Publication numberUS5992519 A
Publication typeGrant
Application numberUS 08/979,907
Publication dateNov 30, 1999
Filing dateSep 29, 1997
Priority dateSep 29, 1997
Fee statusPaid
Publication number08979907, 979907, US 5992519 A, US 5992519A, US-A-5992519, US5992519 A, US5992519A
InventorsTerizhandur S. Ramakrishnan, R. K. Michael Thambynayagam
Original AssigneeSchlumberger Technology Corporation
Export CitationBiBTeX, EndNote, RefMan
External Links: USPTO, USPTO Assignment, Espacenet
Real time monitoring and control of downhole reservoirs
US 5992519 A
Abstract
The method for the active or automated control of the reservoir uses a reservoir model with available data such as seismic, log, and core data as inputs, and uses the reservoir model in conjunction with a reservoir simulation tool in order to determine a production strategy which will maximize certain criteria, e.g., profits. The production strategy may include fixed elements which are not easily altered once the wells go into production, and variable elements which can be adjusted without serious effort during production. The production strategy is implemented by drilling wells, etc., and fluids are then controllably produced from the reservoir according to the variable production strategy; i.e., fluid flow rates are monitored by sensors, and, by adjusting control valves, are kept to desired values (which may change over time) set according to the variable production strategy. According to another aspect of the invention, information gleaned as a result of the adjustments to the control means is used to update the reservoir model. As a result, the variable and fixed production strategies can be updated and implemented.
Images(3)
Previous page
Next page
Claims(22)
We claim:
1. A method for the active or automated control of a reservoir in a formation, comprising:
a) using a reservoir model, with previously determined information regarding the formation as an input thereto, to determine a preferred production strategy for the reservoir, said preferred production strategy including a desired production flow rate from a well in the formation;
b) producing fluids from the well;
c) using sensing means, monitoring a flow rate at which said fluids are produced from the well;
d) comparing said flow rate of said monitoring with said desired production flow rate to obtain a difference signal; and
e) adjusting a valve control means by minimizing an indication of said difference signal with respect to at least one parameter which relates said difference signal to a valve coefficient of said valve control means, in order to cause said fluids to be produced from the well at substantially said production flow rate according to said production strategy.
2. A method according to claim 1, wherein:
said monitoring a flow rate and said adjusting a valve control means occur in real time.
3. A method according to claim 1, wherein:
said preferred production strategy includes a preferred variable production strategy with a plurality of first parameters, said plurality of first parameters including at least one of a depletion method, a flooding sequence, and said flow rate.
4. A method according to claim 3, wherein:
said preferred production strategy includes a preferred fixed production strategy with a plurality of second parameters including at least one of well spacing, well orientations, and a completion option.
5. A method according to claim 1, wherein:
said reservoir model characterizes the formation into a plurality of geological objects which are assigned properties and values based on said previously determined information.
6. A method according to claim 5, wherein:
said previously determined information includes information obtained from at least one of seismic exploration of said formation, geological coring of said formation, and logging said formation with a borehole tool.
7. A method according to claim 1, wherein:
said reservoir model characterizes the formation into a grid of blocks, each block having assigned properties and values based on said previously determined information.
8. A method according to claim 7, wherein:
said previously determined information includes information obtained from at least one of seismic exploration of said formation, geological coring of said formation, and logging said formation with a borehole tool.
9. A method according to claim 1, wherein:
said using a reservoir model to determine a preferred production strategy includes using a reservoir simulation tool which relies on said reservoir model, and based on said reservoir simulation tool and said reservoir model, conducting an economic evaluation of a plurality of production strategies, with said preferred production strategy being one of said plurality of production strategies.
10. A method according to claim 1, further comprising:
after determining said preferred production strategy, and prior to said producing, drilling wells in said formation based on said preferred production strategy.
11. A method according to claim 1, further comprising:
after determining said preferred production strategy, and prior to said producing, locating said sensors in the well.
12. A method according to claim 1, further comprising:
measuring pressure transients in the well, and using information obtained from said measuring to update said reservoir model.
13. A method according to claim 12, further comprising:
with an updated reservoir model, determining a new preferred production strategy for the reservoir, and
adjusting the control means to cause said fluids to be produced from the well according to said new preferred production strategy.
14. A method for the active or automated control of a reservoir in a formation, comprising:
a) using a reservoir model, with previously determined information regarding the formation as an input thereto, to determine a preferred production strategy for the reservoir, said preferred production strategy including a desired production flow rate from a well in the formation;
b) producing fluids from the well;
c) using sensing means, monitoring a flow rate at which said fluids are produced from the well;
d) based on said monitoring, adjusting a control means in order to cause said fluids to be produced from the well at said production flow rate according to said production strategy;
e) measuring pressure transients in the well; and
f) using information obtained from said measuring to update said reservoir model;
with an updated reservoir model, determining a new preferred variable production strategy for the reservoir, and
adjusting the control means to cause said fluids to be produced from the well according to said new preferred variable production strategy.
15. A method according to claim 1, wherein:
said preferred production strategy includes production flow rates from a plurality of wells in the formation,
said producing fluids comprises producing fluids from said plurality of wells;
said monitoring comprises monitoring flow rates at which said fluids are produced from said plurality of wells;
said adjusting a valve control means comprises adjusting control valve means in each of said plurality of wells to cause said fluids to be produced from said plurality of wells at substantially said production flow rates according to said production strategy.
16. A system for the active or automated control of a reservoir in a formation traversed by a plurality of wells, comprising:
a) a reservoir model means having previously determined information regarding the formation as an input thereto, said reservoir model means for determining a preferred production strategy for the reservoir, said preferred production strategy including a desired production flow rate from at least a designated one of the wells in the formation;
b) production means for producing fluids from the designated well, said production means including adjustable control means for controlling a rate at which the fluids are produced from the designated well; and
c) sensing means for monitoring a flow rate at which the fluids are produced from the designated well, said sensing means being coupled to said adjustable control means in a feedback loop, said adjustable control means including means for comparing said flow rate monitored by said sensing means with said desired production flow rate to obtain a difference signal, and means for minimizing an indication of said difference signal with respect to at least one parameter which relates said difference signal to a valve coefficient of said control means in order to cause said fluids to be produced from the designated well at substantially said production flow rate according to said production strategy.
17. A system according to claim 16, further comprising:
means for measuring pressure transients in the well, wherein indications of said pressure transients are provided to said reservoir model means for updating said reservoir model.
18. A system according to claim 16, wherein:
said preferred production strategy includes a preferred variable production strategy with a plurality of first parameters, said plurality of first parameters including at least one of a depletion method, a flooding sequence, and said flow rate, and
said preferred production strategy includes a preferred fixed production strategy with a plurality of second parameters including at least one of well spacing, well orientations, and a completion option.
19. A system according to claim 16, wherein:
said preferred production strategy includes an injection rate into an injector well of the formation.
20. A method according to claim 14, wherein:
said preferred production strategy includes a preferred variable production strategy with a plurality of first parameters, said plurality of first parameters including at least one of a depletion method, a flooding sequence, and said flow rate.
21. A method according to claim 20, further comprising:
with an updated reservoir model, determining a new preferred variable production strategy for the reservoir, and
adjusting the control means to cause said fluids to be produced from the well according to said new preferred variable production strategy.
22. A system for the active or automated control of a reservoir in a formation traversed by a plurality of wells, comprising:
a) a reservoir model having previously determined information regarding the formation as an input thereto, said reservoir model including (i) means for determining a preferred production strategy for the reservoir, said preferred production strategy including a production flow rate from at least a designated one of the wells in the formation, and (ii) update means for updating said reservoir model based on additional information obtained regarding said designated well;
b) production means for producing fluids from the designated well, said production means including adjustable control means for controlling a rate at which fluids are produced from the designated well;
c) sensing means for monitoring a flow rate at which the fluids are produced from the designated well, said sensing means being coupled to said control means in a feedback loop in order to cause said fluids to be produced from the designated well at said production flow rate according to said production strategy; and
d) means for measuring pressure transients in the designated well, wherein indications of said pressure transients are provided to update means for updating said reservoir model.
Description
BACKGROUND OF THE INVENTION

1. Field of the Invention

The present invention relates broadly to the production of oil from subsurface geological formations. More particularly, the present invention relates to methods and apparatus for real time control of oil exploitation through active intervention in the process of the oil reservoir exploitation.

2. State of the Art

It is well recognized in the art that the monitoring of fluid movement in subsurface formations is essential in improving oil recovery techniques. Only by monitoring the reservoir is it possible to intervene in the recovery process in order to maximize recovery.

For many years, monitoring was carried out via the periodic logging of cased wells. More recently, monitoring has evolved into the continuous monitoring of pressure, temperature, and flow rates within the wellbore (See, e.g., Baker et al., "Permanent Monitoring," Oilfield Review, 7(4) 32-46 (1995)). Such continuous acquisition of data, when properly analyzed, has had the benefit of reducing production loss, because the analysis of the data has led to occasional intervention in the recovery process.

For example, decisions regarding oil production are presently most often based on decline curve analysis. (See, A. Satter and G. Thakur, Integrated Petroleum Reservoir Management, A Team Approach, Pennwell Publishing Company, Chapter 6 (1994). A detailed analysis is often carried out using standard reservoir simulators where factors such as optimal production/injection well placement are studied. Using history matching technique, an update to the reservoir model is carried out. Reservoir simulation is then complemented with results from data obtained from the well. As a result, determinations are made as whether to intervene in the recovery process (e.g., in order to increase production) such as by using an acid treatment, a fracture job, infill drilling, or the drilling of new wells to produce unswept oil. (See, Integrated Petroleum Reservoir Management, id.)

While the present techniques of monitoring and occasional intervention in the production process are useful in increasing production and reducing costs, these techniques are not ideal because they do not control the reservoir production in the shortest time scale of practical relevance ("real time"), but rather are reactive in nature to conditions that may have changed over a long period of time.

SUMMARY OF THE INVENTION

It is therefore an object of the invention to provide to provide methods and apparatus for real time reservoir control.

It is another object of the invention to provide methods for the active and/or automated control of oil reservoirs.

It is a further object of the invention to provide methods for at least partially automating control of fluid in a reservoir in order to satisfy predetermined, updatable production criteria.

It is an additional object of the invention to use continuous monitoring of downhole data in conjunction with a reservoir model for the control of flow rates from a reservoir, wherein information gleaned from controlled changes is used to update the reservoir model.

In accord with the objects of the invention, the method for the active or automated control of the reservoir generally comprises: obtaining a reservoir model which uses available data such as seismic, log, and core data as inputs; using the reservoir model in determining a production strategy; producing fluids from the reservoir according to the production strategy under influence of control means; monitoring the production of fluids; and adjusting the control means (preferably in real time) to influence the production of fluids based on information obtained during monitoring. According to a further aspect of the invention, information gleaned as a result of the adjustments to the control means is used to update the reservoir model.

Reservoir models are well known in which each geological object (layer) or grid block is assigned property values. These property values are obtained from seismic, log, or core data; i.e., from information obtained using seismic tools on the formation surface, from information obtained from sonic, electromagnetic, nuclear, NMR, and other logging tools which traverse the formation in an open borehole or a cased well, from formation and well testing, and from information obtained from analysis of core samples taken from a borehole.

Production strategy involves a basis for making decisions regarding production, such as the maximization of profits based on discounted cash flow, return on investment, or pay out time. Using a simulation tool which relies on the reservoir model, and varying parameters such as well spacing, well orientations, completion options, depletion method, choice of flooding sequences, optimal injection rates (in injection wells), and optimal rates of depletion (rate of production in each producer well) as a function of time, the objective function (e.g., profits) may be maximized. The results of the optimization dictate a production strategy which may involve fixed elements which are not easily altered once the wells go into production, and variable elements which can be adjusted without serious effort during production. Fixed elements include the orientation of the wells, the number of wells per acre, etc. Variable elements include the rate of depletion of each well.

According to the invention, once a production strategy has been decided upon, fluids from the reservoir are produced according to the production strategy. Thus, wells are drilled based on the fixed production strategy. Production of oil (i.e., the fluid flow rates in the wells) is based on the variable production strategy. Fluid flow rates are monitored by sensors, and, by adjusting control valves, are kept to desired values (which may change over time) set according to the variable production strategy.

According to a further aspect of the invention, information gleaned over time regarding the reservoir is used to update the reservoir model, and as a result, the production strategy can be updated. The result can include changes in the variable production strategy, and even the fixed production strategy; e.g., additional wells may be drilled; producers may be changed to injectors (and vice versa), etc.

Additional objects and advantages of the invention will become apparent to those skilled in the art upon reference to the detailed description taken in conjunction with the provided figures.

BRIEF DESCRIPTION OF THE DRAWINGS

FIG. 1 is a block diagram of the method of the invention of determining a production strategy.

FIG. 2 is a schematic diagram of an oilfield having a plurality of wells with flow control apparatus and sensors.

FIG. 3 is a signal flow diagram for controlling the flow control apparatus of FIG. 2.

FIG. 4 is a block diagram of the method for updating the reservoir model used in determining production strategy.

DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

In accord with a first aspect of the invention, and as seen in FIG. 1, a method is provided for determining production strategy for an oil reservoir. In particular, a reservoir model such as the Strata Model (sold by Halliburton Company, Texas) is provided at 12. The reservoir model permits the formation to be characterized as a plurality of geological objects (e.g., layers), or as a grid, and permits values to be assigned to properties of the formation for each object or element of the grid. Input values to the reservoir model for the formation properties are obtained from results of using seismic tools 15 on the formation surface, from results of information obtained from sonic electromagnetic, NMR, nuclear, and other logging tools 20 which traverse the formation in an openhole borehole or cased well, and from results of information obtained from analysis of core samples 25 taken from a borehole. In addition, physical properties of formation fluids are provided at 25, including pressure-volume-temperature (PVT) relationships, etc. In addition, any additional available geological information 30 (e.g., known layering) is provided to the reservoir model, as is petrophysics information 35 which includes the interpretation of porosity, saturation, capillary pressure, permeability, fluid mobilities, etc. Based on all of the information, the formation is initially characterized with values for its properties, preferably including porosity, permeability, water and oil saturations, lithology, etc.

As seen in FIG. 1, with the starting values for formation parameters, and in conjunction with fixed production strategy options 40 and variable production strategy options 50, a simulation tool such as ECLIPSE (sold by GeoQuest, Houston, Tex.) can be run at 55 to simulate the formation so that economic evaluations can be made at 60. By optimizing the economic evaluations (e.g., maximizing profits based on discounted cash flow, return on investment, pay out time, or other criteria), a "best" fixed production strategy in conjunction with a "best" variable production strategy can be chosen at 65. More particularly, the fixed production strategy options 40 include parameters such as well spacing, well orientations, completion options (e.g., perforation numbers and locations, or "intelligent completion options" which permit changing, selective completion combinations), while the variable production strategy options include parameters such as flooding sequences, "intelligent completion" control, and optimal rate of depletion (i.e., the rate of production in each well and their relationships as a function of time). By exploring the parameter domain of the production strategies relative to the reservoir model, the objective function of maximizing profits can be maximized. In order to reduce computation, clearly non-viable parameter domain combinations may be ruled out prior to running the simulations. Also, if desired, expert systems can be developed with respect to reservoir environments and prior knowledge in order to limit the parameter domains and thereby reduce the intensive computation.

Once the production strategy has been chosen, the reservoir is exploited accordingly. Thus, if necessary, wells 100, as seen in FIG. 2, are drilled according to the optimally determined well spacing and well orientation, and are completed according to the determined optimal methods. In completing the wells, flow rate and pressure sensors 110 may be permanently provided in the casing, in the borehole. Alternatively, flow rate and pressure sensors may be dangled in the wellbore, or included on production logging tools which are periodically run in the wells. If desired, fixed resistivity sensors may also be provided. In addition, control valves 120 are provided on the producer wells, while controllable pumps 130 are provided on the injector wells. If desired, control valves may also be provided on the injector wells. With the completed wells in place, the depletion method chosen according to the "best" variable production strategy is used to start producing fluids from the formation. Using the control valves 120, the fluids are produced from the formation at the desired depletion rate pursuant to the production strategy. In order to ensure that the fluids are produced at the desired rate, the flow rates of the fluids are monitored using the sensors 110 (or other fluid flow rate sensors in the well). The difference between the sensed flow rate and the desired flow rate is used as an error signal which produces feedback to the valves 120 and/or pumps 130 as discussed in more detail below with reference to FIG. 3. Thus, the valves and/or pumps are controlled in real time to maintain the desired flow rates in the wells as determined by the production strategy.

Control of the flow rate may be quantitatively understood mathematically. In particular, the formation can be considered a nonlinear system. In designing flow control, for simplicity, it is preferable that the nonlinear system be quasilinearized. After quasilinearization, the sandface flow rate qj, i.e., the flow rate in the formation layer of interest, and the formation pressure pj in well j are related through the known equation ##EQU1## where p0 is the original reservoir pressure before production, δ is a small number, Gij (δt) is a slowly varying time dependent response function of the formation layer of interest, and ∘ designates a convolution integral. Conceptually, this equation is deducible by appreciating that the time scale for saturation movements are large compared to pressure propagation in the formation, provided the formation fluids are only slightly compressible (See, Ramakrishnan, T. S. and Kuchuk, F.: "Testing and Interpretation of Injection Wells Using Rate and Pressure Data", SPE Form. Eval. 9, pp. 228-236 (1994)).

For purposes of illustration, it is assumed that the well N has a specified production rate schedule which is based on the production strategy, and that the ratio of production rates between other wells j to the well N is also defined according to the production strategy. According to the invention, it is the sandface production rate and not the pressure which determines the position of the saturation contours in the formation. Thus, by controlling the flow rates and rate relationships among the wells, regardless of damage to the production system or the wellbore, the saturation contours will remain as close as possible to the values intended by the production strategy.

The flow rates and rate relationships among wells can be controlled through the use of downhole valves. The valve coefficient Kv of a well in the system may be adjusted by moving an electrically or hydraulically operable stem (not shown). With a valve in the system, the sandface flow rate qj and the downhole sandface pressure pj (t) may be related (assuming a surface pressure of zero for simplicity) by

pj (t)=Kvj qj m (t)+Sj (t)qj (t)(2)

where Kv is the valve coefficient, m is a known exponent for the valve, and Sj (t) is a time dependent, dimensionless skin factor multiplied by a constant that relates flow rate to pressure. The first term of the right side of equation (2) is effectively the pressure drop due to the valve, while the second term of the right side of equation (2) is effectively the pressure drop to the skin of the well. In conventional control jargon, Sj can be considered a disturbance variable whose effect on altering the fluxes is rectified by adjusting Kv. The setting of the valve coefficient Kv in a predetermined controller design such as a proportional design, or proportional-integral design depends on the errors

eN (t)=1-(qN (t)/qsN (t))                   (3)

ej (t)=rsj (t)-(qj (t)/qN (t))         (4)

where qsN is the desired flow rate in well N, and rsj is the desired ratio of flow rates in well j≠N and well N; i.e., qsj (t)=rsj (t)qsN (t).

From equations (1)-(4), it is evident that in order to maintain a constant flow rate, the control valve has to correct for changes in skin factor. If the reservoir model is exact and if the governing equations are accurate representations, than the valve coefficient is defined by ##EQU2## Based on equation (5), it is seen that when the offset according to equations (3) and (4) is zero, the valve coefficient changes only due to the skin factor disturbance variable Sj (t). An estimate of the skin factor at any given instant is obtained using ##EQU3## where pwj is the measured wellbore pressure.

While it might be assumed from equation (6) that by measuring the wellbore pressure pwj and the fluid production qj (t), one can solve for Sj at all times and can therefore plug this solution into equation (5) thereby using the wellbore pressure to control fluid flow, in practice, this is not the case because the values Gij are changing over time. Thus, according to the invention, the valve coefficient must be changed based on a determination of flow rate according to a controlled feedback arrangement.

Turning to FIG. 3, a signal flow diagram representing the feedback system of the invention is seen. In particular, it is seen that in a feedback system, the actual production rate qj from a well is compared to the desired rate qsj at 210 to provide an error signal ej. The relationship between the valve coefficient Kv and the error signal e may be parameterized in terms of a vector of parameters α. The error signal for each well is provided to a controller which is designed to optimize α to satisfy an objective function. In particular, in the preferred embodiment of the invention, a controller 220 is designed to minimize the integral of the deviation I between the measured fluxes (qi (t)) and the desired flux (qsi (t)) around the nominal values of the formation properties; i.e., to minimize the equation ##EQU4## with respect to α. The values of α obtained by this procedure will depend on the formation properties, and the skin factor. As previously shown, the nominal value of Kv =Kvs is very dependent on these quantities. The relationship between Kv and e can be defined by

Kvj (t)=Kvsj (t)+f(ei (t), i=1 . . . N, α)∀j(8)

When ej (t)=0 for all wells, the valve coefficients are equal to the nominal value. To minimize I in equation (7), several choices are possible. At any given nominal value, I may be minimized for a fixed fractional change in the skin factors. This ensures that a quick stabilization to a new Kv for the desired rates is possible.

As seen in FIG. 3, the Kv for a well is multiplied at 230 by qj (t)m -1 (obtained from feedback loop 230, 240, 250, 260), with the product being added at 240 to Sj (t). That sum is divided at 250 by pj (t) to provide the sandface flow rate qj (t) in accord with equation (2) above. The flow rate qj (t) is provided to the power function block 260 which generates the value qj (t)m -1 for multiplication by Kvj at 230. It is noted that the sandface flow rate qj (t) is shown as part of loop 250, 270, 280 to relate to the formation pressure according to equation (1) above. Thus, at 270, the sandface flow rate qj (t) is convolved with Gij and summed, and at 280, the summed convolution is subtracted from p0 in order to provide pj (t).

It is possible in certain circumstances (e.g., skin damage) that there may exist no value Kv which will maintain the desired flow rate in a particular well. In such an event, the production goals based on the variable production strategy become inapplicable as a limit on the potential deliverability of the well is reached. When the variable production strategy can no longer be followed, reevaluation is necessary. The result of reevaluation may be invasive action (e.g., an acid flush) to remedy the skin, or a change in the production strategy to reduce the desired production rate in the particular well.

It should be appreciated by those skilled in the art that changes in the flow rate, whether due to meeting the variable production strategy, or due to other variables, cause pressure transients. According to another aspect of the invention, the pressure transients, which contain information regarding the response function Gij, are used to refine values for the response function Gij which are used in the reservoir model. Thus, as seen in FIG. 4, the reservoir model 12 is quasilinearized at 320 to provide an input-output model 330. The input-output model 330 relates pressures, fluid flow, and the response function according to equations (1)-(6) above, with the response function 340 being used for controller design according to equations (7) and (8) above. When the flow rate qi is changed, the measured pressure transient can be used with the measured flow rate, using equation (1) and deconvolution (i.e., via inversion 350), to provide a determination of the linear operators Gij. The new values for the linear operators Gij are then used to update the quasilinearization 320, which in turn causes a change to the input-output model 330 and updates the response function 340. In addition, based on the new information, the reservoir model 12 can be updated, and the procedure described above with reference to FIG. 1 followed in order to generate a new variable production strategy and/or a new fixed production strategy. In addition, the new values for the linear operators Gij are preferably provided to the convolution function 270 of the flow control system of FIG. 3 for purposes of relating measured and expected flow rates. This, in turn will effect the determination of valve coefficients Kvj which are used in controlling the flow of fluid from the formation.

There have been described and illustrated herein methods and apparatus for real time control of oil exploitation through active intervention in the process of the oil reservoir exploitation. While particular embodiments have been described, it is not intended that the invention be limited thereto, as it is intended that the invention be as broad in scope as the art will allow and that the specification be read likewise. Thus, while certain equations governing the relationship between pressure and flowrates have been provided, it will be appreciated that other equations could be utilized. For example, measurements of flow rate can be affected by the compressibility of fluids in the borehole depending upon the location of the measurement. Thus, if the volume of fluid between the sandface and the measurement point is Vj, then cj Vj (dpwj /dt)=qj -qTj, where c denotes the compressibility of the fluid and qTj is the measured rate at the measurement point, and the flow equations must be modified accordingly. Also, while particular reservoir models and simulation tools were referenced, it will be appreciated that other models and tools could be utilized. Further, while the invention was described with reference to both fixed and variable production strategies, it will be appreciated that the invention can be used with reference to variable production strategies only if desired. It will therefore be appreciated by those skilled in the art that yet other modifications could be made to the provided invention without deviating from its spirit and scope as so claimed.

Patent Citations
Cited PatentFiling datePublication dateApplicantTitle
US4155403 *Mar 6, 1978May 22, 1979William HurstAnalyzing fluid flux in formation
US4676313 *Oct 30, 1985Jun 30, 1987Rinaldi Roger EFor extracting a mineral from an earth formation
US5467823 *Nov 17, 1994Nov 21, 1995Schlumberger Technology CorporationMethods and apparatus for long term monitoring of reservoirs
US5597042 *Feb 9, 1995Jan 28, 1997Baker Hughes IncorporatedMethod for controlling production wells having permanent downhole formation evaluation sensors
US5662165 *Aug 12, 1996Sep 2, 1997Baker Hughes IncorporatedProduction wells having permanent downhole formation evaluation sensors
US5680899 *Jun 7, 1995Oct 28, 1997Halliburton Energy Services, Inc.Electronic wellhead apparatus for measuring properties of multiphase flow
US5819848 *Aug 14, 1996Oct 13, 1998Pro Cav Technology, L.L.C.Flow responsive time delay pump motor cut-off logic
US5829520 *Jun 24, 1996Nov 3, 1998Baker Hughes IncorporatedMethod and apparatus for testing, completion and/or maintaining wellbores using a sensor device
Non-Patent Citations
Reference
1Baker et al., "Permanent monitoring-looking at lifetime reservoir dynamics", Winter 1995, Oilfield Review, pp. 32-46.
2 *Baker et al., Permanent monitoring looking at lifetime reservoir dynamics , Winter 1995, Oilfield Review, pp. 32 46.
3Ramakrishnan et al., "Testing injection wells with rate and pressure data", Sep. 1994, pp. 228-236.
4 *Ramakrishnan et al., Testing injection wells with rate and pressure data , Sep. 1994, pp. 228 236.
5Ramakrishnan, "Integrated Petroleum Reservior Management", Chapter 6, (1994) pp. 101-140.
6 *Ramakrishnan, Integrated Petroleum Reservior Management , Chapter 6, (1994) pp. 101 140.
Referenced by
Citing PatentFiling datePublication dateApplicantTitle
US6255819Oct 25, 1999Jul 3, 2001Halliburton Energy Services, Inc.System and method for geologically-enhanced magnetic resonance imaging logs
US6266619Jul 20, 1999Jul 24, 2001Halliburton Energy Services, Inc.System and method for real time reservoir management
US6268726Jan 15, 1999Jul 31, 2001Numar CorporationMethod and apparatus for nuclear magnetic resonance measuring while drilling
US6279660Aug 5, 1999Aug 28, 2001Cidra CorporationApparatus for optimizing production of multi-phase fluid
US6362619 *Jul 31, 2001Mar 26, 2002Numar CorporationMethod and apparatus for nuclear magnetic resonance measuring while drilling
US6366087Oct 28, 1999Apr 2, 2002George Richard CoatesNMR logging apparatus and methods for fluid typing
US6408249 *Aug 30, 2000Jun 18, 2002Exxonmobil Upstream Research CompanyMethod for determining a property of a hydrocarbon-bearing formation
US6415864Nov 30, 2000Jul 9, 2002Schlumberger Technology CorporationSystem and method for separately producing water and oil from a reservoir
US6463813Jun 25, 1999Oct 15, 2002Weatherford/Lamb, Inc.Displacement based pressure sensor measuring unsteady pressure in a pipe
US6512371Jun 5, 2001Jan 28, 2003Halliburton Energy Services, Inc.System and method for determining oil, water and gas saturations for low-field gradient NMR logging tools
US6531868Jun 5, 2001Mar 11, 2003Halliburton Energy Services, Inc.System and methods for formation evaluation while drilling
US6536291Jul 2, 1999Mar 25, 2003Weatherford/Lamb, Inc.Optical flow rate measurement using unsteady pressures
US6541969Dec 14, 2000Apr 1, 2003Halliburton Energy Services, Inc.Method and apparatus for improving the vertical resolution of NMR logs
US6580751Feb 1, 2000Jun 17, 2003Halliburton Energy Services, Inc.High speed downhole communications network having point to multi-point orthogonal frequency division multiplexing
US6583621Mar 27, 2002Jun 24, 2003Numar CorporationMethod and apparatus for nuclear magnetic resonance measuring while drilling
US6585041Jul 23, 2001Jul 1, 2003Baker Hughes IncorporatedVirtual sensors to provide expanded downhole instrumentation for electrical submersible pumps (ESPs)
US6601458Mar 7, 2000Aug 5, 2003Weatherford/Lamb, Inc.Distributed sound speed measurements for multiphase flow measurement
US6629564Sep 28, 2000Oct 7, 2003Schlumberger Technology CorporationDownhole flow meter
US6661226Aug 10, 2000Dec 9, 2003Halliburton Energy Services, Inc.NMR apparatus and methods for measuring volumes of hydrocarbon gas and oil
US6691584Apr 3, 2002Feb 17, 2004Weatherford/Lamb, Inc.Flow rate measurement using unsteady pressures
US6698297Jun 28, 2002Mar 2, 2004Weatherford/Lamb, Inc.Venturi augmented flow meter
US6782150Nov 29, 2000Aug 24, 2004Weatherford/Lamb, Inc.Apparatus for sensing fluid in a pipe
US6788065Oct 12, 2000Sep 7, 2004Schlumberger Technology CorporationSlotted tubulars for subsurface monitoring in directed orientations
US6813962Sep 27, 2002Nov 9, 2004Weatherford/Lamb, Inc.Distributed sound speed measurements for multiphase flow measurement
US6825658Apr 2, 2002Nov 30, 2004George Richard CoatesNMR logging apparatus and methods for fluid typing
US6825659Jun 24, 2003Nov 30, 2004NumarMethod and apparatus for nuclear magnetic resonance measuring while drilling
US6836731 *Feb 5, 2002Dec 28, 2004Schlumberger Technology CorporationMethod and system of determining well performance
US6837098Mar 19, 2003Jan 4, 2005Weatherford/Lamb, Inc.Sand monitoring within wells using acoustic arrays
US6853921Oct 12, 2001Feb 8, 2005Halliburton Energy Services, Inc.System and method for real time reservoir management
US6862920Jan 29, 2002Mar 8, 2005Weatherford/Lamb, Inc.Fluid parameter measurement in pipes using acoustic pressures
US6873267 *Sep 29, 1999Mar 29, 2005Weatherford/Lamb, Inc.Methods and apparatus for monitoring and controlling oil and gas production wells from a remote location
US6910388Aug 22, 2003Jun 28, 2005Weatherford/Lamb, Inc.Flow meter using an expanded tube section and sensitive differential pressure measurement
US6956371Jan 28, 2003Oct 18, 2005Halliburton Energy Services, Inc.Method and apparatus for detecting diffusion sensitive phases with estimation of residual error in NMR logs
US6971259Nov 7, 2001Dec 6, 2005Weatherford/Lamb, Inc.Fluid density measurement in pipes using acoustic pressures
US6975112Feb 11, 2003Dec 13, 2005Halliburton Energy Services, Inc.Systems and methods of determining motion tool parameters in borehole logging
US6980940Sep 12, 2000Dec 27, 2005Schlumberger Technology Corp.Intergrated reservoir optimization
US6986276Mar 7, 2003Jan 17, 2006Weatherford/Lamb, Inc.Deployable mandrel for downhole measurements
US6999879 *Feb 13, 2004Feb 14, 2006Exxonmobil Upstream Research CompanyMethod for controlling seismic coverage using decision theory
US7028538Jan 4, 2005Apr 18, 2006Weatherford/Lamb, Inc.Sand monitoring within wells using acoustic arrays
US7054752 *Jun 2, 2004May 30, 2006Institut Francais Du PetroleMethod for optimizing production of an oil reservoir in the presence of uncertainties
US7059172Jan 14, 2003Jun 13, 2006Weatherford/Lamb, Inc.Phase flow measurement in pipes using a density meter
US7079952Aug 30, 2004Jul 18, 2006Halliburton Energy Services, Inc.System and method for real time reservoir management
US7100708Dec 23, 2003Sep 5, 2006Varco I/P, Inc.Autodriller bit protection system and method
US7109471Jun 4, 2004Sep 19, 2006Weatherford/Lamb, Inc.Optical wavelength determination using multiple measurable features
US7178600Feb 20, 2004Feb 20, 2007Weatherford/Lamb, Inc.Apparatus and methods for utilizing a downhole deployment valve
US7181955Aug 7, 2003Feb 27, 2007Weatherford/Lamb, Inc.Apparatus and method for measuring multi-Phase flows in pulp and paper industry applications
US7255173Oct 1, 2003Aug 14, 2007Weatherford/Lamb, Inc.Instrumentation for a downhole deployment valve
US7278540Sep 25, 2004Oct 9, 2007Varco I/P, Inc.Adjustable basket vibratory separator
US7320252Sep 19, 2006Jan 22, 2008Weatherford/Lamb, Inc.Flow meter using an expanded tube section and sensitive differential pressure measurement
US7331469Apr 29, 2004Feb 19, 2008Varco I/P, Inc.Vibratory separator with automatically adjustable beach
US7337660 *May 12, 2004Mar 4, 2008Halliburton Energy Services, Inc.Method and system for reservoir characterization in connection with drilling operations
US7350590 *Nov 5, 2002Apr 1, 2008Weatherford/Lamb, Inc.Instrumentation for a downhole deployment valve
US7379853Apr 19, 2002May 27, 2008Exxonmobil Upstream Research CompanyMethod for enhancing production allocation in an integrated reservoir and surface flow system
US7422076Aug 31, 2006Sep 9, 2008Varco I/P, Inc.Autoreaming systems and methods
US7434619Feb 4, 2002Oct 14, 2008Schlumberger Technology CorporationOptimization of reservoir, well and surface network systems
US7451809Jun 21, 2005Nov 18, 2008Weatherford/Lamb, Inc.Apparatus and methods for utilizing a downhole deployment valve
US7475732May 3, 2007Jan 13, 2009Weatherford/Lamb, Inc.Instrumentation for a downhole deployment valve
US7478024 *Mar 2, 2005Jan 13, 2009Schlumberger Technology CorporationIntegrated reservoir optimization
US7480056Jun 4, 2004Jan 20, 2009Optoplan AsMulti-pulse heterodyne sub-carrier interrogation of interferometric sensors
US7503217Jan 27, 2006Mar 17, 2009Weatherford/Lamb, Inc.Sonar sand detection
US7512543 *Dec 23, 2002Mar 31, 2009Schlumberger Technology CorporationTools for decision-making in reservoir risk management
US7546228 *Apr 30, 2004Jun 9, 2009Landmark Graphics CorporationStochastically generating facility and well schedules
US7571644Dec 19, 2007Aug 11, 2009Halliburton Energy Services, Inc.Characterizing a reservoir in connection with drilling operations
US7571817Oct 20, 2005Aug 11, 2009Varco I/P, Inc.Automatic separator or shaker with electromagnetic vibrator apparatus
US7577527Dec 29, 2006Aug 18, 2009Schlumberger Technology CorporationBayesian production analysis technique for multistage fracture wells
US7584165Dec 31, 2003Sep 1, 2009Landmark Graphics CorporationSupport apparatus, method and system for real time operations and maintenance
US7606666Jan 28, 2008Oct 20, 2009Schlumberger Technology CorporationSystem and method for performing oilfield drilling operations using visualization techniques
US7627430 *Mar 13, 2008Dec 1, 2009Schlumberger Technology CorporationMethod and system for managing information
US7636671Aug 30, 2004Dec 22, 2009Halliburton Energy Services, Inc.Determining, pricing, and/or providing well servicing treatments and data processing systems therefor
US7658117Jan 22, 2008Feb 9, 2010Weatherford/Lamb, Inc.Flow meter using an expanded tube section and sensitive differential pressure measurement
US7660711Apr 28, 2006Feb 9, 2010Saudi Arabian Oil CompanyAutomated event monitoring system for online reservoir simulation
US7664654Nov 7, 2006Feb 16, 2010Halliburton Energy Services, Inc.Methods of treating subterranean formations using well characteristics
US7672825Jun 23, 2005Mar 2, 2010Shell Oil CompanyClosed loop control system for controlling production of hydrocarbon fluid from an underground formation
US7690432Nov 12, 2008Apr 6, 2010Weatherford/Lamb, Inc.Apparatus and methods for utilizing a downhole deployment valve
US7739089 *Oct 26, 2007Jun 15, 2010Schlumberger Technology CorporationIntegrated reservoir optimization
US7752023Oct 31, 2007Jul 6, 2010Exxonmobil Upstream Research Co.Method for enhancing production allocation in an integrated reservoir and surface flow system
US7762131Dec 19, 2007Jul 27, 2010Ibrahim Emad BSystem for predicting changes in a drilling event during wellbore drilling prior to the occurrence of the event
US7788074Aug 22, 2005Aug 31, 2010Institut Francais Du PetroleMethod of modelling the production of an oil reservoir
US7814989May 20, 2008Oct 19, 2010Schlumberger Technology CorporationSystem and method for performing a drilling operation in an oilfield
US7835893 *Sep 3, 2003Nov 16, 2010Landmark Graphics CorporationMethod and system for scenario and case decision management
US7874357 *Feb 27, 2004Jan 25, 2011Schlumberger Technology CorporationDiagnosis of formation characteristics in wells
US7877246Sep 21, 2007Jan 25, 2011Schlumberger Technology CorporationSystem and method for performing oilfield simulation operations
US7878268Dec 12, 2008Feb 1, 2011Schlumberger Technology CorporationOilfield well planning and operation
US7894991 *Jan 29, 2009Feb 22, 2011Schlumberger Technology Corp.Statistical determination of historical oilfield data
US7900700Jul 31, 2008Mar 8, 2011Schlumberger Technology CorporationMethod and system for cleat characterization in coal bed methane wells for completion optimization
US7900705Nov 30, 2007Mar 8, 2011Schlumberger Technology CorporationFlow control assembly having a fixed flow control device and an adjustable flow control device
US7924001Apr 14, 2009Apr 12, 2011Schlumberger Technology Corp.Determination of oil viscosity and continuous gas oil ratio from nuclear magnetic resonance logs
US7953584Feb 27, 2007May 31, 2011Schlumberger Technology CorpMethod for optimal lift gas allocation
US7966166 *Apr 18, 2008Jun 21, 2011Schlumberger Technology Corp.Method for determining a set of net present values to influence the drilling of a wellbore and increase production
US8014987Apr 2, 2008Sep 6, 2011Schlumberger Technology Corp.Modeling the transient behavior of BHA/drill string while drilling
US8024123Nov 4, 2008Sep 20, 2011Schlumberger Technology CorporationSubterranean formation properties prediction
US8046314Jul 17, 2008Oct 25, 2011Schlumberger Technology CorporationApparatus, method and system for stochastic workflow in oilfield operations
US8064287 *Dec 28, 2006Nov 22, 2011Rock Solid Images, Inc.Method for interpreting seismic data and controlled source electromagnetic data to estimate subsurface reservoir properties
US8073665Feb 19, 2009Dec 6, 2011Schlumberger Technology CorporationAnalyzing an oilfield network for oilfield production
US8073800Jul 30, 2008Dec 6, 2011Schlumberger Technology CorporationValuing future information under uncertainty
US8078444Dec 6, 2007Dec 13, 2011Schlumberger Technology CorporationMethod for performing oilfield production operations
US8099267Dec 30, 2008Jan 17, 2012Schlumberger Technology CorporationInput deck migrator for simulators
US8103493Sep 25, 2008Jan 24, 2012Schlumberger Technology CorporationSystem and method for performing oilfield operations
US8117016Apr 17, 2008Feb 14, 2012Schlumberger Technology CorporationSystem and method for oilfield production operations
US8121790Dec 12, 2008Feb 21, 2012Schlumberger Technology CorporationCombining reservoir modeling with downhole sensors and inductive coupling
US8140310Oct 31, 2008Mar 20, 2012Schlumberger Technology CorporationReservoir fracture simulation
US8145463Oct 25, 2007Mar 27, 2012Schlumberger Technology CorporationGas reservoir evaluation and assessment tool method and apparatus and program storage device
US8145464Nov 1, 2007Mar 27, 2012Schlumberger Technology CorporationOilfield operational system and method
US8156131May 12, 2009Apr 10, 2012Schlumberger Technology CorporationQuality measure for a data context service
US8176979Dec 11, 2008May 15, 2012Schlumberger Technology CorporationInjection well surveillance system
US8185311Mar 16, 2009May 22, 2012Schlumberger Technology CorporationMultiuser oilfield domain analysis and data management
US8195401Jan 19, 2007Jun 5, 2012Landmark Graphics CorporationDynamic production system management
US8235127Aug 13, 2010Aug 7, 2012Schlumberger Technology CorporationCommunicating electrical energy with an electrical device in a well
US8244471Dec 20, 2007Aug 14, 2012Schlumberger Technology CorporationOilfield analysis system and method
US8244509Jul 30, 2008Aug 14, 2012Schlumberger Technology CorporationMethod for managing production from a hydrocarbon producing reservoir in real-time
US8255816Jan 14, 2009Aug 28, 2012Schlumberger Technology CorporationModifying a magnified field model
US8280635Jan 19, 2007Oct 2, 2012Landmark Graphics CorporationDynamic production system management
US8280709Aug 27, 2009Oct 2, 2012Schlumberger Technology CorporationFully coupled simulation for fluid flow and geomechanical properties in oilfield simulation operations
US8285532Mar 6, 2009Oct 9, 2012Schlumberger Technology CorporationProviding a simplified subterranean model
US8312923Mar 19, 2010Nov 20, 2012Schlumberger Technology CorporationMeasuring a characteristic of a well proximate a region to be gravel packed
US8332194Jul 29, 2008Dec 11, 2012Schlumberger Technology CorporationMethod and system to obtain a compositional model of produced fluids using separator discharge data analysis
US8346695Mar 28, 2008Jan 1, 2013Schlumberger Technology CorporationSystem and method for multiple volume segmentation
US8352226Jan 31, 2007Jan 8, 2013Landmark Graphics CorporationMethods, systems, and computer-readable media for real-time oil and gas field production optimization using a proxy simulator
US8352227Oct 30, 2007Jan 8, 2013Schlumberger Technology CorporationSystem and method for performing oilfield simulation operations
US8363510Oct 31, 2008Jan 29, 2013Exxonmobil Upstream Research CompanyDetection of features in seismic images
US8386226Nov 25, 2009Feb 26, 2013Halliburton Energy Services, Inc.Probabilistic simulation of subterranean fracture propagation
US8392164 *Aug 4, 2008Mar 5, 2013IfpMethod for evaluating an underground reservoir production scheme taking account of uncertainties
US8392165Nov 25, 2009Mar 5, 2013Halliburton Energy Services, Inc.Probabilistic earth model for subterranean fracture simulation
US8412502Dec 3, 2010Apr 2, 2013Schlumberger Technology CorporationSystem and method for performing oilfield simulation operations
US8437962Jul 16, 2010May 7, 2013Halliburton Energy Services, Inc.Generating probabilistic information on subterranean fractures
US8457897Oct 31, 2008Jun 4, 2013Exxonmobil Upstream Research CompanyMethods and systems to estimate wellbore events
US8499829Aug 4, 2009Aug 6, 2013Schlumberger Technology CorporationOilfield application framework
US8504341Jan 31, 2007Aug 6, 2013Landmark Graphics CorporationMethods, systems, and computer readable media for fast updating of oil and gas field production models with physical and proxy simulators
US8527248Jan 25, 2010Sep 3, 2013Westerngeco L.L.C.System and method for performing an adaptive drilling operation
US8577660Jan 21, 2009Nov 5, 2013Schlumberger Technology CorporationThree-dimensional mechanical earth modeling
US8612193 *May 20, 2003Dec 17, 2013Schlumberger Technology CenterProcessing and interpretation of real-time data from downhole and surface sensors
US8620636 *Feb 13, 2007Dec 31, 2013Schlumberger Technology CorporationInterpreting well test measurements
US8620715 *May 10, 2007Dec 31, 2013Schlumberger Technology CorporationMethod including a field management framework for optimization of field development and planning and operation
US8670966Aug 4, 2009Mar 11, 2014Schlumberger Technology CorporationMethods and systems for performing oilfield production operations
US8688487Apr 17, 2008Apr 1, 2014Schlumberger Technology CorporationMethod and system for measuring technology maturity
US8706541Sep 8, 2009Apr 22, 2014Schlumberger Technology CorporationReservoir management linking
US8751164Dec 17, 2008Jun 10, 2014Schlumberger Technology CorporationProduction by actual loss allocation
US8775141Jul 2, 2008Jul 8, 2014Schlumberger Technology CorporationSystem and method for performing oilfield simulation operations
US8789587 *Feb 27, 2009Jul 29, 2014Baker Hughes IncorporatedMonitoring of downhole parameters and tools utilizing fiber optics
US8793111Jan 20, 2009Jul 29, 2014Schlumberger Technology CorporationAutomated field development planning
US8793112Aug 4, 2010Jul 29, 2014Bp Corporation North America Inc.Reservoir architecture and connectivity analysis
US8803878Mar 17, 2009Aug 12, 2014Schlumberger Technology CorporationVisualizing region growing in three dimensional voxel volumes
US8812334Feb 21, 2007Aug 19, 2014Schlumberger Technology CorporationWell planning system and method
US8818777 *Oct 30, 2007Aug 26, 2014Schlumberger Technology CorporationSystem and method for performing oilfield simulation operations
US8839850Oct 4, 2010Sep 23, 2014Schlumberger Technology CorporationActive integrated completion installation system and method
US20080103743 *Oct 30, 2007May 1, 2008Schlumberger Technology CorporationSystem and method for performing oilfield simulation operations
US20110106317 *Nov 23, 2010May 5, 2011Groundswell Technologies, Inc.Integrated resource monitoring system with interactive logic control
US20110120705 *Nov 25, 2009May 26, 2011Halliburton Energy Services, Inc.Simulating Injection Treatments from Multiple Wells
USRE41999Feb 8, 2007Dec 14, 2010Halliburton Energy Services, Inc.System and method for real time reservoir management
USRE42245May 6, 2009Mar 22, 2011Halliburton Energy Services, Inc.System and method for real time reservoir management
EP1263653A2 *Feb 14, 2001Dec 11, 2002Schlumberger Technology CorporationIntegrated reservoir optimization
EP1484704A1 *May 17, 2004Dec 8, 2004Institut Français du PétroleMethod for helping oilfield management decision making in the presence of technically and economically uncertain parameters
EP1630348A1 *Aug 8, 2005Mar 1, 2006Institut Francais Du PetroleMethod for modelling the production of an oil-bearing formation
EP2431767A2Sep 13, 2011Mar 21, 2012Services Pétroliers SchlumbergerDynamic subsurface engineering
WO2001006091A1 *Jul 17, 2000Jan 25, 2001Halliburton Energy Serv IncSystem and method for real time reservoir management
WO2004076816A1 *Feb 26, 2004Sep 10, 2004Cui HuanwenEstimation of formation characteristics in wells
WO2006003118A1 *Jun 23, 2005Jan 12, 2006Shell Int ResearchClosed loop control system for controlling production of hydrocarbon fluid from an underground formation
WO2007015053A1 *Jul 19, 2006Feb 8, 2007Schlumberger HoldingsSystem and method of flow assurance in a well
WO2008055186A2 *Oct 30, 2007May 8, 2008Andrew John HowellSystem and method for performing oilfield simulation operations
WO2008055188A2 *Oct 30, 2007May 8, 2008William J BaileySystem and method for performing oilfield simulation operations
WO2008061200A1 *Nov 15, 2007May 22, 2008Michael CarneyOilfield management system
WO2008070864A1 *Dec 7, 2007Jun 12, 2008Andrew John HowellA method for performing oilfield production operations
WO2008083009A1 *Dec 19, 2007Jul 10, 2008Prad Res & Dev LtdBayesian production analysis technique for multistage fracture wells
WO2008083011A1 *Dec 19, 2007Jul 10, 2008Hooyman Patrick JMethod and system for altering pore pressure in a fracturing operation
WO2008083230A1 *Dec 27, 2007Jul 10, 2008Gunnarshaug JoOilfield analysis system and method
WO2008083343A1 *Dec 28, 2007Jul 10, 2008Kerry James HuguetOilfield management system and method
WO2008127948A1 *Apr 9, 2008Oct 23, 2008Schlumberger Ca LtdModeling the transient behavior of bha/drill string while drilling
WO2008131284A1 *Apr 18, 2008Oct 30, 2008Vijaya HalabeSystem and method for oilfield production operations
WO2008157706A2Jun 19, 2008Dec 24, 2008Schlumberger Ca LtdSystem and method for performing oilfield simulation operations
WO2009075962A2 *Oct 31, 2008Jun 18, 2009Exxonmobil Upstream Res CoMethods and systems to estimate wellbore events
WO2010062635A2 *Oct 28, 2009Jun 3, 2010Schlumberger Canada LimitedMethods and apparatus for planning and dynamically updating sampling operations while drilling in a subterranean formation
WO2010088516A2 *Jan 29, 2010Aug 5, 2010Chevron U.S.A. Inc.System and method for predicting fluid flow in subterranean reservoirs
WO2010101593A1 *Dec 14, 2009Sep 10, 2010Exxonmobil Upstream Research CompanyOptimizing reservoir performance under uncertainty
WO2011037925A2 *Sep 21, 2010Mar 31, 2011Baker Hughes IncorporatedMethod for controlling fluid production from a wellbore by using a script
WO2013059224A1 *Oct 17, 2012Apr 25, 2013Saudi Arabian Oil Company4d saturation modeling
WO2014022614A1 *Aug 1, 2013Feb 6, 2014Schlumberger Canada LimitedAssessment, monitoring and control of drilling operations and/or geological-characteristic assessment
Classifications
U.S. Classification166/250.15, 166/250.01, 166/53
International ClassificationE21B47/00, E21B43/00, E21B43/12
Cooperative ClassificationE21B43/00, E21B43/12, E21B47/00
European ClassificationE21B43/00, E21B47/00, E21B43/12
Legal Events
DateCodeEventDescription
Apr 27, 2011FPAYFee payment
Year of fee payment: 12
May 4, 2007FPAYFee payment
Year of fee payment: 8
May 6, 2003FPAYFee payment
Year of fee payment: 4