Search Images Maps Play YouTube News Gmail Drive More »
Sign in
Screen reader users: click this link for accessible mode. Accessible mode has the same essential features but works better with your reader.

Patents

  1. Advanced Patent Search
Publication numberUS20040238176 A1
Publication typeApplication
Application numberUS 10/491,866
PCT numberPCT/GB2002/004624
Publication dateDec 2, 2004
Filing dateOct 11, 2002
Priority dateOct 12, 2001
Also published asEP1446550A1, WO2003033863A1
Publication number10491866, 491866, PCT/2002/4624, PCT/GB/2/004624, PCT/GB/2/04624, PCT/GB/2002/004624, PCT/GB/2002/04624, PCT/GB2/004624, PCT/GB2/04624, PCT/GB2002/004624, PCT/GB2002/04624, PCT/GB2002004624, PCT/GB200204624, PCT/GB2004624, PCT/GB204624, US 2004/0238176 A1, US 2004/238176 A1, US 20040238176 A1, US 20040238176A1, US 2004238176 A1, US 2004238176A1, US-A1-20040238176, US-A1-2004238176, US2004/0238176A1, US2004/238176A1, US20040238176 A1, US20040238176A1, US2004238176 A1, US2004238176A1
InventorsDavid Appleford, Brian Lane
Original AssigneeAppleford David Eric, Lane Brian William
Export CitationBiBTeX, EndNote, RefMan
External Links: USPTO, USPTO Assignment, Espacenet
Early hydrocarbon production system
US 20040238176 A1
Abstract
A subsea hydrocarbon reserve is exploited by intially drilling a first well (4) from a floating drilling vessel (2). A tree (8) is then installed on the well (4) and a production riser (10) is established between the well and the vessel for transferring production fluid from the first well (4) to the vessel (2) from where an off-loading hose (12) conveys the production fluid to a tanker (18). Production fluid is then extracted from the first well (4) via the production riser (10) which is of sufficient flexibility and length to permit the drilling vessel (2) to move between appropriate locations to drill further wells (4′, 20).
Images(3)
Previous page
Next page
Claims(13)
1. A method of exploiting a subsea hydrocarbon reserve, comprising the steps of drilling a first well (4) from a floating drilling vessel (2), establishing a production riser (10) for transferring production fluid from the first well (4) to the drilling vessel or production fluid reception means (18) closely associated with the vessel, and extracting production fluid from the first well (4) while drilling one or more further wells (20) from the drilling vessel (2), and characterised by the steps of:
(i) processing the production fluid with processing means (24) installed on the drilling vessel (2);
(ii) subsequently installing the processing means (24) on the seabed; and
(iii) carrying out subsea processing of production fluid from the wells (4,4′,20) by using the processing means (24).
2. A method as claimed in claim 1, wherein the processing means (24) is in the form of a module for installation as part of a seabed processing system.
3. A method as claimed in claim 1, wherein the processing means (24) separates the production fluid into different components.
4. A method as claimed in claim 1, wherein the production riser (10) is sufficiently flexible to permit local excursions of the drilling vessel (2) while it is drilling a said further well (20).
5. A method as claimed in claim 1, wherein the production riser (10) is of sufficient flexibility and length to permit the drilling vessel (2) to move between appropriate locations for drilling plural further wells (20) in order that output from two or more wells (4,4′) can be exploited while well drilling is still in progress.
6. A method as claimed in claim 5, including the step of establishing at least one further well (4′) and transferring production fluid from the first well (4) and the at least one further well (4′) to the drilling vessel (2) or the production fluid reception means (18) closely associated with the vessel while drilling at least one additional well (20).
7. A method as claimed in claim 6, including conveying the production fluid from the drilling vessel (2) to an off-loading buoy (12) for onward conveyance.
8. A method as claimed in claim 7, wherein said production fluid reception means comprises a floating storage unit (18), and the method includes storing production fluid for a period of time in the buoy (12) while the floating storage unit (18) is removed for replacement by another floating storage unit.
9. A method as claimed in claim 1, including conveying the production fluid from the drilling vessel (2) to a pipeline leading to a remote location via an off-loading buoy (12).
10. A method as claimed in claim 7, wherein production fluid is conveyed from the drilling vessel (2) to the buoy (12) by means of an off-loading hose (16) extending from the drilling vessel (2) to the buoy (12).
11. A method as claimed in claim 10, wherein fluid is conveyed from a said further well (4′) by an additional production riser (10′) to the drilling vessel (2) or production fluid reception means (18).
12. A method as claimed in claim 11, wherein fluid is conveyed from a said further well (4′) by interconnecting said further well (4′) with at least one other well (4) so that the combined production flow from a number of wells (4,4′) is conveyed via a common production riser (10).
13. A method as claimed in claim 1, wherein fluid is conveyed from a said further well (4′) by installing a manifold to which the further well or wells is/are attached and the combined production flow is conveyed to the drilling vessel (2) or production fluid reception means (18) via the production riser (10).
Description
  • [0001]
    The present invention relates to the development of a hydrocarbon extraction system and more particularly to the early stages of extraction of hydrocarbons from a subsea hydrocarbon deposit.
  • [0002]
    When a subsea hydrocarbon deposit is to be tapped, it is customary to drill a number of wells into the deposit, each of which is capped by a so-called “Christmas tree” or “tree”. Once a number of wells with associated trees have been established, a tree connecting manifold is installed on the sea bed which is linked to a pipeline for conveying production fluid from the wells to a floating or shore-based processing or storage facility for example. Since it commonly takes around a month to drill a well and install a tree on it, and a single drilling ship is used for this purpose, wells capped with a tree often remain unproductive for some months while the drilling ship drills other wells. Furthermore, the installation of a manifold: while drilling is in progress may present severe operational conflict problems. Such a manifold could be installed before or after drilling operations or while drilling a well some distance from, the location of the manifold.
  • [0003]
    An object of the invention is to overcome the above problem.
  • [0004]
    Thus, according to the invention, there is provided a method of exploiting a subsea hydrocarbon reserve comprising the steps of:
  • [0005]
    (i) drilling a first well from a floating drilling vessel;
  • [0006]
    (ii) establishing a production riser for transferring production fluid from the first well to the vessel or production fluid reception means closely associated with the vessel; and
  • [0007]
    (iii) extracting production fluid from the first well while drilling one or more further wells from the drilling vessel.
  • [0008]
    With such an arrangement, exploitation of the first well need not wait until all associated wells have been drilled. The consequent early production from the well can be used to generate revenue at an early stage, thus assisting cash flow.
  • [0009]
    Preferably, the production riser is sufficiently flexible to permit local excursions of the drilling vessel while it is drilling one of the further wells. More preferably, the production riser is of sufficient flexibility and length to permit the drilling vessel to move between appropriate locations for drilling plural further wells in order that output from two or more wells can be exploited while well drilling is still in progress.
  • [0010]
    Advantageously the method includes the step of establishing at least one further well and transferring production fluid from the first well and the at least one further well to the vessel or the production fluid reception means while drilling at least one additional well. Fluid may be conveyed from the further well;
  • [0011]
    (i) by an additional production riser to the vessel etc;
  • [0012]
    (ii) by ‘daisy chaining’ or interconnecting it with at least one other well so that the combined production flow from a number of wells is conveyed via common production riser; or
  • [0013]
    (iii) by installing a manifold to which the further well or wells is/are attached and the combined production flow is conveyed to the vessel etc. via the production riser.
  • [0014]
    The method may include processing the production fluid with processing means installed on the vessel. The method may also include the step of subsequently installing the processing means on the sea bed and carrying out subsea processing of production fluid from the wells by using the processing means.
  • [0015]
    The method may include conveying the production fluid to an off-loading buoy possibly by means of an off-loading hose extending from the drilling vessel to the buoy.
  • [0016]
    Production fluid reaching the buoy may be conveyed to a floating storage unit such as a tanker and may be stored for a period of time in the buoy while one such floating storage unit is removed for replacement by another. Alternatively, the buoy may be connected to a pipeline (e.g. a seabed pipeline) leading to a remote location such as a floating or shore-based storage or production facility.
  • [0017]
    The invention will now be described by way of example only with reference to the accompanying figures in which:—
  • [0018]
    [0018]FIG. 1 shows a first stage of the method according to the invention; and
  • [0019]
    [0019]FIG. 2 shows a second stage of the method according to the invention.
  • [0020]
    [0020]FIG. 1 shows a drilling vessel 2 drilling a first well 4 in the seabed 6 with a drill string 7. Once the well 4 has been completed, a first tree 8 is installed, on the well as shown in FIG. 2. Such trees are well known in the art and include valves for controlling the, flow of; production fluid from a hydrocarbon reservoir tapped by the well 4. A first flexible production riser 10 is installed between the first tree 8 and the vessel 2. The first flexible riser 10 may include buoyant means 11 for supporting at least a part of the weight of the flexible riser 10. Such flexible risers, including buoyancy means, are well known in the art.
  • [0021]
    An off-loading buoy 12 is moored in the vicinity of the first well 4 by means of mooring lines 14 connected to the sea bed 6. An off-loading hose 16 is installed for conveying production fluid etc. from the drilling vessel 2 to the off-loading buoy 12 and a floating storage unit, for example a tanker 18, is connected to the buoy 12 for receiving and storing production fluid etc. Production fluid may alternatively be routed from the buoy 12 to a sea bed pipeline for conveyance to a remote location.
  • [0022]
    The drilling vessel 2 then moves to an appropriate location as shown in FIG. 2 for drilling a second well 20. When this has been drilled, a second tree 22 (shown in broken lines) is installed thereon.
  • [0023]
    As indicated in FIG. 2 with broken lines, plural wells 4, 4′ may be connected to the drilling vessel 2 while the drilling vessel is drilling a further well 20. With such an arrangement, it is possible to exploit the production from two or more wells through the flexible production risers 10, 10′ while the further well 20 is being drilled. Alternatively, well 4′ and any subsequent well may be “daisy chained” to well 4 so that the combined production flow from both wells is conveyed to the vessel 2 by the flexible production riser 10. Alternatively, and not shown, a manifold may be installed to which wells 4′ and 4 and any subsequent wells are connected and the combined production flow routed to the vessel 2 either by the flexible riser 10, or by an additional flexible riser.
  • [0024]
    The drilling vessel 2 may have processing equipment 24 mounted thereon such as a processing module forming part of the modular system designed by Alpha Thames Limited of Essex, United Kingdom and named AlphaPRIME. The processing equipment may effect separation of different components of the production fluid from each other for separate conveyance to a remote location. The processing equipment 24 may be in the form of a module for installation as, part of a sea bed processing system such as that designed by Alpha Thames Limited.
  • [0025]
    Once drilling of all associated wells has been completed, production fluid from the wells will be routed to a remote location (before or after processing) via an alternative route, i.e. not via the flexible risers 10, 10′ and the drilling vessel 2. Production fluid may for example be routed to a sea bed processing unit which separates different constituents of the production fluid for conveyance through sea bed pipelines to a remote location.
  • [0026]
    The invention provides a method of exploiting output from one or more wells in a field prior to or while other wells are being drilled and other infrastructure fabricated or manufactured. This will: enable early exploitation of the, well to occur and assist cash flow by generating revenue at an earlier stage than has hitherto been possible.
Patent Citations
Cited PatentFiling datePublication dateApplicantTitle
US3504741 *Jun 27, 1968Apr 7, 1970Mobil Oil CorpUnderwater production satellite
Referenced by
Citing PatentFiling datePublication dateApplicantTitle
US7470163 *Aug 11, 2005Dec 30, 2008Exxonmobil Upstream Research CompanyCombined riser, offloading and mooring system
US7628224 *Apr 30, 2007Dec 8, 2009Kellogg Brown & Root LlcShallow/intermediate water multipurpose floating platform for arctic environments
US7793723 *Jan 10, 2007Sep 14, 2010Single Buoy Moorings, Inc.Submerged loading system
US7975769 *Oct 13, 2004Jul 12, 2011Single Buoy Moorings Inc.Field development with centralised power generation unit
US8122965 *May 29, 2007Feb 28, 2012Horton Wison Deepwater, Inc.Methods for development of an offshore oil and gas field
US8141645 *Jan 5, 2010Mar 27, 2012Single Buoy Moorings, Inc.Offshore gas recovery
US8162063 *Sep 3, 2010Apr 24, 2012Stena Drilling Ltd.Dual gradient drilling ship
US8800607 *Jun 4, 2010Aug 12, 2014Chevron U.S.A. Inc.Method and system for offshore export and offloading of LPG
US8919449 *May 29, 2009Dec 30, 2014Shell Oil CompanyOffshore drilling and production systems and methods
US9458700 *Apr 2, 2010Oct 4, 2016Single Buoy Moorings Inc.Use of underground gas storage to provide a flow assurance buffer between interlinked processing units
US20070163481 *Jan 10, 2007Jul 19, 2007Stein VedeldSubmerged loading system
US20080096448 *Aug 11, 2005Apr 24, 2008Lokken Roald TCombined Riser, Offloading and Mooring System
US20080135233 *May 29, 2007Jun 12, 2008Horton Technologies, LlcMethods for Development of an Offshore Oil and Gas Field
US20080223582 *Oct 13, 2004Sep 18, 2008Hein WilleField Development with Centralised Power Generation Unit
US20080267716 *Apr 30, 2007Oct 30, 2008D Souza RichardShallow/intermediate water multipurpose floating platform for arctic environments
US20100108322 *Mar 25, 2008May 6, 2010Eilertsen Terje WParallel drilling and completion for a dry tree floating production facility
US20100175884 *Jan 5, 2010Jul 15, 2010Leendert PoldervaartOffshore gas recovery
US20110132615 *May 29, 2009Jun 9, 2011Romulo GonzalezOffshore drilling and production systems and methods
US20110299960 *Jun 4, 2010Dec 8, 2011Chevron U.S.A. Inc.Method and System for Offshore Export and Offloading of LPG
US20120024391 *Apr 2, 2010Feb 2, 2012Single Buoy Moorings Inc.Use of underground gas storage to provide a flow assurance buffer between interlinked processing units
WO2006036325A1 *Aug 11, 2005Apr 6, 2006Exxonmobil Upstream Research CompanyCombined riser, offloading and mooring system
WO2008073815A1 *Dec 7, 2007Jun 19, 2008Agr Deepwater Development Systems, Inc.Methods for development of an offshore oil and gas field
WO2010089725A2 *Feb 9, 2010Aug 12, 2010Services Petroliers SchlumbergerSystem and method for well clean-up
WO2010089725A3 *Feb 9, 2010Nov 25, 2010Services Petroliers SchlumbergerSystem and method for well clean-up
Classifications
U.S. Classification166/353
International ClassificationE21B7/128, E21B43/01
Cooperative ClassificationB63B27/34, E21B7/128, B63B22/021, E21B43/01
European ClassificationE21B7/128, E21B43/01
Legal Events
DateCodeEventDescription
Oct 22, 2004ASAssignment
Owner name: ALPHA THAMES LTD., UNITED KINGDOM
Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:APPLEFORD, DAVID ERIC;LANE, BRIAN WILLIAM;REEL/FRAME:015280/0360
Effective date: 20041004