US3902212A - Building of multispan bridges or the like works, by the cantilever method - Google Patents

Building of multispan bridges or the like works, by the cantilever method Download PDF

Info

Publication number
US3902212A
US3902212A US379999A US37999973A US3902212A US 3902212 A US3902212 A US 3902212A US 379999 A US379999 A US 379999A US 37999973 A US37999973 A US 37999973A US 3902212 A US3902212 A US 3902212A
Authority
US
United States
Prior art keywords
pier
scaffold
voussoir
voussoirs
median
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US379999A
Inventor
Jean M Muller
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
D'etudes De Genie Civil Et De Techniques Industrielles (gecti) Ste
GENIE CIVIL ET DE TECH IND GE
Original Assignee
GENIE CIVIL ET DE TECH IND GE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GENIE CIVIL ET DE TECH IND GE filed Critical GENIE CIVIL ET DE TECH IND GE
Priority to US379999A priority Critical patent/US3902212A/en
Application granted granted Critical
Publication of US3902212A publication Critical patent/US3902212A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • E01D21/10Cantilevered erection
    • E01D21/105Balanced cantilevered erection

Definitions

  • ABSTRACT A device for use in building the superstructure of a multispan civil engineering work, such as a bridge or elevated road or track, which superstructure comprises at least one beam extending on both sides of a pier and resting upon the latter, the said beam being produced in successive sections or voussoirs which are placed in position by cantilevering in opposite directions starting from an initial or pier voussoir which caps the said pier, the said device comprising a raised scaffold having a median support adapted to rest on the said pier, wherein the said median support comprises a central bearing member which is adapted to rest on the said pier voussoir and two additional bearing members which are adapted to respectively rest on the two first voussoirs which border on the said pier voussoir, and wherein means are provided for anchoring said additional bearing members to the respective voussoir on which they are adapted to rest.
  • the present invention relates to the building of a supcrstructure of a multispan. civil engineering work. such as a bridge or an elevated road or track. which structure comprises at least one two-arm beam resting on a pier. the term beanf designating the assembly constituted by the two portions or arms of superstructure each substantially equal to half a span which extend on both sides of the said pier.
  • a known technique for building the superstructure of a multispan bridge or the like work consists in producing the said beam in successive sections or voussoirs which are placed in position by cantilevering on both sides of an initial voussoir or pier voussoir which caps the said pier.
  • a scaffold of this kind makes it possible to simplify. and speed up to a remarkable extent. operations involving the placing in position of very long supcrstruetures.
  • the assembling of successive sections or voussoirs by cantilevering in opposite directions starting from a previously erected pier has the essential advantage of making it possible to at least roughly balance against one another the overturning moments which occur on each side of the said pier because of the weight of the two arms ofthc beam.
  • this balancing is completely achieved only if the operations for assembling the voussoirs at the end of each arm of the beam are carried out in a strictly symmetrical and simultaneous manner.
  • the voussoirs are generally placed in position. in turn. on one side of the pier and then the other. so that a residual but substantial overturning moment continues to exist. which is generally reabsorbed by making provi sion for. at least temporary. bedding-in or anchoring of the pier voussoir on the head of the pier.
  • bedding-in or anchoring may be inad equate or diflicult to carry out. particularly in a case which will be more particularly considered below where the width" of the piers considered in longitudinal direction ofthe bridge. as imposed upon the builder of the bridge or the like work. is too small.
  • the pier voussoir bridge In a bridge of this kind having thin or narrow piers. the pier voussoir bridge generally rests on the pier via an articulation or pseudo-articulation (for example a plate made of an elastomer such as Neoprene"). and its length (which is substantially equal to the width of the pier in question) is much less than that of the other voussoirs in the beam.
  • the residual overturning moment alluded to herein above then tends to produce. about the said articulation or pseudo-articulation. a rocking movement of the beam. the construction of which is thus made more difficult.
  • the object of the present invention is to eliminate this difficulty and to permit, even in the case of a civil engineering work having "thin" piers. satisfactory stabilization of the beam under construction. in a case where the said beam is produced with the aid of a raised scaffold of the type mentioned above.
  • a device for use in building the superstructure of a multispan civil engineering work such as a bridge or elevated road or track.
  • which superstructure comprises at least one two-arm beam extending in a longitudinal direction substantially symmetrically on both sides of a previously erected pier and resting upon the latter.
  • the said beam being produced in successive sections or voussoirs which are placed in position by cantilevering in opposite directions starting from an initial or pier voussoir which caps the said pier.
  • the said device being of the kind comprising a raised elongated scaffold having a median support adapted to rest on the said pier.
  • the said median support comprises a central bearing member which is adapted to rest on the said pier voussoir and two additional bearing members which are adapted to respectively rest on the two first voussoirs which border on the said pier voussoir. and wherein means are provided for anchoring said additional bearing members to the respective voussoirs on which they are adapted to rest.
  • means are provided for adjusting the attitude of the said median support and causing it to occupy. either a first position in which it rests. via said central bearing member. solely upon the pier voussoir. or a second position in which it rests. via said two additional bearing members. solely upon the said two first voussoirs which border on the said pier voussoir.
  • Anchoring means may be provided. in the vicinity of an end support of the scaffold. for the purpose of connecting the said scaffold to a portion of superstructure which has already been completed.
  • the present invention also relates to civil engineering works built with the device according to the invention.
  • FIG. I is a diagrammatic view, in longitudinal elevation, of part of the superstructure of a civil engineering work, such as a multispan bridge, which is being built by means of a known scaffold;
  • FIG. 2 is a view which is similar to FIG. I but which illustrates a scaffold equipped with a median support according to one embodiment of the invention
  • FIG. 3 is a larger-scale view of part of FIG. 2, showing the said median support in a first phase in the construction of a beam which constitutes part of the said superstructure;
  • FIG. 4 is a view, in transverse section, of the median support illustrated in FIG. 3;
  • FIGS. 5 and 6 are views of part of FIG. 3, which show the said median support in a second and third phase, respectively, in the construction of the beam;
  • FIG. 7 is a view which is similar to that in FIG. 4 and shows, in addition, a device which makes it possible, in particular, to adjust the attitude of the said median support.
  • the reference symbols P,, P,,, F, have been used to indicate the piers ofa multispan civil engineering work, such as a bridge or an elevated road or track. Resting upon these piers, which are assumed to have been beforehand, is a superstructure, such as the deck of a bridge, which comprises at least one beam F,, resting upon a pier P,,, the term be-am" designating the assembly constituted by the two portions of superstructure each substantially equal to half a span which extend on both sides of the said pier. The last beam, which is assumed to have already been completed, is indicated by the reference symbol F,,
  • an elongated horizontal scaffold E extending in the longitudinal direction of the two-arm beam F,, and above the same, and having a length which is greater than one span and is, for example, equal to the sum of the lengths of two spans.
  • the scaffold E presents two end-regions and a median egion located between two end-regions and remote from said two end-regions.
  • this scaffold has the structure of a girder having a triangular cross-section (see FIG. 4), along the three edges of which lie booms l, 2, 3, such as I-sections, which serve to ensure the strength of the scaffold.
  • the booms l and 2 also constitute rolling tracks for carriages 4 and 5, the useful purpose of which will be indicted below.
  • the scaffold E is provided with supports A, B, C which comprise, in particular, an end support A extending from an end-region of the scaffold and a median support B extending from the median region of said scaffold. Both supports A and B are integral i.e. rigidly locked with the said scaffold.
  • the support A constitutes a rear support by means of which the scaffold rests, in the position illustrated in FIG. I, upon the beam F,, which constitutes part of the portion of superstructure already completed, while the supports B and C rest upon the piers F,, and P,, H respectively.
  • the support C is constituted by a detachable pillar upon which the rests via the carriage 5, while the said towerscaffold rests upon the pier P,, via adjustable jacks which are not shown.
  • the scaffold E may, where neces sary, be guyed by means of ties 6 and 7 which are attached to a mast 8 surmounting the median support B.
  • the beam F In the position illustrated in FIG. I, the beam F, is in the process of being produced in successive sections or voussoirs V V,, V V' which are placed in position by cantilevering in opposite directions starting from an initial or pier voussoir V, which caps the pier P,,. As soon as it has been placed in position, each voussoir is made integral with its neighbours. It will be seen, in FIG. I, that the last voussoir placed is the voussoir V and that the next to be placed is the voussoir V',. The latter is illustrated-rotated by 90 while being transported by means of the carriage 4. As shown in FIG. 4, the shape of the support B (like that of the support A, moreover) is so designed as to leave clear a space 9 which is intended to permit the passage of the voussoirs.
  • the beam F is connected to the preceding beam F, by means of a keying-up voussoir, and the mobile scaffold E is moved forward by the length of a span.
  • a second pillar D which can be seen in FIG. 7, is brought into operation.
  • This pillar D is supported via adjustable jacks I0 on that portion of superstructure (in this instance, the beam F,,) which has just been completed, and on the carriage 4.
  • adjustable jacks I0 By acting upon the jacks I0, it is therefore possible to raise the unit constituted by the scaffold E and the supports A and B.
  • the unit A-B-C is rolled along on the carriages 4 and 5 carried by the pillars D and C respectively, until the support A arrives vertically above the pier P and the support B vertically above the pier P
  • the pillar C is then removed so that the carriage 5 is temporarily free and can be used to transport the pier voussoir V which is in tended to cap the next pier P (not shown).
  • the carriage 5 once again works in conjunction with the pillar C in order to constitute the third support vertically above the pier P for the scaffold E. The latter is then in precisely the position illustrated in FIG. 1.
  • the bridge or the like civil engineering work to be produced comprises relatively thin or narrow" piers on which the successive beams F,,-,, F,,. rest via articulations or pseudoarticulations (such as plates made of *Neoprene) which are designated by the reference numeral 1 I.
  • the length of the pier voussoir V is substantially equal to the width of the pier P,,. and much less than that of the other voussoirs in the beam.
  • FIGS. 2 to 7 show certain arrangements which constitute the object of the invention with the aid of which this rocking tendency can be effectively counteracted.
  • the median support B which extends from the median region of the scaffold E and is integral therewith comprises two legs I3,, 8-: which are disposed on either side of the longitudinal plane of symmetry of the scaffold E. in
  • Each of these legs is a .compact. concen tratcd bearing unit. which is subdivided. at the bottom. into' three longitudinally consecutive. adjaccntly grouped, bearing members l2, l3, 14, that is to say a central longitudinally-consecutive bearing member 12 which is located vertically above the pier voussoir V and two additional bearing members 13, 14 adjacent said central bearing member 12 on either side thereof. which additional bearing members are respectively located vertically above the two first voussoirs V V next consecutive to and immediately bordering on the said pier voussoir.
  • the central bearing member 12 extends slightly further downwards than its two neighbours, and may advantageously be in the form of a ball which is adapted to work in conjunction with a bearing socket 15 carried by the pier voussoir V Moreover, as shown in FIG. 2, anchoring means 22 are provided in the vicinity of the end support A. for the purpose of connecting the scaffold E to that portion of superstructure, F l, which has already been completed.
  • FIGS. 3, 5 and 6 show three successive phases in the operations involving the construction and stabilization of the beam F,,.
  • FIG. 3 there has been illustrated the initial phase of these operations, in which each of the legs B and B the combination of which constitutes the median support B rests solely upon the pier voussoir V the only one which is in place.
  • the next phase has been diagammatically illustrated in FIG. 5.
  • the voussoir V hasjust been placed in position and made integral with the voussoir V,,.
  • the voussoir V situated vertically below the bearing member 13 is anchored to the latter by means of adjustable anchorage rods 16.
  • the voussoir V carries a section 17 which is situated opposite the lower face of the bearing member 13, and an adjustable wedging system 18, for example of the screw type. is placed in position between the said section 17 and the said bearing member 12.
  • FIG. 6 the same operation has been shown, repeated for the voussoir V which is shown anchored to the bearing member 14 by means of adjustable anchorage rods 19.
  • the lower face of the supporting part 14 is then situated opposite a section carried by the voussoir V and an adj ustable wcdging system 21 similar to the wedging system 18 is placed in position between the said section 20 and the said bearing member 14.
  • each of the two legs B and B is still resting via the central bearing member 12 only upon the pier voussoir V
  • the load is then transferred, from said central bearing member 12 to the two additional bearing members l3, 14.
  • the unit constituted by the scaffold E and the median support B is raised slightly. by means of the jacks H) (see FIG. 7 in such a way as to bring the ball 12 out of contact with the bearing socket 15.
  • the two wedging systems 18 and Zn are next adjusted so that. when the support B is lowered again. it comes to rest solely ⁇ ia the two additional bearing members l3. l4 and the wedging systems 18. 2] upon the two voussoirs V which adjoin the pier voussoir V while the central bearing member 12 remains out of contact with the socket 15.
  • the adjustable anchorge rods l6, 19 are then tightened up again.
  • the invention also applies to works, the superstructure of which comprises a plurality of parallel beams, or to works comprising metal sec tions assembled by any known method, or to works of which the superstructure. instead of being made up of prefabricated voussoirs, is concretcd in situ. The scaffold E would then be modified to support a concreting platform.
  • a superstructure of a multispan civil engineering work under construction such as a bridge or an elevated road or track
  • which superstructure comprises at least one two-arm beam which extends in a longitudinal direction substantially symmetrically on both sides of a previously erected pier and rests upon the latter
  • which two-arm beam comprises a plurality of longitudinally-consecutive voussoirs including an initial pier-voussoir which caps the said pier and two first voussoirs respectively consecutive to and bordering on said pier-voussoir on either side thereof.
  • a device for successively placing the voussoirs in position in cantilever fashion in opposite directions from said pier said device being of the kind comprising an elongated horizontal scaffold extending in the longitudinal direction of the twoarm beam and above the same, said scaffold presenting two longitudinally-spaced endregions and a median region located between and remote from said two end-regions. and an end-support extending from an end-region of the scaffold for supporting said scaffold on an already-completed part of the work, wherein the improvement comprises a median support integral with said scaffold and extending from the median region thereof for supporting said scaffold on the said pier.
  • said median support being a compact concentrated bearing unit subdivided into three longitudinally-consecutivc and adjaccntly grouped bearing members.
  • a device as claimed in claim 1. comprising further anchoring means for connecting an end region of said scaffold to an already-completed part of the work.

Abstract

A device for use in building the superstructure of a multispan civil engineering work, such as a bridge or elevated road or track, which superstructure comprises at least one beam extending on both sides of a pier and resting upon the latter, the said beam being produced in successive sections or voussoirs which are placed in position by cantilevering in opposite directions starting from an initial or pier voussoir which caps the said pier, the said device comprising a raised scaffold having a median support adapted to rest on the said pier, wherein the said median support comprises a central bearing member which is adapted to rest on the said pier voussoir and two additional bearing members which are adapted to respectively rest on the two first voussoirs which border on the said pier voussoir, and wherein means are provided for anchoring said additional bearing members to the respective voussoir on which they are adapted to rest.

Description

United States Patent [1 1 Muller [4 1 Sept. 2, 1975 [75] Inventor: Jean M. Muller, Suresnes, France [73] Assignee: Societe dEtudes de Genie Civil et de Techniques Industrielles (GE.C.T.I), Paris, France 22 Filed: July 17,1973
21 App1.No.:379,999
642,388 8/1950 United Kingdom 104/40 OTHER PUBLICATIONS Construction Methods; April 1966, pages 94 and 95.
Primary Examiner-Ernest R. Purser Assistant ExaminerH. E. Radnazo Attorney, Agent, or FirmWigman & Cohen [57] ABSTRACT A device for use in building the superstructure of a multispan civil engineering work, such as a bridge or elevated road or track, which superstructure comprises at least one beam extending on both sides of a pier and resting upon the latter, the said beam being produced in successive sections or voussoirs which are placed in position by cantilevering in opposite directions starting from an initial or pier voussoir which caps the said pier, the said device comprising a raised scaffold having a median support adapted to rest on the said pier, wherein the said median support comprises a central bearing member which is adapted to rest on the said pier voussoir and two additional bearing members which are adapted to respectively rest on the two first voussoirs which border on the said pier voussoir, and wherein means are provided for anchoring said additional bearing members to the respective voussoir on which they are adapted to rest.
3 Claims, 7 Drawing Figures PATENTED 2|975 3.902 212 sum u [If 5 r PATENTEDSEP' 21% 3,962,212
sum 5 or 5 Eli BUILDING ()F MULTISPAN BRIDGES OR THE LIKE WORKS. BY THE CAN'IILEVER METHOD BACKGROUND OF THE INVENTION The present invention relates to the building of a supcrstructure of a multispan. civil engineering work. such as a bridge or an elevated road or track. which structure comprises at least one two-arm beam resting on a pier. the term beanf designating the assembly constituted by the two portions or arms of superstructure each substantially equal to half a span which extend on both sides of the said pier.
A known technique for building the superstructure of a multispan bridge or the like work consists in producing the said beam in successive sections or voussoirs which are placed in position by cantilevering on both sides of an initial voussoir or pier voussoir which caps the said pier.
It is known that the building of elevated civil engineering works which have to project over a very busy road. rail. river or sea thoroughfare. may pose certain problems because of the fact that access to the subjacent ground is either difficult for an assembling device such as a scaffold or else the said subjacent ground must remain clear. This is why it has already been proposed. for the purpose of effecting the transfer and/or positioning of the elements. for example prefabricated voussoirs. intended to constitute the successive sections of a beam. that use be made of a raised mobile scaffold. also called a launching girder. which comprises at least one end support and one median support. This scaffold. the length of which is at least equal to that of a span. can be displaced along the portion of superstructure already completed, until it assumes a position in which it projects. in an overhanging manner. above the location for the beam to be constructed. In this position. it rests. by its rear support. on the said portion of superstructure which has already been cornpletcd. and. by its median support. on the pier relating to the beam to be constructed. A scaffold of this kind makes it possible to simplify. and speed up to a remarkable extent. operations involving the placing in position of very long supcrstruetures.
As is already known. the assembling of successive sections or voussoirs by cantilevering in opposite directions starting from a previously erected pier has the essential advantage of making it possible to at least roughly balance against one another the overturning moments which occur on each side of the said pier because of the weight of the two arms ofthc beam. However. this balancing is completely achieved only if the operations for assembling the voussoirs at the end of each arm of the beam are carried out in a strictly symmetrical and simultaneous manner. In actual fact. the voussoirs are generally placed in position. in turn. on one side of the pier and then the other. so that a residual but substantial overturning moment continues to exist. which is generally reabsorbed by making provi sion for. at least temporary. bedding-in or anchoring of the pier voussoir on the head of the pier.
However. such bedding-in or anchoring may be inad equate or diflicult to carry out. particularly in a case which will be more particularly considered below where the width" of the piers considered in longitudinal direction ofthe bridge. as imposed upon the builder of the bridge or the like work. is too small. In a bridge of this kind having thin or narrow piers. the pier voussoir bridge generally rests on the pier via an articulation or pseudo-articulation (for example a plate made of an elastomer such as Neoprene"). and its length (which is substantially equal to the width of the pier in question) is much less than that of the other voussoirs in the beam. The residual overturning moment alluded to herein above then tends to produce. about the said articulation or pseudo-articulation. a rocking movement of the beam. the construction of which is thus made more difficult.
SUMMARY OF THE INVENTION The object of the present invention is to eliminate this difficulty and to permit, even in the case of a civil engineering work having "thin" piers. satisfactory stabilization of the beam under construction. in a case where the said beam is produced with the aid of a raised scaffold of the type mentioned above.
According to the invention. there is provided a device for use in building the superstructure of a multispan civil engineering work. such as a bridge or elevated road or track. which superstructure comprises at least one two-arm beam extending in a longitudinal direction substantially symmetrically on both sides of a previously erected pier and resting upon the latter. the said beam being produced in successive sections or voussoirs which are placed in position by cantilevering in opposite directions starting from an initial or pier voussoir which caps the said pier. the said device being of the kind comprising a raised elongated scaffold having a median support adapted to rest on the said pier. wherein the said median support comprises a central bearing member which is adapted to rest on the said pier voussoir and two additional bearing members which are adapted to respectively rest on the two first voussoirs which border on the said pier voussoir. and wherein means are provided for anchoring said additional bearing members to the respective voussoirs on which they are adapted to rest.
According to one embodiment of the invention. means are provided for adjusting the attitude of the said median support and causing it to occupy. either a first position in which it rests. via said central bearing member. solely upon the pier voussoir. or a second position in which it rests. via said two additional bearing members. solely upon the said two first voussoirs which border on the said pier voussoir.
Anchoring means may be provided. in the vicinity of an end support of the scaffold. for the purpose of connecting the said scaffold to a portion of superstructure which has already been completed.
The arrangements according to the invention thus make it possible to achieve the equivalent of temporary bedding-in of the beam under construction. not on the pier (which has been assumed to be too narrow to permit the implementation of effective bedding-in but on the median support. the base of which has a width defined by the distance separating the aforesaid two additional bearing members from one another which is much greater than that of the pier. In spite of the small width of the pier and the presence of an articulation or pseudo-articulation. any inconvenient rocking movement of the beam under construction is thus prevented.
The present invention also relates to civil engineering works built with the device according to the invention.
BRIEF DESCRIPTION OF THE DRAWINGS The invention will now be further described, by way of example, with reference to the accompanying drawings, in which:
FIG. I is a diagrammatic view, in longitudinal elevation, of part of the superstructure of a civil engineering work, such as a multispan bridge, which is being built by means of a known scaffold;
FIG. 2 is a view which is similar to FIG. I but which illustrates a scaffold equipped with a median support according to one embodiment of the invention;
FIG. 3 is a larger-scale view of part of FIG. 2, showing the said median support in a first phase in the construction of a beam which constitutes part of the said superstructure;
FIG. 4 is a view, in transverse section, of the median support illustrated in FIG. 3;
FIGS. 5 and 6 are views of part of FIG. 3, which show the said median support in a second and third phase, respectively, in the construction of the beam; and
FIG. 7 is a view which is similar to that in FIG. 4 and shows, in addition, a device which makes it possible, in particular, to adjust the attitude of the said median support.
DESCRIPTION OF PREFERRED EMBODIMENTS In the drawings, the reference symbols P,, P,,, F,, have been used to indicate the piers ofa multispan civil engineering work, such as a bridge or an elevated road or track. Resting upon these piers, which are assumed to have been beforehand, is a superstructure, such as the deck of a bridge, which comprises at least one beam F,, resting upon a pier P,,, the term be-am" designating the assembly constituted by the two portions of superstructure each substantially equal to half a span which extend on both sides of the said pier. The last beam, which is assumed to have already been completed, is indicated by the reference symbol F,,
For building the beam F,,, use is made of an elongated horizontal scaffold E extending in the longitudinal direction of the two-arm beam F,, and above the same, and having a length which is greater than one span and is, for example, equal to the sum of the lengths of two spans. The scaffold E presents two end-regions and a median egion located between two end-regions and remote from said two end-regions. In the drawings this scaffold has the structure of a girder having a triangular cross-section (see FIG. 4), along the three edges of which lie booms l, 2, 3, such as I-sections, which serve to ensure the strength of the scaffold. The booms l and 2 also constitute rolling tracks for carriages 4 and 5, the useful purpose of which will be indicted below.
The scaffold E is provided with supports A, B, C which comprise, in particular, an end support A extending from an end-region of the scaffold and a median support B extending from the median region of said scaffold. Both supports A and B are integral i.e. rigidly locked with the said scaffold. The support A constitutes a rear support by means of which the scaffold rests, in the position illustrated in FIG. I, upon the beam F,, which constitutes part of the portion of superstructure already completed, while the supports B and C rest upon the piers F,, and P,, H respectively. The support C is constituted by a detachable pillar upon which the rests via the carriage 5, while the said towerscaffold rests upon the pier P,, via adjustable jacks which are not shown. The scaffold E may, where neces sary, be guyed by means of ties 6 and 7 which are attached to a mast 8 surmounting the median support B.
In the position illustrated in FIG. I, the beam F,, is in the process of being produced in successive sections or voussoirs V V,, V V' which are placed in position by cantilevering in opposite directions starting from an initial or pier voussoir V,, which caps the pier P,,. As soon as it has been placed in position, each voussoir is made integral with its neighbours. It will be seen, in FIG. I, that the last voussoir placed is the voussoir V and that the next to be placed is the voussoir V',. The latter is illustrated-rotated by 90 while being transported by means of the carriage 4. As shown in FIG. 4, the shape of the support B (like that of the support A, moreover) is so designed as to leave clear a space 9 which is intended to permit the passage of the voussoirs.
Once it is completed, the beam F,, is connected to the preceding beam F,, by means of a keying-up voussoir, and the mobile scaffold E is moved forward by the length of a span. For this purpose, a second pillar D which can be seen in FIG. 7, is brought into operation. This pillar D is supported via adjustable jacks I0 on that portion of superstructure (in this instance, the beam F,,) which has just been completed, and on the carriage 4. By acting upon the jacks I0, it is therefore possible to raise the unit constituted by the scaffold E and the supports A and B. In its raised position, the unit A-B-C is rolled along on the carriages 4 and 5 carried by the pillars D and C respectively, until the support A arrives vertically above the pier P and the support B vertically above the pier P The pillar C is then removed so that the carriage 5 is temporarily free and can be used to transport the pier voussoir V which is in tended to cap the next pier P (not shown). Once this pier voussoir has been placed in position, the carriage 5 once again works in conjunction with the pillar C in order to constitute the third support vertically above the pier P for the scaffold E. The latter is then in precisely the position illustrated in FIG. 1.
As shown in FIG. I, the bridge or the like civil engineering work to be produced) comprises relatively thin or narrow" piers on which the successive beams F,,-,, F,,. rest via articulations or pseudoarticulations (such as plates made of *Neoprene) which are designated by the reference numeral 1 I. The length of the pier voussoir V is substantially equal to the width of the pier P,,. and much less than that of the other voussoirs in the beam. The result of this is that it is difficult to achieve effective temporary bedding-in of the said pier voussoir on the head of the said pier, so that, when a voussoir such as V is placed in position, the residual moment caused by the weight of this vous soir tends to produce a rocking movement shown diagramm'atically in broken lines in FIG. 1 which thus makes construction of the beam much more difficult.
FIGS. 2 to 7 show certain arrangements which constitute the object of the invention with the aid of which this rocking tendency can be effectively counteracted.
As shown more particularly in FIGS. 3 and 4, the median support B which extends from the median region of the scaffold E and is integral therewith comprises two legs I3,, 8-: which are disposed on either side of the longitudinal plane of symmetry of the scaffold E. in
such a way as to'form' between them the aforesaid clear space 9 which is intended for the free passage of the voussoirs. Each of these legs is a .compact. concen tratcd bearing unit. which is subdivided. at the bottom. into' three longitudinally consecutive. adjaccntly grouped, bearing members l2, l3, 14, that is to say a central longitudinally-consecutive bearing member 12 which is located vertically above the pier voussoir V and two additional bearing members 13, 14 adjacent said central bearing member 12 on either side thereof. which additional bearing members are respectively located vertically above the two first voussoirs V V next consecutive to and immediately bordering on the said pier voussoir. The central bearing member 12 extends slightly further downwards than its two neighbours, and may advantageously be in the form of a ball which is adapted to work in conjunction with a bearing socket 15 carried by the pier voussoir V Moreover, as shown in FIG. 2, anchoring means 22 are provided in the vicinity of the end support A. for the purpose of connecting the scaffold E to that portion of superstructure, F l, which has already been completed.
More particular reference will now be made to FIGS. 3, 5 and 6 which show three successive phases in the operations involving the construction and stabilization of the beam F,,.
In FIG. 3. there has been illustrated the initial phase of these operations, in which each of the legs B and B the combination of which constitutes the median support B rests solely upon the pier voussoir V the only one which is in place.
The next phase has been diagammatically illustrated in FIG. 5. The voussoir V hasjust been placed in position and made integral with the voussoir V,,. In order to Uthe unit V.,V from rocking, the voussoir V situated vertically below the bearing member 13 is anchored to the latter by means of adjustable anchorage rods 16. The voussoir V carries a section 17 which is situated opposite the lower face of the bearing member 13, and an adjustable wedging system 18, for example of the screw type. is placed in position between the said section 17 and the said bearing member 12.
ln FIG. 6, the same operation has been shown, repeated for the voussoir V which is shown anchored to the bearing member 14 by means of adjustable anchorage rods 19. The lower face of the supporting part 14 is then situated opposite a section carried by the voussoir V and an adj ustable wcdging system 21 similar to the wedging system 18 is placed in position between the said section 20 and the said bearing member 14.
At this stage, each of the two legs B and B is still resting via the central bearing member 12 only upon the pier voussoir V The load is then transferred, from said central bearing member 12 to the two additional bearing members l3, 14. For this purpose. after the adjustable anchorage rods l6, 19 have been slightly loosened. the unit constituted by the scaffold E and the median support B is raised slightly. by means of the jacks H) (see FIG. 7 in such a way as to bring the ball 12 out of contact with the bearing socket 15. The two wedging systems 18 and Zn are next adjusted so that. when the support B is lowered again. it comes to rest solely \ia the two additional bearing members l3. l4 and the wedging systems 18. 2] upon the two voussoirs V which adjoin the pier voussoir V while the central bearing member 12 remains out of contact with the socket 15. The adjustable anchorge rods l6, 19 are then tightened up again.
There is thus achieved the equivalent of temporary bedding-in of the beam F,, on the median support B. of which the width which is defined by the distance separating the additional bearing members 13 and 14 from one another is much greater than that of the pier P,,. The beam F,, is thus effectively stabilized, as shown by FIG. 2, in spite of the low width of the pier and the presence of the articulation or pseudoarticulation 11. The forces resulting from the residual overturning moment of the beam F,, are transmitted, via the median support B, to the scaffold E. They are then transferred to the portion of superstructure already completed, F,, via the rear support A in the case of compressive forces. and via the anchoring means 22 in the case of tractive forces.
It should be clear that the embodiment described is only an example and that it would be possible to modify it, particularly by the substitution of technical equivalents, without thereby departing from the scope of the invention, as defined in the appended claims.
Thus, for instance. the invention also applies to works, the superstructure of which comprises a plurality of parallel beams, or to works comprising metal sec tions assembled by any known method, or to works of which the superstructure. instead of being made up of prefabricated voussoirs, is concretcd in situ. The scaffold E would then be modified to support a concreting platform.
What is claimed is:
1. In combination with a superstructure of a multispan civil engineering work under construction, such as a bridge or an elevated road or track, which superstructure comprises at least one two-arm beam which extends in a longitudinal direction substantially symmetrically on both sides of a previously erected pier and rests upon the latter, which two-arm beam comprises a plurality of longitudinally-consecutive voussoirs including an initial pier-voussoir which caps the said pier and two first voussoirs respectively consecutive to and bordering on said pier-voussoir on either side thereof. a device for successively placing the voussoirs in position in cantilever fashion in opposite directions from said pier, said device being of the kind comprising an elongated horizontal scaffold extending in the longitudinal direction of the twoarm beam and above the same, said scaffold presenting two longitudinally-spaced endregions and a median region located between and remote from said two end-regions. and an end-support extending from an end-region of the scaffold for supporting said scaffold on an already-completed part of the work, wherein the improvement comprises a median support integral with said scaffold and extending from the median region thereof for supporting said scaffold on the said pier. said median support being a compact concentrated bearing unit subdivided into three longitudinally-consecutivc and adjaccntly grouped bearing members. namely a central bearing member overtopping the said pier-voussoir. and two additional bearing members located adjacent said cen tral bearing member on either side thereof and respectively overtopping the said two first voussoirs next consecutive to and bordering on the said pier-voussoir. and means for anchoring said two additional bearing members to said two first voussoirs respectively.
first voussoirs which border on the said pier-voussoir. 3. A device as claimed in claim 1. comprising further anchoring means for connecting an end region of said scaffold to an already-completed part of the work.
UNITED STATES PATENT OFFICE CERTIFICATE OF CORRECTION Q PATENT NO. 1 3,902,212
DATED September 2, 1975 INVENTOR( 1 Jean M. Muller It is certified that error appears in the ab0ve-identifiecl patent and that said Letters Patent are hereby corrected as shown below:
Column 2, line 1, delete "bridge";
Column 3, line 32-, before "beforehand" insert -erected--;
Column 3, line 47, change "egion' to region;
Column 3, line 68, before "rests" insert soaffold E-;
' Column 3, line 68, "tower" should be -pillar-;
Column 4, line 1, delete "scaffold";
Column 4, line 4 1, delete Column 5, line 35, change "0" to -prevent-;
Column 6, line 25, before "works" insert -civil engineering--.
' Signed and Scaled this seventeenth D ay Of February 1976 [SEAL] Arrest: O
RUTH c. MASON c. MARSHALL DANN Arresting Officer Commissioner uj'larenrs and Trademarks

Claims (3)

1. In combination with a superstructure of a multispan civil engineering work under construction, such as a bridge or an elevated road or track, which superstructure comprises at least one two-arm beam which extends in a longitudinal direction substantially symmetrically on both sides of a previously erected pier and rests upon the latter, which two-arm beam comprises a plurality of longitudinally-consecutive voussoirs including an initial pier-voussoir which caps the said pier and two first voussoirs respectively consecutive to and bordering on said piervoussoir on either side thereof, a device for successively placing the voussoirs in position in cantilever fashion in opposite directions from said pier, said device being of the kind comprising an elongated horizontal scaffold extending in the longitudinal direction of the two-arm beam and above the same, said scaffold presenting two longitudinally-spaced end-regions and a median region located between and remote from said two endregions, and an end-support extending from an end-region of the scaffold for supporting said scaffold on an already-completed part of the work, wherein the improvement comprises a median support integral with said scaffold and extending from the median region thereof for supporting said scaffold on the said pier, said median support being a compact concentrated bearing unit subdivided into three longitudinally-consecutive and adjacently grouped bearing members, namely a central bearing member overtopping the said pier-voussoir, and two additional bearing members located adjacent said central bearing member on either side thereof and respectively overtopping the said two first voussoirs next consecutive to and bordering on the said piervoussoir, and means for anchoring said two additional bearing members to said two first voussoirs respectively.
2. A device as claimed in claim 1, further comprising means for adjusting the attitude of said median support and causing it to occupy either a first position in which it rests, via said central bearing member, solely on said pier-voissoir, or a second position in which it rests, via said two additional bearing members, solely on said two first voussoirs which border on the said pier-voussoir.
3. A device as claimed in claim 1, comprising further anchoring means for connecting an end region of said scaffold to an already-completed part of the work.
US379999A 1973-07-17 1973-07-17 Building of multispan bridges or the like works, by the cantilever method Expired - Lifetime US3902212A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US379999A US3902212A (en) 1973-07-17 1973-07-17 Building of multispan bridges or the like works, by the cantilever method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US379999A US3902212A (en) 1973-07-17 1973-07-17 Building of multispan bridges or the like works, by the cantilever method

Publications (1)

Publication Number Publication Date
US3902212A true US3902212A (en) 1975-09-02

Family

ID=23499520

Family Applications (1)

Application Number Title Priority Date Filing Date
US379999A Expired - Lifetime US3902212A (en) 1973-07-17 1973-07-17 Building of multispan bridges or the like works, by the cantilever method

Country Status (1)

Country Link
US (1) US3902212A (en)

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4158942A (en) * 1977-07-25 1979-06-26 Hart Wayne C Method of forming a floor assembly and precast concrete slabs therefor
US4282978A (en) * 1980-01-28 1981-08-11 Antonio Zambon Bridge crane for the emplacement of elongate prefabricated members of structures spanning a multiplicity of spaced-apart supports
US4301565A (en) * 1980-03-19 1981-11-24 Irwin Weinbaum Method and system for the removal and replacement of a bridge
US4497153A (en) * 1981-06-19 1985-02-05 Mueller Eberhard Method and device for erecting building structures such as bridges, using pre-fabricated concrete beams
US4651375A (en) * 1984-11-15 1987-03-24 Romualdo Macchi Launching system for bridge bays, especially continuous-beam bridges made up of prefabricated segments and to be tightened upon installation by means of prestressed wires
US4799279A (en) * 1985-12-02 1989-01-24 Figg And Muller Engineers, Inc. Method of constructing the approach and main spans of a cable stayed segmental bridge
US5511268A (en) * 1994-08-08 1996-04-30 The United States Of America As Represented By The Secretary Of Commerce Construction of large structures by robotic crane placement of modular bridge sections
US6416258B1 (en) * 2000-01-07 2002-07-09 Chi-Kuang Chang Ground advance shoring system
US6721985B2 (en) * 1999-04-09 2004-04-20 Mccrary Homer T. Intelligent public transit system using dual-mode vehicles
US20070163058A1 (en) * 2005-12-20 2007-07-19 Flatiron Constructors, Inc. Method and Apparatus for Bridge Construction
US20080301889A1 (en) * 2007-06-05 2008-12-11 Samsung Corporation Construction method for girder in bridge, crane for pulling up girder, vehicle for carring girder, and girder used for the same
US20110030155A1 (en) * 2007-10-09 2011-02-10 Hntb Holdings Ltd Method for building over an opening via incremental launching
ES2352023A1 (en) * 2008-04-03 2011-02-15 Structural Research, S.L. Procedure for assembling prefabricated concrete dimensions. (Machine-translation by Google Translate, not legally binding)
US20130081215A1 (en) * 2011-10-04 2013-04-04 Sps New England, Inc. Bridge beam placement system and apparatus
WO2017003314A1 (en) * 2015-06-29 2017-01-05 Berd - Projecto, Investigação E Engenharia De Pontes, S.A. Process of hybrid construction of large span bridge with precast segments and hybrid large span bridge construction system with precast segments
WO2017213532A1 (en) 2016-06-08 2017-12-14 Pgpi - Marcas E Patentes, S.A. Caisson upper launcher or falsework with hollow lower section
US10006176B2 (en) * 2014-06-06 2018-06-26 Soletanche Freyssinet Method for building a bridge and bridge-building apparatus
CN111169805A (en) * 2019-10-18 2020-05-19 绍兴市城投建筑工业化制造有限公司 Supplementary bent cap is stacked prevents heeling device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3299191A (en) * 1962-12-21 1967-01-17 Polensky & Zoellner Method and means for erecting bridges
US3490605A (en) * 1967-04-24 1970-01-20 Kurt Koss Traveling beam for the production of bridge sections
US3571835A (en) * 1967-10-30 1971-03-23 Dyckerhoff & Widmann Ag Apparatus for concreting multiple section structures, particularly bridge supports of reinforced or prestressed concrete
US3724595A (en) * 1972-04-14 1973-04-03 Green James E Tuna tower

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3299191A (en) * 1962-12-21 1967-01-17 Polensky & Zoellner Method and means for erecting bridges
US3490605A (en) * 1967-04-24 1970-01-20 Kurt Koss Traveling beam for the production of bridge sections
US3571835A (en) * 1967-10-30 1971-03-23 Dyckerhoff & Widmann Ag Apparatus for concreting multiple section structures, particularly bridge supports of reinforced or prestressed concrete
US3724595A (en) * 1972-04-14 1973-04-03 Green James E Tuna tower

Cited By (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4158942A (en) * 1977-07-25 1979-06-26 Hart Wayne C Method of forming a floor assembly and precast concrete slabs therefor
US4282978A (en) * 1980-01-28 1981-08-11 Antonio Zambon Bridge crane for the emplacement of elongate prefabricated members of structures spanning a multiplicity of spaced-apart supports
US4301565A (en) * 1980-03-19 1981-11-24 Irwin Weinbaum Method and system for the removal and replacement of a bridge
US4497153A (en) * 1981-06-19 1985-02-05 Mueller Eberhard Method and device for erecting building structures such as bridges, using pre-fabricated concrete beams
US4651375A (en) * 1984-11-15 1987-03-24 Romualdo Macchi Launching system for bridge bays, especially continuous-beam bridges made up of prefabricated segments and to be tightened upon installation by means of prestressed wires
US4799279A (en) * 1985-12-02 1989-01-24 Figg And Muller Engineers, Inc. Method of constructing the approach and main spans of a cable stayed segmental bridge
US5511268A (en) * 1994-08-08 1996-04-30 The United States Of America As Represented By The Secretary Of Commerce Construction of large structures by robotic crane placement of modular bridge sections
US6721985B2 (en) * 1999-04-09 2004-04-20 Mccrary Homer T. Intelligent public transit system using dual-mode vehicles
US6416258B1 (en) * 2000-01-07 2002-07-09 Chi-Kuang Chang Ground advance shoring system
US20090282625A1 (en) * 2005-12-20 2009-11-19 Flatiron Construction, Inc. Method and Apparatus for Bridge Construction
US8060966B2 (en) 2005-12-20 2011-11-22 Flatiron Constructors, Inc. Method and apparatus for bridge construction
US7520014B2 (en) * 2005-12-20 2009-04-21 Flatiron Constructors, Inc. Method and apparatus for bridge construction
US20070163058A1 (en) * 2005-12-20 2007-07-19 Flatiron Constructors, Inc. Method and Apparatus for Bridge Construction
US20080301889A1 (en) * 2007-06-05 2008-12-11 Samsung Corporation Construction method for girder in bridge, crane for pulling up girder, vehicle for carring girder, and girder used for the same
US8166596B2 (en) * 2007-06-05 2012-05-01 Samsung Corporation Construction method for girder in bridge, crane for pulling up girder, vehicle for carring girder, and girder used for the same
US20110030155A1 (en) * 2007-10-09 2011-02-10 Hntb Holdings Ltd Method for building over an opening via incremental launching
US8359810B2 (en) * 2007-10-09 2013-01-29 Hntb Holdings Ltd Method for building over an opening via incremental launching
ES2352023A1 (en) * 2008-04-03 2011-02-15 Structural Research, S.L. Procedure for assembling prefabricated concrete dimensions. (Machine-translation by Google Translate, not legally binding)
US20130081215A1 (en) * 2011-10-04 2013-04-04 Sps New England, Inc. Bridge beam placement system and apparatus
US8595879B2 (en) * 2011-10-04 2013-12-03 Sps New England, Inc. Bridge beam placement system and apparatus
US10006176B2 (en) * 2014-06-06 2018-06-26 Soletanche Freyssinet Method for building a bridge and bridge-building apparatus
WO2017003314A1 (en) * 2015-06-29 2017-01-05 Berd - Projecto, Investigação E Engenharia De Pontes, S.A. Process of hybrid construction of large span bridge with precast segments and hybrid large span bridge construction system with precast segments
WO2017213532A1 (en) 2016-06-08 2017-12-14 Pgpi - Marcas E Patentes, S.A. Caisson upper launcher or falsework with hollow lower section
CN111169805A (en) * 2019-10-18 2020-05-19 绍兴市城投建筑工业化制造有限公司 Supplementary bent cap is stacked prevents heeling device

Similar Documents

Publication Publication Date Title
US3902212A (en) Building of multispan bridges or the like works, by the cantilever method
US3863771A (en) Gantry cranes
CN103806374B (en) The overall track erection supplying system of assembly type steel bridge on highway and erection push technique
CN213114323U (en) Bridge girder erection machine over-span device based on curve track and large longitudinal slope environment
CN210856954U (en) Support-free cable hoisting construction structure of steel arch center for deck arch bridge
CN112681135A (en) Construction method of n-shaped sea-crossing temporary steel trestle
US4662019A (en) Method of erecting a cable stayed bridge
US4478773A (en) Scaffolding girder for constructing multiple-span bridge structures movable from one bridge to another
CN212404881U (en) Bridge box girder large-span pushing and sliding system
CN115748513A (en) Construction method of ultra-small high-span-ratio all-welded steel truss girder bridge based on cantilever aerial work platform
CN114016424A (en) Self-propelled platform and method suitable for construction of small-angle oblique crossing overpass bridge
CN210368664U (en) Wide-body bridge girder erection machine
CN207714162U (en) Across existing railway Business Line freely-supported tied arch pushing tow flat turn and high-order fall girder apparatus
CN210684482U (en) Steel arch frame segmented transfer device for deck type arch bridge construction
CN112609586B (en) Synchronous construction method for steel box girder self-anchoring suspension bridge tower girder
CN216947827U (en) High-position beam falling buttress structure of steel box girder
CN219637691U (en) Aerial temporary operation platform for integrally assembling bridge steel structure sections
CN219637692U (en) Rail camel moving equipment of aerial operation platform
Vion et al. Fabrication and erection of U-trough section bridges
US20210372059A1 (en) Modular Longitudinal System for Bridge Decks for Double-Track Railways
JPS5845522B2 (en) How to build a bridge
JPS62185905A (en) Moving type mold frame construction method of slab of high bridge
CN115538285A (en) Rigid cable-stayed bridge and pushing construction method
CN114808745A (en) Incremental launching construction method for steel truss bridge
LINE Long railway viaducts with special spans: Part 1. Arch construction by balanced cantilever with auxiliary cables