Search Images Maps Play YouTube News Gmail Drive More »
Sign in
Screen reader users: click this link for accessible mode. Accessible mode has the same essential features but works better with your reader.

Patents

  1. Advanced Patent Search
Publication numberUS20030217062 A1
Publication typeApplication
Application numberUS 10/321,037
Publication dateNov 20, 2003
Filing dateDec 17, 2002
Priority dateDec 18, 2001
Also published asCA2471224A1, CA2471225A1, CA2471226A1, CA2471227A1, CN1605077A, CN1606732A, CN1615479A, CN1615484A, CN102013060A, EP1466229A2, EP1466229A4, EP1466247A1, EP1466247A4, EP1468350A2, EP1468350A4, EP1468374A2, EP1468374A4, US6636857, US7765181, US8266124, US8321468, US8484248, US8631014, US8825712, US8856646, US9348914, US20030140031, US20030140046, US20030140052, US20030140057, US20030154199, US20030217042, US20080177753, US20100169981, US20110047170, US20120016962, US20120179794, US20130055236, US20140046868, WO2003052557A2, WO2003052557A3, WO2003052558A2, WO2003052558A3, WO2003052559A2, WO2003052559A3, WO2003052560A2, WO2003052560A3, WO2003052600A1, WO2003052601A1
Publication number10321037, 321037, US 2003/0217062 A1, US 2003/217062 A1, US 20030217062 A1, US 20030217062A1, US 2003217062 A1, US 2003217062A1, US-A1-20030217062, US-A1-2003217062, US2003/0217062A1, US2003/217062A1, US20030217062 A1, US20030217062A1, US2003217062 A1, US2003217062A1
InventorsShawn Thomas, Michael Woodfin
Original AssigneeShawn Thomas, Michael Woodfin
Export CitationBiBTeX, EndNote, RefMan
External Links: USPTO, USPTO Assignment, Espacenet
Method and system for asset transition project management
US 20030217062 A1
Abstract
The method and system of the present invention provides an improved method for asset transition project management. Information is aggregated from a variety of sources into a centralized computerized database. Thereafter, assets that are electronically connected to the computerized database are monitored. If a transition occurs, information concerning the transition is input into the computerized database on a real-time basis during the implementation of the transition. The information input into the computerized database can be used to manage the transition.
Images(6)
Previous page
Next page
Claims(24)
We claim:
1. A method for asset transition project management comprising the steps of:
creating a computerized database, said computerized database containing information relating to the assets of an enterprise wherein said assets are electronically connected to said computerized database;
monitoring the transition of said assets;
inputting new information relating to said transition into said computerized database on a real-time basis during the implementation of said transition; and
using said new information to manage said transition of said assets.
2. The method of claim 1 wherein said computerized database is a relational database.
3. The method of claim 1 wherein said information is selected from the group consisting of user information, legacy asset information, new asset information, software application information, financial information, site information, event history information, logistical information, ownership information and usage information.
4. The method of claim 1 wherein said assets are selected from the group consisting of desktop computers, laptop computers, handheld computers, printers, scanners, networking devices and storage devices.
5. The method of claim 1 wherein said computerized database is located remotely from the location of said assets.
6. The method of claim 1 wherein said information is transmitted to said computerized database through the Internet.
7. The method of claim 1 wherein said information is transmitted to said computerized database through a local area network.
8. The method of claim 6 wherein said information is transmitted to said computerized database through secure, encrypted transmission.
9. The method of claim 1 wherein said transition is selected from the group consisting of asset installation, asset -relocation, asset maintenance and asset disposition.
10. The method of claim 1 wherein said new information is used to manage said transition through management activities selected from the group consisting of installation management, relocation management, lease management, exception management, scheduling management, workflow management and resource management.
11. The method of claim 1 wherein said new information is used to manage said transition through the production of reports.
12. The method of claim 11 wherein said reports are selected from the group consisting of status by location, status by group, hardware mix by site, user software, warehouse status by group, technical status, asset reconciliation, asset disposition and user survey.
13. A system for asset transition project management comprising:
a computerized database;
assets electronically connected to said computerized database;
means for monitoring the transition of said assets;
means for inputting new information relating to said transition into said computerized database during said transition of said transition;
means for using said new information to manage said transition of said assets.
14. The system of claim 13 wherein said computerized database is a relational database.
15. The system of claim 13 wherein said information is selected from the group consisting of user information, legacy asset information, new asset information, software application information, financial information, site information, event history information, logistical information, ownership information and usage information.
16. The system of claim 13 wherein said assets are selected from the group consisting of desktop computers, laptop computers, handheld computers, printers, scanners, networking devices and storage devices.
17. The system of claim 13 wherein said computerized database is located remotely from the location of said assets.
18. The system of claim 13 wherein said information is transmitted to said computerized database through the Internet.
19. The system of claim 13 wherein said information is transmitted to said computerized database through a local area network.
20. The system of claim 13 wherein said information is transmitted to said computerized database through secure, encrypted transmission.
21. The system of claim 13 wherein said transition is selected from the group consisting of asset installation, asset relocation, asset maintenance and asset disposition.
22. The system of claim 13 wherein said new information is used to manage said transition through management activities selected from the group consisting of installation management, relocation management, lease management, exception management, scheduling management, workflow management and resource management.
23. The system of claim 13 wherein said new information is used to manage said transition through the production of reports.
24. The system of claim 13 wherein said reports are selected from the group consisting of status by location, status by group, hardware mix by site, user software, warehouse status by group, technical status, asset reconciliation, asset disposition and user survey.
Description
    PRIORITY STATEMENT UNDER 35 U.S.C. 119 & 37 C.F.R. 1.78
  • [0001]
    This non-provisional application claims priority based upon prior U.S. Provisional Patent Application Serial No. 60/342,031 filed Dec. 18, 2001 in the names of Shawn Thomas, Gregory Gray, Michael Woodfin, Warner Mizell and Brian Thomas, entitled “Method and System for Deploying, Tracking and Managing Technology-Related Resources.”
  • BACKGROUND OF THE INVENTION
  • [0002]
    1. Technical Field of the Invention
  • [0003]
    The present invention relates generally to an improved method and system for asset transition project management. More particularly, the present invention provides a means for aggregating information into a computerized database. Thereafter, assets that are electronically connected to the computerized database are monitored. If a transition occurs, information concerning the transition is input into the computerized database on a real-time basis during the implementation of the transition. The information input into the computerized database can be used to manage the transition.
  • [0004]
    2. Description of Related Art
  • [0005]
    Large enterprises are faced with a daunting task when it comes to managing their information technology resources. Each user within the enterprise demands up-to-date hardware devices. This fact, coupled with the proliferation of new hardware devices, such as PDAs, cell phones and laptops, creates an enormous problem when it comes to tracking each device. This also makes it difficult to determine whether the transition of a device, for example, the installation, replacement, disposition or maintenance of the device, is being conducted efficiently and properly. Moreover, the process of managing asset transitions becomes extremely complicated.
  • [0006]
    In many cases, such transaction activities are tracked manually. For example, after a technician performs an asset transition activity, he may record certain information concerning the activity either in manual or digital form. Thereafter, he may return to his office where he may record the information to either a handwritten log a local computer database. Alternatively, the information may be called in or sent by e-mail to a central repository. In any event, there is a significant delay between the time the asset transition event occurs and the information is recorded into a data repository. A further limitation of the prior art is that the information collected by the technician may either be collected inaccurately or may be transferred inaccurately into the centralized repository. As a result of the foregoing limitations, information is not available to manage asset transition projects on a real-time basis. Consequently, a need exist for an improved method and system for asset transition project management.
  • SUMMARY OF THE INVENTION
  • [0007]
    The present invention addresses the need for an improved method and system for asset transition project management. The method and system of the present invention provides an improved technique for asset transition project management. Information regarding the enterprise's assets is aggregated from a variety of sources into a computerized database. Thereafter, assets that are electronically connected to the computerized database are monitored. If a transition occurs, information concerning the transition is input into the computerized database on a real-time basis during the implementation of the transition. The information input into the computerized database can be used to manage the transition.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • [0008]
    The disclosed invention will be described with reference to the accompanying drawings, which show important sample embodiments of the invention and which are incorporated in the specification hereof by reference, wherein:
  • [0009]
    [0009]FIG. 1 illustrates the preferred method of asset transition project management;
  • [0010]
    [0010]FIG. 2 illustrates a screen display identifying the types of reports available to the user;
  • [0011]
    [0011]FIG. 3 illustrates a screen display showing the content of the Management Status by Location report;
  • [0012]
    [0012]FIG. 4 illustrates a screen display showing the content of the Management Status by Group report; and
  • [0013]
    [0013]FIG. 5 illustrates the preferred system for asset transition project management.
  • DETAILED DESCRIPTION OF THE EXEMPLARY EMBODIMENTS OF THE INVENTION
  • [0014]
    The numerous innovative teachings of the present application will be described with particular reference to the presently preferred exemplary embodiments. However, it should be understood that these embodiments provide only a few examples of the many advantageous uses of the innovative teachings herein. In general, statements made in the specification of the present application do not necessarily delimit any of the various claimed inventions. Moreover, some statements may apply to some inventive features, but not to others.
  • [0015]
    [0015]FIG. 1 illustrates a work flow process for the preferred embodiment of the asset transition project management method. The first step in the method is the creation of a computerized database 101. The computerized database 101 will contain substantive information concerning assets owned by the enterprise. The computerized database 101 may be, for example, a relational database. In addition, the database may be located remotely from the location of the asset transition. Information included in the computerized database may include, for example, asset ownership information, usage information, user information, legacy asset information, new asset information, software application information, financial information, site information, event history information and logistical information. The database may include information on such assets as desktop computers, laptop computers, hand-held computers, printers, scanners, networking devices and storage devices. All assets are electronically connected to the computerized database 101.
  • [0016]
    Once a thorough, comprehensive, computerized database 101 has been created, the assets that are electronically connected to the computerized database 101 are monitored to determine whether an asset transition 102 has occurred. An asset transition 102 may be an event such as an asset installation, asset relocation, asset disposition or asset maintenance activity. Information from the asset transition 102 may be transmitted to the computerized database 101 through, for example, the Internet or a local area network. In addition, the transmission may occur by secure, encrypted means.
  • [0017]
    Upon the occurrence of an asset transition 102, information relating to the asset transition is transmitted electronically to the computerized database 101 thereby inputting transition information 103 into the computerized database 101 on a real-time basis. The information is transmitted to the computerized database 101 concurrently with and as a part of the asset transition 102. By instantaneously and simultaneously inputting transition information 103 into the computerized database 101, any delay in updating the database is eliminated. Thereafter, information in the computerized database can be used to manage asset transition activities 104. The types of activities that may be managed as part of the aforesaid management may include, for example, installation management, relocation management, lease management, exception management, scheduling management, workflow management and resource management. In addition, reports may be generated to assist with the project management activities. Reports may include, for example, status by location, status by group, hardware mix by site, user software, warehouse status by group, technical status, asset reconciliation, asset disposition and user satisfaction survey.
  • [0018]
    [0018]FIG. 2 illustrates a screen display identifying the types of reports available to the user. Typical reports include a Status by Location report which provides an overall summary of activity by site, a Status by Group report which provides summary information by schedule group, a Hardware Mix by site report which summarizes the hardware profiles selected by site or enterprise-wide, a User Detailed Software Report which summarizes the selected user software by site, schedule group or department, a Warehouse Status by Group report which provides summary and detail information about pre-deployment activities, a Technical Status report which provides summary and detail information about installations, quality control and timeliness, an Asset Reconciliation report which provides details by site or schedule group of assets removed and installed, an Asset Disposition report which contains details by site or schedule group of legacy assets to be removed, and a User Survey report which provides summary and detail level information about user current and new assets. Because all information in the computerized database 101 is updated on a real-time basis, all information and all reports are up to date and accurate at all times.
  • [0019]
    [0019]FIG. 3 illustrates a screen display showing the content of the Management Status by Location report. The display provides a general management overview of such information as the date the survey was completed, the asset count, the number of installations started, the number of installations completed, the number that have completed quality control and the number that have completed quality control follow-up, in each case by location.
  • [0020]
    [0020]FIG. 4 illustrates a screen display showing the content of the Management Status by Group report. The display provides such information as installation schedule date, units scheduled, the number of installations completed, the number of installations started, the number of serial numbers recorded and the number of backups completed in each case by group.
  • [0021]
    [0021]FIG. 5 illustrates the preferred embodiment for a system for asset transition project management. A series of assets 501, 502, 503 and 504 are attached to a computerized database 500. Each of the assets 501, 502, 503 and 504 are electronically connected 511, 512, 513 and 514 to the computerized database 500. The computerized database 500 may be located remotely from the assets 501, 502, 503 and 504. If so, transmission of information from the computerized database 500 to the assets 501, 502, 503 and 504 may be through the Internet or through a local area network. In addition, transmission of information between the assets 501, 502, 503 and 504 may be made in a secure, encrypted manner. The assets 501, 502, 503 and 504 may be such as assets as desktop computers, laptop computers, hand-held computers, printers, scanners, network devices and storage devices.
  • [0022]
    The system provides a means for monitoring the transition of the assets 501, 502, 503 and 504. An asset transition may include an asset installation, asset relocation, asset maintenance activity or asset disposition. When an asset transition occurs, the system provides a means for inputting new information relating to the transition into the computerized database 500 concurrently with transition of the assets. The information in the computerized database 500 is continuously and simultaneously updated.
  • [0023]
    Because the information in the computerized database 500 is current and up to date on a real-time basis, the information in the database can be used to manage asset transition activity. The type of management activities that may be performed using the information in the computerized database 500 may include, for example, installation management, relocation management, lease management, exception management, scheduling management, workflow management and resource management. In addition, the information in the computerized database 500 may be used to generate reports such as status by location, status by group, hardware mix by site, user software, warehouse status by group, technical status, asset reconciliation, asset disposition and user survey.
Patent Citations
Cited PatentFiling datePublication dateApplicantTitle
US5586322 *Jun 2, 1995Dec 17, 1996Beck; Robert E.Workgroup organized network manager with workstation comparison system
US5778395 *Oct 23, 1995Jul 7, 1998Stac, Inc.System for backing up files from disk volumes on multiple nodes of a computer network
US5787491 *Jan 26, 1996Jul 28, 1998Dell Usa LpFast method and apparatus for creating a partition on a hard disk drive of a computer system and installing software into the new partition
US5793951 *May 10, 1996Aug 11, 1998Apple Computer, Inc.Security and report generation system for networked multimedia workstations
US6038665 *Jun 19, 1998Mar 14, 2000Fairbanks Systems GroupSystem and method for backing up computer files over a wide area computer network
US6128661 *Apr 10, 1998Oct 3, 2000Microsoft CorporationIntegrated communications architecture on a mobile device
US6145126 *Apr 15, 1998Nov 7, 2000Fujitsu LimitedApparatus and method for installing software and recording medium storing program for realizing the method
US6161176 *Nov 20, 1998Dec 12, 2000Microsoft CorporationSystem and method for storing configuration settings for transfer from a first system to a second system
US6189008 *Apr 3, 1998Feb 13, 2001Intertainer, Inc.Dynamic digital asset management
US6220768 *Jun 28, 1996Apr 24, 2001Sun Microsystems, Inc.Network asset survey tool for gathering data about node equipment
US6327617 *Apr 25, 2000Dec 4, 2001Microsoft CorporationMethod and system for identifying and obtaining computer software from a remote computer
US6330566 *Jun 22, 1998Dec 11, 2001Microsoft CorporationApparatus and method for optimizing client-state data storage
US6366916 *Dec 23, 1998Apr 2, 2002International Business Machines CorporationConfigurable and extensible system for deploying asset management functions to client applications
US6490587 *Dec 8, 2000Dec 3, 2002Allen Dwight EastyDynamic digital asset management
US6502096 *Aug 22, 2000Dec 31, 2002Ncr CorporationComputerized asset management system
US6519600 *Aug 22, 2000Feb 11, 2003Ncr CorporationComputerized asset management system
US6633977 *Mar 31, 2000Oct 14, 2003International Business Machines CorporationSystem and method for computer system duplication
US6650622 *Aug 9, 1999Nov 18, 2003Chrimar Systems, Inc.System for communicating with electronic equipment
US6654802 *Feb 12, 1999Nov 25, 2003Sprint Communications Company, L.P.Network system and method for automatic discovery of topology using overhead bandwidth
US20010029474 *Nov 29, 2000Oct 11, 2001Noriaki YadaAsset management system and asset management method
US20020038267 *Sep 4, 2001Mar 28, 2002Necmettin CanSystem and method for using radio frequency identification in retail operations
US20020065736 *May 22, 2001May 30, 2002David WillnerElectronic procurement system
US20020065825 *Apr 2, 2001May 30, 2002Peter KassanUniversal asset and relationship manager
US20020073114 *Oct 30, 2001Jun 13, 2002Nicastro Cherisse M.Business asset management system
US20020083102 *Sep 28, 2001Jun 27, 2002Claus VetterAsset information exchange
US20020091699 *Oct 31, 2001Jul 11, 2002Norton Phillip G.Hosted asset information management system and method
US20020143775 *Feb 7, 2002Oct 3, 2002Wilkinson Paul D.Multi-media management systems
US20020143782 *Jul 31, 2001Oct 3, 2002Intertainer, Inc.Content management system
US20020184619 *May 30, 2001Dec 5, 2002International Business Machines CorporationIntelligent update agent
US20020198997 *Jun 20, 2001Dec 26, 2002Linthicum Steven EricSystem and method for on board maintenance instructions and records
US20030009455 *Jul 6, 2001Jan 9, 2003Brent CarlsonTargeted asset capture, identification, and management
US20030018746 *Jul 18, 2001Jan 23, 2003Boesch S. ChristopherMethod, computer program program product, and system for selecting and migrating information and device drivers to a computer system
US20030055749 *May 3, 1999Mar 20, 2003Cora L. CarmodyInformation technology asset management
US20030079132 *Feb 23, 2001Apr 24, 2003International Business Machines CorporationComputer functional architecture and a locked down environment in a client-server architecture
US20030093521 *Nov 4, 2002May 15, 2003Xerox Corporation.Asset management system for network-based and non-network-based assets and information
US20030093688 *Jun 21, 2001May 15, 2003Helgesen Jan IngvardMethod for automation of software upgrade
US20030110169 *Apr 26, 2002Jun 12, 2003Secretseal Inc.System and method for providing manageability to security information for secured items
US20030120677 *Dec 21, 2001Jun 26, 2003Vernon William EarlClosed loop asset management process
US20030120684 *Jul 25, 2002Jun 26, 2003Secretseal Inc.System and method for providing manageability to security information for secured items
US20030140150 *Jun 25, 2002Jul 24, 2003Dean KempSelf-monitoring service system with reporting of asset changes by time and category
US20030167323 *May 31, 2002Sep 4, 2003Tetsuro MotoyamaMethod and apparatus for monitoring remote devices by creating device objects for the monitored devices
US20030187758 *Mar 27, 2002Oct 2, 2003International Business Machines CorporationCapital asset inventory system and method
US20030233287 *Jun 12, 2002Dec 18, 2003Dean SadlerInternet-based apparatus and method of tracking and reporting assets
US20040044688 *Aug 30, 2002Mar 4, 2004Brudz John JasonPatent asset management systems and methods
US20040049578 *Jun 20, 2003Mar 11, 2004Brother Kogyo Kabushiki KaishaNetwork system, information processor and electronic apparatus
Referenced by
Citing PatentFiling datePublication dateApplicantTitle
US7765181Jun 18, 2003Jul 27, 2010Shawn ThomasWeb-based asset management
US8266124Dec 17, 2002Sep 11, 2012Caldvor Acquisitions Ltd., LlcIntegrated asset management
US8321468Oct 29, 2010Nov 27, 2012Caldvor Acquisitions Ltd., LlcWeb-based asset management
US8484248Mar 9, 2012Jul 9, 2013Caldvor Acquisitions Ltd., LlcWeb-based asset management
US8631014Sep 10, 2012Jan 14, 2014Caldvor Acquisitions Ltd., LlcMethod and system for integrated asset management
US8682706Jul 31, 2007Mar 25, 2014Apple Inc.Techniques for temporarily holding project stages
US8825712Jul 8, 2013Sep 2, 2014Caldvor Acquisitions Ltd., LlcWeb-based asset management
US8856646Mar 27, 2008Oct 7, 2014Caldvor Acquisitions Ltd., LlcAsset transition project management
US9009718 *Jul 31, 2009Apr 14, 2015Microsoft Technology Licensing, LlcProcessing singleton task(s) across arbitrary autonomous server instances
US9348914Mar 12, 2010May 24, 2016Caldvor Acquisitions Ltd., LlcWeb-based asset management
US20070260428 *May 5, 2006Nov 8, 2007International Business Machines CorporationSystem and method for benchmarking correlated stream processing systems
US20080177753 *Mar 27, 2008Jul 24, 2008Bluecurrent, Inc.Method and system for asset transition project management
US20090037198 *Jul 31, 2007Feb 5, 2009Michel Shane SimpsonTechniques for temporarily holding project stages
US20100305994 *Sep 1, 2008Dec 2, 2010Gasconex LimitedProject Management Tool
US20110029976 *Jul 31, 2009Feb 3, 2011Microsoft CorporationProcessing singleton task(s) across arbitrary autonomous server instances
WO2009027709A1 *Sep 1, 2008Mar 5, 2009Gasconex LimitedProject management tool
Classifications
U.S. Classification1/1, 707/999.01
International ClassificationG06Q10/00, G06F9/445, G06F17/30, G06F15/16, G06F7/00, G06F12/00, G06F11/30, G06Q99/00, G06Q30/00
Cooperative ClassificationG06F17/30, G06F17/30864, G06F17/211, G06F17/24, G06F9/4451, G06Q10/06, Y10S707/99948, G06Q30/02, G06Q99/00, G06Q40/02
European ClassificationG06Q40/02, G06Q30/02, G06Q99/00, G06Q10/06, G06F9/445C2
Legal Events
DateCodeEventDescription
Jun 23, 2003ASAssignment
Owner name: BLUECURRENT, INC., TEXAS
Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:THOMAS, SHAWN;GRAY, GREGORY;WOODFIN, MICHAEL;AND OTHERS;REEL/FRAME:014206/0925;SIGNING DATES FROM 20030401 TO 20030402
Owner name: BLUECURRENT, INC., TEXAS
Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:THOMAS, SHAWN;GRAY, GREGORY;WOODFIN, MICHAEL;AND OTHERS;SIGNING DATES FROM 20030401 TO 20030402;REEL/FRAME:014206/0925
Jan 9, 2007ASAssignment
Owner name: SELECTED INTERESTS, INC., TEXAS
Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:BLUECURRENT, INC.;REEL/FRAME:018731/0006
Effective date: 20061214
Mar 3, 2008ASAssignment
Owner name: SELECTED INTERESTS, INC., TEXAS
Free format text: CORRECTIVE ASSIGNMENT TO CORRECT THE NATURE OF CONVEYANCE FROM ASSIGNMENT TO SECURITY INTEREST PREVIOUSLY RECORDED ON REEL 018731 FRAME 0006;ASSIGNOR:BLUECURRENT, INC.;REEL/FRAME:020582/0581
Effective date: 20061214
Owner name: SELECTED INTERESTS, INC., TEXAS
Free format text: CORRECTIVE ASSIGNMENT TO CORRECT THE NATURE OF CONVEYANCE FROM ASSIGNMENT TO SECURITY INTEREST PREVIOUSLY RECORDED ON REEL 018731 FRAME 0006. ASSIGNOR(S) HEREBY CONFIRMS THE PARTIES AND THE GRANT OF SECURITY INTEREST CONTAINED IN THE ORIGINAL DOCUMENT;ASSIGNOR:BLUECURRENT, INC.;REEL/FRAME:020582/0581
Effective date: 20061214
Mar 13, 2008ASAssignment
Owner name: BLUECURRENT, INC., TEXAS
Free format text: RELEASE;ASSIGNOR:SELECTED INTERESTS, INC.;REEL/FRAME:020645/0227
Effective date: 20080310
Apr 3, 2008ASAssignment
Owner name: BLUECURRENT, INC., TEXAS
Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:THOMAS, SHAWN;WOODFIN, MICHAEL;REEL/FRAME:020750/0452
Effective date: 20030402
Dec 19, 2008ASAssignment
Owner name: CALDVOR ACQUISITIONS LTD., LLC, DELAWARE
Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:BLUECURRENT INC.;REEL/FRAME:022010/0239
Effective date: 20081104