Search Images Maps Play YouTube News Gmail Drive More »
Sign in
Screen reader users: click this link for accessible mode. Accessible mode has the same essential features but works better with your reader.

Patents

  1. Advanced Patent Search
Publication numberUS3656690 A
Publication typeGrant
Publication dateApr 18, 1972
Filing dateMar 23, 1970
Priority dateMar 22, 1969
Also published asDE1914712A1, DE1914712B2, DE1914712C3
Publication numberUS 3656690 A, US 3656690A, US-A-3656690, US3656690 A, US3656690A
InventorsHanig Siegfried
Original AssigneeIlseder Huette
Export CitationBiBTeX, EndNote, RefMan
External Links: USPTO, USPTO Assignment, Espacenet
Railbed
US 3656690 A
Abstract
A railbed for high-speed railways in which a plurality of elongated concrete slabs are longitudinally prestressed in groups with cast synthetic-resin sealing strips between the adjoining ends of the concrete slabs. The slabs are laid over a hollow bed and are cushioned below with a hard-foam synthetic resin including expanded mineral filters, the foamable synthetic resin being injected through perforated ducts. The downward force is supported by a pair of longitudinally extending sills flanking the hollow and carrying the concrete-slab platform via sealing strips. The sills may be formed in situ by grouting mounds of loose stone or may be cast monolithically with the remainder of the bed.
Images(4)
Previous page
Next page
Claims  available in
Description  (OCR text may contain errors)

United States Patent 3 Hanig [451 Apr. 18, 1972 s41 RAILBED 2,669,942 2/1964 Schevchzer ..104/11 676,128 6/1901 Goldie [721 sm'md pemeeemany 676,129 6/1901 Goldie [73] Assignee: ine' am H anr c er, Ger 3,112,681 12/1963 Gesslcr et 211..

many 3,565,336 2/1971 Eisses ..238/265 [22] Wed: 1970 Fri/nary Examiner- Arthur L. La Point [21] Appl. No.: 21,953 Assistant Examiner-Richard A. Bertsch Attorneyl(arl F. Ross [30] Foreign Application Priority Data [57] ABSTRACT Mar. 22, 1969 Germany. ..P 19 14 712.7

Field 61 Search ..1o4/11-14;23s/2,

A railbed for high-speed railways in which aplurality of elongated concrete slabs are longitudinally prestressed in groups with-cast synthetic-resin sealing-strips between the adjoining ends of the concrete slabs. The slabs are laid over'a hollow bed and are cushioned below with a hard-foam synthetic resin including expanded mineral filters, the foamable synthetic resin being injected through perforated ducts. The downward force [56] REM-em Cited is supported by a pair of longitudinally extending sills flanking UNITED STATES P S the hollow and carrying the concrete-slab platform via sealing strips. The sills may be formed in situ by grouting mounds of 2,875,953 3/1959 Weber et a1. 104/11 loose Stone or may be a monolithically h the remainder 3,432,098 3/1969 Sato 238/283 fth bed. 3,038,393 6/1962 Nagin et a1 ..94/22 3,250,188 5/1966 Leonards ..94/7 5Claims,6Drawing Figures 3,550,850 12/1970 Sonneville ..238/283 I STEP TWO= PLACE PLATE IOo l2 22 15 4. 3 \E: 8 9 5 lo H l2 /lOO4 r v 1 4:',E=.-:;;:-'- $m D .E-a 1 MV/ 7 M \\//A STEP ONE FORM AND GROUT 6 1 STEP THREE IN JECT SYN.-RE$IN RIDGES AGGREGATE MIXTURE PATENTEDAPR 18 I972 SHEET 10F 4 P2 33. "oz; m5

v INVENTOR. SIEGFRIED Hldms BY 96m! 9. Rm,

n mzO mukm ATTORNEY PATENTEDAPR 18 I972 SHEET 20? 4 INVENTOR.

SIE'GFRIED *HKNIG xarlgiqn ATTORNEY PATENTEDAPR 18 m2 FIG.3A

SHEET t f u a" 0 INVENTOR. SIEGFRiED HANIG ATTORNEY [N VENTOR.

HANIG SIEGFRIED 1 Jim! ATTORNEY SHEET u BF 4 I PATENTEDAFR18 I972 RAILBED FIELD OF THE INVENTION The present invention relates to a railbed or track assembly.

BACKGROUND OF THE INVENTION A railbed for a railroad train usually consists of an elongated mount of ballast on which is laid a multiplicity of substantially,

parallel ties extending transversely to the mount; one or more pairs of parallel rails. can be attached to these ties-and extending longitudinally along the mount or ridge of ballast. The train rides these rails.

Such railbeds have proven increasingly unsatisfactory for todays high-speed and extremely heavy trains. Rails weighing Another problem with conventional railbeds is that frequent thawing and freezing loosens and unpacks the ballast. This ballast must be periodically replenished and reconsolidated or tamped. Such maintenance is expensive and time-consuming OBJECTS OFTHEINVENTION It is, therefore, an object of the present invention to provide an improved railbed.

Another object is to provide such a railbed which can be used by trains at speeds of upwards of 200 km/hourand which requires verylittle maintenance.

SUMMARY OF THE INVENTION The above objects are obtained with a railbedcomprising a trough formed by two ridges flanking an elongated hollow region, with a plurality of track-carrying members covering the region and bridging the ridges. The space (hollow) beneath the members and between the ridgesis completely filled with a mass of cushioning and insulating material consisting at least partially of a settable synthetic resin, preferably a hardenable cellular or foam of the closed-pore type.

According to a feature of this invention the ridges consist of hydraulic-cement-grouted piles of ballast, and the hollow region is covered with a fluid-tight layer such as bitumen-impregnated paper or polyethylene film, so that the syntheticresin mass cannot penetrate too far into the ballast.

in accordance with other features of the present invention the settable synthetic resin is injected into an effectively closed bag which is laid in the hollow region beneath the track-carrying members, while expanded slag is used as an aggregate with the synthetic-resin foam as binder.

Thus the method of the invention makes use of prefabricated, superficially crowned, stressable concrete slabs of generally rectangular configuration which are disposed substantially in end-to-end contiguity to form a more or less continuous platform for the track, any gaps between the slabs being filled with a weather resistant hardenable synthetic-resin sealant which is cast in place. The longitudinally interconnected reinforcement rods of the connected group of slabs are stressed against the ends of the group by conventional prestressing means to apply longitudinal compression loading. of a magnitude sufiicient to overcome the tensional stress applied by the train.

This substantially continuous, fluid-impermeable unit is provided, according to a most important feature of the invention, over a continuous ribbon of nonweathering hard cellular synthetic resin of a width equal at least to a major part of the widthof the slabs and possibly over this entire width; the continuous fluid-impermeable ribbon is expanded in place to an expanded volume in excess of the space within which it is confined, thereby applying upward force to cushion the continuous concrete platform. The cushion may contain a large prothe compressive strength of this layer as well as its resilience and resistance to vibration fatigue.

Preferably this cushion or ribbon is received between a pair of load-supporting ridges extending continuously over the length of the right-of-way and sealingly engaging the lateral edges of the multislab concrete rail platform, the ridges and slabs having mutually confronting parallel planar horizontal surfaces to facilitate sealing of the space between the ridges. A continuous yieldable but weather-resistant strip of a sealant of high compressive strength is received between thepairs of surfaces along these lateral edges.

DESCRIPTION OF THE DRAWING The above and other objects, features, and advantages will become apparent from the following description,'reference being made. to the following drawing, in which: I v

FlGpl is a cross section of a first embodiment of the present invention;

20 FIG. 2' is a similar section ofa an embodiment or this invention; FIG. 3A is a side view of a detail of FIG. 2;

FIG. 3B is a top view of the detail shown in FIG.3A; FIG. 4 is a cross section of a fourth embodiment 'of the 2 present invention; and

FIG. 5 is a top view of the first embodiment of the invention in greatly reduced scale.

" SPECIFIC DESCRIPTION The embodiment shown in FIGS. 1 and 5 applies the present invention to. the conversion of an existing old-style railbed to one according to this invention. The old ties and rails are removed,'then the existing ballast l is cleaned and put back in place in the form of a shallow trough of a depth D of at most 30 cm. Edge portions 2 are grouted with a quick-setting hydraulic (Portland) cement mixture, and a very accurate sill 3 of the same quick-setting mixture is fonned on the top of each edge ridge 2 with particular care being taken to maintain these sills 4 parallel andwith regular flat upper surfaces. Atop each sill 3 is placeda strip 4 of a sealing material having a high compressive strength and resilience, such as Heraklite. Excellent results have been obtained with sealing strips laminated from paper and phenol-formaldehyde resins or with woodfiber compositions saturated with such resins.

The hollow center region 5 between the ridges 2'is covered with a watertight material, here tar paper (i.e. bitumen-impregnated paper) 6 is used. This paper 6, for which an impermeable foil may be substituted covers the entire hollow region, and can even extend up over the sills 3 and under the strips 4 to completely seal the region 5. Extending through one .of the ridges 2 is a plurality of pipes 7 which may span across the hollow region 5 and are formed with laterally opening holes 8. A settable synthetic-resin hard foam 9 (e.g. a stiff polyurethane or cellular and preferably expandable epoxy or polyester) is injected into the hollow region 5 under a concrete plate 10 laid over the two strips 4 to completely fill the empty space between the watertight covering 6 and the plate 10. The foamable material 9 is solvent thinned. This plate 10 is made of prestressed concrete and has on its upper surface two downwardly sloping flanks 10a and a pair of grooves 10b on its lower surface near the longitudinal edges. These grooves 101 prevent water from running back under the plate 10, while the flanks 10a prevent rainwater or the like from accumulating on the upper surface. Rails 12 are fixed to the top of the plates 10 with conventional rail clips.

There is shown at 11 pieces of an aggregate or filler which can be mixed with the synthetic-resin foam 9. Expanded slag or other material is advantageously used as aggregate or filler. This combination serves both to support and cushion the plates 10 and to insulate the ballast 1 so that no hard freezing thereof can take place. At the same time, water can in no way get into the railbed, so that the spring maintenance work can portion (e.g. 50% by volume) of expanded mineral to increase be virtually eliminated. The customary railway drainage ditches will receive the water draining off the plate 10 and thin-walled tubes 22, are threaded-and are attached together in spaces 17 between adjoining plates by sleeves 16. This gap 17 is thenfilled with an epoxycement l8 and finally the plates over a stretch of around 100 meters are all longitudinally stressed together. The epoxy l8 preveals relative slippage. The transverse bars may be used to apply full prestress v 1 .15

of the casting site.

FIGS. 2, 3A, and 3B show an arrangement similar to that of FIG. 1, except that the aggregate 11 is contained in a synthetic-resin bag 13 fitted with the pipes 7, which, asshown in H6. 38, extend out on both sides. Once the plates 10 are placed one directly next to the other, theliquid foam binder is injected in through the pipes 7, whence it moves out from the pipes in all directions and completely fills the bag 13, forcing it against. the plates 10 and against the ballast 1. This bag can be rolled out in the trough fonned in the ballast. These figures also show that the strip 4 can be dispensed with if necessary.

In FIG. 4 there is shown a railbed which is, unlike the embodiments of FIGS. 1 3B, intended for a very hard surface needing no ballast. The trough is formed with two sills or ridges made of small sill plates 14 (designed to allow the concrete slabs tobe sealed cleanly) which are carefully laid and spaced in continuous parallel rows to each side of theexg 4 cavated trough 5. The l3'full of aggregate 11 is placed and "filled as above for FIGS. '2, 3A, and 3B. Thereafter, large concrete blocks with reinforcing rods 21 are placed to each side of the roadbed to prevent erosion.

I claim: 7 a

l. Arailbed comprising; a pair of substantially parallel grouted-ballast ridges flank.- ing a hollow region and forming therewith a trough, said ridges having flat upper surfaces; 'a plurality of elongated and substantially longitudinally contiguous concrete slabs bridging said ridges and covering said regions;

respective sealing strips between of said ridges and said slabs;

means for sealing longitudinally adjoining edges of the slabs;

v a bed of ungrouted ballast betwee'nisaid ridges and spaced below said'slabs in said region; and v amass of cushioning and insulating material at least partially consisting of hardened foamed synthetic resin entirely filling the space within said hollow region beneath said slabs and above said ballast. I 2. The'railbed defined in claim 1 wherein-said mass further includes an aggregate.

3. The railbed defined in claim 2 wherein said aggregate is expanded slag.

4. The railbed defined in claim 1, further comprising a fluidtight covering between said trough and said mass.

' 5. The railbed defined in claim 1, further comprising a flexible sleeve containing said mass.

* IF i

Patent Citations
Cited PatentFiling datePublication dateApplicantTitle
US676128 *Jul 25, 1900Jun 11, 1901William GoldieMethod of surfacing railroad-tracks.
US676129 *Jul 25, 1900Jun 11, 1901William GoldieApparatus for surfacing railroad-tracks.
US2669942 *Dec 7, 1950Feb 23, 1954Auguste ScheuchzerPneumatic ballast tamper
US2875953 *Sep 21, 1954Mar 3, 1959Carl WeberRailway track construction
US3038393 *May 5, 1954Jun 12, 1962Reliance Steel Prod CoPavement and method of making the same
US3112681 *Aug 3, 1959Dec 3, 1963Exxon Research Engineering CoPaving with polymer-bonded aggregates
US3250188 *Mar 4, 1963May 10, 1966Dow Chemical CoPavement construction
US3432098 *Feb 14, 1967Mar 11, 1969Japan National RailwayMethod of filling gaps in permanent rail beds
US3550850 *Nov 12, 1968Dec 29, 1970Sonneville Roger PDevice for fixing a composite sleeper on a railway track support without ballast
US3565336 *Sep 11, 1968Feb 23, 1971James Walker & Co Nederland NvRailway track support structure
Referenced by
Citing PatentFiling datePublication dateApplicantTitle
US3756507 *Aug 4, 1971Sep 4, 1973Salzgitter Peine StahlwerkeRailroad track bed
US3813040 *Jul 5, 1972May 28, 1974Dow Chemical CoPlastic railway crosstie
US3841554 *Oct 10, 1973Oct 15, 1974Phillips Petroleum CoStabilized railway bed and method of construction
US3869988 *May 24, 1974Mar 11, 1975Basf AgConsolidating ballast
US3878987 *Feb 12, 1973Apr 22, 1975Japan National RailwayRailway track structure
US3907200 *Oct 19, 1973Sep 23, 1975Regie Autonome TransportsTrack and method of laying track on a concrete road bed
US3939774 *Jan 10, 1975Feb 24, 1976Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H.Apparatus for bonding together pieces of track ballast
US3942448 *May 24, 1974Mar 9, 1976Basf AktiengesellschaftApparatus for consolidating ballast
US4156440 *May 24, 1977May 29, 1979Japanese National RailwaysHardenable thermoplastic
US4303199 *Aug 20, 1979Dec 1, 1981Eisses Jacobus ARestored vibration isolation for railway tracks
US4406403 *Jun 15, 1981Sep 27, 1983True Temper CorporationMethod of providing a containment reservoir
US4925342 *Apr 10, 1989May 15, 1990Site Masters, Inc.Water management system
US5163614 *Mar 13, 1991Nov 17, 1992Beton-Es Vasbetonipari MuvekRailway roadbeds with rail slabs, and method for preparing
US7896255Jan 18, 2007Mar 1, 2011Msb-Management GmbhPartly foamed railroad track support arrangement
US8240580 *Apr 22, 2008Aug 14, 2012Central Japan Railroad CompanyBallast retaining structure, bedded track
US20100193596 *Apr 22, 2008Aug 5, 2010Central Japan Railway CompanyBallast retaining structure, bedded track
US20130140373 *Apr 18, 2011Jun 6, 2013Bayer Intellectual Property GmbhPolyurethane ballast layer, the method for preparing the same and the use thereof
CN1732315BDec 6, 2003May 12, 2010马克斯博革建筑两合公司Method for constructing a rigid pavement, and a rigid pavement carriageway
CN101245580BDec 28, 2007Mar 16, 2011中铁二局股份有限公司Asphalt mortar bottling method for rail plate
EP0142468A1 *Oct 11, 1984May 22, 1985Irete S.A.Method of filling cracks in masonry constructions
EP2287414A1 *Jul 16, 2009Feb 23, 2011Zingelmann, JochenDevice for receiving deformation energy
WO1989001543A1 *Aug 2, 1988Feb 23, 1989Irete SaProcess for protecting masonry or concrete structures from runoff water
WO2004059084A1 *Dec 6, 2003Jul 15, 2004Boegl Max Bauunternehmung GmbhMethod for constructing a rigid track and a communication track
Classifications
U.S. Classification238/2, 104/11, 404/31
International ClassificationE01B29/00, E01B1/00
Cooperative ClassificationE01B2204/03, E01B2204/01, E01B2204/09, E01B1/001, E01B29/005, E01B1/008, E01B1/002
European ClassificationE01B1/00D, E01B29/00B