CA2590683C - Method for predicting rate of penetration using bit-specific coefficients of sliding friction and mechanical efficiency as a function of confined compressive strength - Google Patents

Method for predicting rate of penetration using bit-specific coefficients of sliding friction and mechanical efficiency as a function of confined compressive strength Download PDF

Info

Publication number
CA2590683C
CA2590683C CA2590683A CA2590683A CA2590683C CA 2590683 C CA2590683 C CA 2590683C CA 2590683 A CA2590683 A CA 2590683A CA 2590683 A CA2590683 A CA 2590683A CA 2590683 C CA2590683 C CA 2590683C
Authority
CA
Canada
Prior art keywords
bit
rock
ccs
compressive strength
confined compressive
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CA2590683A
Other languages
French (fr)
Other versions
CA2590683A1 (en
Inventor
William Malcolm Calhoun
Hector Ulpiano Caicedo
Russell Thomas Ewy
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chevron USA Inc
Original Assignee
Chevron USA Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chevron USA Inc filed Critical Chevron USA Inc
Publication of CA2590683A1 publication Critical patent/CA2590683A1/en
Application granted granted Critical
Publication of CA2590683C publication Critical patent/CA2590683C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B44/00Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B45/00Measuring the drilling time or rate of penetration

Abstract

A method for predicting the rate of penetration (ROP) of a drill bit drilling a well bore through intervals of rock of a subterranean formation is provided.
The method uses an equation based upon specific energy principles. A
relationship is determined between a bit-specific coefficient of sliding friction ~ and confined compressive strength CCS over a range of confined compressive strengths CCS. Similarly, another relationship for the drill bit is determined between mechanical efficiency EFFM and confined compressive strength CCS over a range of confined compressive strengths CCS. Confined compressive strength CCS is estimated for intervals of rock through which the drill bit is to be used to drill a well bore. The rate of penetration ROP is then calculated utilizing the estimates of confined compressive strength CCS
of the intervals of rock to be drilled and those determined relationships between the bit-specific coefficient of sliding friction ~ and the mechanical efficiency EFFM and the confined compressive strengths CCS, as well as using estimated drill bit speeds N (RPM) and weights on bit (WOB).

Description

8 The present invention relates generally to the drilling of well bores in subterranean 9 formations, and more particularly, to methods for predicting and optimizing the rate at which the well bores are drilled including the proper selection of drill bits 11 and bit performance assessment.

16 It has become standard practice to plan wells and analyze bit performance by using 17 log-based rock strength analysis and/or specific energy theory. The most widely 18 used characterization of rock strength is unconfined compressive strength (UCS), 19 but this is somewhat problematic because the apparent strength of the rock to the bit is typically different than UCS. Specific energy theory has been used for bit 21 performance assessment for years. One of the challenges of application of the 22 specific energy theory, however, is uncertainty or lack of consistency in reasonable 23 values for input variables to be used in specific energy based equations.

1 The present invention addresses the need to provide reasonable values for the 2 input variables used to predict rate of penetration and reactive torque of a drill 3 bit using specific energy theory 6 A method for predicting the rate of penetration (ROP) of a drill bit drilling a well 7 bore through intervals of rock of a subterranean formation is provided.
The 8 method uses an equation based upon specific energy principles. For a drill bit, 9 relationships are determined between confined compressive strength CCS
and (1) a bit-specific coefficient of sliding friction, (2) mechanical efficiency EFFm, 11 (3) weight on bit WOB, and (4) bit rpm N. These relationships are determined 12 over a range of confined compressive strengths CCS and for a number of 13 predominant bit types. The confined compressive strength CCS is estimated 14 for intervals of rock through which the drill bit is to be used to drill a well bore.
The rate of penetration ROP and bit torque is then preferably calculated 16 utilizing the estimates of confined compressive strength CCS of the intervals of 17 rock to be drilled and bit type as the only inputs. Alternatively, ROP
and bit 18 torque can be calculated utilizing one or more of the input 19 coefficients/parameters appropriately determined by another equally suitable method or specified as a constant, and the estimates of confined compressive 21 strength and bit type as the only inputs for coefficients/parameters not 22 determined by another method or specified as constant.

24 Correction factors may also be determined for the effect that mud weight and bit configuration have on those relationships between the coefficient of sliding 26 friction p and mechanical efficiency EFFm and the estimated CCS values.

28 The present invention establishes relationships for specific types of drill bits for 29 bit-specific coefficients of sliding friction p and mechanical efficiency EFFm, and preferably weight on bit WOB and rpm N all as a function of apparent rock 31 strength and drilling environment (mud weight, equivalent circulating density 32 (ECD) etc.), and then uses these relationships to predict reasonable and 1 achievable ROP and associated bit torque based upon the apparent strength of 2 the rock which is to be drilled.

6 These and other objects, features and advantages of the present invention will 7 become better understood with regard to the following description, pending 8 claims and accompanying drawings where:

FIG. 1 is a flowchart of steps used in a preferred embodiment of the present 11 invention to predict rate of penetration ROP for a drill bit drilling through 12 intervals of rock of a subterranean formation;

14 FIGS. 2A and 2B are flowcharts for determining bit-specific relationships for input variables used in calculating ROP in FIG. 1, the relationships being 16 determined based upon simulator testing or expert based knowledge;

18 FIG. 3 is a schematic drawing of a well bore and confining fluid pressures 19 applied to rock in a depth of cut zone during drilling of rock by a drill bit;
21 FIG. 4 is a graph of differential pressure applied to rock in the depth of cut zone 22 versus radial position at the bottom of a hole for impermeable rock using 23 calculated values of confined compressive strength CCS and values of CSS
=
24 determined using a finite element model;
26 FIG. 5 is a chart produced during a full-scale simulator test for a roller insert bit 27 for hard formations;

29 FIG. 6 is a graph of a bit-specific coefficient of sliding friction p as a function of CCS for PDC bits with more than seven blades;

1 FIG. 7 is a graph of minimum and maximum mechanical efficiencies EFFm as a 2 function of CCS for PDC bits with more than seven blades;

4 FIG. 8 is a graph of weight on bit WOB and WOB factor (lbs per inch bit diameter) versus CCS for an 8.5" steel tooth bit type;

7 FIG. 9 is a graph of rotary drill speed N (RPM) versus CCS for roller cone bits;

9 FIG. 10 is a graph of a correction factor for coefficient of sliding friction p versus mud weight for PDC bits;

12 FIG. 11 is a graph of a correction factor for mechanical efficiency EFFm versus 13 mud weight for PDC bits;

FIG. 12 is a graph of a correction factor for coefficients of sliding friction p 16 which is dependent upon cutter size for PDC bits;

18 FIG. 13 is chart of a bit optimization and selection for a first well;

FIG. 14 is chart of a bit optimization and selection for a second well;

22 FIG. 15 is chart of a bit optimization and selection for a third well;
and 24 FIG. 16 is chart of a bit optimization and selection for a fourth well.

28 I. Overview FIG. 1 illustrates a flowchart of steps taken in a preferred embodiment of the 31 present invention for calculating the rate of penetration (ROP) by a particular 32 type of drill bit into a subterranean formation under specified drilling conditions.
-4-, 1 Details of these steps will be described in greater detail below. The rate of 2 penetration ROP for the well bore is preferably estimated using specific energy 3 theory. More particularly, equation (1) ideally is used to calculate the ROP as 4 follows:
ROP 13.330/ (1) \EFF * WOB AB
6 where: ROP = Rate of penetration by a bit (ft/hr);
7 p bit-specific coefficient of sliding friction;
8 N rotational speed of drill bit (revolutions per minute 9 (RPM));
DB = diameter of bit (inches);
11 GCS = confined compressive strength (apparent 12 strength of the rock to the bit (psi));
13 EFFm = mechanical efficiency of the bit (percent);
14 WOB = weight on bit (pounds); and AB = area of bit (square inches).

17 Referring now to the flowchart of FIG. 1, rock properties of the subterranean 18 region to be drilled is determined in step 10. In particular, properties are 19 determined such as unconfined compressive rock strength (UCS) and friction angle (FA) for intervals of rock to be drilled. Core samples from nearby well 21 bores may be obtained and analyzed to determine properties of the rock which 22 are likely to be encountered during the drilling of a well bore.
Alternatively, by 23 way of example and not limitation, such properties could be estimated from 24 open hole logs or from seismic surveys. Next in step 15, properties such as in situ pore pressure PP of the rock, mud weights MW likely to be used during the 26 drilling operation and overburden (OB) pressure for a given depth of formation 27 are calculated. From these properties, the apparent rock strength (confined 28 compressive strength CCS) for intervals of rock along the well bore path is 29 determined in step 20.
1 Knowing the calculated CCS for an interval of rock, input values for p, EFFm, N, 2 and WOB can be rapidly obtained from relationships which have previously 3 been determined such as by simulator testing or using expert based 4 knowledge. FIGS. 2A and B illustrate the source of how these relationships are established. Bit characteristics such area of bit AB and diameter of bit DB
are 6 known based upon the particular bit size for which the ROP calculation is to be 7 perforMed.
9 Values for these input variables may be modified in appropriate cases.
For example, correction factors for CFmw may be applied in step 30 to EFFm and p 11 if the mud weight to be used for drilling is different from that mud weight under 12 which the relationship between EFFm and p and CCS were determined.
13 Likewise, a correction factor CFcs may be applied in step 35 to p if the cutter 14 size of a POD bit is different from a POD bit which was used to develop the p vs. CCS relationship.

17 In step, 40 the aforementioned inputs can be used to calculate the ROP
of the 18 drill bit utilizing equation (1). Preferably, these inputs are known based upon 19 the CSS of the particular interval of rock being drilled and the drill bit configuration.

22 Referring now to FIG. 2A, in order to determine the coefficients of sliding 23 friction u and the mechanical efficiencies EFFm for each particular type of drill 24 bit, full scale simulators tests using hydrodynamic pressures that are typically encountered under normal drilling conditions are performed in step 50. Test 26 results from these full scale simulator tests are used in steps 55 and 60 to 27 establish relationships of bit-specific coefficients of sliding friction p and 28 mechanical efficiency EFFm as a function of confined compressive strength 29 COS of the rock. Correction factors CFmw and CFcs due to mud weight and cutter size of bit used may also be derived from simulator tests using different 31 mud weights and bits with differing cutter sizes.

1 Optionally, relationships N versus CCS and WOB versus CCS may also be 2 established in steps 85 and 90. These relationships are generally based upon 3 the expert knowledge 80 of an experienced drilling engineer, bit type, and rock 4 strength.
6 Using the above methodology and globally applicable rock property 7 determination techniques, ROP can be determined very rapidly for numerous 8 bit types with reasonable accuracy and without any calibration.

II. Determination of Confined Compressive Strength based upon 11 Rock Mechanics Principles 13 The method of the present invention relies upon using an estimated apparent 14 strength of rock to the bit or confined compressive strength (CCS). The preferred method of estimating CCS utilizes a well known rock mechanics 16 formula which has been adapted to more accurately estimate CCS for rocks of 17 low and limited permeability. This preferred method of calculating CCS
is 18 described in co-pending application entitled "Method for Estimating Confined 19 Compressive Strength for Rock Formations Utilizing Skempton Theory "
which was concurrently filed with this application. A condensed description of this 21 preferred method will be described below.

23 An important part of the strength of a rock to resist drilling depends upon the 24 compressive state under which the rock is subjected. This apparent rock strength of rock to resist drilling by a drill bit under the confining conditions of 26 drilling shall be referred to as a rock's confined compressive strength CCS.
27 Prior to drilling, the compressive state of a rock at a particular depth is largely 28 dependent on the weight of the overburden being supported by the rock.
29 During a drilling operation the bottom portion of a vertical well bore, i.e., rock in the depth of cut zone, is exposed to drilling fluids rather than to the overburden 31 which has been removed.

1 Ideally, a realistic estimate of in situ pore pressure PP in a bit's depth of cut 2 zone is determined when calculating confined compressive strength CCS for 3 the rock to be drilled. This depth of cut zone is typically on the order of zero to 4 15 mm, depending on the penetration rate, bit characteristics, and bit operating parameters. The preferred method of calculating CCS includes a novel way to 6 calculate the altered pore pressure PP at the bottom of the well bore 7 (immediately below the bit in the depth of cut zone), for rocks of limited 8 permeability.

While not wishing to be held to a particular theory, the following describes the 11 general assumptions made in arriving at a method for calculating confined 12 compressive strength (CCS) for rock being drilled using a drill bit and drilling 13 fluid to create a generally vertical well bore with a flat profile.
Referring now to 14 FIG. 3, a bottom hole environment for a vertical well in a porous/permeable rock formation is shown. A rock formation 120 is depicted with a vertical well 16 bore 122 being drilled therein. The inner periphery of the well bore 122 is filled 17 with a drilling fluid 124 which creates a filter cake 126 lining well bore 122.
18 Arrows 128 indicate that pore fluid in rock formation 120, i.e., the surrounding 19 reservoir, can freely flow into the pore space in the rock in the depth of cut zone.
This is generally the case when the rock is highly permeable. Also, the drilling 21 fluid 124 applies pressure to the well bore as suggested by arrows 130.

23 The rock previously overlying the depth of cut zone, which exerted an 24 "overburden stress or OB pressure" prior to the drilling of the well bore, has been replaced by the drilling fluid 124. Although there can be exceptions, the 26 fluid pressure exerted by the drilling fluid 124 is typically greater than the in situ 27 pore pressure PP in the depth of cut zone and less than the overburden OB
28 pressure previously exerted by the overburden. Under this common drilling 29 condition, the rock in the depth of cut zone expands slightly at the bottom of the hole or well bore due to the reduction of stress (pressure from drilling fluid is 31 less than overburden pressure OB exerted by overburden). Similarly, it is 32 assumed that the pore volume in the rock also expands. Contrarily, it is 1 assumed that the rock and its pores will contract in the case where drilling fluid 2 ECD pressure is greater than the removed overburden OB pressure. The 3 expansion of the rock and its pores will result in an instantaneous pore 4 pressure PP decrease in the affected region if no fluid flows into the pores of the expanded rock in the depth of cut zone.

7 If the rock is highly permeable, the pore pressure reduction results in fluid 8 movement from the far field (reservoir) into the expanded region, as indicated 9 by arrows 128. The rate and degree to which pore fluid flows into the expanded region, thus equalizing the pore pressure of the expanded rock to 11 that of the far field (reservoir pressure), is dependent on a number of factors.
12 Primary among these factors is the rate of rock alteration which is correlative to 13 rate of penetration and the relative permeability of the rock to the pore fluid.
14 This assumes that the reservoir volume is relatively large compared to the depth of cut zone, which is generally a reasonable assumption. At the same 16 time, if drilling fluid or ECD pressure is greater than in situ pore pressure PP, 17 filtrate from the drilling fluid will attempt to enter the permeable pore space in 18 the depth of cut zone. The filter cake 126 built during the initial mud invasion 19 (sometimes referred to as spurt loss) acts as a barrier to further filtrate invasion.
If the filter cake 126 build up is efficient, (very thin and quick, which is desirable 21 and often achieved) it is reasonable to assume that the impact of filtrate 22 invasion on altering the pore pressure PP in the depth of cut region is negligible.
23 It is also assumed that the mud filter cake 126 acts as an impermeable 24 membrane for the typical case of drilling fluid pressure being greater than pore pressure PP. Therefore, for highly permeable rock drilled with drilling fluid, the 26 pore pressure in the depth of cut zone can reasonably be assumed to be 27 essentially the same as the in-situ pore pressure PP of the surrounding 28 reservoir rock.

For substantially impermeable rock, such as shale and very tight non-shale, it is 31 assumed that there is no substantial amount of pore fluid movement or filtrate 32 invasion into the depth of cut zone. Therefore, the instantaneous pore 1 pressure in the depth of cut zone is a function of the stress change on the rock in the depth 2 of cut zone, rock properties such as permeability and stiffness, and in-situ pore fluid 3 properties (primarily compressibility).

Confined compressive strength is determined based upon the unconfined compressive 6 strength of the rock and the confining or differential pressure applied to the rock during 7 drilling. Equation (2) represents one widely practiced and accepted "rock mechanics"
8 method for calculating confined compressive strength of rock.

CCS = UCS + DP +2DPsinFA/(1 -sinFA) (2) 11 where: UCS = rock unconfined compressive strength;
12 DP = differential pressure (or confining stress) across the rock; and 13 FA = internal angle of friction of the rock.

In the preferred and exemplary embodiment of the present invention, the unconfined 16 compressive strength UCS and internal angle of friction FA is calculated by the processing 17 of acoustic well log data or seismic data. Those skilled in the art will appreciate that other 18 methods of calculating unconfined compressive strength UCS and internal angle of 19 friction FA are known and can be used with the present invention. By way of example, and not limitation, these alternative methods of determining UCS and FA
include 21 alternative methods of processing of well log data, and analysis and/or testing of core or 22 drill cuttings.

24 Theoretical details regarding the internal angle of friction can be found in U.S. Patent No.
5,416,697, to Goodman, entitled "Method for Determining Rock Mechanical 26 Properties Using Electrical Log Data". Goodman utilizes an expression for the angle of 27 internal friction disclosed by Turk and Dearnian in 1986 in "Estimation of Friction 28 Properties of Rock from Deformation Measurements", Chapter 14, 1 Proceedings of the 27th U.S. Symposium on Rock Mechanics, Tuscaloosa, 2 Ala., Jun. 23-25, 1986. The function predicts that as Poisson's ratio changes 3 with changes in water saturation and shaliness, the angle of internal friction 4 changes. The angle of internal friction is therefore also related to rock drillability and therefore to drill bit performance. Adapting this methodology to the bottom 6 hole drilling conditions for permeable rock is accomplished by defining 7 differential pressure DP as equivalent circulating density ECD pressure minus 8 the in-situ pore pressure PP. This results in the mathematical expressions for 9 CCSHp and DP as described above with respect to equation (2). Equation (2) assumes that friction angle FA is linear across a range of CCS. Equations may 11 also be used which due not make this linearity assumption for FA.
13 ECD pressure is most preferably calculated by directly measuring pressure with 14 down hole tools. Alternatively, ECD pressure may be estimated by adding a reasonable value to mud pressure or calculating with software. Those skilled in 16 the art will appreciate that other ways of determining the mud or ECD
pressure 17 may be used with the present invention to estimate GCS for a rock.

19 Rather than assuming the pore pressure PP in low permeability rock is essentially zero, the present invention ideally utilizes a soil mechanics 21 methodology to determine the change in pore pressure PP and applies this 22 approach to the drilling of rocks. For the case of impermeable rock, a 23 relationship described by Skempton, A.W.: "Pore Pressure Coefficients A
and 24 B," Geotechnique (1954), Vol. 4, pp 143-147 is adapted for use with Equation (1). Skempton pore pressure may generally be described as the in-situ pore 26 pressure PP of a porous but generally non-permeable material modified by the 27 pore pressure change APP due to the change in average stress on a volume of 28 the material assuming that permeability is so low that no appreciable flow of 29 fluids occurs into or out of the material. In the present application, the porous material under consideration is the rock in the depth of cut zone and it is 31 assumed that that permeability is so low that no appreciable flow of fluids 32 occurs into or out of the depth of cut zone.

2 This differential pressure DP across the rock in the depth of cut zone may be 3 mathematically expressed as:

DP = ECD ¨ (PP+ APP) (3) 7 where: DP = differential pressure across the rock;
8 ECD = Equivalent Circulating Density of the drilling fluid;
9 (PP+ APP) = Skempton pore pressure;
PP = Pore Pressure prior to drilling in the rock; and 11 APP = change in pore pressure due to ECD pressure 12 replacing earth stress.

14 Skempton describes two pore pressure coefficients A and B, which determine the change in pore pressure APP caused by changes in applied total stress for 16 a porous material under conditions of zero drainage. The change in pore 17 pressure, APP, is given in the general case by:

19 APP = BRAai + Aa2+ Aa3 )/3 +
V1/2[(6, 0-1¨ A 0-2) + (A. 0--, ¨ A 0.3)2 + (A. ¨ A f-r )2 *(3A ¨ 1)/31 2 3 (4) 22 where: A = coefficient that describes change in pore pressure 23 caused by change in shear stress;
24 B = coefficient that describes change in pore pressure caused by change in mean stress;
26 c5 1= first principal stress;
27 = second principal stress;
28 CY3 = third principal stress; and 29 A = operator describing the difference in a particular stress on the rock before drilling and during 31 drilling.

1 For a generally vertical well bore, the first principal stress is the overburden 2 pressure OB prior to drilling which is replaced by the ECD pressure applied to 3 the rock during drilling, and a , andg are horizontal principal earth stresses 4 applied to the stress block. Also, (Aai + AG2+ Ao-3)/3 represents the change in average, or mean stress, and 6.\11/2[(Acri¨A0-2)2+(6.0-i¨Auj + (6.0-2¨AcyArepresents the change in 7 shear stress on a volume of material.

9 For an elastic material it can be shown that A=1/3. This is because a change in shear stress causes no volume change for an elastic material. If there is no 11 volume change then there is no pore pressure change (the pore fluid neither 12 expands nor compresses). If it is assumed that the rock near the bottom of the 13 hole is deforming elastically, then the pore pressure change equation can be 14 simplified to:
16 APP = B(Aal + Ao-2 + Aa3)/3 (5) 18 For the case where it is assumed that 02 is generally equal to 03, then APP = B(Aai + 2Aa3)/3 (6) 22 Equation (5) describes that pore pressure change APP is equal to the constant 23 B multiplied by the change in mean, or average, total stress on the rock. Note 24 that mean stress is an invariant property. It is the same no matter what coordinate system is used. Thus the stresses do not need to be principal 26 stresses. Equation (5) is accurate as long as the three stresses are mutually 27 perpendicular. For convenience, az will be defined as the stress acting in the 28 direction of the well bore and ax and ay as stresses acting in directions 29 mutually orthogonal to the direction of the well bore. Equation (5) can then be rewritten as:

1 APP = B(Aaz + AO)( + Ao-y)/3 (7) 3 There will be changes in ax and ay near the bottom of the hole. However, 4 these changes are generally small when compared to ACTz and can be neglected for a simplified approach. Equation (7) then simplifies to 7 APP = B(Aaz)/3 (8) 9 For most shale, B is between 0.8 and ¨1Ø Young, soft shale have B
values of 0.95 to 1.0, while older stiffer shale will be closer to 0.8. For a simplified 11 approach that does not require rock properties, it is assumed that B=1Ø Since 12 ACJz is equal to (ECD - az) for a vertical well bore, equation (8) can be rewritten 13 as APP = (ECD - az)/3 (9) 17 Note that APP is almost always negative. That is, there will be a pore pressure 18 decrease near the bottom of the hole due to the drilling operation. This is 19 because ECD pressure is almost always less than the in situ stress parallel to the well (az) 22 The altered pore pressure (Skempton pore pressure) near the bottom of the 23 hole is equal to PP + APP, or PP + (ECD - az)/3. This can also be expressed 24 as:
26 PP - (az- ECD)/3. (10) 28 For the case of a vertical well, az is equal to the overburden stress or OB
29 pressure which is removed due to the drilling operation.
In the case of a vertical well and most shale (not unusually hard and stiff), the 31 change in average stress can be approximated by the term "(0B-ECD)/3".

I Utilizing this assumption, the following expression can be used for generally 2 vertical well bores wherein low permeability rock is being drilled:

4 CCSLp = UCS + DP +2DP5inFA/(1-sinFA); (11) where: DP = ECD pressure ¨ Skempton Pore Pressure; (12) 6 Skempton Pore Pressure = PP ¨ (0B-ECD)/3 (13) 8 where: OB = Overburden pressure or stress az in the z-direction;
9 and PP = in situ pore pressure.

12 Overburden OB pressure is most preferably calculated by integrating rock 13 density from the surface (or mud line or sea bottom for a marine environment).
14 Alternatively, overburden OB pressure may be estimated by calculating or assuming average value of rock density from the surface (or mud line for 16 marine environment). In this preferred and exemplary embodiment of this 17 invention, Equations (2) and (11) are used to calculate confined compressive 18 strength for high and low permeability rock, i.e. "CCSHp" and "CCSty".
For 19 intermediate values of permeability, these values are used as "end points" and "mixing" or interpolating between the two endpoints is used to calculate CCS
21 for rocks having an intermediate permeability between that of low and high 22 permeability rock. As permeability can be difficult to determine directly from 23 well logs, the present invention preferably utilizes effective porosity (Pe.
24 Effective porosity (Pe is defined as the porosity fraction of the non-shale fraction of rock multiplied by the fraction of non-shale rock. Effective porosity (Pe of the 26 shale fraction is zero. It is recognized that permeability could be used directly 27 when/if available in place of effective porosity in the methodology described 28 herein.

Although there are exceptions, it is believed that effective porosity (Pe generally correlates well with permeability and, as such, effective porosity threshold (Pe is 1 used as a means to quantify the permeable and impermeable endpoints. The 2 following methodology is preferably employed to calculate "CeSmix", the 3 confined compressive strength of the rock to the drill bit:

COS= = COSHp if (Pe ?- cPHP, (14) 6 CCSmix = CCSLp if (Pe 5 (piy, (15) 7 COS= =-= CCSLp x (THp - (Pe)/( (PHP-(PLp) CCSHpx (Te-(PLP)/( THP
-8 (1)LP) 9 if (PLp5 (Pe5. THP; (16) where: (Pe = effective porosity;
11 (PLp = low permeability rock effective porosity threshold;
12 and 13 (PHp. high permeability rock effective porosity threshold.

In this exemplary embodiment, a rock is considered to have low permeability if 16 it's effective porosity (Pe is less than or equal to .05 and to have a high 17 permeability if its effective porosity (Pe is equal to or greater than 0.20. This 18 results in the following values of CCSmix in this preferred embodiment:
CCSmIx = CCSHp if (Pe .20; (17) 21 CCSNAlx = CCSLp If (Pe (18) 22 CCSmIx = CCSLp X (.20- (Pe)/.15 CCSidp X ((Pe-.05)/.15 (19) 23 if .05 cpe< .20.

As can be seen from the equations above, the assumption is made that the 26 rock behaves as impermeable if (Pe is less than or equal to 0.05 and as 27 permeable if (pe is greater than or equal to 0.20. The endpoint (pe values of 28 0.05 and 0.20 are assumed, and it is recognized that reasonable endpoints for 29 this method are dependent upon a number of factors including the drilling rate.
Those skilled in the art will appreciate that other endpoints may be used to 31 define the endpoints for low and high permeability. Likewise, it will be 1 appreciated that non-linear interpolation schemes can also be used to estimate 2 CCSmix between the endpoints. Further, other schemes of calculating CCSmix 3 for a range of permeabilities may be used which rely, in part, upon the 4 Skempton approach described above for calculating pore pressure change APP which is generally mathematically described using Equations (4-9).

7 Calculations for CCS may be modified to account for factors such as (1) the 8 deviated angle from vertical at which the well bore is being drilled, (2) stress 9 concentrations in the depth of cut zone; and (3) effects of the profile or shape of the well bore due to the geometry of the drill bit being used to create the well 11 bore. These calculations are described in co-pending patent application 12 entitled, "Method for Estimating Confined Compressive Strength for Rock 13 Formation Utilizing Skempton Theory".

FIG. 4 illustrates that using Skempton theory in conjunction with equation (3) 16 produces values for differential pressure DP that corresponds well with 17 differential pressure DP arrived at using a finite element modeling. The finite 18 element model and results corresponding to FIG. 4 are described in Warren, 19 T.M., Smith, M.B.: "Bottomhole Stress Factors Affecting Drilling Rate at Depth,"
J. Pet. Tech. (Aug. 1985) 1523-1533.
21 While the above description provides the preferred mode for calculating CCS, 22 those skilled in the art will appreciate that other methods of determining CCS
23 may also be used in conjunction with this invention to calculate ROP and make 24 other estimations based on CCS of rocks. By way of example, and not limitation, one alternative method of how to determine CCS is described in U.S.
26 Patent 5,767,399 to Smith and Goldman, entitled "Method of Assaying the 27 Compressive Strength of Rock".

29 III. Determination of ROP based upon Specific Energy Principles A methodology has been developed for quantitative prediction of the input 31 variables to a specific energy ROP model, except bit size as bit size is known 32 or given, based on apparent rock strength to the bit. This allows rapid 1 prediction of the expected range of ROP and drilling parameters (WOB, rpm, 2 torque) for all bit types, according to rock properties and the drilling 3 environment, i.e., (mud weight and ECD).

Specific energy (Es) principles provide a means of predicting or analyzing bit 6 performance. Es is based on fundamental principles related to the amount of 7 energy required to destroy a unit volume of rock and the efficiency of bits to 8 destroy the rock. The Es parameter is a useful measure for predicting the 9 power requirements (bit torque and rpm) for a particular bit type to drill at a given ROP in a given rock type, and the ROP that a particular bit might be 11 expected to achieve in a given rock type.

13 Teale, R.: "The Concept of Specific Energy in Rock Drilling," mt. J.
Rock Mech.
14 Mining Sci. (1965) 2, 57-53, describes the use of specific energy theory in assessing bit performance. Equation 20 shows Teale's specific energy 16 equation derived for rotary drilling at atmospheric conditions.

18 WOB 120*n *N*T
(20) AB AB* ROP

where: Es = Specific energy (psi) 21 WOB = Weight on bit (pounds) 22 AB = Borehole area (sq-in) 23 N = rpm 24 T = Torque (ft-lbf) ROP = Rate of penetration (ft/hr) 26 WOB = Weight on bit (pounds) 28 Pessier, R.C., Fear, M.J.: "Quantifying Common Drilling Problems with 29 Mechanical Specific Energy and Bit-Specific Coefficient of Sliding Friction,"
paper SPE 24584 presented at 1992 SPE Conference, Washington, D.C., 31 October 4-7, validated Equation (1) for drilling under hydrostatic pressure.

1 Because the majority of field data is in the form of surface measurements of 2 weight on bit (WOB), rpm (N), and rate of penetration (ROP), a bit-specific 3 coefficient of sliding friction (p) was introduced by Teale to express torque (T) 4 as a function of WOB. This coefficient is used to compute specific input energy (Es) values in the absence of reliable torque measurements, as follows:
6 T (21) u=36 D. * WOB
7 where: T = bit torque (ft-lbf);
8 DB = bit size (inches);
9 p = bit-specific coefficient of sliding friction (dimensionless); and 11 WOB = weight on bit (lb).

13 Teale also introduced the concept of minimum specific energy and maximum 14 mechanical efficiency. The minimum specific energy is reached when the specific energy approaches or is roughly equal to the compressive strength of 16 the rock being drilled. The mechanical efficiency (EFFm) for any bit type is then 17 calculated as follows:

19 EFFni Es min ___________________ *100 (22) Es where: Es min = Rock Strength 22 The associated bit torque for a particular bit type to drill at a given ROP in a 23 given rock type (CCS) is computed by using equation (23), which is derived 24 from equation (20) and equation (22), as follows:
26 ,r=( CCS 4* WOB DB2 *ROP) (23) EFFm TE *DB2 )*( 480*N
27 Substituting Es in terms of mechanical efficiency EFFm and torque T as a 28 function of WOB and solving equation (20) for ROP, the rate of penetration can 29 be calculated using equation (1) as described above.

1 Specific Energy ROP (SEROP) Model 3 The present invention ideally predicts the coefficients required in Equation (1) 4 as a function of rock strength CSS. These predictions of coefficients are performed for a number of predominant bit types, including steel tooth, insert 6 tooth, PDC, TSP, impregnated, and natural diamond bit types. More 7 particularly, relationships for (1) the coefficient of sliding friction p and (2) the 8 mechanical efficiency EFFm, and preferably for (3) WOB, and (4) bit speed N is 9 determined for a number of types of bits as a function of apparent rock strength or CCS to the bit.

12 Equation (1) is used to calculate ROP for multiple bit types. Ideally, three ROPs 13 are calculated for each bit type: a minimum ROP, a maximum ROP, and an 14 average or nominal ROP. These computations are possible because three mechanical efficiencies (minimum efficiency, maximum efficiency, and nominal 16 efficiency) are determined from the full-scale simulator tests for each bit type.

18 Full-scale Simulator Tests Full-scale simulator tests were conducted at Hughes Christensen facilities in 21 the Woodlands, Texas using a pressurized vessel test rig to determine sliding 22 coefficient of friction p and mechanical efficiency EFFm for a select number of 23 types of drill bits. Detailed information about this facility and full-scale simulator 24 test procedures can be found in the 1999 ASME ETCE99-6653 technical paper titled "Re-Engineered Drilling Laboratory is a Premium Tool Advancing Drilling 26 Technology by Simulating Downhole Environments".

28 The drilling simulator, which is capable of testing bits up to 12-1/4"
in diameter, 29 reproduces downhole conditions. It is equipped with a high-pressure drilling simulator and uses full-scale bits. The laboratory is capable of re-creating the 31 geostatic stresses in the well bore at equivalent drilling depths of up to 20,000 ft 32 with typical drilling fluids.

1 Drilling parameters, weight on bit WOB, rotary speed N, rate of penetration 2 ROP, torque T, and bit hydraulics are computer controlled and/or recorded 3 throughout the individual test. Typically torque T is recorded. One of two 4 variables WOB and ROP are controlled with the other being a measured response. This data is then used to compute bit-specific coefficient of sliding 6 friction (p), mechanical efficiency (EFFm), and specific energy (Es) for each test 7 and bit type.

9 Rock samples with confined compressive strength ranging from 5,000 to 75,000 psi were used to develop the relationships for p, and EFFm as a function 11 of confined compressive strength (CCS) for all bit types.

13 The following rock samples were used:
14 - Catoosa Shale - Mancos Shale 16 - Carthage Marble 17 - Crab Orchard Sandstone 18 - Mansfield Sandstone From this test, three points are derived to develop the relationships for p and 21 EFFm for an 8-1/2" roller cone bit for hard formations. These points are:

23 p =0.11 at 66,000 psi 24 Minimum EFFm = 19% at 66,000 psi Maximum EFFm = 44% at 66,000 psi 26 CCS = 66,000 psi 28 Bit Types in the ROP Model The following bit types were tested:

32 Steel Tooth bits (ST);

1 Tungsten Carbide Insert bits (TCI_SF) for soft formations;
2 Tungsten Carbide Insert bits (TCI_MF) for medium formations;
3 Tungsten Carbide Insert bits (TCI_HF) for hard formations;
4 Polycrystalline Diamond Compact bits (PDC):
- PDC bits with 3 to 4 blades;
6 - PDC bits with 5 to 7 blades;
7 - PDC bits with more than 7 blades;
8 Natural Diamond bits (ND);
9 Impregnated bits (IMP REG);
Thermally Stable Polycrystalline bits (TSP);
11 Universal Roller Cone bits (ST and TCI bits);
12 Universal PDC bits (all PDC bits); and 13 Universal ND and TSP bits.

FIG. 5 shows data from one of the tests conducted to determine bit coefficient 16 of sliding friction p, mechanical efficiency EFFm, and specific energy for a 17 particular combination of bit type, environment, and confined rock strength 18 CCS. The test data shown in FIG. 5 provided values for torque at several 19 WOB/ROP pairs for a given bit type and CCS, and from which Es, p and EFFm are calculated.

22 Bit-Specific Coefficient of Sliding Friction (p) 24 An example of how a relationship between a bit-specific coefficient of sliding friction p and confined compressive strength CCS is determined from multiple 26 tests is illustrated in FIG. 6. In this case the bit is a PDC bit with more than 27 seven blades. Rock samples from Crab Orchard Sandstone, Catoosa shale, 28 and Carthage Marble were used for multiple tests with a PDC bit with more 29 than seven blades. All tests used a mud weight of 9.5 ppg. The corresponding CCS values at 6,000 psi bottom hole pressure were 18,500 psi for Catoosa 31 shale, 36,226 psi for Carthage Marble, and 66,000 psi for Crab Orchard.

1 The correlation established from this test data and then used to compute p as a 2 function of CCS for a PDC bit with more than seven blades, derived from FIG.
3 6, is shown in equation (24).

0.9402*EXP(-8E- 06 * CCS) (24) 7 The same procedure and full-scale simulator tests were performed to 8 determine the relationships of p as a function of confined compressive strength 9 CCS for all bit types.
11 Mechanical Efficiency (EFFM) 13 As shown in FIG. 5, Es changes as drilling parameters change.
Consequently, 14 Es can not be represented by a single accurate number. Minimum and maximum values of Es were computed from each full-scale simulator test, and 16 these values were used to compute minimum and maximum mechanical 17 efficiencies for each test. For example, the test data from FIG. 5 indicates a 18 mechanical efficiency in the range of approximately 19% to 44% for this test.

FIG. 7 illustrates the relationships of minimum and maximum mechanical 21 efficiencies for PDC bits with more than seven blades as derived from test data.
22 The relationships derived from FIG. 7 and shown in Equations (25) and (26) are 23 then used to compute the minimum efficiency (Min EFFm) and maximum 24 efficiency (Max EFFm) as a function of COS for PDC bits with more than seven blades are as follows:

Min EFFm = 0.0008* CCS + 8.834 27 (25 and 26) Max EFFm = 0.0011* CCS +13.804 28 A nominal mechanical efficiency (Nom EFFm) is the average efficiency derived 29 from the minimum and maximum efficiencies. Equation (27) indicates the Nom EFFm for PDC bits with more than seven blades.

1 Nom EFFm = 0.00095* CCS +10.319 (27) 3 Similar procedures and testing methods were applied to determine the 4 mechanical efficiencies, minimum, maximum and nominal, for all bit types.
These correlations are not shown in this application.

7 Weight on bit (WOB) and bit rpm 9 Drilling parameters WOB and N are variables that are selected based on a number of factors, including but not limited to field experience, bit type, and/or 11 bottom hole (BHA) configuration. However, the present invention also has the 12 capability of predicting the appropriate WOB and N based on CCS.

14 FIG. 9 shows the relationship between WOB factor (pounds force per inch of bit diameter) and CCS, and the relationship between WOB for an 8.5" steel tooth 16 bit and CCS. FIG. 9 shows the relationship between N (RPM for roller cone 17 bits) and CCS.

19 Adjustments to p and EFFm due to Drilling Environment 21 The efficiency of drill bits is affected by mud weight. The magnitude of 22 efficiency change arising from changes in mud weight has been determined by 23 performing additional tests that use different mud weight systems.
Because full-24 scale simulator tests for all bit types were performed using a 9.5 ppg mud weight, the potential effect of mud weight on p and EFFm was evaluated using a 26 heavier mud weight. Consequently, full-scale tests were performed for all bit 27 types using a 16.5 ppg mud weight.

29 It has been determined that the value of p for PDC bits is reduced by approximately 49% when increasing mud weight from 9.5 ppg to 16.5 ppg. As a 31 result, the value of p is preferably corrected if the mud weight is different from 1 9.5 ppg. From FIG. 10, the following correction factor for coefficient of sliding 2 friction p for PDC bits with more than seven blades was established.

4 CF p = -0.8876 * Ln (mud weight) +2.998 (28) 6 Equation (29) is a revised formula for computing the value of p for any mud 7 weight.

II = [(0.9402 * EXP(-8E - 06* CCS)]*
9 29) [-0.8876*Ln(MudWeight) + 2.998]
11 It was determined that mechanical efficiency for PDC bits was reduced by 12 approximately 56% when increasing the mud weight from 9.5 ppg to 16.5 ppg.
13 FIG. 11 establishes the following correction factor to EFFm for PDC bits with 14 more than seven blades:
16 CFEFFM = -1.0144 * LN (Mud Weight) +3.2836 (30) 18 Equations (31) and (32) show the revised correlations for Min and Max 19 mechanical efficiencies for PDC bits with more than seven blades.
Min EFFm = [-0.0008*CCS+8.834]*
21 [1.0144*Ln(Mud Weight) + 3.2836] (31) 22 Max EEFm = [-0.0011*CCS+13.804]*
[1.0144*LnMud Weight) = 3.2836] (32) 24 The same testing procedure was conducted to establish the correction factors for p and EFFm for all bit types. Although the above equations are linear, as 26 are the curves shown in FIGS. 10 and 11, it is recognized that non-linear 27 relationships may, in fact, be valid and more realistic. Accordingly, those 28 skilled in the art may preferably employ such non-linear equations/relationships 29 when appropriate.
1 Correction Factor for PDC Bits due to Cutter Size 3 To account for the effect of cutter size for PDC bits in the ROP model, full-scale simulator tests were performed using various cutter sizes with PDC bits. FIG.
12 illustrates the effect of cutter size with PDC bits. Because full-scale simulator tests for PDC bits were performed using drill bits with 19 mm cutters, additional tests were performed with cutter size greater than or less than 19 8 mm. The test results indicated that the bit coefficient of sliding friction p is 9 decreased or increased by 1.77% when the cutter size is decreased or increased for each millimeter above or below 19 mm, as shown in FIG. 12.

12 Therefore, the correction factor to adjust p due to cutter size is as follows:

14 0.0177* Cutter Size + 0.6637 (33) 16 where: cutter size is in millimeters.

Although the above equation indicates a linear relationship, it is recognized that 19 non-linear relationships may, in fact, be valid and more realistic, and may preferably be employed when appropriate. This, in fact, is indicated by FIG.
11.

Combining all the correction factors, the final correlation for p for PDC bits with 23 more than seven blades is shown in equation (34).
= [(0.9402 * EXP(-8E - 06 * CCS)] *
24 [-0.8876*Ln(MudWeight) + 2.998] * (34) [0.0177* Cutter Size + 0.6637]
In a similar manner, final correlations for p for all bit types may be made for 26 other bit types.
1 Limitations of ROP Model 3 The above described ROP model based upon specific energy does not take 4 into account bit design features, such as cone offset angle, cone diameter, and journal angle of roller cone bits, and does not take into account design features, 6 such as back rack angle and bit profile of PDC bits. The selection of the proper 7 bit design features for each application could impact ROP. Although the impact 8 on ROP
of all design features is quantitatively measured in the lab, field tests 9 using the subject ROP model indicate that the impact on ROP could be between 10% and 20%. The variation of ROP as a result of bit design features 11 is assumed to be captured by the ROP model because it computes a maximum 12 and a minimum ROP as a function of maximum and minimum efficiency. In 13 fact, in most of the field examples, the nominal ROP closely correlates with 14 actual ROP, but there are a few cases in which either the minimum or the maximum ROP correlate with actual ROP.

17 Mud systems, such as water based mud (WBM) or oil based mud/synthetic 18 based mud (OBM/SBM), are not differentiated in the specific energy ROP
19 model.
However, field tests show that a significant factor affecting bit performance and ROP is bit balling with WBM. If bit balling is eliminated with 21 optimum hydraulics and control of mud properties, it is assumed the predicted 22 ROP will be approximately the same for both mud systems.

24 The specific energy ROP model does not consider or optimize hydraulics. Full scale simulator tests used to develop the ROP model were performed with 26 optimum hydraulics. Again, because the specific energy ROP model predicts 27 minimum and maximum ROP, the actual ROP typically falls within the minimum 28 and maximum ROP parameters for any bit type, provided that the actual 29 hydraulics are adequate.
31 The ROP model of the present invention is currently adapted only for sharp 32 bits. It does not take into account bit wear. However, ROP model may be 1 further adjusted for bit wear as bit wear and/or bit life models may be 2 developed. Examples of how bit wear and bit life may be incorporated into 3 drilling predictions are described in U.S. Patent Number 6,408,953 to Goldman, 4 entitled "Method and System for Predicting Performance of a Drilling System for a Given Formation". The disclosure of this patent is hereby incorporated by 6 reference in its entirety.

8 Predicted ROP for PDC bits is for groups of bits based on blade count.
Three 9 groups were established: PDC bits with three to four blades, PDC bits with five to seven blades, and PDC bits with more than seven blades. Field tests 11 indicate that minimum ROP generally correlates with PDC bits with the highest 12 number of blades within the group and maximum ROP correlates with the 13 lowest blade count in the group.
14 Predicted ROP for roller cone bits was made for four groups of bits:
steel tooth bits, roller insert bits for soft formations, roller insert bits for medium formations, 16 roller insert bits for hard formations.

18 The specific energy ROP model doesn't account for when the CCS might 19 exceed the maximum CCS suitable for a particular bit type. As a result, with the exception of very high strength rock, the specific energy ROP model 21 generally predicts that the highest ROP for a PDC bit with three to four blades, 22 the next highest ROP for a PDC bit with five to seven blades, and so forth, 23 through the range of different bit types according to aggressiveness.

Bit Selection and Optimization 27 The most common approach for evaluating drilling performance and bit 28 selection in the oil field is based on past observed performance from offset 29 wells. This methodology tends to apply the same drilling performance and rock strength to the current application without evaluating changes in rock strength, 31 lithology, drilling environment, and potential ROP if other bit types are used.
32 The CCS and specific energy ROP models use rock properties and drilling 33 environments to accurately predict the potential ROP for all bit types.

1 Therefore, the present approach is global; it is not restricted to a particular area 2 or region nor does it necessarily require calibration to local conditions.

4 In a real-time bit optimization scenario, predicted ROP and Es energy values can be used to assess bit performance. This can be accomplished if the rock 6 properties are known, either by correlation or directly measured and calculated 7 from LWD (logging while drilling) data or from drilling parameters as indicated 8 in section IV below. Bit performance and condition can be evaluated by 9 comparing actual Es to predicted Es, as well as by comparing actual ROP
to predicted ROP. Bit performance analysis using real time predicted Es and 11 actual Es values can be also used to detect and correct drilling problems, such 12 as bit vibration and bit balling. Predicted and actual Es values can also be used 13 in dull bit and/or bit failure analysis.

IV. Back Calculation of UCS

17 The specific energy ROP and CCS models described above can be used to 18 back calculate CCS and rock properties in the absence of log or other data.
19 The rock properties can then be used for real-time bit optimization, wellbore stability and sanding or post-drill bit optimization, wellbore stability and sanding 21 or post-drill bit optimization, wellbore stability and sanding analysis.

23 Assuming drilling parameters are obtained during drilling, values of CCS
can be 24 determined as follows: downhole torque and WOB are available from downhole tools, bit-specific coefficient of sliding friction can be calculated using 26 equation (21):
27 =36 ______ Do * WOB
28 Once the bit-specific coefficient of sliding friction has been determined using 29 equation (21), the confined compressive strength of the rock being drilled (CCS) is determined by using the relationships between bit-specific coefficient 1 of sliding friction p and confined compressive strength CCS determined for all 2 bit types (e.g. relationship in FIG 6).

4 Once CCS is determined, the mechanical efficiency EFFm for any bit type is derived from the relationships between minimum and maximum mechanical 6 efficiency (e.g. relationship in FIG. 7). Knowing CCS, the ROP for any bit type 7 can be calculated using equation (1) for a given set of drilling parameters 8 (WOB and N).

In the absence of downhole torque, p can be calculated by trial and error 11 methods until predicted ROP match with actual ROP. EFFm can be determined 12 using average values of EFFm or determined by trial and error methods until 13 predicted ROP matches with actual ROP. Then CCS can be calculated using 14 equation (1). Further UCS can be back calculated from the CCS using equation (2). Once UCS is determined, this value of UCS can be used in well 16 bore stability and sanding analysis.

The field test examples presented below illustrate how the GCS and specific 21 ROP models may be used to improved drilling performance by reducing both 22 drilling time and drilling costs. This performance is achieved by selecting the 23 optimum drill bits and drilling parameters for each application.

Well 26 FIG. 13 shows the drilling performance for a specific interval composed mainly 27 of dolomite in which the ROP has been very low (approximately 1 meter/hour) 28 with roller cone bits (TOD, heavy set PDC bits, and impregnated bits 29 (IMPREG). Analysis indicates that CCS ranged from about 20,000 psi to 35,000 psi.

32 Track 5 provides an example of the correlation between the predicted ROP
to 33 the actual ROP for all bit types used to drill the interval. Predicted ROP is calculated using actual drilling parameters (WOB, RPM) from actual bit runs 2 shown in Track 4. Track 3 shows the actual bits used and their dull grades.
3 Track 6 illustrates the potential ROP for Insert bits (TCI medium formations), 4 PDC bits with five to seven blades and 19 mm cutters (PDC 5-7B), PDC bits with more than seven blades (PDC>7B), Natural Diamond (ND) bits, Thermally 6 Stable Polycrystalline (TSP) bits, and Impregnated (IMPREG) bits. The predicted ROP for ND, TSP, and IMPREG bits is calculated using global 8 defaults in the specific energy ROP model.

The analysis suggested that neither roller cone bits nor Impreg bits are suitable 11 for this application because of low ROP. The analysis indicated that PDC bits 12 with five to seven blades and 19 mm cutters could deliver a ROP between 6 13 and 8 meters per hour (WOB between 10 and 20 Klbs and N between 120 and rpm). Although, a PDC bits with three to four blades will deliver a higher ROP (not shown here), this bit was not considered because the high rock 16 strength exceeds the bits rock strength capability. As a result, the recommended approach is to use a six bladed PDC bit with 19 mm abrasive resistance cutters and thinner diamond tables (less than 0.120 inches thickness). Wells can now be drilled at an average ROP of 6 to 8 meters per hour.

22 Well 2 23 FIG. 14 provides another example of the use of the CCS and specific energy model to select the optimum bit for an exploratory well. Log data and drilling data from offset wells are used to create a composite for the proposed 26 well, and then rock mechanics and specific energy ROP analysis are 27 performed.

29 The evaluation shows that the interval is comprised of low strength rock with CCS ranging between 3,000 psi and 5,000 psi, and that the interval can be 31 drilled with an aggressive PDC bit. The recommended approach is to use a five 32 bladed PDC bit with 19 mm abrasive resistance cutters. The well is drilled at 1 ROP rate of 160 to 180 ft/hr. Although the lithology in the well drilled is not 2 exactly the same as the offset wells, the predicted ROP (solid line, track 4) 3 closely correlates with actual ROP achieved in well drilling.

Well 3 6 FIG. 15 shows the drilling performance for an 8-1/2 in. hole drilled using PDC
7 bits with seven and nine blades. The well was drilled at a ROP of 20 to 40 ft/hr.
8 FIG. 15 also illustrates the bit optimization performed for a sidetrack out of the 9 same well bore. Rock mechanics analysis indicates that the CCS for the interval (CCS, track 2) is between 8,000 psi to 10,000 psi and that the well 11 could be drilled with a more aggressive PDC bits than the bits used to drill the 12 original well bore. The analysis suggested that the sidetrack be drilled with a six 13 bladed PDC bit with 19 mm cutters to achieve better penetration rates.
See the 14 actual ROP achieved in original well bore in track 4 and predicted ROPs for the sidetrack in track 5.
16 The sidetrack was drilled with one PDC bit at ROP of 60 to 80 ft/hr. The 17 sidetrack was drilled in four days rather than eight days required to drill the 18 original wellbore.

Well 4 21 FIG. 16 shows how the CCS and SEROP models can be used to assess bit 22 performance real-time, and thereby optimize drilling performance.
Predicted Es 23 and ROP values can be used to determine whether or not the bit is performing 24 efficiently or whether or not bit efficiency is affected by bit vibration, bit balling, and/or dull bits.

27 FIG. 16 illustrates that the first bit drilled the top section of interval efficiently as 28 the predicted ROP closely correlates with actual ROP (track 5). In addition, 29 actual Es also correlates with predicted Es except for shale intervals where Es is several times higher than predicted Es (track 6), probably due to bit balling.
31 The second bit drilled the lower part of the section inefficiently.
Neither the 32 predicted ROP nor Es matched with the actual ROP and Es. The actual Es was 1 higher than the predicted Es by more than five times, indicating that bit 2 efficiency is extremely low as a result of bit vibration and/or bit balling. The bit 3 record showed that bit was balled up.

While in the foregoing specification this invention has been described in relation 6 to certain preferred embodiments thereof, and many details have been set forth 7 for purposes of illustration, it will be apparent to those skilled in the art that the 8 invention is susceptible to alteration and that certain other details described 9 herein can vary considerably without departing from the basic principles of the invention.

Claims (16)

1. A method for determining the rate of penetration (ROP) of a drill bit drilling a well bore through intervals of rock of a subterranean formation, the method comprising the steps of:
a) determining for at least one type of drill bit a relationship between a bit-specific coefficient of sliding friction u and confined compressive strength CCS over a range of confined compressive strengths CCS;
b) determining for the at least one type of drill bit a relationship between mechanical efficiency EFFM and confined compressive strength CCS
over a range of confined compressive strengths CCS;
c) determining the confined compressive strength for intervals of rock through which the at least one type of drill bit is to be drilled to form a well bore; and d) calculating the rate of penetration ROP for the at least one type of drill bit drilling along the intervals of rock to create a well bore, the calculations utilizing the confined compressive strength of the intervals of rock being drilled and the relationships between the bit-specific coefficient of sliding friction p and the mechanical efficiency EFFAA and the confined compressive strengths CCS.
2. The method of claim -I wherein:
the relationship between the bit-specific coefficient of sliding friction p and the confined compressive strength CCS over a range of confined compressive strengths CCS for the at least one type of drill bit is dependent upon the weight of the drilling fluid being used to drill an interval of rock.
3. The method of claim '1 wherein:
the relationship between the bit-specific coefficient of sliding friction p and the confined compressive strength CCS over a range of confined compressive strengths CCS is dependent upon the size of the cutters for polycrystalline diamond compound (PDC) bits.
4. The method of claim 1 wherein:

the relationship between the mechanical efficiency EFF M and the confined compressive strength CCS over a range of confined compressive strengths CCS for at least one drill bit is dependent upon the weight of the drilling fluid being used to drill the well bore.
5. The method of claim 1 further comprising:
determining a relationship, for the at least one type of drill bit, between the revolutions per minute (N) at which the at least one type of drill bit is to be operated and confined compressive strength CCS over a range of confined compressive strengths CCS; and calculating the rate of penetration ROP for the at least one type of drill bit drilling through the intervals of rock to create a well bore utilizing the confined compressive strength of the intervals of rock being drilled and the relationships between the bit-specific coefficient of sliding friction u, the mechanical efficiency Eff M and the revolutions per minute (N) at which the drill bit is to be operated and the confined compressive strengths.
6. The method of claim 1 further comprising:
determining a relationship for the at least one drill bit between the weight on bit (WOB) at which the at least one drill bit is to be operated and confined compressive strength CCS over a range of confined compressive strengths CCS; and calculating the rate of penetration for the at least one type of drill bit drilling along the intervals of rock utilizing the confined compressive strength of the intervals of rock being drilled and the relationships between the bit-specific coefficient of sliding friction u, the mechanical efficiency Eff M, and WOB at which the bit should be operated and confined compressive strength.
7. The method of claim 1 wherein:
the rate of penetration is calculated in accordance with the following mathematical expression:
where: ROP = Rate of penetration (ft/hr);
µ = bit-specific coefficient of sliding friction;
N = revolutions per minute of the at least one drill bit;
CCS = Confined compressive strength (psi) of the rock in the interval being drilled;
WOB = weight on bit (lbs);
EFF M = Mechanical efficiency (%);
D B = Bit diameter (in); and A B = Borehole area (sq-in) of the well bore being drilled.
8. The method of claim 1 wherein:
the confined compressive strength (CCS) of an interval of rock is determined at least in part based upon the unconfined compressive strength (UCS) of the interval of rock, the equivalent circulating density (ECD) of a drilling fluid being used to drill the interval of rock, the overburden stress (OB) removed from the interval of rock being drilled, the in situ pore pressure (PP) of pore fluids proximate the interval of rock being drilled, and the permeability of the interval of rock being drilled.
9. The method of claim 8 wherein:
CCS is calculated in accordance with the following mathematical expression for intervals of rock having low permeability:
CCS = UCS f(DP) where UCS = Unconfined Compressive Strength for the rock;
and;

f(DP) = function of the differential pressure DP applied across the rock during drilling.
10. The method of claim 8 wherein:
CCS is calculated in accordance with the following mathematical expression for intervals of rock having low permeability:
CCS LP = UCS + DP LP+ 2DP LP sinFA/(1-sinFA);
where: DP LP = ECD pressure - (PP - (OB-ECD)/3);
ECD = Equivalent Circulating pressure;
PP = in situ Pore Pressure; and OB = Overburden pressure.
11. The method of claim 10 wherein:
CCS is calculated in accordance with the following mathematical expression for intervals of rock having high permeability:
CCS = UCS + DP +2DPsinFA/(1-sinFA) where: UCS = Unconfined Compressive Strength of the rock;
DP = ECD - PP;
DP = differential pressure between bottom hole pressure exerted by ECD and in-situ pore pressure;
and FA = the internal angle of friction of the rock.
12. The method of claim 1 wherein:
the step of determining relationships between the coefficient of sliding friction µ and the mechanical efficiency Eff M of at least one drill bit as a varying function of a range of confined compressive strengths is bit wear dependent.
13. A method for back calculating confined compressive strength CCS of rock in an interval of a subterranean formation in which a well bore has been drilled using a type of drill bit and drilling fluids, the method comprising the steps:
a) measuring (i) the rate of penetration (ROP); (ii) weight on bit (WOB);
(iii) bit torque T; and (iv) the revolutions per minute (N) used during the drilling through an interval of rock in a subterranean formation by the type of drill bit;
b) estimating the coefficient of sliding friction II during the drilling through the interval of rock; and c) selecting a value of CCS from a predetermined relationship between !I
and CCS for the type of drill bit.
14. The method of claim 13 wherein:
estimating the coefficient of sliding friction µ is calculated in accordance with the following mathematical expression:
where: T = bit torque (ft-lb f);
DB = bit size (inches);
µ = bit-specific coefficient of sliding friction (dimensionless); and WOB = weight on bit (lbs).
15. The method of claim 13 further comprising:
determining the mechanical efficiency EFF M of the drill bit utilizing a predetermined relationship between EFF M and CCS.
16. The method of claim 13 further comprising:
back calculating the unconfined compressive strength UCS of the rock in the interval in accordance with the following mathematical expression:
CCS = UCS + DP +2DPsinFA/(1-sinFA) where: UCS = rock unconfined compressive strength;
DP = differential pressure (or confining stress) across the rock; and FA = internal angle of friction of the rock.
CA2590683A 2004-12-16 2005-12-09 Method for predicting rate of penetration using bit-specific coefficients of sliding friction and mechanical efficiency as a function of confined compressive strength Expired - Fee Related CA2590683C (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
US11/015,899 US7412331B2 (en) 2004-12-16 2004-12-16 Method for predicting rate of penetration using bit-specific coefficient of sliding friction and mechanical efficiency as a function of confined compressive strength
US11/015,899 2004-12-16
PCT/US2005/044742 WO2006065678A2 (en) 2004-12-16 2005-12-09 Method for predicting rate of penetration using bit-specific coefficients of sliding friction and mechanical efficiency as a function of confined compressive strength

Publications (2)

Publication Number Publication Date
CA2590683A1 CA2590683A1 (en) 2006-06-22
CA2590683C true CA2590683C (en) 2014-03-25

Family

ID=36588411

Family Applications (1)

Application Number Title Priority Date Filing Date
CA2590683A Expired - Fee Related CA2590683C (en) 2004-12-16 2005-12-09 Method for predicting rate of penetration using bit-specific coefficients of sliding friction and mechanical efficiency as a function of confined compressive strength

Country Status (9)

Country Link
US (2) US7412331B2 (en)
EP (1) EP1836509B1 (en)
CN (1) CN101116009B (en)
AU (1) AU2005316731B2 (en)
BR (1) BRPI0519114A2 (en)
CA (1) CA2590683C (en)
EA (1) EA011469B1 (en)
NO (1) NO20073535L (en)
WO (1) WO2006065678A2 (en)

Families Citing this family (44)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7946356B2 (en) * 2004-04-15 2011-05-24 National Oilwell Varco L.P. Systems and methods for monitored drilling
US7555414B2 (en) * 2004-12-16 2009-06-30 Chevron U.S.A. Inc. Method for estimating confined compressive strength for rock formations utilizing skempton theory
US7412331B2 (en) * 2004-12-16 2008-08-12 Chevron U.S.A. Inc. Method for predicting rate of penetration using bit-specific coefficient of sliding friction and mechanical efficiency as a function of confined compressive strength
EA013360B1 (en) * 2005-11-18 2010-04-30 Эксонмобил Апстрим Рисерч Компани Method of producing hydrocarbons from subsurface formations
US8151874B2 (en) 2006-02-27 2012-04-10 Halliburton Energy Services, Inc. Thermal recovery of shallow bitumen through increased permeability inclusions
US7814978B2 (en) * 2006-12-14 2010-10-19 Halliburton Energy Services, Inc. Casing expansion and formation compression for permeability plane orientation
US7640982B2 (en) * 2007-08-01 2010-01-05 Halliburton Energy Services, Inc. Method of injection plane initiation in a well
US7640975B2 (en) * 2007-08-01 2010-01-05 Halliburton Energy Services, Inc. Flow control for increased permeability planes in unconsolidated formations
US7647966B2 (en) * 2007-08-01 2010-01-19 Halliburton Energy Services, Inc. Method for drainage of heavy oil reservoir via horizontal wellbore
WO2009075667A2 (en) * 2007-11-30 2009-06-18 Halliburton Energy Services Method and system for predicting performance of a drilling system having multiple cutting structures
AU2008338627B2 (en) * 2007-12-14 2014-04-10 Halliburton Energy Services, Inc. Methods and systems to predict rotary drill bit walk and to design rotary drill bits and other downhole tools
US7832477B2 (en) * 2007-12-28 2010-11-16 Halliburton Energy Services, Inc. Casing deformation and control for inclusion propagation
NO2331904T3 (en) * 2008-10-03 2018-09-15
US8082104B2 (en) * 2009-01-23 2011-12-20 Varel International Ind., L.P. Method to determine rock properties from drilling logs
US8451683B2 (en) * 2009-04-03 2013-05-28 Exxonmobil Upstream Research Company Method for determining the fluid/pressure distribution of hydrocarbon reservoirs from 4D seismic data
US8498853B2 (en) * 2009-07-20 2013-07-30 Exxonmobil Upstream Research Company Petrophysical method for predicting plastic mechanical properties in rock formations
US8799198B2 (en) * 2010-03-26 2014-08-05 Smith International, Inc. Borehole drilling optimization with multiple cutting structures
US9797235B2 (en) 2010-12-13 2017-10-24 Schlumberger Technology Corporation Drilling optimization with a downhole motor
US8854373B2 (en) 2011-03-10 2014-10-07 Baker Hughes Incorporated Graph to analyze drilling parameters
US8833487B2 (en) * 2011-04-14 2014-09-16 Wwt North America Holdings, Inc. Mechanical specific energy drilling system
US9285794B2 (en) 2011-09-07 2016-03-15 Exxonmobil Upstream Research Company Drilling advisory systems and methods with decision trees for learning and application modes
US8955585B2 (en) 2011-09-27 2015-02-17 Halliburton Energy Services, Inc. Forming inclusions in selected azimuthal orientations from a casing section
US9359881B2 (en) 2011-12-08 2016-06-07 Marathon Oil Company Processes and systems for drilling a borehole
CN102691497B (en) * 2012-05-28 2013-06-12 中国石油大学(北京) Method for predicting drillable level value of rock under different well bottom differential pressures
US9411071B2 (en) 2012-08-31 2016-08-09 Exxonmobil Upstream Research Company Method of estimating rock mechanical properties
US9482084B2 (en) 2012-09-06 2016-11-01 Exxonmobil Upstream Research Company Drilling advisory systems and methods to filter data
EA033474B1 (en) * 2012-11-13 2019-10-31 Exxonmobil Upstream Res Co Method to detect drilling dysfunctions
US10048403B2 (en) 2013-06-20 2018-08-14 Exxonmobil Upstream Research Company Method and system for generation of upscaled mechanical stratigraphy from petrophysical measurements
US10094210B2 (en) 2013-10-01 2018-10-09 Rocsol Technologies Inc. Drilling system
WO2015051027A1 (en) * 2013-10-01 2015-04-09 Geir Hareland Drilling system
RU2633006C1 (en) * 2013-10-21 2017-10-11 Хэллибертон Энерджи Сервисиз, Инк. Automation of drilling with use of optimal control based on stochastic theory
US10221671B1 (en) * 2014-07-25 2019-03-05 U.S. Department Of Energy MSE based drilling optimization using neural network simulaton
US10494913B2 (en) 2014-11-20 2019-12-03 Halliburton Energy Services, Inc. Earth formation crushing model
EP3059385A1 (en) 2015-02-23 2016-08-24 Geoservices Equipements Systems and methods for determining and/or using estimate of drilling efficiency
EP3320177B1 (en) * 2015-07-09 2022-11-02 ConocoPhillips Company Rock strength and in-situ stresses from drilling response
CN105824059B (en) * 2016-03-17 2017-12-15 重庆大学 A kind of tunnel rock-burst monitoring method using piezoelectric acceleration sensor
CN108825204B (en) * 2018-06-11 2022-01-28 中国石油集团川庆钻探工程有限公司 Drilling time correction method based on engineering parameters while drilling
CN110763383A (en) * 2018-07-25 2020-02-07 中国石油化工股份有限公司 Method for determining torque of drill bit and method for determining working efficiency of drill bit
CN110263476B (en) * 2019-06-28 2022-09-23 重庆理工大学 Diamond abrasive wear prediction method based on finite element dynamic scoring simulation
US11326447B2 (en) * 2019-07-15 2022-05-10 Saudi Arabian Oil Company Wellbore stability prediction
US11952880B2 (en) * 2021-03-26 2024-04-09 Saudi Arabian Oil Company Method and system for rate of penetration optimization using artificial intelligence techniques
US11753926B2 (en) * 2021-07-01 2023-09-12 Saudi Arabian Oil Company Method and system for predicting caliper log data for descaled wells
WO2023067391A1 (en) 2021-10-22 2023-04-27 Exebenus AS System and method for predicting and optimizing drilling parameters
CN115749730B (en) * 2022-11-10 2023-10-20 中国石油天然气集团有限公司 Rock mechanical parameter prediction method and system while drilling

Family Cites Families (29)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB8411361D0 (en) * 1984-05-03 1984-06-06 Schlumberger Cambridge Researc Assessment of drilling conditions
US4981037A (en) * 1986-05-28 1991-01-01 Baroid Technology, Inc. Method for determining pore pressure and horizontal effective stress from overburden and effective vertical stresses
US4914591A (en) * 1988-03-25 1990-04-03 Amoco Corporation Method of determining rock compressive strength
GB9004952D0 (en) * 1990-03-06 1990-05-02 Univ Nottingham Drilling process and apparatus
GB9015433D0 (en) * 1990-07-13 1990-08-29 Anadrill Int Sa Method of determining the drilling conditions associated with the drilling of a formation with a drag bit
US5205164A (en) * 1990-08-31 1993-04-27 Exxon Production Research Company Methods for determining in situ shale strengths, elastic properties, pore pressures, formation stresses, and drilling fluid parameters
NO930044L (en) * 1992-01-09 1993-07-12 Baker Hughes Inc PROCEDURE FOR EVALUATION OF FORMS AND DRILL CONDITIONS
US5305836A (en) * 1992-04-08 1994-04-26 Baroid Technology, Inc. System and method for controlling drill bit usage and well plan
US5416697A (en) * 1992-07-31 1995-05-16 Chevron Research And Technology Company Method for determining rock mechanical properties using electrical log data
US6408953B1 (en) * 1996-03-25 2002-06-25 Halliburton Energy Services, Inc. Method and system for predicting performance of a drilling system for a given formation
US5767399A (en) * 1996-03-25 1998-06-16 Dresser Industries, Inc. Method of assaying compressive strength of rock
US5794720A (en) * 1996-03-25 1998-08-18 Dresser Industries, Inc. Method of assaying downhole occurrences and conditions
US6109368A (en) * 1996-03-25 2000-08-29 Dresser Industries, Inc. Method and system for predicting performance of a drilling system for a given formation
US6612382B2 (en) * 1996-03-25 2003-09-02 Halliburton Energy Services, Inc. Iterative drilling simulation process for enhanced economic decision making
US5704436A (en) * 1996-03-25 1998-01-06 Dresser Industries, Inc. Method of regulating drilling conditions applied to a well bit
US7032689B2 (en) * 1996-03-25 2006-04-25 Halliburton Energy Services, Inc. Method and system for predicting performance of a drilling system of a given formation
US6167964B1 (en) * 1998-07-07 2001-01-02 Shell Oil Company Method of determining in-situ stresses
US6412577B1 (en) * 1998-08-31 2002-07-02 Halliburton Energy Services Inc. Roller-cone bits, systems, drilling methods, and design methods with optimization of tooth orientation
US6095262A (en) * 1998-08-31 2000-08-01 Halliburton Energy Services, Inc. Roller-cone bits, systems, drilling methods, and design methods with optimization of tooth orientation
US6169967B1 (en) * 1998-09-04 2001-01-02 Dresser Industries, Inc. Cascade method and apparatus for providing engineered solutions for a well programming process
US6386297B1 (en) * 1999-02-24 2002-05-14 Baker Hughes Incorporated Method and apparatus for determining potential abrasivity in a wellbore
US6353799B1 (en) * 1999-02-24 2002-03-05 Baker Hughes Incorporated Method and apparatus for determining potential interfacial severity for a formation
IT1313324B1 (en) 1999-10-04 2002-07-17 Eni Spa METHOD TO OPTIMIZE THE SELECTION OF THE DRILLING FLOWER AND THE DRILLING PARAMETERS USING ROCK RESISTANCE MEASUREMENTS
FR2802012B1 (en) * 1999-12-07 2002-02-15 St Microelectronics Sa FAST DRAM MEMORY
US6424919B1 (en) * 2000-06-26 2002-07-23 Smith International, Inc. Method for determining preferred drill bit design parameters and drilling parameters using a trained artificial neural network, and methods for training the artificial neural network
US6634441B2 (en) * 2000-08-21 2003-10-21 Halliburton Energy Services, Inc. System and method for detecting roller bit bearing wear through cessation of roller element rotation
US6631772B2 (en) * 2000-08-21 2003-10-14 Halliburton Energy Services, Inc. Roller bit rearing wear detection system and method
US7555414B2 (en) * 2004-12-16 2009-06-30 Chevron U.S.A. Inc. Method for estimating confined compressive strength for rock formations utilizing skempton theory
US7412331B2 (en) * 2004-12-16 2008-08-12 Chevron U.S.A. Inc. Method for predicting rate of penetration using bit-specific coefficient of sliding friction and mechanical efficiency as a function of confined compressive strength

Also Published As

Publication number Publication date
CN101116009A (en) 2008-01-30
US7991554B2 (en) 2011-08-02
EA011469B1 (en) 2009-04-28
EP1836509A2 (en) 2007-09-26
CN101116009B (en) 2011-06-29
AU2005316731A1 (en) 2006-06-22
US20060149478A1 (en) 2006-07-06
US20080249714A1 (en) 2008-10-09
EP1836509B1 (en) 2011-10-26
AU2005316731B2 (en) 2012-01-12
BRPI0519114A2 (en) 2008-12-23
CA2590683A1 (en) 2006-06-22
EA200701277A1 (en) 2007-12-28
WO2006065678A3 (en) 2007-05-18
EP1836509A4 (en) 2010-08-04
US7412331B2 (en) 2008-08-12
NO20073535L (en) 2007-09-13
WO2006065678A2 (en) 2006-06-22

Similar Documents

Publication Publication Date Title
CA2590683C (en) Method for predicting rate of penetration using bit-specific coefficients of sliding friction and mechanical efficiency as a function of confined compressive strength
AU2005316828B2 (en) Method for estimating confined compressive strength for rock formations utilizing Skempton theory
Caicedo et al. Unique ROP predictor using bit-specific coefficient of sliding friction and mechanical efficiency as a function of confined compressive strength impacts drilling performance
Bourgoyne Jr et al. A multiple regression approach to optimal drilling and abnormal pressure detection
US4914591A (en) Method of determining rock compressive strength
US10282497B2 (en) Model for estimating drilling tool wear
US10385678B2 (en) Method for analysing pore pressure in shale formations
Hankins et al. An integrated approach for drilling optimization using advanced drilling optimizer
Gallant et al. Wellbore stability considerations for drilling high-angle wells through finely laminated shale: a case study from Terra Nova
Etesami et al. A semiempirical model for rate of penetration with application to an offshore gas field
Mohammadi Behboud et al. Studying empirical correlation between drilling specific energy and geo-mechanical parameters in an oil field in SW Iran
Eren et al. Real-time drilling rate of penetration performance monitoring
Rasmus et al. Real-time pore-pressure evaluation from MWD/LWD measurements and drilling-derived formation strength
Atashnezhad et al. Rate of Penetration (ROP) Model for PDC Drill Bits based on Cutter Rock Interaction
Prasad et al. An Innovative and Reliable Method of Estimating Rock Strength From Drilling Data Acquired Downhole
Caicedo et al. Unique bit performance predictor using specific energy coefficients as a function of confined compressive strength impacts drilling performance
Alsenwar NCS Drilling Data Based ROP Modelling and its Application
Wilson Rock-Strength Analysis and Integrated FEA Modeling Optimize Bit Selection
Ziaja et al. Lithology diagnosis based on the measurements of drilling forces and moments at the bit
Hassan et al. Optimization of drilling parameters with aid of real time data for buzargan oil field
Prasad et al. An Innovative and Independent Method for Formation Strengths and Facies Identification Using Real-Time Downhole Drilling Data, and its Application in Geosteering for Optimal Well Placement
Hmayed Ormen Lange 6305/7 drilling data based ROP modelling and its application
Tahmeen et al. A convenient technology to calculate geomechanical properties from drilling data
Mohamud ROP Modelling, Analysis and Optimization Study Based on Morvin Field 6506/11 Drilling Data.
Oriji et al. Comparative Analysis of Abnormal Pore Pressure Prediction Models for Niger Delta Oil and Gas Fields Development

Legal Events

Date Code Title Description
EEER Examination request
MKLA Lapsed

Effective date: 20161209