US20080238215A1 - Method, memory media and apparatus for detection of grid disconnect - Google Patents

Method, memory media and apparatus for detection of grid disconnect Download PDF

Info

Publication number
US20080238215A1
US20080238215A1 US10/713,310 US71331003A US2008238215A1 US 20080238215 A1 US20080238215 A1 US 20080238215A1 US 71331003 A US71331003 A US 71331003A US 2008238215 A1 US2008238215 A1 US 2008238215A1
Authority
US
United States
Prior art keywords
phase shift
disconnect
grid
feeder
distributed generator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
US10/713,310
Other versions
US7427815B1 (en
Inventor
Zhihong Ye
Pengwei Du
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
General Electric Co
Original Assignee
General Electric Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by General Electric Co filed Critical General Electric Co
Priority to US10/713,310 priority Critical patent/US7427815B1/en
Assigned to GENERAL ELECTRIC COMPANY reassignment GENERAL ELECTRIC COMPANY ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: DU, PENGWEI, YE, ZHIHONG
Priority to CN2004800399020A priority patent/CN101019293B/en
Priority to JP2006549249A priority patent/JP4719691B2/en
Priority to EP20040822579 priority patent/EP1743409A2/en
Priority to PCT/US2004/037888 priority patent/WO2006068634A2/en
Application granted granted Critical
Publication of US7427815B1 publication Critical patent/US7427815B1/en
Publication of US20080238215A1 publication Critical patent/US20080238215A1/en
Expired - Fee Related legal-status Critical Current
Adjusted expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/50Testing of electric apparatus, lines, cables or components for short-circuits, continuity, leakage current or incorrect line connections
    • G01R31/66Testing of connections, e.g. of plugs or non-disconnectable joints
    • G01R31/68Testing of releasable connections, e.g. of terminals mounted on a printed circuit board
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/388Islanding, i.e. disconnection of local power supply from the network

Definitions

  • the present disclosure relates to a method and apparatus for detection of a disconnection of the power grid. More particularly, the present disclosure relates to islanding and the prevention thereof.
  • Islanding of a grid-connected distributed generator occurs when a section of the grid containing the DG is disconnected from the main utility, but the DG continues to energize the grid lines in the isolated section (termed as an island).
  • DG grid-connected distributed generator
  • a load not owned by the DG owner
  • a grid disconnect device (circuit breaker, recloser, fuse, or sectionalizer) opens, it is possible for the DG to continue to supply current to the isolated section of the grid. This is islanding, and the isolated section of the grid being powered by the DG system is referred to as an island.
  • islanding is prevented in a power system that includes a power grid having a feeder connected in circuit with a distributed generator and at least one load.
  • the method determines a phase shift of a voltage at an output of the distributed generator.
  • the phase shift is compared to a threshold phase shift that signifies a phase shift due to a disconnect of the grid from the feeder. If the phase shift is greater than the threshold phase shift, a command is issued for a disconnect of the distributed generator from the feeder.
  • islanding is prevented in a power system that includes a power grid having a feeder connected in circuit with a distributed generator and at least one load.
  • the method determines a disconnect of the grid from the feeder by a phase shift procedure when a power mismatch between the distributed generator and the load exceeds a threshold.
  • the method further determines the disconnect by either or both of an under/over frequency procedure and an under/over voltage procedure when any power mismatch does not exceed the threshold.
  • a controller embodiment of the invention islanding is prevented in a power system that includes a power grid having a feeder connected in circuit with a distributed generator and at least one load.
  • the controller comprises a processor, a memory and an input/output unit.
  • the memory includes a grid disconnect program that causes the processor to determine a phase shift of a voltage at an output of the distributed generator.
  • the program also causes the processor to compare the phase shift to a threshold phase shift that signifies a phase shift due to a disconnect of the grid from the feeder. If the phase shift is greater than the threshold phase shift, the processor issues a command for a disconnect of the distributed generator from the feeder.
  • FIG. 1 is block diagram of an embodiment of a power grid disconnect detection apparatus.
  • FIG. 2 is a waveform diagram of the output voltage of the data generator of the FIG. 1 apparatus.
  • FIG. 3 is a block diagram of the controller of the FIG. 1 apparatus.
  • FIGS. 4 and 5 are flow diagrams of the grid disconnect detection program of the controller of FIG. 3 .
  • an electrical power grid 20 is connected to a feeder 22 that is connected in a circuit with a load 24 and a DG 26 .
  • Grid 20 is connected with a public utility (not shown).
  • a disconnect device 28 is disposed in feeder 22 for the purpose of disconnecting grid 20 from feeder 22 should abnormal disturbances occur in grid 20 .
  • Another disconnect device 30 is disposed in feeder 22 for the purpose of disconnecting DG 26 from feeder 26 . It will be apparent to those skilled in the art that more than one load can be connected to feeder 22 and that DG 26 and load 24 may be connected to feeder 22 via transformers (not shown).
  • Disconnect devices 28 and 30 may be any suitable disconnect devices, such as circuit breakers, reclosers, fuses, sectionalizers and the like.
  • DG 28 may be any distributed generator or a group of distributed generators, such as a photovoltaic system, a fuel cell, a microturbine, a small engine and the like.
  • disconnect device 28 opens, it is possible for DG 26 to continue to supply current to feeder 22 , which would be isolated from grid 20 due to the open disconnect device 28 . This is islanding and the isolated section of the grid (feeder 22 and circuits connected thereto) is referred to as an island.
  • a voltage measuring device 36 monitors the voltage at the output of DG 26 .
  • Voltage measuring device 36 provides samples of the monitored voltage to a controller 40 .
  • Controller 40 processes the voltage samples to detect a phase jump that occurs when grid 20 is disconnected by action of disconnect device 28 .
  • the output voltage of DG 26 is regulated by grid 20 .
  • grid 20 is disconnected by the opening of disconnect device 28 , DG 26 becomes islanded. If there is a power mismatch between DG 26 and load 24 , the voltage vector will shift its phase in order to balance the reactive power due to Ohm's law. This phase shift normally occurs right after grid 20 is disconnected.
  • detection of the phase jump tries to capture the phase change of the voltage vector in the first one or few cycles based on the voltage measurement and then sends a trip signal to disconnect device 30 , which opens. This action disconnects DG 26 from feeder 22 , thereby preventing islanding.
  • ⁇ P and ⁇ Q are power mismatch and ⁇ threshold is the phase jump setting threshold.
  • phase shift ⁇ is greater than the threshold phase shift ⁇ threshold , the phase jump (i.e., grid 20 disconnect) is detected. If the phase shift ⁇ is equal to or less than the threshold phase shift ⁇ threshold , any phase shift is assumed to be due to normal disturbances.
  • the phase shift ⁇ threshold is selected based on the maximum possible disturbances of the system in which the device is used.
  • the threshold should be larger (with certain margin) than the phase shift caused by the disturbances so as to avoid a falxe trip during normal grid connected operation.
  • Equation (1) reveals that if the power mismatch ⁇ P and ⁇ Q at the time of grid disconnect satisfy the condition ( ⁇ threshold ), then the islanding cannot be detected because the actual phase jump is smaller the threshold.
  • Equation (1) the effectiveness of the phase jump method is not influenced by the quality factor Qf of load 24 . Under/over frequency protection becomes less effective with higher quality factor load.
  • the phase shift detection method is combined with under/over frequency and under/over voltage protection.
  • This combination reduces the non-detection zone (defined in ⁇ P and ⁇ Q space, ⁇ P and ⁇ Q being small enough within the zone for the detection processes to respond) of under/over frequency protection.
  • the phase jump method is not very effective with high active power mismatch, but under/over voltage protection is sensitive to high active power mismatch. Therefore, combing the phase jump, under/over frequency, and under/over voltage will result in a reduced anti-islanding non-detection zone.
  • the phase shift procedure is used to determine the grid disconnect if a power mismatch between DG 26 and load 24 exceeds a threshold and either or both of the under/over frequency procedure and the under/over voltage procedure is used if any power mismatch does not exceed the threshold.
  • This embodiment may employ any conventional under/over procedure for frequency and under/over voltage procedure.
  • Voltage measuring device 36 continuously monitors the voltage at the output of DG 26 and sends samples thereof to controller 40 . Based on the measured voltage, frequency can be computed, either based on zero-crossing, phase lock loop, DQ (direct quadric) phase lock loop, or other frequency tracking procedures.
  • a voltage characteristic waveform 42 after grid 20 is disconnected.
  • the frequency can be measured based on the time period, defined as T n-1 , of the two consecutive waveform zero crossings.
  • T n-1 the time period of the two consecutive waveform zero crossings.
  • the next zero crossing time can be calculated as if there were no grid disconnection.
  • the angle between the calculated zero-crossing and the actually measured zero crossing is the phase shift, ⁇ n , due to the grid disconnection and is given by:
  • ⁇ n 2 ⁇ ⁇ ⁇ ⁇ ( 1 - f n - 1 f n ) ( 2 )
  • an alternative embodiment of the invention instead of using the phase change of one period with two consecutive measurements, uses three periods. In this case, although more storage is needed, the security and reliability are significantly improved. The reason is, due to grid transients, some phase change may occur momentarily even without grid disconnection. Controller 40 may pick up those transients as an islanding event and cause a false trip. Those transients are normally causing the frequency up and down momentarily, rather than drifting away in one direction. Therefore, by doing three periods, the short-term frequency oscillation will not cause too much phase change.
  • the implementation of the three-period measurements can be expressed below:
  • controller 40 includes a processor 50 , an input/output (I/O) unit 52 , a memory 54 and a bus 56 .
  • Bus 56 interconnects processor 50 , I/O unit 52 and memory 54 .
  • I/O unit 52 includes any desired I/O device, such as a keyboard, display, printer, communications device for communicating over a network, ports for receiving signals (e.g., the voltage samples from voltage measuring device 36 ) or for sending signals (e.g., a trip signal to disconnect device 30 ) and the like.
  • Memory 52 includes an operating system 58 and a controller program 60 .
  • Controller program 60 includes a grid disconnect detection program 62 .
  • a memory media 64 e.g., a disk
  • a memory media 64 (e.g., a disk) contains a copy of grid disconnect program 62 and may also include a copy of operating system 58 , controller program 60 , or other software, which can be loaded into memory 54 .
  • Operating system 58 controls processor 50 to execute controller program 60 and grid disconnect detection program 62 for detecting a disconnect of grid 20 from feeder 22 .
  • Grid disconnect program 62 processes the voltage samples to determine a phase shift ⁇ n between a current zero crossing and one or more previous zero crossings. The phase shift ⁇ n is compared to the phase shift threshold ⁇ threshold and if greater, the phase shift ⁇ n indicates a grid disconnect. A command is then issued that causes a trip signal to be sent to disconnect device 30 to disconnect DG 26 from feeder 22 .
  • a first embodiment of grid disconnect detection program 62 measures the output voltage of DG 26 at step 70 .
  • Step 70 receives the voltage samples and determines the zero-crossing times.
  • Step 72 determines the current frequency f n , based on the current zero-crossing.
  • Step 74 determines the phase change ⁇ n based on the current frequency f n and the previous frequency f n-1 . For example, step 74 uses Equation 2.
  • Step 76 compares the current phase shift ⁇ n to the threshold phase shift ⁇ threshold . If the current phase shift ⁇ n is greater, step 78 issues a command to generate a trip signal that trips disconnect device 30 , thereby disconnecting DG 26 from feeder 22 .
  • step 80 stores the current frequency f, for use during the next iteration. Steps 70 through 76 and 80 are repeated continuously until step 76 determines that the current phase shift ⁇ n is greater than the threshold phase shift ⁇ threshold . Step 78 then issues the command for the trip signal and resets program 52 .
  • FIG. 5 another embodiment of grid disconnect program 62 is the same as the embodiment shown in FIG. 4 except that the current phase change ⁇ n is determined based on the current frequency f n and the three previous frequencies f n-1 , f n-2 , and f n-3 .
  • Steps in FIG. 5 that are identical to those shown in FIG. 4 bear the same reference numerals.
  • Step 74 of FIG. 4 is replaced in FIG. 5 by step 84 which makes the phase shift determination based on current frequency f n and the three previous frequencies f n-1 , f n-2 , and f n-3 .
  • step 84 may use Equation (3).

Abstract

A phase shift procedure for detecting a disconnect of a power grid from a feeder that is connected to a load and a distributed generator. The phase shift procedure compares a current phase shift of the output voltage of the distributed generator with a predetermined threshold and if greater, a command is issued for a disconnect of the distributed generator from the feeder. To extend the range of detection, the phase shift procedure is used when a power mismatch between the distributed generator and the load exceeds a threshold and either or both of an under/over frequency procedure and an under/over voltage procedure is used when any power mismatch does not exceed the threshold.

Description

    CROSS-REFERENCE TO RELATED APPLICATIONS
  • The U.S. Government may have certain rights in this invention pursuant to contract number NAD-1-30605-01 awarded by the U.S. Department of Energy.
  • BACKGROUND OF INVENTION
  • The present disclosure relates to a method and apparatus for detection of a disconnection of the power grid. More particularly, the present disclosure relates to islanding and the prevention thereof.
  • Islanding of a grid-connected distributed generator (DG) occurs when a section of the grid containing the DG is disconnected from the main utility, but the DG continues to energize the grid lines in the isolated section (termed as an island). For example, consider a DG system connected to a feeder through a transformer. A load (not owned by the DG owner) is also connected to the same feeder through another transformer. If a grid disconnect device (circuit breaker, recloser, fuse, or sectionalizer) opens, it is possible for the DG to continue to supply current to the isolated section of the grid. This is islanding, and the isolated section of the grid being powered by the DG system is referred to as an island.
  • Accordingly, there is a continuing desire for a method and controller that prevent islanding.
  • BRIEF DESCRIPTION OF THE INVENTION
  • In a method embodiment of the invention islanding is prevented in a power system that includes a power grid having a feeder connected in circuit with a distributed generator and at least one load. The method determines a phase shift of a voltage at an output of the distributed generator. The phase shift is compared to a threshold phase shift that signifies a phase shift due to a disconnect of the grid from the feeder. If the phase shift is greater than the threshold phase shift, a command is issued for a disconnect of the distributed generator from the feeder.
  • In another method embodiment of the invention islanding is prevented in a power system that includes a power grid having a feeder connected in circuit with a distributed generator and at least one load. The method determines a disconnect of the grid from the feeder by a phase shift procedure when a power mismatch between the distributed generator and the load exceeds a threshold. The method further determines the disconnect by either or both of an under/over frequency procedure and an under/over voltage procedure when any power mismatch does not exceed the threshold.
  • In a controller embodiment of the invention islanding is prevented in a power system that includes a power grid having a feeder connected in circuit with a distributed generator and at least one load. The controller comprises a processor, a memory and an input/output unit. The memory includes a grid disconnect program that causes the processor to determine a phase shift of a voltage at an output of the distributed generator. The program also causes the processor to compare the phase shift to a threshold phase shift that signifies a phase shift due to a disconnect of the grid from the feeder. If the phase shift is greater than the threshold phase shift, the processor issues a command for a disconnect of the distributed generator from the feeder.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • FIG. 1 is block diagram of an embodiment of a power grid disconnect detection apparatus.
  • FIG. 2 is a waveform diagram of the output voltage of the data generator of the FIG. 1 apparatus.
  • FIG. 3 is a block diagram of the controller of the FIG. 1 apparatus.
  • FIGS. 4 and 5 are flow diagrams of the grid disconnect detection program of the controller of FIG. 3.
  • DETAILED DESCRIPTION OF THE INVENTION
  • Referring to FIG. 1, an electrical power grid 20 is connected to a feeder 22 that is connected in a circuit with a load 24 and a DG 26. Grid 20 is connected with a public utility (not shown). A disconnect device 28 is disposed in feeder 22 for the purpose of disconnecting grid 20 from feeder 22 should abnormal disturbances occur in grid 20. Another disconnect device 30 is disposed in feeder 22 for the purpose of disconnecting DG 26 from feeder 26. It will be apparent to those skilled in the art that more than one load can be connected to feeder 22 and that DG 26 and load 24 may be connected to feeder 22 via transformers (not shown).
  • Disconnect devices 28 and 30 may be any suitable disconnect devices, such as circuit breakers, reclosers, fuses, sectionalizers and the like. DG 28 may be any distributed generator or a group of distributed generators, such as a photovoltaic system, a fuel cell, a microturbine, a small engine and the like.
  • If disconnect device 28 opens, it is possible for DG 26 to continue to supply current to feeder 22, which would be isolated from grid 20 due to the open disconnect device 28. This is islanding and the isolated section of the grid (feeder 22 and circuits connected thereto) is referred to as an island.
  • A voltage measuring device 36 monitors the voltage at the output of DG 26. Voltage measuring device 36 provides samples of the monitored voltage to a controller 40. Controller 40 processes the voltage samples to detect a phase jump that occurs when grid 20 is disconnected by action of disconnect device 28.
  • Under normal conditions, the output voltage of DG 26 is regulated by grid 20. When grid 20 is disconnected by the opening of disconnect device 28, DG 26 becomes islanded. If there is a power mismatch between DG 26 and load 24, the voltage vector will shift its phase in order to balance the reactive power due to Ohm's law. This phase shift normally occurs right after grid 20 is disconnected.
  • In a first embodiment of the invention, detection of the phase jump tries to capture the phase change of the voltage vector in the first one or few cycles based on the voltage measurement and then sends a trip signal to disconnect device 30, which opens. This action disconnects DG 26 from feeder 22, thereby preventing islanding.
  • The relationship between the power mismatch and the phase jump θ can be derived as follow:
  • arc tan ( Δ Q / P 1 + Δ P / P ) θ threshold ( 1 )
  • where ΔP and ΔQ are power mismatch and θthreshold is the phase jump setting threshold.
  • If the phase shift θ is greater than the threshold phase shift θthreshold, the phase jump (i.e., grid 20 disconnect) is detected. If the phase shift θ is equal to or less than the threshold phase shift θthreshold, any phase shift is assumed to be due to normal disturbances.
  • The phase shift θthreshold is selected based on the maximum possible disturbances of the system in which the device is used. The threshold should be larger (with certain margin) than the phase shift caused by the disturbances so as to avoid a falxe trip during normal grid connected operation.
  • Equation (1) reveals that if the power mismatch ΔP and ΔQ at the time of grid disconnect satisfy the condition (θ≦θthreshold), then the islanding cannot be detected because the actual phase jump is smaller the threshold.
  • It can also be seen from Equation (1) that the effectiveness of the phase jump method is not influenced by the quality factor Qf of load 24. Under/over frequency protection becomes less effective with higher quality factor load.
  • In a second embodiment of the invention, the phase shift detection method is combined with under/over frequency and under/over voltage protection. This combination reduces the non-detection zone (defined in ΔP and ΔQ space, ΔP and ΔQ being small enough within the zone for the detection processes to respond) of under/over frequency protection. Also, it can be seen that the phase jump method is not very effective with high active power mismatch, but under/over voltage protection is sensitive to high active power mismatch. Therefore, combing the phase jump, under/over frequency, and under/over voltage will result in a reduced anti-islanding non-detection zone. In this embodiment, the phase shift procedure is used to determine the grid disconnect if a power mismatch between DG 26 and load 24 exceeds a threshold and either or both of the under/over frequency procedure and the under/over voltage procedure is used if any power mismatch does not exceed the threshold. This embodiment may employ any conventional under/over procedure for frequency and under/over voltage procedure.
  • Voltage measuring device 36 continuously monitors the voltage at the output of DG 26 and sends samples thereof to controller 40. Based on the measured voltage, frequency can be computed, either based on zero-crossing, phase lock loop, DQ (direct quadric) phase lock loop, or other frequency tracking procedures.
  • Referring to FIG. 2, an example of the zero-crossing technique is depicted by a voltage characteristic waveform 42 after grid 20 is disconnected. Before grid 20 disconnected, the frequency can be measured based on the time period, defined as Tn-1, of the two consecutive waveform zero crossings. After grid 20 is disconnected, there will be a phase shift due to DG 26 and load power mismatch. Then the next time period, defined as Tn, of the two consecutive zero-crossings will be different from Tn-1. Here Tn and Tn-1 are the inverse of the two consecutive frequency measurement: fn=(1/Tn) and fn−1=(1/Tn-1). Based on the previously measured frequency fn-1, the next zero crossing time can be calculated as if there were no grid disconnection. The angle between the calculated zero-crossing and the actually measured zero crossing is the phase shift, θn, due to the grid disconnection and is given by:
  • θ n = 2 π · ( 1 - f n - 1 f n ) ( 2 )
  • To improve the performance, an alternative embodiment of the invention, instead of using the phase change of one period with two consecutive measurements, uses three periods. In this case, although more storage is needed, the security and reliability are significantly improved. The reason is, due to grid transients, some phase change may occur momentarily even without grid disconnection. Controller 40 may pick up those transients as an islanding event and cause a false trip. Those transients are normally causing the frequency up and down momentarily, rather than drifting away in one direction. Therefore, by doing three periods, the short-term frequency oscillation will not cause too much phase change. The implementation of the three-period measurements can be expressed below:
  • θ total = θ n - 2 + θ n - 1 + θ n = 2 π · ( 3 - f n - 3 f n - 2 - f n - 2 f n - 1 - f n - 1 f n ) ( 3 )
  • Referring to FIG. 3, controller 40 includes a processor 50, an input/output (I/O) unit 52, a memory 54 and a bus 56. Bus 56 interconnects processor 50, I/O unit 52 and memory 54. I/O unit 52 includes any desired I/O device, such as a keyboard, display, printer, communications device for communicating over a network, ports for receiving signals (e.g., the voltage samples from voltage measuring device 36) or for sending signals (e.g., a trip signal to disconnect device 30) and the like. Memory 52 includes an operating system 58 and a controller program 60. Controller program 60 includes a grid disconnect detection program 62. A memory media 64 (e.g., a disk) contains a copy of grid disconnect program 62 and may also include a copy of operating system 58, controller program 60, or other software, which can be loaded into memory 54.
  • Operating system 58 controls processor 50 to execute controller program 60 and grid disconnect detection program 62 for detecting a disconnect of grid 20 from feeder 22. Grid disconnect program 62 processes the voltage samples to determine a phase shift θn between a current zero crossing and one or more previous zero crossings. The phase shift θn is compared to the phase shift threshold θthreshold and if greater, the phase shift θn indicates a grid disconnect. A command is then issued that causes a trip signal to be sent to disconnect device 30 to disconnect DG 26 from feeder 22.
  • Referring to FIG. 4, a first embodiment of grid disconnect detection program 62 measures the output voltage of DG 26 at step 70. Step 70 receives the voltage samples and determines the zero-crossing times. Step 72 determines the current frequency fn, based on the current zero-crossing. Step 74 determines the phase change θn based on the current frequency fn and the previous frequency fn-1. For example, step 74 uses Equation 2. Step 76 compares the current phase shift θn to the threshold phase shift θthreshold. If the current phase shift θn is greater, step 78 issues a command to generate a trip signal that trips disconnect device 30, thereby disconnecting DG 26 from feeder 22. If the current phase shift θn is equal to or less than the threshold phase shift θthreshold, step 80 stores the current frequency f, for use during the next iteration. Steps 70 through 76 and 80 are repeated continuously until step 76 determines that the current phase shift θn is greater than the threshold phase shift θthreshold. Step 78 then issues the command for the trip signal and resets program 52.
  • Referring to FIG. 5, another embodiment of grid disconnect program 62 is the same as the embodiment shown in FIG. 4 except that the current phase change θn is determined based on the current frequency fn and the three previous frequencies fn-1, fn-2, and fn-3. Steps in FIG. 5 that are identical to those shown in FIG. 4 bear the same reference numerals. Step 74 of FIG. 4 is replaced in FIG. 5 by step 84 which makes the phase shift determination based on current frequency fn and the three previous frequencies fn-1, fn-2, and fn-3. For example, step 84 may use Equation (3).
  • Regardless of where the instructions for the program steps are stored, when they are executed by the processor, they provide a technical effect of facilitating the detection of grid disconnect from circuits that include a DG.
  • It should also be noted that the terms “first”, “second”, “third”, “upper”, “lower”, and the like may be used herein to modify various elements. These modifiers do not imply a spatial, sequential, or hierarchical order to the modified elements unless specifically stated.
  • While the present invention has been described with reference to one or more exemplary embodiments, it will be understood by those skilled in the art that various changes may be made and equivalents may be substituted for elements thereof without departing from the scope of the present invention. In addition, many modifications may be made to adapt a particular situation or material to the teachings of the disclosure without departing from the scope thereof. Therefore, it is intended that the present invention not be limited to the particular embodiment(s) disclosed as the best mode contemplated for carrying out this invention, but that the invention will include all embodiments falling within the scope of the appended claims.

Claims (10)

1-3. (canceled)
4. A method for preventing islanding in a power system that includes a power grid having a feeder connected in circuit with a distributed generator and at least one load, said method comprising:
determining a phase shift of a voltage based solely on sequential frequency measurements at an output of said distributed generator;
comparing said phase shift to a threshold phase shift that signifies a phase shift due to a disconnect of said grid from said feeder; and
if said phase shift is greater than said threshold phase shift, issuing a command for a disconnect of said distributed generator from said feeder, wherein said phase shift is determined by:
θ n = 2 π · ( 1 - f n - 1 f n ) ,
where θn is said phase shift and fn and fn-1 are the frequencies at a current zero-crossing and a previous zero-crossing of said voltage, respectively.
5. A method for preventing islanding in a power system that includes a power grid having a feeder connected in circuit with a distributed generator and at least one load, said method comprising:
determining a phase shift of a voltage based solely on sequential frequency measurements at an output of said distributed generator;
comparing said phase shift to a threshold phase shift that signifies a phase shift due to a disconnect of said grid from said feeder; and
if said phase shift is greater than said threshold phase shift, issuing a command for a disconnect of said distributed generator from said feeder, wherein said phase shift is determined by:
θ total = θ n - 2 + θ n - 1 + θ n = 2 π · ( 3 - f n - 3 f n - 2 - f n - 2 f n - 1 - f n - 1 f n ) ,
where θtotal is said phase shift, θn, θn-1, and θn-2, are the current, the first previous and the second previous phase shifts, respectively, and fn, fn-1, fn-2, fn-3, are the frequencies at a current, a first previous, a second previous and a third previous zero-crossing of said voltage, respectively.
6-8. (canceled)
9. A controller for preventing islanding in a power system that includes a power grid having a feeder connected in circuit with a distributed generator and at least one load, said controller comprising:
a processor, a memory and an input/output unit, wherein said memory includes a grid disconnect program that causes said processor to perform the operations of;
determining a phase shift of a voltage based solely on sequential frequency measurements at an output of said distributed generator;
comparing said phase shift to a threshold phase shift that signifies a phase shift due to a disconnect of said grid from said feeder; and
if said phase shift is greater than said threshold phase shift, issuing a command for a disconnect of said distributed generator from said feeder, wherein said phase shift is determined by:
θ n = 2 π · ( 1 - f n - 1 f n ) ,
where θn is said phase shift and fn and fn-1 are the frequencies at a current zero-crossing and a previous zero-crossing of said voltage, respectively.
10. A controller for preventing islanding in a power system that includes a powder grid having a feeder connected in circuit with a distributed generator and at least one load, said controller comprising:
a processor, a memory and an input/output unit, wherein said memory includes a grid disconnect program that causes said processor to perform the operations of;
determining a phase shift of a volt based solely on sequential frequency measurements at an output of said distributed generator;
comparing said phase shift to a threshold phase shift that signifies a phase shift due to a disconnect of said grid from said feeder; and
if said phase shift is greater than said threshold phase shift, issuing a command for a disconnect of said distributed generator from said feeder, wherein said phase shift is determined by:
θ total = θ n - 2 + θ n - 1 + θ n = 2 π · ( 3 - f n - 3 f n - 2 - f n - 2 f n - 1 - f n - 1 f n ) ,
where θtotal is said phase shift, θn, θn-1, and θn-2, are the current, the first previous and the second previous phase shifts, respectively, and fn, fn-1, fn-2, fn-3, are the frequencies at a current, a first previous, a second previous and a third previous zero-crossing of said voltage, respectively.
11-13. (canceled)
14. A memory media for a controller for preventing islanding in a power system that includes a power grid having a feeder connected in circuit with a distributed generator and at least one load, said controller comprising a processor, a memory and an input/output unit said memory media comprising, a grid disconnect detection program that causes said processor to perform the operations of:
determining a phase shift of a voltage based solely on sequential frequency measurements at an output of said distributed generator;
comparing said phase shift to a threshold phase shift that signifies a phase shift due to a disconnect of said grid from said feeder; and
if said phase shift is greater than said threshold phase shift, issuing a command for a disconnect of said distributed generator from said feeder, wherein said phase shift is determined by:
θ n = 2 π · ( 1 - f n - 1 f n ) ,
where θn is said phase shift and fn and fn-1 are the frequencies at a current zero-crossing and a previous zero-crossing of said voltage, respectively.
15. A memory media for a controller for preventing islanding in a power system that includes a power grid having a feeder connected in circuit with a distributed generator and at least one load, said controller comprising a processor, a memory and an input/output unit, said memory media comprising a grid disconnect detection program that causes said processor to perform the operations of:
determining a phase shift of a voltage based solely on sequential frequency measurements at an output of said distributed generator;
comparing said phase shift to a threshold phase shift that signifies a phase shift due to a disconnect of said grid from said feeder; and
if said phase shift is greater than said threshold phase shift, issuing a command for a disconnect of said distributed generator from said feeder, wherein said phase shift is determined by:
θ total = θ n - 2 + θ n - 1 + θ n = 2 π · ( 3 - f n - 3 f n - 2 - f n - 2 f n - 1 - f n - 1 f n ) ,
where θtotal is said phase shift, θn, θn-1, and θn-2 are the current, the first previous and the smcond previous phase shifts, respectively, and fn, fn-1, fn-2, fn-3, are the frequencies at a current, a first previous, a second previous and a third previous zero-crossing of said voltage, respectively.
16. (canceled)
US10/713,310 2003-11-14 2003-11-14 Method, memory media and apparatus for detection of grid disconnect Expired - Fee Related US7427815B1 (en)

Priority Applications (5)

Application Number Priority Date Filing Date Title
US10/713,310 US7427815B1 (en) 2003-11-14 2003-11-14 Method, memory media and apparatus for detection of grid disconnect
CN2004800399020A CN101019293B (en) 2003-11-14 2004-11-12 Method for islanding detection of grid-connected electrical power systems
JP2006549249A JP4719691B2 (en) 2003-11-14 2004-11-12 Method, memory medium and apparatus for detection of grid disconnection
EP20040822579 EP1743409A2 (en) 2003-11-14 2004-11-12 Method for islanding detection of grid-connected electrical power systems
PCT/US2004/037888 WO2006068634A2 (en) 2003-11-14 2004-11-12 Method for islanding detection of grid-connected electrical power systems

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US10/713,310 US7427815B1 (en) 2003-11-14 2003-11-14 Method, memory media and apparatus for detection of grid disconnect

Publications (2)

Publication Number Publication Date
US7427815B1 US7427815B1 (en) 2008-09-23
US20080238215A1 true US20080238215A1 (en) 2008-10-02

Family

ID=36602175

Family Applications (1)

Application Number Title Priority Date Filing Date
US10/713,310 Expired - Fee Related US7427815B1 (en) 2003-11-14 2003-11-14 Method, memory media and apparatus for detection of grid disconnect

Country Status (5)

Country Link
US (1) US7427815B1 (en)
EP (1) EP1743409A2 (en)
JP (1) JP4719691B2 (en)
CN (1) CN101019293B (en)
WO (1) WO2006068634A2 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080093853A1 (en) * 2006-10-20 2008-04-24 Barker Sidney A Method and apparatus for operating electrical machines
US20080179966A1 (en) * 2007-01-30 2008-07-31 Sanyo Electric Co., Ltd. Grid interconnection device, grid interconnection system, and electric power control system
US20110137474A1 (en) * 2009-12-16 2011-06-09 Einar Vaughn Larsen Method and systems for operating a wind turbine
US8751036B2 (en) 2011-09-28 2014-06-10 Causam Energy, Inc. Systems and methods for microgrid power generation management with selective disconnect
US8872372B2 (en) 2012-11-30 2014-10-28 General Electric Company Method and systems for operating a wind turbine when recovering from a grid contingency event
WO2016023990A1 (en) * 2014-08-15 2016-02-18 Aei Power Gmbh Method for island network recognition

Families Citing this family (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7816815B2 (en) * 2006-09-28 2010-10-19 Asco Power Technologies, L.P. System and method for the detection of regenerated AC voltage
MX2011010064A (en) * 2009-03-27 2012-01-12 Aclara Power Line Systems Inc Under frequency/under voltage detection in a demand response unit.
WO2011038756A1 (en) * 2009-09-30 2011-04-07 Areva T&D Uk Limited Phase angle drift detection method for loss of mains /grid protection
US8334618B2 (en) * 2009-11-13 2012-12-18 Eaton Corporation Method and area electric power system detecting islanding by employing controlled reactive power injection by a number of inverters
US9692319B1 (en) * 2009-12-31 2017-06-27 Sunpower Corporation Power system islanding detection with waveform fitting
WO2011130733A1 (en) * 2010-04-16 2011-10-20 Enphase Energy, Inc. Method and apparatus for indicating a disconnection within a distributed generator
EP2501014B1 (en) * 2011-03-14 2016-05-11 ABB Research Ltd. Method and apparatus for detecting islanding conditions of distributed generator
US9006925B2 (en) 2011-05-31 2015-04-14 General Electric Company Distribution protection system and method
US9287714B2 (en) * 2011-11-30 2016-03-15 Michael Ropp Method and system for island detection and anti-islanding protection in distributed power generation systems
CA2883166A1 (en) * 2012-08-30 2014-03-06 Huibin Zhu System and method for detecting islanding of electrical machines and protecting same
US9620994B2 (en) 2013-01-17 2017-04-11 Eaton Corporation Method and system of anti-islanding of a microgrid in a grid-connected microgrid system
US20140244187A1 (en) * 2013-02-25 2014-08-28 Mitsubishi Electric Research Laboratories, Inc. Method for Detecting Islanding with Periodically Transmitted Sequence of Unsynchronized Signals
DE102014104216B3 (en) * 2014-03-26 2015-06-11 Sma Solar Technology Ag Single-phase emergency operation of a three-phase inverter and corresponding inverter
US10069304B2 (en) 2014-06-11 2018-09-04 Sinewatts, Inc. System and method for islanding detection and prevention in distributed generation
US9997920B2 (en) * 2014-06-11 2018-06-12 Sinewatts, Inc. System and method for islanding detection and prevention in distributed generation
US11477412B2 (en) * 2018-09-25 2022-10-18 New York University System, method, and computer-accessible medium for remote sensing of the electrical distribution grid with hypertemporal imaging
CN110690716B (en) * 2019-08-16 2022-09-27 中国电力科学研究院有限公司 Method and system for positioning active splitting section of power grid based on voltage trajectory information

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5749064A (en) * 1996-03-01 1998-05-05 Texas Instruments Incorporated Method and system for time scale modification utilizing feature vectors about zero crossing points
US6219623B1 (en) * 1997-11-24 2001-04-17 Plug Power, Inc. Anti-islanding method and apparatus for distributed power generation
US6304113B1 (en) * 1999-07-30 2001-10-16 Stmicroelectronics S.A. Device for synchronizing a reference event of an analog signal on a clock
US6429546B1 (en) * 1998-11-20 2002-08-06 Georgia Tech Research Corporation Systems and methods for preventing islanding of grid-connected electrical power systems
US20040178641A1 (en) * 2000-10-12 2004-09-16 Capstone Turbine Corporation Detection of islanded behavior and anti-islanding protection of a generator in grid-connected mode
US6917124B2 (en) * 2000-10-27 2005-07-12 Liebert Corporation Uninterruptible power supply

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06284560A (en) * 1993-03-24 1994-10-07 Ngk Insulators Ltd System anomaly detection method
JPH0888979A (en) * 1994-09-14 1996-04-02 Nissin Electric Co Ltd Single-operation detector for decentralized power supply
JP3588502B2 (en) * 1995-04-25 2004-11-10 大阪瓦斯株式会社 Synchronous generator islanding detection device and generator
JP3942336B2 (en) * 2000-03-31 2007-07-11 山洋電気株式会社 Method and apparatus for detecting isolated operation of distributed power supply
DE10211206A1 (en) 2002-03-06 2003-09-18 Klaus-Wilhelm Koeln Monitoring island formation in current network, involves generating current pulses, detecting voltage changes or phase shifts as network reaction and monitoring for sudden magnitude changes

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5749064A (en) * 1996-03-01 1998-05-05 Texas Instruments Incorporated Method and system for time scale modification utilizing feature vectors about zero crossing points
US6219623B1 (en) * 1997-11-24 2001-04-17 Plug Power, Inc. Anti-islanding method and apparatus for distributed power generation
US6429546B1 (en) * 1998-11-20 2002-08-06 Georgia Tech Research Corporation Systems and methods for preventing islanding of grid-connected electrical power systems
US6304113B1 (en) * 1999-07-30 2001-10-16 Stmicroelectronics S.A. Device for synchronizing a reference event of an analog signal on a clock
US20040178641A1 (en) * 2000-10-12 2004-09-16 Capstone Turbine Corporation Detection of islanded behavior and anti-islanding protection of a generator in grid-connected mode
US6917124B2 (en) * 2000-10-27 2005-07-12 Liebert Corporation Uninterruptible power supply

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080093853A1 (en) * 2006-10-20 2008-04-24 Barker Sidney A Method and apparatus for operating electrical machines
US7629705B2 (en) * 2006-10-20 2009-12-08 General Electric Company Method and apparatus for operating electrical machines
US20080179966A1 (en) * 2007-01-30 2008-07-31 Sanyo Electric Co., Ltd. Grid interconnection device, grid interconnection system, and electric power control system
US7840313B2 (en) * 2007-01-30 2010-11-23 Sanyo Electric Co., Ltd. Grid interconnection device, grid interconnection system, and electric power control system
US20110137474A1 (en) * 2009-12-16 2011-06-09 Einar Vaughn Larsen Method and systems for operating a wind turbine
US8046109B2 (en) 2009-12-16 2011-10-25 General Electric Company Method and systems for operating a wind turbine
US8509958B2 (en) 2009-12-16 2013-08-13 General Electric Company Power limiter system
US8751036B2 (en) 2011-09-28 2014-06-10 Causam Energy, Inc. Systems and methods for microgrid power generation management with selective disconnect
US8872372B2 (en) 2012-11-30 2014-10-28 General Electric Company Method and systems for operating a wind turbine when recovering from a grid contingency event
WO2016023990A1 (en) * 2014-08-15 2016-02-18 Aei Power Gmbh Method for island network recognition

Also Published As

Publication number Publication date
CN101019293A (en) 2007-08-15
JP2007512000A (en) 2007-05-10
WO2006068634A2 (en) 2006-06-29
US7427815B1 (en) 2008-09-23
JP4719691B2 (en) 2011-07-06
CN101019293B (en) 2013-04-24
EP1743409A2 (en) 2007-01-17
WO2006068634A3 (en) 2006-11-23

Similar Documents

Publication Publication Date Title
US7427815B1 (en) Method, memory media and apparatus for detection of grid disconnect
Yin et al. Recent developments in islanding detection for distributed power generation
US10739414B2 (en) Determining status of electric power transmission lines in an electric power transmission system
Singam et al. Assessing SMS and PJD schemes of anti-islanding with varying quality factor
EP1926844B1 (en) Method for detecting islanding operation of a distributed generator
Yu et al. A review of current anti-islanding methods for photovoltaic power system
Kim et al. An enhanced zone 3 algorithm of a distance relay using transient components and state diagram
Kundu et al. Enhanced protection security using the system integrity protection scheme (SIPS)
US20120239215A1 (en) Method and apparatus for detecting islanding conditions of distributed generator
Nagpal et al. Protection challenges and practices for interconnecting inverter based resources to utility transmission systems
Paiva et al. Reviewing of anti-islanding protection
Balaguer et al. Survey of photovoltaic power systems islanding detection methods
Rath et al. A comprehensive review on microgrid protection: issues and challenges
Chandrakar et al. An assessment of distributed generation islanding detection methods
Taheri et al. Power swing detection using the variation rates of the average value of apparent power
Quoc-Tuan New methods of islanding detection for photovoltaic inverters
Taft Fault intelligence: Distribution grid fault detection and classification
Kojovic et al. Integration of distributed generation in a typical USA distribution system
Suman et al. Unintentional islanding detection
Hari et al. Phasor measurement based fault detection and blocking/de-blocking of distance relay under power swing
Ballal et al. Methodology for the improvements in synchrophasor based System Integrity Protection Schemes under stressed conditions
KR20200003631A (en) Protection device and method for distributed energy resources in electric distribution system
Wang et al. Investigation of frequency oscillation caused false trips for biomass distributed generation
Mahmoud et al. Out‐of‐step detection of synchronous generators using dual computational techniques based on correlation and instantaneous powers
Pujhari Islanding detection in distributed generation

Legal Events

Date Code Title Description
AS Assignment

Owner name: GENERAL ELECTRIC COMPANY, NEW YORK

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:YE, ZHIHONG;DU, PENGWEI;REEL/FRAME:014710/0785;SIGNING DATES FROM 20031104 TO 20031110

FEPP Fee payment procedure

Free format text: PAYOR NUMBER ASSIGNED (ORIGINAL EVENT CODE: ASPN); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

CC Certificate of correction
FPAY Fee payment

Year of fee payment: 4

REMI Maintenance fee reminder mailed
LAPS Lapse for failure to pay maintenance fees
STCH Information on status: patent discontinuation

Free format text: PATENT EXPIRED DUE TO NONPAYMENT OF MAINTENANCE FEES UNDER 37 CFR 1.362

FP Lapsed due to failure to pay maintenance fee

Effective date: 20160923