CN103500381A - Earning measuring and calculating method based on ERP (enterprise resource planning) system - Google Patents

Earning measuring and calculating method based on ERP (enterprise resource planning) system Download PDF

Info

Publication number
CN103500381A
CN103500381A CN201310482811.5A CN201310482811A CN103500381A CN 103500381 A CN103500381 A CN 103500381A CN 201310482811 A CN201310482811 A CN 201310482811A CN 103500381 A CN103500381 A CN 103500381A
Authority
CN
China
Prior art keywords
erp system
information
new order
earning
new
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310482811.5A
Other languages
Chinese (zh)
Inventor
黄士柱
赵峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinan Iron and Steel Group Co Ltd
Original Assignee
Jinan Iron and Steel Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinan Iron and Steel Group Co Ltd filed Critical Jinan Iron and Steel Group Co Ltd
Priority to CN201310482811.5A priority Critical patent/CN103500381A/en
Publication of CN103500381A publication Critical patent/CN103500381A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention provides an earning measuring and calculating method based on an ERP (enterprise resource planning) system. The method comprises the following processes that the whole contract is split into a plurality of new order forms; all of the new order forms are respectively input into the ERP system; each new order form is compared with the original order form in an ERP system database to obtain the cost information of the new order forms; the obtained cost information is used for calculating the complete cost of the new order forms; the earning information is extracted from the new order forms; the gross profit of the new order forms is calculated by using the earning information and the complete cost; the gross profit of all of the new order forms is accumulated to obtain the gross profit of the whole contract. The earning measuring and calculating method has the advantages that the measurement and the calculation on the contact earning is realized through extracting the original data in the ERP system and combining the earning information in the new orders, the data reference is provided for the production management, cost control and sale decision making, the production efficiency is further improved, and the earning of enterprises is greatly increased.

Description

Revenue calculation method based on ERP system
Technical field
The present invention relates to the measuring and calculating field, relate in particular to a kind of revenue calculation method based on ERP system.
Background technology
Now, increasing company built has erected the ERP system of oneself.ERP system refers to and is based upon on Information Technology Foundation, with systematized management thought, for business decision layer and employee provide the management platform of decision-making operation means.It is from the MRP(MRP) the New Generation of Integrated management information system that develops, it has expanded the function of MRP, and its core concept is supply chain management.It has jumped out traditional forms of enterprises border, goes to optimize the resource of enterprise from the supply chain scope.ERP system integrates infotech and advanced management thought, becomes the operational mode of modern enterprise, and the reflection epoch, the requirement of creating the wealth of society substantially, became the foundation stone of enterprise in information age existence, development to enterprise's rational allocation resource.It for improving business events flow path, improving the core competitiveness of enterprise has remarkable effect.
At present, my company built up comprise buying, sale, production, general ledger, receivable, deal with, the ERP system of the module composition such as cost, assets, quality, equipment.Yet ERP system can only realize simple contract management and check, can't realize the operation of higher function, particularly, in early stage, to the revenue calculation of signing a contract, can effectively help enterprise better to plan production run, production control cost, thereby the benefit of enterprise and competitive power.
Summary of the invention
For solving above-mentioned defect of the prior art, the invention provides a kind of revenue calculation method based on ERP system, by the application to data in ERP system, realized calculating the measuring and calculating of contractual revenue.
For solving the problems of the technologies described above, the present invention program comprises: the revenue calculation method based on ERP system, it is characterized in that, and described method comprises following process:
By whole contract splitting, be some new orders;
All new orders are inputted respectively to ERP system;
Original order in each new order and ERP system database is compared, obtain the cost information of new order;
The cost information that utilization is obtained calculates the absorbed costs of new order;
Extract avail information from new order;
Utilize avail information and full costing to go out the gross profit of new order;
The gross profit of all new orders is added up, obtain the gross profit of whole contract.
Further, described cost information at least comprises following content: production cost, remaining material lose, change the original sentence to loss.
Further, described avail information at least comprises following content: income price, order volume.
Further, the computing formula of utilizing cost information to obtain absorbed costs is: absorbed costs=production cost+remaining material loses+changes the original sentence to loss.
Further, the computing formula of utilizing avail information and absorbed costs to obtain the order gross profit is: single order gross profit=[income price/(the 1+ tax rate)-absorbed costs] * order volume.
The invention has the beneficial effects as follows: the present invention is by extracting the legacy data in ERP system, in conjunction with the avail information in new order, realized the measuring and calculating to the contract income, for production management, cost control and Authorize to X provide the data reference, further enhance productivity, greatly increased the income of enterprise.
The accompanying drawing explanation
Fig. 1 is process flow diagram of the present invention.
Embodiment
Below in conjunction with accompanying drawing, specific embodiment of the invention is described.
As shown in Figure 1, the revenue calculation method that the present invention is based on ERP system comprises following process:
1, according to the difference of department or flow process, by whole contract splitting, obtain some new orders;
2, by uploading, the form of scanning or typing, all new orders are inputted respectively to ERP system;
3, original order in each new order and ERP system database is compared, obtain the loss of production cost in new order, remaining material, change the original sentence to the cost information such as loss, wherein, production cost comprises variable cost and fixed expense, described production cost refers to every producing cost that production unit occurs for producing product or utility service, comprise every direct expenditure and manufacturing expense, total amount that described variable cost refers to those costs is the linear cost changed in relevant range along with the change of portfolio;
4, utilize computing formula: absorbed costs=production cost+remaining material loses+changes the original sentence to loss, calculate the absorbed costs of new order, wherein remaining material loss refers to the remaining material of the not enough smelting produced of order volume and the remaining material of rolling, become the loss that stock causes, change the original sentence to loss and refer in production run that product quality occurs is sub-standard and change the original sentence to the loss brought, change the original sentence to and can produce stock or waste product;
5, extract the avail information such as income price, order volume from new order, wherein, income price is the price that sales contract and client sign;
6, utilize computing formula: single order gross profit=[income price/(the 1+ tax rate)-absorbed costs] * order volume, calculate respectively the gross profit of each new order, wherein, the current tax rate is 17%;
7, the gross profit of all new orders is added up, obtain the gross profit of whole contract.
If in the task of same batch, a plurality of contracts are arranged, can will according to the method described above each contract gross profit be calculated, then the gross profit of all contracts is added up, obtain total gross profit of this batch of task.
If want to calculate the income of each product line, in computation process, only need cost information and avail information that this product line is related to extract, then calculate and get final product according to flow process of the present invention.
Should be understood that; the above-mentioned description for preferred embodiment is comparatively detailed; can not therefore think the restriction to scope of patent protection of the present invention; those of ordinary skill in the art is under enlightenment of the present invention; do not breaking away from the scope situation that the claims in the present invention protect; can also make the various deformation such as replacement, simple combination, within these all fall into protection scope of the present invention, the scope of asking for protection of the present invention should be as the criterion with claims.

Claims (5)

1. the revenue calculation method based on ERP system, is characterized in that, described method comprises following process:
By whole contract splitting, be some new orders;
All new orders are inputted respectively to ERP system;
Original order in each new order and ERP system database is compared, obtain the cost information of new order;
The cost information that utilization is obtained calculates the absorbed costs of new order;
Extract avail information from new order;
Utilize avail information and full costing to go out the gross profit of new order;
The gross profit of all new orders is added up, obtain the gross profit of whole contract.
2. the revenue calculation method based on ERP system according to claim 1, is characterized in that, described cost information at least comprises following content: production cost, remaining material lose, change the original sentence to loss.
3. the revenue calculation method based on ERP system according to claim 2, is characterized in that, the computing formula of utilizing cost information to obtain absorbed costs is: absorbed costs=production cost+remaining material loses+change the original sentence to loss.
4. the revenue calculation method based on ERP system according to claim 1, is characterized in that, described avail information at least comprises following content: income price, order volume.
5. the revenue calculation method based on ERP system according to claim 4, is characterized in that, the computing formula of utilizing avail information and absorbed costs to obtain the order gross profit is: single order gross profit=[income price/(the 1+ tax rate)-absorbed costs] * order volume.
CN201310482811.5A 2013-10-16 2013-10-16 Earning measuring and calculating method based on ERP (enterprise resource planning) system Pending CN103500381A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310482811.5A CN103500381A (en) 2013-10-16 2013-10-16 Earning measuring and calculating method based on ERP (enterprise resource planning) system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310482811.5A CN103500381A (en) 2013-10-16 2013-10-16 Earning measuring and calculating method based on ERP (enterprise resource planning) system

Publications (1)

Publication Number Publication Date
CN103500381A true CN103500381A (en) 2014-01-08

Family

ID=49865586

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310482811.5A Pending CN103500381A (en) 2013-10-16 2013-10-16 Earning measuring and calculating method based on ERP (enterprise resource planning) system

Country Status (1)

Country Link
CN (1) CN103500381A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109658025A (en) * 2018-12-13 2019-04-19 合肥鑫晟光电科技有限公司 The acquisition methods and device of the proportion of goods damageds

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030126005A1 (en) * 2002-01-02 2003-07-03 Yi-Ming Liao Method of claiming obsolescence
CN101699483A (en) * 2009-11-18 2010-04-28 金蝶软件(中国)有限公司 Production collaboration method, device and system
CN101719243A (en) * 2009-12-29 2010-06-02 金蝶软件(中国)有限公司 Method for processing production order, application server and group enterprise network system
CN102214331A (en) * 2011-05-30 2011-10-12 林大统 ERP (enterprise resource planning)-based contract reviewing method
CN103246950A (en) * 2012-10-30 2013-08-14 中国科学院沈阳自动化研究所 Method for promising order of semiconductor assembly and test enterprise

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030126005A1 (en) * 2002-01-02 2003-07-03 Yi-Ming Liao Method of claiming obsolescence
CN101699483A (en) * 2009-11-18 2010-04-28 金蝶软件(中国)有限公司 Production collaboration method, device and system
CN101719243A (en) * 2009-12-29 2010-06-02 金蝶软件(中国)有限公司 Method for processing production order, application server and group enterprise network system
CN102214331A (en) * 2011-05-30 2011-10-12 林大统 ERP (enterprise resource planning)-based contract reviewing method
CN103246950A (en) * 2012-10-30 2013-08-14 中国科学院沈阳自动化研究所 Method for promising order of semiconductor assembly and test enterprise

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
不详: "济钢订单效益测算分析系统研究开发和应用", 《世界金属导报》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109658025A (en) * 2018-12-13 2019-04-19 合肥鑫晟光电科技有限公司 The acquisition methods and device of the proportion of goods damageds
CN109658025B (en) * 2018-12-13 2021-02-19 合肥鑫晟光电科技有限公司 Method and device for acquiring loss rate

Similar Documents

Publication Publication Date Title
Dimitrios et al. Assessing air transport socio-economic footprint
Tian et al. How does industrial structure change impact carbon dioxide emissions? A comparative analysis focusing on nine provincial regions in China
Andreeva et al. Green finance: Trends and financial regulation prospects
Elsheikh et al. Economic impacts of changes in wheat’s import tariff on the Sudanese economy
Los et al. The demand for skills 1995-2008: A global supply chain perspective
Hoffmann Can green growth really work and what are the true (socio-) economics of Climate Change?
Varho et al. Wind power in Finland up to the year 2025—‘soft’scenarios based on expert views
Chang Returns to scale in DEA models for performance evaluations
Kim et al. Reform and privatization of state-owned enterprises in India
Athukorala Rethinking Sri Lanka's Industrialization Strategy: Achievements, Lost Opportunities and Prospects
Chen et al. The relationship between business performance, corporate social responsibility, and innovation capital: A case study of Taiwan
CN103500381A (en) Earning measuring and calculating method based on ERP (enterprise resource planning) system
Sharma et al. Role of SMES in India economy and TQM
Khan et al. Impact of China-Pakistan economic corridor (CPEC) on GDP, GNP, industrial production, unemployment, and inflation
Elbaum How Godzilla ate Pittsburgh: The long rise of the Japanese iron and steel industry, 1900–1973
Simonova et al. The formation of strategic priorities for development of industrial enterprises of the Samara region
Kushnirenko et al. The impact of industry 4.0 technologies on structural transformation in the manufacturing
Zheng et al. Application of activity-based costing quality cost accounting research
Nasiri et al. Consequences of Targeted Subsidies on Energy Products
Malanichev Contemplation of global steel industry future using scenario approach
Cirilo et al. Development of a costing system in a small nautical company of the Manaus industrial pole
Huang et al. The Impact of Digital Economy on Industrial Agglomeration
Abbas Some important factors affecting evolution of Activity Based Costing (ABC) system in Egyptian manufacturing firms.
Honga et al. Overview of Green marketing strategy and its influences on business efficiency in the enterprises
Wang et al. Study on steel bar management of construction project

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20140108

RJ01 Rejection of invention patent application after publication