DE69333392T2 - Einrichtung zur Bedarfsregelung und Regelsystem zur Energieverteilung - Google Patents
Einrichtung zur Bedarfsregelung und Regelsystem zur Energieverteilung Download PDFInfo
- Publication number
- DE69333392T2 DE69333392T2 DE1993633392 DE69333392T DE69333392T2 DE 69333392 T2 DE69333392 T2 DE 69333392T2 DE 1993633392 DE1993633392 DE 1993633392 DE 69333392 T DE69333392 T DE 69333392T DE 69333392 T2 DE69333392 T2 DE 69333392T2
- Authority
- DE
- Germany
- Prior art keywords
- loads
- amount
- work flow
- demand
- level
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/12—Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
- H02J3/14—Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
- H02J13/00004—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by the power network being locally controlled
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
- H02J13/00006—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
- H02J13/00016—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment using a wired telecommunication network or a data transmission bus
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2310/00—The network for supplying or distributing electric power characterised by its spatial reach or by the load
- H02J2310/10—The network having a local or delimited stationary reach
- H02J2310/12—The local stationary network supplying a household or a building
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2310/00—The network for supplying or distributing electric power characterised by its spatial reach or by the load
- H02J2310/50—The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads
- H02J2310/56—The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads characterised by the condition upon which the selective controlling is based
- H02J2310/62—The condition being non-electrical, e.g. temperature
- H02J2310/64—The condition being economic, e.g. tariff based load management
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B70/00—Technologies for an efficient end-user side electric power management and consumption
- Y02B70/30—Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
- Y02B70/3225—Demand response systems, e.g. load shedding, peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B90/00—Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02B90/20—Smart grids as enabling technology in buildings sector
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P80/00—Climate change mitigation technologies for sector-wide applications
- Y02P80/10—Efficient use of energy, e.g. using compressed air or pressurized fluid as energy carrier
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
- Y04S20/222—Demand response systems, e.g. load shedding, peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S40/00—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
- Y04S40/12—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
- Y04S40/124—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using wired telecommunication networks or data transmission busses
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S50/00—Market activities related to the operation of systems integrating technologies related to power network operation or related to communication or information technologies
- Y04S50/10—Energy trading, including energy flowing from end-user application to grid
Description
- Gebiet der Erfindung
- Die vorliegende Erfindung bezieht sich auf eine Einrichtung zur Bedarfsregelung zum Verringern der Gesamtleistung, die von einer Gruppe von Lasten verbraucht wird.
- Beschreibung des Standes der Technik
- Kürzlich haben viele Verbraucher in großem Umfang versucht, Energie zu sparen, indem der maximale Arbeitsleistungspegel oder der maximale Leistunganforderungswert gesetzt wurde, um die Gesamtmenge der verbrauchten elektrischen Leistung innerhalb des durch den gesetzten Bedarfswert definierten Bereichs zu halten. Die herkömmlichen Systeme zur Bedarfsregelung sind bekannt als von einem derartigen Typ, dass ein Warn- oder Steuerbefehl für eine Last oder Lasten erzeugt wird, in der/denen die Eingangsleistung den gesetzten Leistungspegel überschreitet oder dass eine Last mit einer größeren Arbeitsleistung vorzugsweise abgeschaltet wie in der Japanischen Patent-Offenlegungsschrift Nr. Sho 57-71233 beschrieben ist. Es ist auch eine Einrichtung zur Bedarfsregelung bekannt, die mehrere Lasten aufweist, die in ein-/aussteuerbare Lasten und produzierende Lasten klassifiziert sind, so dass, wenn der Pegel der verbrauchten Arbeitsleistung den gesetzten Bedarfspegel überschreitet, die Anzahl von erzeugenden Lasten zuerst reduziert wird, um den Pegel der Arbeitsleistung auf einen Zielpegel zu steuern, und dann werden schließlich die ein-/aus-steuerbaren Lasten abgeschaltet, wie in der Japanischen Patent-Offenlegungsschrift Nr. Sho 57-101526 beschrieben ist. die Japanische Patent-Offenlegungsschrift Nr. Sho 55-103043 beschreibt weiterhin eine Bedarfssteuereinrichtung, die ein Fehlsignal erzeugen kann, wenn die Gesamtmenge der verbrauchten elektrischen Leistung den Zielpegel überschreitet, selbst wenn alle zu steuernde Lasten gesteuert abgeschaltet sind.
- Jedoch erfordert die in der Japanischen Patent-Offenlegungsschrift Nr. Sho 57-71233 beschriebene Einrichtung zur Bedarfsregelung die Registrierung einer elektrischen Arbeitsleistung. Obgleich das System wirksam den Pegel der Arbeitsleistung unter den gesetzten Bedarfspegel drücken kann, da jede Last mit einer größeren Arbeitsleistung vorzugsweise abgeschaltet wird, kann die Folge der Prioritäten nicht in Abhängigkeit von der Größe der Arbeitsleistung geändert werden, so dass die elektrische Leistung wirksam innerhalb des durch den gesetzten Bedarfswert definierten Bereichs verwendet wird. Die Einrichtung zur Bedarfsregelung nach der Japanischen Patent-Offenlegungsschrift Nr. Sho 57-101526 kann auch die Folge der Prioritäten für die Lasten nicht ändern und den Typ von zu steuernden Instrumenten auswählen. Somit kann die Einrichtung zur Bedarfsregelung nicht in Häusern, Fabriken und anderweitig in Abhängigkeit von verschiedenen Situationen verwendet werden. Schließlich kann das Steuersystem nach der Japanischen Patent-Offenlegungsschrift Nr. Sho 55-103043 nur ein Fehlsignal erzeugen, ohne einen tatsächlichen Vorgang durchzuführen.
- Die herkömmlichen Systeme zur Bedarfsregelung führen einem weiteren Problem, wenn irgendeine der Lasten oder eines der Instrumente abgeschaltet ist. Wenn z. B. mehrere Instrumente wie ein Reiskocher, ein Wassererhitzer, eine Klimaanlage usw. morgens in einem typischen Haushalt verwendet werden, wird es, wenn irgendeine der Instrumente abgeschaltet wird, sehr unangenehm.
- Das Dokument EP-A-0 464 423 offenbart eine Einrichtung zur Bedarfsregelung, die mit einer Gruppe von Lasten verbunden ist und ausgebildet ist zum vollständigen oder teilweisen Abschalten oder zum Verringern der Leistungszuführung zu Lasten auf eine mögliche Größe des Arbeitsstroms entsprechend ihren gesetzten Prioritäten, so dass die Gesamtmenge des Arbeitsstroms in der Gruppe von Lasten gleich der oder geringer als eine gesetzte Größe des Arbeitsstroms wird, welche Einrichtung aufweist:
- – Leistungserfassungsmittel zum Erfassen und Berechnen der Gesamtgröße des Arbeitsstroms oder der Größe des Arbeitsstroms in jeder der Lasten, und
- – Wiederstartmittel zum Wiederstarten einer oder mehrerer Lasten entsprechend ihrer Priorität in nerhalb eines durch eine zulässige Arbeitsstromgröße definierten Bereichs.
- Das Dokument EP-A-0 372 961 offenbar ein Zuschalt/Abschalt-System zum Zuschalten/Abschalten von Lasten, um den Leistungsverbrauch eines Gebäudes unterhalb eines vorbestimmten Pegels zu halten. Gemäß diesem Dokument ist eine Einrichtung zur Bedarfsregelung mit einer Gruppe von Lasten verbunden und geeignet, die Leistungszuführung zu Lasten entsprechend ihren gesetzten Prioritätspegeln abzuschalten. Weiterhin wird der Gesamtleistungsverbrauch erfasst. Weiterhin sind Wiederstartmittel zum Zuschalten von Lasten vorgesehen, die eine Last entsprechend ihrem Prioritätspegel wieder starten, wenn die Summe des gegenwärtigen Gesamtleistungsverbrauchs und der bekannte Leistungsverbrauch der jeweiligen Last geringer sind als eine zulässige gesetzte Arbeitsstromgröße.
- Es ist daher die Aufgabe der vorliegenden Erfindung, eine Einrichtung zur Bedarfssteuerung vorzusehen, die ordnungsgemäß die Gesamtmenge der Arbeitsleistung für eine Gruppe von Lasten unterhalb eines gegebenen Pegels einstellen kann in Abhängigkeit von Umständen von Häusern, Fabriken usw.
- ZUSAMMENFASSUNG DER ERFINDUNG
- Zu diesem Zweck sieht die vorliegende Erfindung eine Einrichtung zur Bedarfsregelung vor, wie sie in Anspruch 1 definiert ist.
- KURZBESCHREIBUNG DER ZEICHNUNGEN
-
1 ist ein schematisches Blockschaltbild einer Einrichtung zur Bedarfsregelung. -
2 ist eine Ansicht, die die Steuerfolge in der in1 gezeigten Einrichtung zur Bedarfsregelung illustriert. - DETAILLIERTE BESCHREIBUNG DER BEVORZUGTEN AUSFÜHRUNGSBEISPIELE
- Es wird zuerst auf
1 Bezug genommen, in der eine Einrichtung zur Bedarfsregelung gezeigt ist, die entsprechend dem ersten Ausführungsbeispiel der vorliegenden Erfindung ausgebildet ist. Die Einrichtung zur Bedarfsregelung ist mit Lasten 1, 2 und 3 verbunden und so ausgebildet, dass sie die Leistungszuführung zu den jeweiligen Lasten entsprechend den gesetzten Prioritätspegel abschaltet, so dass die Gesamtmenge der Arbeitsleistung in der Gruppe von Lasten auf oder unter einem Leistungseinstellpegel gehalten wird. Die Steuerung der Einrichtung zur Bedarfsregelung wird in der in2 gezeigten Weise durchgeführt. - Aus Gründen der Einfachheit wird nun angenommen, dass zwei Instrumente, d. h., ein Instrument a mit einem Arbeitsstrom gleich 10A und ein anderes Instrument b mit einem Arbeitsstrom gleich 5A verwendet werden. Es wird auch angenommen, dass der gesetzte Bedarfspegel gleich 8A ist und dass der Prioritätspegel des Instruments a höher als der des Instruments b ist. Wenn beide Instrumente eingeschaltet sind, wird die Gesamtgröße des Arbeitsstroms gleich 15A, welche den Bedarfspegel überschreitet. Somit schaltet die Einrichtung zur Bedarfsregelung die Leistungszuführung zu dem Instrument b mit dem niedrigeren Prioritätspegel ab. Die Gesamtmenge des Arbeitsstroms wird gleich 10A. Jedoch überschreitet auch diese den gesetzten Bedarfspegel. Folglich wird das Instrument a ebenfalls abgeschaltet.
- Die Einrichtung zur Bedarfsregelung weist einen Leistungserfassungsabschnitt oder -Mittel
5 auf für die Berechnung der Größe des Arbeitsstroms in einem Instrument, wenn es von der Leistungszuführung abgeschaltet wird, wobei die Berechnung auf einer Differenz zwischen den Gesamtgrößen des Arbeitsstroms in diesem Instrument vor und nach dem Abschalten beruht, wie in2 gezeigt ist. Es wird nun durch den Leistungserfassungsabschnitt5 festgestellt, dass die Größe des Arbeitsstroms in dem Instrument a gleich 10A ist, während diejenige des Instruments b gleich 5A ist. - Die Einrichtung zur Bedarfsregelung weist auch einen Wiederstart-Steuerabschnitt oder -Mittel
6 auf zum Vergleichen einer nun zulässigen Größe des Stroms mit der Größe des Stroms in einer Last und zum Wiederstarten dieser Last entsprechend ihrem Prioritätspegel innerhalb des durch die zulässige Größe des Stroms definierten Bereichs. Der Wiederstart-Steuerabschnitt6 vergleicht zuerst die zulässige Größe des Stroms mit der Größe des Arbeitsstroms in dem Instrument a mit dem höchsten Prioritätspegel. Da die Größe des Arbeitsstroms in dem Instrument a den zulässigen Pegel überschreitet, wird es durch den Wiederstart-Steuerabschnitt6 nicht wieder gestartet. Nachfolgend wird die Größe des Arbeitsstroms in dem Instrument b mit der zulässigen Größe des Stroms verglichen. Da die Größe des Arbeitsstroms in dem Instrument b innerhalb des zulässigen Bereichs ist, wird dieses wieder gestartet. Wenn ein Instrument c mit einer Größe des Arbeitsstroms gleich 2A zusätzlich zu den Instrumenten a und b mit der Einrichtung zur Bedarfsregelung verbunden ist, wird das Instrument c wieder gestartet, da die Größe seines Arbeitsstroms innerhalb des zulässigen Bereichs ist.
Claims (1)
- Einrichtung zur Bedarfsregelung, die mit einer Gruppe von Lasten verbunden und ausgebildet ist, die Leistungszuführung zu Lasten entsprechend ihren gesetzten Prioritätspegeln so abzuschalten, dass die Gesamtmenge des Arbeitsstroms in der Gruppe von Lasten gleich einer oder geringer als eine gesetzte Strommenge ist, welche Einrichtung aufweist: Leistungserfassungsmittel (
5 ) zum Berechnen der Menge des Arbeitsstroms in jeder der Abschaltlasten aus einer Differenz zwischen den Gesamtmengen des Arbeitsstroms vor und nach dem Abschalten dieser Last; und Wiederstart-Regelmittel (6 ) zum weiteren Vergleichen der Menge des Arbeitsstroms in jeder der besagten vorher abgeschalteten Lasten gemäß Informationen über die von den Leistungserfassungsmitteln erfasste Menge des Arbeitsstroms in der Last mit einer Differenz zwischen der gesetzten Strommenge und der Gesamtmenge des Arbeitsstroms zu der gegenwärtigen Zeit, und zum Regeln des Wiederstartens von einer oder mehreren der vorher abgeschalteten Lasten gemäß ihren Prioritätspegeln und gemäß dem Ergebnis des Vergleichs, wenn die Menge des Arbeitsstroms von einer oder mehreren Lasten innerhalb eines Bereichs ist, der durch die Differenz zwischen der gesetzten Strommenge und der Gesamtmenge des Arbeitsstroms zu der gegenwärtigen Zeit definiert ist.
Applications Claiming Priority (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP4051941A JPH05260658A (ja) | 1992-03-10 | 1992-03-10 | デマンド制御装置 |
JP5194192 | 1992-03-10 | ||
JP07463492A JP3362055B2 (ja) | 1992-03-30 | 1992-03-30 | 電力分配制御システム |
JP7463492 | 1992-03-30 |
Publications (2)
Publication Number | Publication Date |
---|---|
DE69333392D1 DE69333392D1 (de) | 2004-02-26 |
DE69333392T2 true DE69333392T2 (de) | 2004-11-11 |
Family
ID=26392529
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE1993633392 Expired - Lifetime DE69333392T2 (de) | 1992-03-10 | 1993-03-09 | Einrichtung zur Bedarfsregelung und Regelsystem zur Energieverteilung |
DE1993633596 Expired - Lifetime DE69333596T2 (de) | 1992-03-10 | 1993-03-09 | Steuerungssystem für die Energieverteilung |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE1993633596 Expired - Lifetime DE69333596T2 (de) | 1992-03-10 | 1993-03-09 | Steuerungssystem für die Energieverteilung |
Country Status (4)
Country | Link |
---|---|
US (1) | US5481140A (de) |
EP (3) | EP0886362B1 (de) |
DE (2) | DE69333392T2 (de) |
HK (3) | HK1011468A1 (de) |
Families Citing this family (132)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5969435A (en) * | 1991-01-08 | 1999-10-19 | Nextek Power Systems, Inc. | Modular DC cogenerator systems |
US5500561A (en) * | 1991-01-08 | 1996-03-19 | Wilhelm; William G. | Customer side power management system and method |
US5803754A (en) * | 1991-01-08 | 1998-09-08 | Nextek Power Systems Inc. | Modified receptacle and plug for low voltage DC distribution |
US6933627B2 (en) | 1991-01-08 | 2005-08-23 | Nextek Power Systems Inc. | High efficiency lighting system |
GB2278207B (en) * | 1993-05-17 | 1996-05-15 | Ea Tech Ltd | Heating control apparatus |
CA2115717A1 (en) * | 1994-02-15 | 1995-08-16 | Nazir Dosani | Method and apparatus for remote control of an electrical load |
AU3172795A (en) * | 1994-09-19 | 1996-04-04 | Boundary Technologies Pty. Ltd. | Management of an elecrical power supply system by remote deactivation of loads |
US5770895A (en) * | 1995-06-08 | 1998-06-23 | Tokyo Electron Limited | Operation control device and method for a plurality of electric power consuming systems |
US20010018971A1 (en) * | 1996-01-10 | 2001-09-06 | Ellen Marcie Emas | Heat storage air conditioning apparatus and heat storage estimating method |
US6598029B1 (en) | 1997-02-24 | 2003-07-22 | Geophonic Networks, Inc. | Bidding for energy supply with request for service |
ITTO980134A1 (it) * | 1998-02-20 | 1999-08-20 | Merloni Elettrodomestici Spa | Sistema, dispositivo e metodo per il monitoraggio di una pluralita' di utenze elettriche, in particolare elettrodomestici, connesse in rete |
DE19817191C2 (de) * | 1998-04-17 | 2001-07-05 | Thomas Frank | Verfahren zum Regeln der Gesamtleistung von energietechnischen Anlagen, insbesondere einer Gruppe von elektrischen Verbrauchern |
US6529839B1 (en) * | 1998-05-28 | 2003-03-04 | Retx.Com, Inc. | Energy coordination system |
IT1308762B1 (it) * | 1999-06-28 | 2002-01-10 | Merloni Elettrodomestici Spa | Metodo di gestione del consumo di energia da parte di apparecchielettrodomestici. |
US6785592B1 (en) | 1999-07-16 | 2004-08-31 | Perot Systems Corporation | System and method for energy management |
WO2001006612A1 (en) * | 1999-07-16 | 2001-01-25 | Perot Systems Corporation | System and method for energy management |
US20040024483A1 (en) * | 1999-12-23 | 2004-02-05 | Holcombe Bradford L. | Controlling utility consumption |
US6348777B1 (en) | 2000-02-29 | 2002-02-19 | Alaris Medical Systems, Inc. | Power management system |
JP2001258175A (ja) * | 2000-03-14 | 2001-09-21 | Hitachi Ltd | 電力貯蔵用二次電池の利用システムおよび利用方法 |
JP2002015036A (ja) * | 2000-06-28 | 2002-01-18 | Mitsubishi Electric Corp | 電力量制御方法および電力量制御装置 |
DE10039134A1 (de) * | 2000-08-10 | 2002-02-21 | Abb Patent Gmbh | Verfahren und System zur Steuerung der Energieversorgung von elektrischen Verbrauchern |
IT1320622B1 (it) * | 2000-09-05 | 2003-12-10 | Wrap Spa | Sistema e dispositivo per il monitoraggio di almeno una utenzaelettrica domestica, in particolare un elettrodomestico. |
JP2002269470A (ja) * | 2001-03-09 | 2002-09-20 | Hitachi Ltd | 分散型電源事業の需要家情報開示・契約方法 |
US6826029B2 (en) * | 2001-08-30 | 2004-11-30 | The Boeing Company | Methods and apparatus for distributing electrical power |
JP2003087969A (ja) | 2001-09-17 | 2003-03-20 | Mitsubishi Electric Corp | 電力需要調整システム |
US6631622B1 (en) | 2002-03-22 | 2003-10-14 | Whirlpool Corporation | Demand side management of freezer systems |
JP2003289664A (ja) * | 2002-03-28 | 2003-10-10 | Tdk Corp | スイッチング電源装置用の制御回路及びこれを用いたスイッチング電源装置 |
EP1367685A1 (de) * | 2002-05-31 | 2003-12-03 | Whirlpool Corporation | Elektronisches System zur Geräteleistungsverbrauchsverwaltung |
US7561977B2 (en) * | 2002-06-13 | 2009-07-14 | Whirlpool Corporation | Total home energy management system |
US7196433B2 (en) * | 2002-08-08 | 2007-03-27 | Tai-Her Yang | Multi-output device with preset power supply priority |
US20040083112A1 (en) * | 2002-10-25 | 2004-04-29 | Horst Gale R. | Method and apparatus for managing resources of utility providers |
US7049798B2 (en) * | 2002-11-13 | 2006-05-23 | Power-One, Inc. | System and method for communicating with a voltage regulator |
US6949916B2 (en) * | 2002-11-12 | 2005-09-27 | Power-One Limited | System and method for controlling a point-of-load regulator |
US7000125B2 (en) * | 2002-12-21 | 2006-02-14 | Power-One, Inc. | Method and system for controlling and monitoring an array of point-of-load regulators |
US7394445B2 (en) * | 2002-11-12 | 2008-07-01 | Power-One, Inc. | Digital power manager for controlling and monitoring an array of point-of-load regulators |
US7456617B2 (en) * | 2002-11-13 | 2008-11-25 | Power-One, Inc. | System for controlling and monitoring an array of point-of-load regulators by a host |
US6833691B2 (en) * | 2002-11-19 | 2004-12-21 | Power-One Limited | System and method for providing digital pulse width modulation |
US6858797B2 (en) * | 2002-11-22 | 2005-02-22 | Gore Enterprise Holdings, Inc. | Support member for an assembly |
US7737961B2 (en) * | 2002-12-21 | 2010-06-15 | Power-One, Inc. | Method and system for controlling and monitoring an array of point-of-load regulators |
US7673157B2 (en) | 2002-12-21 | 2010-03-02 | Power-One, Inc. | Method and system for controlling a mixed array of point-of-load regulators through a bus translator |
US7882372B2 (en) * | 2002-12-21 | 2011-02-01 | Power-One, Inc. | Method and system for controlling and monitoring an array of point-of-load regulators |
US6933709B2 (en) * | 2003-02-10 | 2005-08-23 | Power-One Limited | Digital control system and method for switched mode power supply |
US7266709B2 (en) * | 2002-12-21 | 2007-09-04 | Power-One, Inc. | Method and system for controlling an array of point-of-load regulators and auxiliary devices |
US7836322B2 (en) * | 2002-12-21 | 2010-11-16 | Power-One, Inc. | System for controlling an array of point-of-load regulators and auxiliary devices |
US7743266B2 (en) * | 2002-12-21 | 2010-06-22 | Power-One, Inc. | Method and system for optimizing filter compensation coefficients for a digital power control system |
US7249267B2 (en) * | 2002-12-21 | 2007-07-24 | Power-One, Inc. | Method and system for communicating filter compensation coefficients for a digital power control system |
US7373527B2 (en) * | 2002-12-23 | 2008-05-13 | Power-One, Inc. | System and method for interleaving point-of-load regulators |
EP1441430B1 (de) * | 2003-01-21 | 2015-05-06 | Whirlpool Corporation | Verfahren zur Verwaltung und zur Beschränkung des Leistungsbedarfs von Geräte und deren Komponenten, und dasselbe Verfahren gebrauchendes System |
US7023190B2 (en) * | 2003-02-10 | 2006-04-04 | Power-One, Inc. | ADC transfer function providing improved dynamic regulation in a switched mode power supply |
US7710092B2 (en) * | 2003-02-10 | 2010-05-04 | Power-One, Inc. | Self tracking ADC for digital power supply control systems |
US6936999B2 (en) * | 2003-03-14 | 2005-08-30 | Power-One Limited | System and method for controlling output-timing parameters of power converters |
US7080265B2 (en) * | 2003-03-14 | 2006-07-18 | Power-One, Inc. | Voltage set point control scheme |
US6788036B1 (en) | 2003-03-28 | 2004-09-07 | Ower-One Limited | Method and system for current sharing among a plurality of power modules |
US20040230533A1 (en) * | 2003-05-16 | 2004-11-18 | Benco David S. | Pro-rated consumable resource governor |
US20050027636A1 (en) * | 2003-07-29 | 2005-02-03 | Joel Gilbert | Method and apparatus for trading energy commitments |
US8234876B2 (en) * | 2003-10-15 | 2012-08-07 | Ice Energy, Inc. | Utility managed virtual power plant utilizing aggregated thermal energy storage |
US7854129B2 (en) * | 2003-10-15 | 2010-12-21 | Ice Energy, Inc. | Refrigeration apparatus |
EP1533893A3 (de) * | 2003-11-19 | 2014-07-02 | Panasonic Corporation | Ein Verfahren zur Kontrolle einer Vorrichtung erzeugendes Generatorkontrollsystem, Programm und Aufnahmemedium |
US6958592B2 (en) * | 2003-11-26 | 2005-10-25 | Power-One, Inc. | Adaptive delay control circuit for switched mode power supply |
US7372682B2 (en) * | 2004-02-12 | 2008-05-13 | Power-One, Inc. | System and method for managing fault in a power system |
US20050286709A1 (en) * | 2004-06-28 | 2005-12-29 | Steve Horton | Customer service marketing |
US20060052906A1 (en) * | 2004-09-03 | 2006-03-09 | Lawrence Kates | Method and apparatus for load management metering in an electric power system |
US20060049694A1 (en) * | 2004-09-03 | 2006-03-09 | Lawrence Kates | Method and apparatus for load management in an electric power system |
US7554310B2 (en) * | 2005-03-18 | 2009-06-30 | Power-One, Inc. | Digital double-loop output voltage regulation |
US7141956B2 (en) * | 2005-03-18 | 2006-11-28 | Power-One, Inc. | Digital output voltage regulation circuit having first control loop for high speed and second control loop for high accuracy |
US7239115B2 (en) * | 2005-04-04 | 2007-07-03 | Power-One, Inc. | Digital pulse width modulation controller with preset filter coefficients |
US7327149B2 (en) * | 2005-05-10 | 2008-02-05 | Power-One, Inc. | Bi-directional MOS current sense circuit |
US8027752B2 (en) * | 2005-06-09 | 2011-09-27 | Whirlpool Corporation | Network for changing resource consumption in an appliance |
US8615332B2 (en) * | 2005-06-09 | 2013-12-24 | Whirlpool Corporation | Smart current attenuator for energy conservation in appliances |
US9151516B2 (en) * | 2006-01-27 | 2015-10-06 | Emerson Electric Co. | Smart energy controlled water heater |
US9188363B2 (en) | 2006-01-27 | 2015-11-17 | Emerson Electric Co. | Smart energy controlled water heater |
US9310098B2 (en) | 2006-01-27 | 2016-04-12 | Emerson Electric Co. | Water heater control using external temperature sensor |
JP2007236038A (ja) * | 2006-02-28 | 2007-09-13 | Sanyo Electric Co Ltd | デマンド制御装置 |
US20070299562A1 (en) * | 2006-06-26 | 2007-12-27 | Lawrence Kates | Method and apparatus for temperature-based load management metering in an electric power system |
JP4201050B2 (ja) * | 2006-10-11 | 2008-12-24 | トヨタ自動車株式会社 | 電気負荷制御装置及び電気負荷制御方法、並びに電動負荷制御装置及び電動負荷制御方法 |
US7705484B2 (en) * | 2007-04-10 | 2010-04-27 | Whirlpool Corporation | Energy management system and method |
US20110182094A1 (en) * | 2007-08-13 | 2011-07-28 | The Powerwise Group, Inc. | System and method to manage power usage |
US8085009B2 (en) | 2007-08-13 | 2011-12-27 | The Powerwise Group, Inc. | IGBT/FET-based energy savings device for reducing a predetermined amount of voltage using pulse width modulation |
US8619443B2 (en) | 2010-09-29 | 2013-12-31 | The Powerwise Group, Inc. | System and method to boost voltage |
US8120307B2 (en) | 2007-08-24 | 2012-02-21 | The Powerwise Group, Inc. | System and method for providing constant loading in AC power applications |
US8085010B2 (en) * | 2007-08-24 | 2011-12-27 | The Powerwise Group, Inc. | TRIAC/SCR-based energy savings device for reducing a predetermined amount of voltage using pulse width modulation |
US8810190B2 (en) * | 2007-09-14 | 2014-08-19 | The Powerwise Group, Inc. | Motor controller system and method for maximizing energy savings |
US8698447B2 (en) | 2007-09-14 | 2014-04-15 | The Powerwise Group, Inc. | Energy saving system and method for devices with rotating or reciprocating masses |
US8160752B2 (en) | 2008-09-30 | 2012-04-17 | Zome Networks, Inc. | Managing energy usage |
US7834613B2 (en) * | 2007-10-30 | 2010-11-16 | Power-One, Inc. | Isolated current to voltage, voltage to voltage converter |
US8014902B2 (en) * | 2008-02-22 | 2011-09-06 | Lawrence Kates | Method and apparatus for energy-efficient temperature-based systems management |
US20100010683A1 (en) * | 2008-07-14 | 2010-01-14 | Lawrence Kates | Method and apparatus for power-limiting electrical access |
US8004255B2 (en) * | 2008-08-07 | 2011-08-23 | The Powerwise Group, Inc. | Power supply for IGBT/FET drivers |
US8803040B2 (en) * | 2008-09-15 | 2014-08-12 | General Electric Company | Load shedding for surface heating units on electromechanically controlled cooking appliances |
AU2009290591B2 (en) | 2008-09-15 | 2015-10-01 | Haier Us Appliance Solutions, Inc. | Energy management of clothes washer appliance |
US8541719B2 (en) * | 2008-09-15 | 2013-09-24 | General Electric Company | System for reduced peak power consumption by a cooking appliance |
US8548638B2 (en) * | 2008-09-15 | 2013-10-01 | General Electric Company | Energy management system and method |
US8843242B2 (en) * | 2008-09-15 | 2014-09-23 | General Electric Company | System and method for minimizing consumer impact during demand responses |
US9303878B2 (en) | 2008-09-15 | 2016-04-05 | General Electric Company | Hybrid range and method of use thereof |
DE102008057563B4 (de) | 2008-11-11 | 2017-07-13 | Fraunhofer-Gesellschaft zur Förderung der angewandten Forschung e.V. | Verfahren und Vorrichtung zum netzkonformen Betreiben einer Mehrzahl von dezentralen mit Verbrauchern/Erzeugern von elektrischer Energie versehenen und an ein elektrisches Niederspannungsnetz angeschlossenen Einheit |
US9665838B2 (en) * | 2008-12-03 | 2017-05-30 | Whirlpool Corporation | Messaging architecture and system for electronic management of resources |
US8200370B2 (en) | 2008-12-04 | 2012-06-12 | American Power Conversion Corporation | Energy reduction |
US20100145884A1 (en) * | 2008-12-04 | 2010-06-10 | American Power Conversion Corporation | Energy savings aggregation |
JP4710982B2 (ja) * | 2009-01-26 | 2011-06-29 | ダイキン工業株式会社 | デマンド制御装置、デマンド制御システム、およびデマンド制御プログラム |
US20100207728A1 (en) * | 2009-02-18 | 2010-08-19 | General Electric Corporation | Energy management |
US8271147B2 (en) * | 2009-02-26 | 2012-09-18 | Massachusetts Institute Of Technology | Methods and apparatus for energy demand management |
CA2771121C (en) * | 2009-09-08 | 2018-05-15 | The Powerwise Group, Inc. | Energy saving system and method for devices with rotating or reciprocating masses |
US8698446B2 (en) * | 2009-09-08 | 2014-04-15 | The Powerwise Group, Inc. | Method to save energy for devices with rotating or reciprocating masses |
US8522579B2 (en) * | 2009-09-15 | 2013-09-03 | General Electric Company | Clothes washer demand response with dual wattage or auxiliary heater |
US8874277B2 (en) * | 2009-09-15 | 2014-10-28 | Denis Kouroussis | Smart-grid adaptive power management method and system with power factor optimization and total harmonic distortion reduction |
US8943845B2 (en) | 2009-09-15 | 2015-02-03 | General Electric Company | Window air conditioner demand supply management response |
US8943857B2 (en) * | 2009-09-15 | 2015-02-03 | General Electric Company | Clothes washer demand response by duty cycling the heater and/or the mechanical action |
US8869569B2 (en) * | 2009-09-15 | 2014-10-28 | General Electric Company | Clothes washer demand response with at least one additional spin cycle |
WO2011052957A2 (en) * | 2009-10-26 | 2011-05-05 | Lg Electronics Inc. | Method of controlling network system |
GB2469361B (en) * | 2010-01-28 | 2011-04-13 | Energy2Trade Ltd | Power flow measurement and management |
GB2482425B (en) * | 2010-07-27 | 2013-03-27 | Responsiveload Ltd | Responsive load monitoring system and method |
GB2482426B (en) * | 2010-07-27 | 2013-03-27 | Responsiveload Ltd | Responsive load monitoring system and method |
US8386087B2 (en) * | 2010-08-02 | 2013-02-26 | General Electric Company | Load shed system for demand response without AMI/AMR system |
US8801862B2 (en) | 2010-09-27 | 2014-08-12 | General Electric Company | Dishwasher auto hot start and DSM |
US20120179596A1 (en) * | 2011-01-11 | 2012-07-12 | Kenji Mitsumoto | Power reserve margin trading system and power reserve margin trading method |
JP5487125B2 (ja) * | 2011-01-11 | 2014-05-07 | 株式会社東芝 | 電力需給調整予備力取引システムおよび電力需給調整予備力取引方法 |
US9300138B2 (en) * | 2011-06-07 | 2016-03-29 | Fujitsu Limited | System and method for managing power consumption |
US20130066482A1 (en) * | 2011-09-13 | 2013-03-14 | Samsung Electronics Co., Ltd. | Apparatus and method for executing energy demand response process in an electrical power network |
EP3276537B1 (de) * | 2012-03-07 | 2019-04-24 | FeliCa Networks, Inc. | Kommunikationsvorrichtung, steuerverfahren dafür und programm |
CA2774407C (en) | 2012-04-17 | 2013-06-25 | Renewable Environmental Energy Services Inc. | Rate based power management device |
WO2013179876A1 (ja) | 2012-05-28 | 2013-12-05 | 三菱電機株式会社 | 需給調整システム |
JP6012313B2 (ja) * | 2012-07-11 | 2016-10-25 | 京セラ株式会社 | 電力制御装置、電力制御方法、及び電力制御システム |
US20140246909A1 (en) * | 2013-03-04 | 2014-09-04 | Adam A. Todorski | System and method for balancing supply and demand of energy on an electrical grid |
US9405304B2 (en) | 2013-03-15 | 2016-08-02 | A. O. Smith Corporation | Water heater and method of operating a water heater |
JP2014207793A (ja) * | 2013-04-15 | 2014-10-30 | 株式会社東芝 | 要求制御装置、方法及びプログラム |
JP6342131B2 (ja) * | 2013-09-13 | 2018-06-13 | 株式会社東芝 | 受給エネルギー削減情報算出装置、受給エネルギー削減情報算出方法およびプログラム |
CN104536311B (zh) * | 2014-12-02 | 2016-03-23 | 漳州科华技术有限责任公司 | 一种ups多路输出智能控制系统与方法 |
US9991738B2 (en) * | 2015-01-07 | 2018-06-05 | Gojo Industries, Inc. | Powering a plurality of dispensers |
DE102016112249A1 (de) * | 2016-07-05 | 2018-01-11 | Dr. Ing. H.C. F. Porsche Aktiengesellschaft | Verfahren zur Verteilung von Energie in einem Hausenergieversorgungssystem |
US10971949B2 (en) * | 2016-12-31 | 2021-04-06 | Abb Schweiz Ag | Systems and methods for performing building energy management |
CN107395397B (zh) * | 2017-06-23 | 2020-09-04 | 深圳市盛路物联通讯技术有限公司 | 一种基于物联网的耗电控制方法和装置 |
CN108306293B (zh) * | 2018-01-18 | 2020-12-15 | 浙江日业电力科技有限公司 | 低压电能质量治理装置 |
Family Cites Families (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4161028A (en) * | 1978-05-30 | 1979-07-10 | Leeds & Northrup Company | Electric demand control system |
GB2043371B (en) * | 1979-02-21 | 1983-05-25 | South Eastern Elec Board | Load shedding |
US4283635A (en) * | 1979-07-25 | 1981-08-11 | Honeywell Inc. | Load demand control system |
US4464724A (en) * | 1981-06-17 | 1984-08-07 | Cyborex Laboratories, Inc. | System and method for optimizing power shed/restore operations |
US4694192A (en) * | 1984-11-23 | 1987-09-15 | Honeywell Inc. | Simplified demand limit control |
FR2584542B1 (fr) * | 1985-07-05 | 1987-10-23 | Cahors App Elec | Adaptateur de puissance pour installations electriques, notamment domestiques |
US4804938A (en) * | 1986-10-24 | 1989-02-14 | Sangamo Weston, Inc. | Distribution energy management system |
ATE64478T1 (de) * | 1986-11-24 | 1991-06-15 | Peter Dr Niedner | Verfahren und system zum verringern von leistungsspitzen von an leitungen gebundenen ver- und/oder entsorgungsleistungen. |
US4731547A (en) * | 1986-12-12 | 1988-03-15 | Caterpillar Inc. | Peak power shaving apparatus and method |
US4916328A (en) * | 1988-12-08 | 1990-04-10 | Honeywell Inc. | Add/shed load control using anticipatory processes |
EP0445448B1 (de) * | 1990-03-06 | 1995-05-17 | Mitsubishi Denki Kabushiki Kaisha | Steuerung und Überwachungssystem für Leistungsverteilungsausrüstung |
DE4019523A1 (de) * | 1990-06-19 | 1992-01-09 | Decher Dieter | Anordnung zum steuern des stromverbrauchs eines abnehmers |
-
1993
- 1993-03-04 US US08/026,552 patent/US5481140A/en not_active Expired - Fee Related
- 1993-03-09 DE DE1993633392 patent/DE69333392T2/de not_active Expired - Lifetime
- 1993-03-09 EP EP19980114424 patent/EP0886362B1/de not_active Expired - Lifetime
- 1993-03-09 EP EP19930103755 patent/EP0561255B1/de not_active Expired - Lifetime
- 1993-03-09 DE DE1993633596 patent/DE69333596T2/de not_active Expired - Lifetime
- 1993-03-09 EP EP20030009607 patent/EP1330007B1/de not_active Expired - Lifetime
-
1998
- 1998-11-26 HK HK98112350A patent/HK1011468A1/xx not_active IP Right Cessation
- 1998-11-26 HK HK04100154.8A patent/HK1057293A1/xx not_active IP Right Cessation
-
1999
- 1999-05-11 HK HK99102112A patent/HK1017167A1/xx not_active IP Right Cessation
Also Published As
Publication number | Publication date |
---|---|
US5481140A (en) | 1996-01-02 |
EP0886362B1 (de) | 2004-08-18 |
DE69333596D1 (de) | 2004-09-23 |
EP0561255B1 (de) | 2004-01-21 |
EP1330007A3 (de) | 2005-11-30 |
HK1057293A1 (en) | 2004-03-19 |
DE69333596T2 (de) | 2005-09-15 |
EP0886362A1 (de) | 1998-12-23 |
DE69333392D1 (de) | 2004-02-26 |
HK1017167A1 (en) | 1999-11-12 |
HK1011468A1 (en) | 1999-07-09 |
EP1330007B1 (de) | 2012-08-22 |
EP1330007A2 (de) | 2003-07-23 |
EP0561255A1 (de) | 1993-09-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE69333392T2 (de) | Einrichtung zur Bedarfsregelung und Regelsystem zur Energieverteilung | |
DE3317834C2 (de) | ||
DE60206265T2 (de) | Programmierbare steuereinheit zur ferngesteuerten regelung der eingangsleistung eines verbrauchers vermittels schalter sowie verfahren dazu | |
DE2714511C2 (de) | Vorrichtung zur Regelung der Vorlauftemperatur in einer Sammelheizungsanlage | |
DE4334488C2 (de) | Verfahren und Vorrichtung zur Reduzierung der Spitzenbelastung elektrischer Energienetze und Energieerzeuger | |
CH641889A5 (de) | Heizungsanlage. | |
DE2920343A1 (de) | Vorrichtung zur steuerung von brennern | |
EP0134505B1 (de) | Hochspannungs-Gleichstromversorgung mit Überstromschutz | |
EP0641538A1 (de) | Vorrichtung zur Regelung der Leistungsaufnahme eines Staubsaugers | |
DE112014003202T5 (de) | Energie-Steuerungssystem | |
EP0279939B2 (de) | Verfahren zum Einstellen der Förderleistung einer Umwälzpumpe | |
EP0594886B1 (de) | Verfahren zum Regeln einer Heizungsanlage und Vorrichtung zur Durchführung des Verfahrens | |
DE19842043B4 (de) | Verfahren zur automatischen und verbraucherorientierten Minimierung des Gesamtstromverbrauchs und der Leistungsspitze einer Gruppe von an einem Leistungsversorgungsnetz angeschlossenen einzelnen elektrischen Verbrauchern | |
DE3716798A1 (de) | System zur temperaturregelung von warmwasser in wandaufgehaengten mischgas-durchlauferhitzereinheiten | |
EP0444269A2 (de) | Verfahren zur Regelung der Leistung einer Pumpe | |
DE3508049A1 (de) | Schaltungsanordnung zum einstellen der foerderleistung einer umwaelzpumpe | |
DE3517902C2 (de) | ||
DE60014357T2 (de) | Anlaufschaltung für Schaltnetzteile | |
DE112004000336T5 (de) | Betrieb einer Brennstoffzellen-Stromerzeugungsanlage mit festem Gleichstrom | |
DE19651484A1 (de) | Verfahren zur Leistungsaufnahmeoptimierung eines Verbundes elektrisch geheizter bzw. gekühlter Verbraucher | |
DE2456038C2 (de) | ||
DE3606751A1 (de) | Verfahren zum ermitteln eines sollwertes | |
EP0198222A2 (de) | Lastverteilungsverfahren | |
DE3616863C2 (de) | ||
DE19934543B4 (de) | Verfahren und Vorrichtung zur Einhaltung eines oberen Gesamtleistungsgrenzwertes für eine Anzahl von Verbrauchern beim Bezug von Energie |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
8364 | No opposition during term of opposition | ||
8320 | Willingness to grant licences declared (paragraph 23) |