, Time to Trip, Cumulative Excess as a ration to the Cumulative UCS, Bit Cost, and Hole Section Name.
40. The method of claim 38, wherein said one or more sets of input data for said bit selection task is selected from a group consisting of Measured Depth, Unconfined Compressive Strength, Casing Point Depth, Hole Size, Conductor, Casing Type Name, Casing Point, Day Rate Rig, Spread Rate Rig, and Hole Section Name.
41. The method of claim 1, wherein said one or more tasks selected in said task manager comprises a drillstring design task adapted for generating a summary of a drillstring in each hole section of a wellbore in response to said one or more sets of input data.
42. The method of claim 41, wherein said set of results for said drillstring design task that are recorded or displayed by said task view base on said recorder or display device comprise said summary of a drillstring in each hole section of a wellbore.
43. The method of claim 42, wherein said set of results for said drillstring design task that are recorded or displayed by said task view base on said recorder or display device representing said summary of a drillstring in each hole section of a wellbore is selected from a group consisting of Hole Section Begin Depth, Drill Collar 1 Length, Drill Collar 1 Weight, Drill Collar 1, Drill Collar 1 OD, Drill Collar 1 ID, Drill Collar 2 Length, Drill Collar 2 Weight, Drill Collar 2, Drill Collar 2 OD, Drill Collar 2 ID, Heavy Weight Length, Heavy Weight Weight, Heavy Weight, Heavy Weight OD, Heavy Weight ID, Drill Pipe Length, Drill Pipe Weight, Pipe, Pipe OD, Pipe ID, Drill Pipe Tensile Rating, BHA tools, Duration, Kick Tolerance, Drill Collar 1 Linear Weight, Drill Collar 2 Linear Weight, Heavy Weight Linear Weight, Drill Pipe Linear Weight, DC OD, Drill Collar ID, Drill Collar Linear Weight, HW
OD, HW ID, HW Linear Weight, Drill Pipe OD, Drill Pipe ID, and Drill Pipe Linear Weight.
44. The method of claim 42, wherein said one or more sets of input data for said drillstring design task is selected from a group consisting of: Measured Depth, True Vertical Depth, Weight On Bit, Mud Weight, Mud Weight Measured Depth, Inclination, Casing Point Depth, Hole Size, Footage, Rate of Penetration, Time to Trip, Dog Leg Severity, True Vertical Depth, Pore Pressure without Safety Margin, Bit Size, Upper Wellbore Stability Limit, Lower Wellbore Stability Limit, Openhole Or Cased hole completion, BOP Location, Casing Type Name, Hole Section Name, Conductor, Start Depth, End Depth, On Bottom Hours, Statistical Drilled Footage for the bit, Cumulative UCS, Casing Point, Casing Size, Casing Burst Pressure, Casing Collapse Pressure, Casing Connector, Casing Cost, Casing Grade, Casing Weight per foot, Casing Outer Diameter, Casing Internal Diameter, Air Gap, Casing Top Measure Depth, Water Depth, Top of Tail slurry, Top Of Cement, Mud Volume, and Offshore Well.
45. The program storage device of claim 11, wherein said one or more tasks selected in said task manager comprises a risk assessment task adapted for generating risk information in response to said one or more sets of input data.
46. The program storage device of claim 45, wherein said set of results for said risk assessment task that is recorded or displayed by said task view base on said recorder or display device comprises said risk information, said risk information including individual risks, subcategory risks, and risk categories.
47. The program storage device of claim 46, wherein said individual risks are selected from a group consisting of H2S and CO2, Hydrates, Well water depth, Tortuosity, Dogleg severity, Directional Drilling Index, Inclination, Horizontal displacement, Casing Wear, High pore pressure, Low pore pressure, Hard rock, Soft Rock, High temperature, Water-depth to rig rating, Well depth to rig rating, mud weight to kick, mud weight to losses, mud weight to fracture, mud weight window, Wellbore stability window, wellbore stability, Hole section length, Casing design factor, Hole to casing clearance, casing to casing clearance, casing to bit clearance, casing linear weight, Casing maximum overpull, Low top of cement, Cement to kick, cement to losses, cement to fracture, Bit excess work, Bit work, Bit footage, bit hours, Bit revolutions, Bit Rate of Penetration, Drillstring maximum overpull, Bit compressive strength, Kick tolerance, Critical flow rate, Maximum flow rate, Small nozzle area, Standpipe pressure, ECD to fracture, ECD to losses, Gains, Gains Average, Losses, Losses average, Stuck, Stuck average, Mechanical, Mechanical average, Risk Average, Subsea BOP, Large Hole, Small Hole, Number of casing strings, Drillstring parting, and Cuttings.
48. The program storage device of claim 46, wherein said subcategory risks of said risk categories are selected from a group consisting of: gains risks, losses risks, stuck pipe risks, and mechanical risks.
49. The program storage device of claim 46, wherein said risk categories are selected from a group consisting of: an average individual risk, an average subcategory risk, a total risk, an average total risk, a potential risk for each design task, and an actual risk for each design task.
50. The program storage device of claim 46, wherein said one or more sets of input data for said risk assessment task is selected from a group consisting of: Casing Point Depth, Measured Depth, True Vertical Depth, Mud Weight, Measured Depth, ROP, Pore Pressure, Static Temperature, Pump Rate, Dog Leg Severity, ECD, Inclination, Hole Size, Casing Size, Easting-westing, Northing-Southing,Water Depth, Maximum Water Depth, Maximum well Depth, Kick Tolerance, Drill Collar 1 Weight, Drill Collar 2 Weight, Drill Pipe Weight, Heavy Weight Weight, Drill Pipe Tensile Rating, Upper Wellbore Stability Limit, Lower Wellbore Stability Limit, Unconfined Compressive Strength, Bit Size, Mechanical drilling energy (UCS integrated over distance drilled by the bit), Ratio of footage drilled compared to statistical footage, Cumulative UCS, Cumulative Excess UCS, Cumulative UCS
Ratio, Average UCS of rock in section, Bit Average UCS of rock in section, Statistical Bit Hours, Statistical Drilled Footage for the bit, RPM, On Bottom Hours, Calculated Total Bit Revolutions, Time to Trip, Critical Flow Rate, Maximum Flow Rate in hole section, Minimum Flow Rate in hole section, Flow Rate, Total Nozzle Flow Area of bit, Top Of Cement, Top of Tail slurry, Length of Lead slurry, Length of Tail slurry, Cement Density Of Lead, Cement Density Of Tail slurry, Casing Weight per foot, Casing Burst Pressure, Casing Collapse Pressure, Casing Type Name, Hydrostatic Pressure of Cement column, Start Depth, End Depth, Conductor, Hole Section Begin Depth, Openhole Or Cased hole completion, Casing Internal Diameter, Casing Outer Diameter, Mud Type, Pore Pressure without Safety Margin, Tubular Burst Design Factor, Casing Collapse Pressure Design Factor, Tubular Tension Design Factor, Derrick Load Rating, Drawworks Rating, Motion Compensator Rating, Tubular Tension rating, Statistical Bit ROP, Statistical Bit RPM, Well Type, Maximum Pressure, Maximum Liner Pressure Rating, Circulating Pressure, Maximum UCS
of bit, Air Gap, Casing Point Depth, Presence of H2S, Presence of C02, Offshore Well, and Flow Rate Maximum Limit.
51. The program storage device of claim 11, wherein said one or more tasks selected in said task manager comprises a bit selection task adapted for generating a sequence of drill bits and other associated data in response to said one or more sets of input data.
52. The program storage device of claim 51, wherein said set of results for said bit selection task that are recorded or displayed by said task view base on said recorder or display device comprise said sequence of drill bits and other associated data.
53. The program storage device of claim 52, wherein said set of results for said bit selection task that are recorded or displayed by said task view base on said recorder or display device is selected from a group consisting of Measured Depth, Cumulative Unconfined Compressive Strength (UCS), Cumulative Excess UCS, Bit Size, Bit Type, Start Depth, End Depth, Hole Section Begin Depth, Average UCS of rock in section, Maximum UCS of bit, Bit Average UCS of rock in section, Footage, Statistical Drilled Footage for the bit, Ratio of footage drilled compared to statistical footage, Statistical Bit Hours, On Bottom Hours, Rate of Penetration (ROP), Statistical Bit Rate of Penetration (ROP), Mechanical drilling energy (UCS integated over distance drilled by the bit),Weight On Bit, Revolutions per Minute (RPM), Statistical Bit RPM, Calculated Total Bit Revolutions, Time to Trip, Cumulative Excess as a ration to the Cumulative UCS, Bit Cost, and Hole Section Name.
54. The program storage device of claim 52, wherein said one or more sets of input data for said bit selection task is selected from a group consisting of Measured Depth, Unconfined Compressive Strength, Casing Point Depth, Hole Size, Conductor, Casing Type Name, Casing Point, Day Rate Rig, Spread Rate Rig, and Hole Section Name.
55. The program storage device of claim 11, wherein said one or more tasks selected in said task manager comprises a drillstring design task adapted for generating a summary of a drillstring in each hole section of a wellbore in response to said one or more sets of input data.
56. The program storage device of claim 55, wherein said set of results for said drillstring design task that are recorded or displayed by said task view base on said recorder or display device comprise said summary of a drillstring in each hole section of a wellbore.
57. The program storage device of claim 56, wherein said set of results for said drillstring design task that are recorded or displayed by said task view base on said recorder or display device representing said summary of a drillstring in each hole section of a wellbore is selected from a goup consisting of Hole Section Begin Depth, Drill Collar 1 Length, Drill Collar 1 Weight, Drill Collar 1, Drill Collar 1 OD, Drill Collar 1 ID, Drill Collar 2 Length, Drill Collar 2 Weight, Drill Collar 2, Drill Collar 2 OD, Drill Collar 2 ID, Heavy Weight Length, Heavy Weight Weight, Heavy Weight, Heavy Weight OD, Heavy Weight ID, Drill Pipe Length, Drill Pipe Weight, Pipe, Pipe OD, Pipe ID, Drill Pipe Tensile Rating, BHA tools, Duration, Kick Tolerance, Drill Collar 1 Linear Weight, Drill Collar 2 Linear Weight, Heavy Weight Linear Weight, Drill Pipe Linear Weight, DC OD, Drill Collar ID, Drill Collar Linear Weight, HW OD, HW ID, HW Linear Weight, Drill Pipe OD, Drill Pipe ID, and Drill Pipe Linear Weight.
58. The program storage device of claim 56, wherein said one or more sets of input data for said drillstring design task is selected from a group consisting of: Measured Depth, True Vertical Depth, Weight On Bit, Mud Weight, Mud Weight Measured Depth, Inclination, Casing Point Depth, Hole Size, Footage, Rate of Penetration, Time to Trip, Dog Leg Severity, True Vertical Depth, Pore Pressure without Safety Margin, Bit Size, Upper Wellbore Stability Limit, Lower Wellbore Stability Limit, Openhole Or Cased hole completion, BOP
Location, Casing Type Name, Hole Section Name, Conductor, Start Depth, End Depth, On Bottom Hours, Statistical Drilled Footage for the bit, Cumulative UCS, Casing Point, Casing Size, Casing Burst Pressure, Casing Collapse Pressure, Casing Connector, Casing Cost, Casing Grade, Casing Weight per foot, Casing Outer Diameter, Casing Internal Diameter, Air Gap, Casing Top Measure Depth, Water Depth, Top of Tail slurry, Top Of Cement, Mud Volume, and Offshore Well.
CA2560275A 2004-03-17 2005-03-17 Method and system for automatic well planning Active CA2560275C (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
US10/802,622 US7539625B2 (en) 2004-03-17 2004-03-17 Method and apparatus and program storage device including an integrated well planning workflow control system with process dependencies
US10/802,622 2004-03-17
PCT/US2005/009032 WO2005091096A1 (en) 2004-03-17 2005-03-17 Method and apparatus and program storage device including an integrated well planning workflow control system with process dependencies

Publications (2)

Publication Number Publication Date
CA2560275A1 true CA2560275A1 (en) 2005-09-29
CA2560275C CA2560275C (en) 2010-05-04

Family

ID=34963145

Family Applications (1)

Application Number Title Priority Date Filing Date
CA2560275A Active CA2560275C (en) 2004-03-17 2005-03-17 Method and system for automatic well planning

Country Status (9)

Country Link
US (1) US7539625B2 (en)
EP (1) EP1730613A1 (en)
AR (1) AR048585A1 (en)
CA (1) CA2560275C (en)
EA (1) EA010003B1 (en)
MX (1) MXPA06010580A (en)
NO (1) NO20064177L (en)
TW (1) TWI305316B (en)
WO (1) WO2005091096A1 (en)

Families Citing this family (121)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6785641B1 (en) * 2000-10-11 2004-08-31 Smith International, Inc. Simulating the dynamic response of a drilling tool assembly and its application to drilling tool assembly design optimization and drilling performance optimization
US9482055B2 (en) * 2000-10-11 2016-11-01 Smith International, Inc. Methods for modeling, designing, and optimizing the performance of drilling tool assemblies
US20050273304A1 (en) * 2000-03-13 2005-12-08 Smith International, Inc. Methods for evaluating and improving drilling operations
US9765571B2 (en) * 2000-10-11 2017-09-19 Smith International, Inc. Methods for selecting bits and drilling tool assemblies
US20090018891A1 (en) * 2003-12-30 2009-01-15 Jeff Scott Eder Market value matrix
US7876705B2 (en) * 2003-06-25 2011-01-25 Schlumberger Technology Corporation Method and apparatus and program storage device for generating a workflow in response to a user objective and generating software modules in response to the workflow and executing the software modules to produce a product
US7636671B2 (en) * 2004-08-30 2009-12-22 Halliburton Energy Services, Inc. Determining, pricing, and/or providing well servicing treatments and data processing systems therefor
US20070203723A1 (en) * 2006-02-28 2007-08-30 Segura Michael J Methods for designing, pricing, and scheduling well services and data processing systems therefor
GB0519597D0 (en) * 2005-09-26 2005-11-02 Imagination Tech Ltd Scalable multi-threaded media processing architecture
US20100175877A1 (en) * 2006-01-24 2010-07-15 Parris Michael D Method of designing and executing a well treatment
US7784544B2 (en) * 2006-01-24 2010-08-31 Schlumberger Technology Corporation Method of treating a subterranean formation using a rheology model for fluid optimization
US8812334B2 (en) * 2006-02-27 2014-08-19 Schlumberger Technology Corporation Well planning system and method
US7620534B2 (en) * 2006-04-28 2009-11-17 Saudi Aramco Sound enabling computerized system for real time reservoir model calibration using field surveillance data
US7857046B2 (en) * 2006-05-31 2010-12-28 Schlumberger Technology Corporation Methods for obtaining a wellbore schematic and using same for wellbore servicing
US7778859B2 (en) * 2006-08-28 2010-08-17 Schlumberger Technology Corporation Method for economic valuation in seismic to simulation workflows
US7606666B2 (en) * 2007-01-29 2009-10-20 Schlumberger Technology Corporation System and method for performing oilfield drilling operations using visualization techniques
JP5440780B2 (en) * 2007-02-26 2014-03-12 日本電気株式会社 Message notification method, business management apparatus, and computer program
WO2008112929A1 (en) * 2007-03-13 2008-09-18 Schlumberger Canada Limited Method and system for managing information
US8014987B2 (en) * 2007-04-13 2011-09-06 Schlumberger Technology Corp. Modeling the transient behavior of BHA/drill string while drilling
US8688487B2 (en) * 2007-04-18 2014-04-01 Schlumberger Technology Corporation Method and system for measuring technology maturity
US7814989B2 (en) * 2007-05-21 2010-10-19 Schlumberger Technology Corporation System and method for performing a drilling operation in an oilfield
US9175547B2 (en) * 2007-06-05 2015-11-03 Schlumberger Technology Corporation System and method for performing oilfield production operations
US8332194B2 (en) * 2007-07-30 2012-12-11 Schlumberger Technology Corporation Method and system to obtain a compositional model of produced fluids using separator discharge data analysis
US8073800B2 (en) * 2007-07-31 2011-12-06 Schlumberger Technology Corporation Valuing future information under uncertainty
CA2690991C (en) * 2007-08-24 2013-12-24 Exxonmobil Upstream Research Company Method for multi-scale geomechanical model analysis by computer simulation
US8768672B2 (en) * 2007-08-24 2014-07-01 ExxonMobil. Upstream Research Company Method for predicting time-lapse seismic timeshifts by computer simulation
US8548782B2 (en) * 2007-08-24 2013-10-01 Exxonmobil Upstream Research Company Method for modeling deformation in subsurface strata
CA2690992C (en) * 2007-08-24 2014-07-29 Exxonmobil Upstream Research Company Method for predicting well reliability by computer simulation
WO2009061903A2 (en) * 2007-11-10 2009-05-14 Landmark Graphics Corporation Systems and methods for workflow automation, adaptation and integration
AU2008335691B2 (en) 2007-12-13 2013-12-05 Exxonmobil Upstream Research Company Iterative reservior surveillance
US7878268B2 (en) * 2007-12-17 2011-02-01 Schlumberger Technology Corporation Oilfield well planning and operation
US8135862B2 (en) * 2008-01-14 2012-03-13 Schlumberger Technology Corporation Real-time, bi-directional data management
US8868386B2 (en) * 2008-02-29 2014-10-21 Sap Se Navigation in simulated workflows
US20090234623A1 (en) * 2008-03-12 2009-09-17 Schlumberger Technology Corporation Validating field data
US8285532B2 (en) * 2008-03-14 2012-10-09 Schlumberger Technology Corporation Providing a simplified subterranean model
EP2269173A4 (en) 2008-04-22 2017-01-04 Exxonmobil Upstream Research Company Functional-based knowledge analysis in a 2d and 3d visual environment
US9488044B2 (en) 2008-06-23 2016-11-08 Schlumberger Technology Corporation Valuing future well test under uncertainty
WO2010039317A1 (en) * 2008-10-01 2010-04-08 Exxonmobil Upstream Research Company Robust well trajectory planning
US8306842B2 (en) * 2008-10-16 2012-11-06 Schlumberger Technology Corporation Project planning and management
US8849640B2 (en) * 2008-11-06 2014-09-30 Exxonmobil Upstream Research Company System and method for planning a drilling operation
US8498853B2 (en) * 2009-07-20 2013-07-30 Exxonmobil Upstream Research Company Petrophysical method for predicting plastic mechanical properties in rock formations
US8229671B2 (en) * 2009-08-13 2012-07-24 Pritchard David M Method and system for riserless casing seat optimization
US20110131201A1 (en) * 2009-11-30 2011-06-02 Universal Carbon Control Technology Co., Ltd. Supply Chain Digital Map Management System and Integrating Method Therefor
US8386221B2 (en) * 2009-12-07 2013-02-26 Nuovo Pignone S.P.A. Method for subsea equipment subject to hydrogen induced stress cracking
EP2531694B1 (en) 2010-02-03 2018-06-06 Exxonmobil Upstream Research Company Method for using dynamic target region for well path/drill center optimization
BR112012017278A2 (en) 2010-02-12 2016-04-26 Exxonmobil Upstream Res Co Method and system for creating historical fit simulation models
US8731872B2 (en) * 2010-03-08 2014-05-20 Exxonmobil Upstream Research Company System and method for providing data corresponding to physical objects
CA2786584C (en) 2010-03-12 2017-07-18 Exxonmobil Upstream Research Company Dynamic grouping of domain objects via smart groups
US8731887B2 (en) 2010-04-12 2014-05-20 Exxonmobile Upstream Research Company System and method for obtaining a model of data describing a physical structure
US8265874B2 (en) 2010-04-21 2012-09-11 Saudi Arabian Oil Company Expert system for selecting fit-for-purpose technologies and wells for reservoir saturation monitoring
US8727017B2 (en) 2010-04-22 2014-05-20 Exxonmobil Upstream Research Company System and method for obtaining data on an unstructured grid
US8731873B2 (en) 2010-04-26 2014-05-20 Exxonmobil Upstream Research Company System and method for providing data corresponding to physical objects
CN102870087B (en) 2010-04-30 2016-11-09 埃克森美孚上游研究公司 The method and system of fluid limited bulk emulation
US20110283206A1 (en) * 2010-05-13 2011-11-17 Schlumberger Technology Corporation Interactive split feature visualization
US20120011079A1 (en) * 2010-07-12 2012-01-12 International Business Machines Corporation Deriving entity-centric solution models from industry reference process and data models
CA2803066A1 (en) 2010-07-29 2012-02-02 Exxonmobil Upstream Research Company Methods and systems for machine-learning based simulation of flow
US9058445B2 (en) 2010-07-29 2015-06-16 Exxonmobil Upstream Research Company Method and system for reservoir modeling
AU2011283193B2 (en) 2010-07-29 2014-07-17 Exxonmobil Upstream Research Company Methods and systems for machine-learning based simulation of flow
WO2012018428A1 (en) 2010-08-04 2012-02-09 Exxonmobil Upstream Research Company System and method for summarizing data on an unstructured grid
US8731875B2 (en) 2010-08-13 2014-05-20 Exxonmobil Upstream Research Company System and method for providing data corresponding to physical objects
CA2808078C (en) 2010-08-24 2018-10-23 Exxonmobil Upstream Research Company System and method for planning a well path
WO2012039811A1 (en) 2010-09-20 2012-03-29 Exxonmobil Upstream Research Company Flexible and adaptive formulations for complex reservoir simulations
CN102096406B (en) * 2011-01-13 2012-11-21 北京工业大学 Simulation control system and control method for unsteady change of water inflow during biological waste water treatment
US10318663B2 (en) 2011-01-26 2019-06-11 Exxonmobil Upstream Research Company Method of reservoir compartment analysis using topological structure in 3D earth model
WO2012106348A2 (en) * 2011-01-31 2012-08-09 M-I Llc Method of minimizing wellbore instability
US20130311147A1 (en) * 2011-02-01 2013-11-21 Halliburton Energy Services, Inc. Drilling optimization
US20120203591A1 (en) * 2011-02-08 2012-08-09 General Electric Company Systems, methods, and apparatus for determining pipeline asset integrity
AU2011360212B2 (en) 2011-02-21 2017-02-02 Exxonmobil Upstream Research Company Reservoir connectivity analysis in a 3D earth model
US9218177B2 (en) * 2011-03-25 2015-12-22 Microsoft Technology Licensing, Llc Techniques to optimize upgrade tasks
CA2831721C (en) 2011-04-19 2018-10-09 Landmark Graphics Corporation Determining well integrity
US20120278053A1 (en) * 2011-04-28 2012-11-01 Baker Hughes Incorporated Method of Providing Flow Control Devices for a Production Wellbore
US9222350B2 (en) 2011-06-21 2015-12-29 Diamond Innovations, Inc. Cutter tool insert having sensing device
WO2013006226A1 (en) 2011-07-01 2013-01-10 Exxonmobil Upstream Research Company Plug-in installer framework
EP2756382A4 (en) 2011-09-15 2015-07-29 Exxonmobil Upstream Res Co Optimized matrix and vector operations in instruction limited algorithms that perform eos calculations
WO2013169429A1 (en) 2012-05-08 2013-11-14 Exxonmobile Upstream Research Company Canvas control for 3d data volume processing
US9411071B2 (en) 2012-08-31 2016-08-09 Exxonmobil Upstream Research Company Method of estimating rock mechanical properties
CA2883169C (en) 2012-09-28 2021-06-15 Exxonmobil Upstream Research Company Fault removal in geological models
US10190403B2 (en) * 2013-01-03 2019-01-29 Landmark Graphics Corporation System and method for predicting and visualizing drilling events
US20140214476A1 (en) * 2013-01-31 2014-07-31 Halliburton Energy Services, Inc. Data initialization for a subterranean operation
US20150371345A1 (en) * 2013-03-25 2015-12-24 Landmark Graphics Corporation System, Method and Computer Program Product for Predicting Well Production
US10584570B2 (en) 2013-06-10 2020-03-10 Exxonmobil Upstream Research Company Interactively planning a well site
US10048403B2 (en) 2013-06-20 2018-08-14 Exxonmobil Upstream Research Company Method and system for generation of upscaled mechanical stratigraphy from petrophysical measurements
US9864098B2 (en) 2013-09-30 2018-01-09 Exxonmobil Upstream Research Company Method and system of interactive drill center and well planning evaluation and optimization
WO2015053748A1 (en) 2013-10-08 2015-04-16 Halliburton Energy Services, Inc. Integrated well survey management and planning tool
US10337313B2 (en) 2013-10-08 2019-07-02 Halliburotn Energy Services, Inc. Integrated well survey management and planning tool
MX2016011021A (en) * 2014-02-24 2016-10-26 Landmark Graphics Corp Total asset modeling with integrated asset models and persistent asset models.
US10062044B2 (en) * 2014-04-12 2018-08-28 Schlumberger Technology Corporation Method and system for prioritizing and allocating well operating tasks
EP3134611A2 (en) * 2014-04-25 2017-03-01 BP Corporation North America Inc. Systems and methods determining a bit tripping schedule and bit selection based on total cost of drilling
US9909406B2 (en) * 2014-05-16 2018-03-06 Baker Hughes, A Ge Company, Llc Automated delivery of wellbore construction services
US20160012371A1 (en) * 2014-07-11 2016-01-14 Schlumberger Technology Corporation Method and system for assessing oilfield services
US10319143B2 (en) 2014-07-30 2019-06-11 Exxonmobil Upstream Research Company Volumetric grid generation in a domain with heterogeneous material properties
CA2963416A1 (en) 2014-10-31 2016-05-06 Exxonmobil Upstream Research Company Handling domain discontinuity in a subsurface grid model with the help of grid optimization techniques
CA2963092C (en) 2014-10-31 2021-07-06 Exxonmobil Upstream Research Company Methods to handle discontinuity in constructing design space for faulted subsurface model using moving least squares
WO2016100973A1 (en) 2014-12-19 2016-06-23 Schlumberger Technology Corporation Method of creating and executing a plan
WO2016112061A1 (en) * 2015-01-06 2016-07-14 Schlumberger Canada Limited Creating and executing a well construction/operation plan
WO2016128020A1 (en) 2015-02-09 2016-08-18 Siemens Aktiengesellschaft Production module, production system, and method for operating a production module
EP3265647B1 (en) * 2015-03-06 2021-02-24 Hartford Steam Boiler Inspection and Insurance Company Risk assessment for drilling and well completion operations
US10657441B2 (en) * 2015-04-01 2020-05-19 Landmark Graphics Corporation Model generation for real-time rate of penetration prediction
SE542285C2 (en) * 2015-10-01 2020-04-07 Epiroc Rock Drills Ab Method and system for assigning tasks to drill rigs
US10987030B2 (en) * 2016-06-30 2021-04-27 Koninklijke Philips N.V. Method and apparatus for face detection/recognition systems
EP3559401B1 (en) 2016-12-23 2023-10-18 ExxonMobil Technology and Engineering Company Method and system for stable and efficient reservoir simulation using stability proxies
CN108255467A (en) * 2016-12-27 2018-07-06 北京京东尚科信息技术有限公司 The method, apparatus and system of service are performed according to workflow sequence
US11041976B2 (en) 2017-05-30 2021-06-22 Exxonmobil Upstream Research Company Method and system for creating and using a subsurface model in hydrocarbon operations
TWI626622B (en) * 2017-07-04 2018-06-11 System and method for stereoscopic imaging of underground rock formation characteristics
CN108416510B (en) * 2018-02-10 2021-04-27 杭州后博科技有限公司 Iron tower inspection task list real-time adjustment method and system
US11288609B2 (en) 2018-12-04 2022-03-29 Schlumberger Technology Corporation Systems and methods for executing a plan associated with multiple equipment by using rule-based inference
CN112384937A (en) 2018-05-12 2021-02-19 地质探索系统公司 Seismic data interpretation system
CN112262352B (en) * 2018-05-12 2024-04-05 吉奥奎斯特系统公司 Multi-domain planning and execution
US10579231B1 (en) * 2018-11-01 2020-03-03 Nabors Drilling Technologies Usa, Inc. Contextual drilling interface and recommendation system and methods
US11753890B2 (en) 2019-01-15 2023-09-12 Schlumberger Technology Corporation Real-time pump-down perforating data acquisition and application automation response
US11150637B2 (en) * 2019-05-21 2021-10-19 Schlumberger Technology Corporation Systems and methods for asset management using a digital avatar
US11414983B2 (en) 2019-05-21 2022-08-16 Schlumberger Technology Corporation Digital thermal avatar
CN110286663B (en) * 2019-06-28 2021-05-25 云南中烟工业有限责任公司 Regional cigarette physical index standardized production improving method
CN110320872B (en) * 2019-06-28 2021-08-03 云南中烟工业有限责任公司 Method for improving standard production of cigarette mainstream smoke indexes
US11200093B2 (en) * 2019-07-15 2021-12-14 Baker Hughes Oilfield Operations Llc Management of a geomechanical workflow of a geomechanics application in a computer system
CA3087962A1 (en) 2019-07-24 2021-01-24 Schlumberger Canada Limited Coordinated pumping operations
CN112682025B (en) * 2020-08-12 2023-05-26 山西天地煤机装备有限公司 Drilling and anchoring equipment control method, device and system
CN112256925B (en) * 2020-10-21 2022-10-04 西安电子科技大学 Multi-request-oriented scientific workflow data set storage method
CN112462032B (en) * 2020-11-12 2022-03-04 武汉大学 Method suitable for evaluating drainage and salt discharge effects of concealed pipes in saline land area
US20230058683A1 (en) * 2021-08-17 2023-02-23 Landmark Graphics Corporation Well construction optimization techniques
CN114491190B (en) * 2022-01-29 2023-04-07 中国石油化工股份有限公司 Drilling machine drilling speed sensitivity visualization method, device and equipment

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2290330B (en) * 1992-04-08 1996-06-05 Baroid Technology Inc Methods for controlling the execution of a well drilling plan
US5416697A (en) * 1992-07-31 1995-05-16 Chevron Research And Technology Company Method for determining rock mechanical properties using electrical log data
US6728947B1 (en) * 1998-06-05 2004-04-27 R. R. Donnelley & Sons Company Workflow distributing apparatus and method
US6785641B1 (en) * 2000-10-11 2004-08-31 Smith International, Inc. Simulating the dynamic response of a drilling tool assembly and its application to drilling tool assembly design optimization and drilling performance optimization
GB0009266D0 (en) * 2000-04-15 2000-05-31 Camco Int Uk Ltd Method and apparatus for predicting an operating characteristic of a rotary earth boring bit
US6438495B1 (en) * 2000-05-26 2002-08-20 Schlumberger Technology Corporation Method for predicting the directional tendency of a drilling assembly in real-time
US6424919B1 (en) * 2000-06-26 2002-07-23 Smith International, Inc. Method for determining preferred drill bit design parameters and drilling parameters using a trained artificial neural network, and methods for training the artificial neural network
US20020049575A1 (en) * 2000-09-28 2002-04-25 Younes Jalali Well planning and design
US20030177046A1 (en) * 2001-12-03 2003-09-18 John Socha-Leialoha Method and system for reusing components
FI118102B (en) * 2003-07-04 2007-06-29 Medicel Oy Information control system for controlling the workflow
US7725302B2 (en) * 2003-12-02 2010-05-25 Schlumberger Technology Corporation Method and system and program storage device for generating an SWPM-MDT workflow in response to a user objective and executing the workflow to produce a reservoir response model

Also Published As

Publication number Publication date
MXPA06010580A (en) 2007-03-15
EA010003B1 (en) 2008-06-30
NO20064177L (en) 2006-12-18
AR048585A1 (en) 2006-05-10
TWI305316B (en) 2009-01-11
US7539625B2 (en) 2009-05-26
EP1730613A1 (en) 2006-12-13
TW200601117A (en) 2006-01-01
US20050209836A1 (en) 2005-09-22
EA200601713A1 (en) 2007-06-29
CA2560275C (en) 2010-05-04
WO2005091096A1 (en) 2005-09-29

Similar Documents

Publication Publication Date Title
CA2560275A1 (en) Method and system for automatic well planning
Akers Jetting of structural casing in deepwater environments: job design and operational practices
Gupta et al. Expanding the extended reach envelope at Chayvo Field, Sakhalin Island
US7975771B2 (en) Method for running casing while drilling system
Logan Engineered shale completions based on common drilling data
Patel et al. A review on casing while drilling technology for oil and gas production with well control model and economical analysis
Walker Pushing the extended reach envelope at sakhalin: An operator’s experience drilling a record reach well
Rohleder et al. Challenges of drilling an ultra-deep well in deepwater–Spa prospect
Perez et al. Meeting the subsalt challenge
WO2003042488A2 (en) Deepwater slim hole well construction
Viktorin et al. The next generation of Sakhalin extended-reach drilling
Muñoz et al. Directional Casing While Drilling (CwD) Reestablished as Viable Technology in Saudi Arabia
Valisevich et al. Complex well design for multilaterals offshore North Caspian Sea
Hjelle et al. World-record ERD well drilled from a floating installation in the North Sea
Rachman et al. Hydraulic Workover Unit Utilization for New Well Openhole Drilling with Directional Motor and Logging-While-Drilling Bottom-Hole-Assembly in M Area
Palmer Jade North Sea HPHT development: innovative well design generates best in class performance
Akinfolarin et al. Lessons Learned from Drilling a Long Open Hole Interval and Recovery from a Stuck Pipe Incident
Mallary et al. Pressure-while-drilling measurements to solve extended-reach drilling problems on Alaska's North Slope
Eide et al. Further advances in coiled-tubing drilling
Qamar et al. Stretching Lower Completion Limits: Longest One Screen Run in Horizontal Extended Reach Drilling/Multilateral Well on Troll Field, North Sea
Gust et al. Rotation of a long liner in a shallow long-reach well
US20220268115A1 (en) Reamer / guide interchangeable tubular shoe
Hahn et al. Simultaneous Drill and Case Technology-Case Histories, Status and Options for Further Development
Ebrahimi et al. Turbodrill bottomhole assembly and real-time data improve through-tubing coiled-tubing drilling operations in sour gas well
D'Ambrosio et al. Cost-effective ultralarge-diameter polycrystalline-diamond-compact-bit drilling in deepwater gulf of Mexico

Legal Events

Date Code Title Description
EEER Examination request