Publication numberUSRE39210 E1
Publication typeGrant
Application numberUS 10/374,589
Publication dateAug 1, 2006
Filing dateFeb 26, 2003
Priority dateMar 31, 1994
Also published asUS5511749, US5685507
Publication number10374589, 374589, US RE39210 E1, US RE39210E1, US-E1-RE39210, USRE39210 E1, USRE39210E1
InventorsFolkert Horst, Oleh Szklar, Kelly Doig, George R. Cass, Jean L. Bousquet
Original AssigneeCattron Intellectual Property Corporation
Export CitationBiBTeX, EndNote, RefMan
External Links: USPTO, USPTO Assignment, Espacenet
Remote control system for a locomotive
US RE39210 E1
Abstract
A locomotive control system comprising a remote transmitter issuing RF binary coded commands and a slave controller mounted on the locomotive that decodes the transmission and operates is dependence thereof various actuators to carry into effect the commands of the ground based operator.
Images(18)
Previous page
Next page
Claims(20)
1. A remote control system for a locomotive, comprising:
a first transmitter generating a set of RF signal commands, each RF signal command signalling the locomotive to execute a certain function;
a second transmitter generating a set of RF signal commands, each RF signal command from the set of said second transmitter signalling the locomotive to execute a certain function; and
a slave controller receiving RF commands from said first transmitter and from said second transmitter and assigning to each one of said first and second transmitters one of a command authority holder operational status and a command authority non-holder operational status, said slave controller being responsive:
i) to at least one RF signal command generated by said first transmitter causing the locomotive to execute a predetermined function,
ii) to at least one RF signal command generated by said second transmitter causing the locomotive to execute a predetermined function,
iii) to an RF signal command other than said at least one RF signal command generated by a selected one of said first and second transmitters to cause the locomotive to perform a certain function,
iv) an RF signal command other than said at least one frequency signal command solely generated by a transmitter having a command authority holder operational status, and
v) to a command authority relinquish RF signal command generated by one of said first and second transmitters having a command authority holder operational status to assign the command authority holder operational status to the other of said first and second transmitters;
wherein said slave controller rejects an RF command, other than said at least one RF signal command, issued from a non-selected one of said first and second transmitters.
2. A remote control system for a locomotive as claimed in claim 1 14, wherein said at least one RF signal command signals said slave controller to effect application of braking power.
3. A remote control system for a locomotive, comprising:
a first transmitter generating a set of RF signal commands, each RF signal command signalling the locomotive to execute a certain function;
a second transmitter generating a set of RF signal commands, each RF signal command from the set of said second transmitter signalling the locomotive to execute a certain function; and
a slave controller receiving RF commands from said first transmitter and from said second transmitter and assigning to each one of said first and second transmitters one of a command authority holder operational status and a command authority non-holder operational status, said slave controller being responsive:
i) to at least one RF signal command generated by said first transmitter causing the locomotive to execute a predetermined function,
ii) to at least one RF signal command generated by said second transmitter causing the locomotive to execute a predetermined function,
iii) to an RF signal command other than said at least one RF signal command generated by a selected one of said first and second transmitters to cause the locomotive to perform a certain function,
iv) to an RF signal command other than said at least one frequencyRF signal command solely generated by a transmitter having a command authority holder operational status,
v) to a command authority relinquish RF signal command generated by one of said first and second transmitters having a command authority holder operational status, and
vi) to a command authority acceptance RF signal command generated by the other of said first and second transmitters having a command authority non-holder operational status, to assign the command authority holder operational status to the other of said first and second transmitters;
wherein said slave controller rejects an RF command, other than said at least one RF signal command, issued from a non-selected one of said first and second transmitters.
4. A remote control system for a locomotive as claimed in claim 3, wherein said at least one RF signal command signals said slave controller to effect application of braking power.
5. A remote control system for a locomotive as claimed in claim 3 wherein said at least one RF signal command is a signaling command.
6. A remote control system for a locomotive as claimed in claim 5 wherein said at least one RF signal command signals said slave controller to sound a bell or horn.
7. A remote control system for a locomotive as claimed in claim 3 wherein said slave controller initiates a safety check prior to assigning the command authority holder operational status to the other of said first and second transmitters.
8. A remote control system for a locomotive as claimed in claim 7 wherein said safety check includes determining if the locomotive is stopped.
9. A remote control system for a locomotive as claimed in claim 7 wherein said safety check includes a brake safety check.
10. A remote control system for a locomotive as claimed in claim 3 wherein said slave controller maintains a list of two or more identifiers of transmitters permitted to assume the command authority holder operational status.
11. A remote control system for a locomotive as claimed in claim 3 wherein the other of said first and second transmitters acknowledges acceptance within a predetermined time period in order for the slave controller to transfer the command authority holder operational status to the other of said first and second transmitters.
12. A remote control system as defined in claim 3, wherein said first and second transmitters generate RF signal commands on a common carrier frequency.
13. A remote control system for a locomotive, comprising:
a first transmitter generating a set of RF signal commands, each RF signal command signalling the locomotive to execute a certain function;
a second transmitter generating a set of RF signal commands, each RF signal command from the set of said second transmitter signalling the locomotive to execute a certain function; and
a slave controller receiving RF commands from said first transmitter and from said second transmitter and assigning to each one of said first and second transmitters one of a command authority holder operational status and a command authority non-holder operational status, said slave controller being responsive:
i) to at least one RF signal command generated by said first transmitter causing the locomotive to execute a predetermined function,
ii) to at least one RF signal command generated by said second transmitter causing the locomotive to execute a predetermined function,
iii) to an RF signal command other than said at least one RF signal command generated by a selected one of said first and second transmitters to cause the locomotive to perform a certain function,
iv) to an RF signal command other than said at least one RF signal command solely generated by a transmitter having a command authority holder operational status, and
v) to a command authority relinquish RF signal command generated by one of said first and second transmitters having a command authority holder operational status to assign the command authority holder operational status to the other of said first and second transmitters;
wherein said slave controller rejects an RF command, other than said at least one RF signal command, issued from a non-selected one of said first and second transmitters; and
wherein said slave controller maintains a list of two or more identifiers of transmitters permitted to assume the command authority holder operational status and said slave controller checks said list for an identifier designating the other of said first and second transmitters prior to assigning the command authority holder operation status to the other of said first and second transmitters.
14. A remote control system for a locomotive, comprising:
a first transmitter generating a set of RF signal commands, each RF signal command signalling the locomotive to execute a certain function;
a second transmitter generating a set of RF signal commands, each RF signal command from the set of said second transmitter signalling the locomotive to execute a certain function; and
a slave controller receiving RF commands from said first transmitter and from said second transmitter and assigning to each one of said first and second transmitters one of a command authority holder operational status and a command authority non-holder operational status, said slave controller being responsive:
i) to at least one RF signal command generated by said first transmitter causing the locomotive to execute a predetermined function,
ii) to at least one RF signal command generated by said second transmitter causing the locomotive to execute a predetermined function,
iii) to an RF signal command other than said at least one RF signal command generated by a selected one of said first and second transmitters to cause the locomotive to perform a certain function,
iv) to an RF signal command other than said at least one RF signal command solely generated by a transmitter having a command authority holder operational status, and
v) to a command authority relinquish RF signal command generated by one of said first and second transmitters having a command authority holder operational status to assign the command authority holder operational status to the other of said first and second transmitters;
wherein said slave controller rejects an RF command, other than said at least one RF signal command, issued from a non-selected one of said first and second transmitters; and
wherein the other of said first and second transmitters acknowledges acceptance of the command authority holder operational status prior to the slave controller assigning the command authority holder operation status to the other of said first and second transmitters.
15. A remote control system for a locomotive as claimed in claim 14 wherein said at least one RF signal command is a signaling command.
16. A remote control system for a locomotive as claimed in claim 15 wherein said at least one RF signal command signals said slave controller to sound a bell or horn.
17. A remote control system for a locomotive as claimed in claim 14 wherein said slave controller initiates a safety check prior to assigning the command authority holder operational status to the other of said first and second transmitters.
18. A remote control system for a locomotive as claimed in claim 17 wherein said safety check includes determining if the locomotive is stopped.
19. A remote control system for a locomotive as claimed in claim 17 wherein said safety check includes a brake safety check.
20. A remote control system for a locomotive as claimed in claim 14 wherein the other of said first and second transmitters acknowledges acceptance within a predetermined time period in order for the slave controller to transfer the command authority holder operational status to the other of said first and second transmitters.
Description

This application is a divisional application of U.S. application Ser. No. 08/221,704, filed on Apr. 1, 1994, now U.S. Pat. No. 5,511,749.

FIELD OF THE INVENTION

The present invention relates to an electronic system for remotely controlling a locomotive. The system is particularly suitable for use in switching yard assignments.

BACKGROUND OF THE INVENTION

Economic constraints have led railway companies to develop portable units allowing a ground based operator to remotely control a locomotive is a switching yard. The unit is essentially a transmitter communicating with a slave controller on the locomotive by way of a radio link. Typically, the operator carries this unit and can perform duties such as coupling and uncoupling cars while remaining in control of the locomotive movement at all times. This allows for placing the point of control at the point of movement thereby potentially enhancing safety, accuracy and efficiency.

Remote locomotive controllers currently used in the industry are relatively simple devices that enable the operator to manually regulate the throttle and brake in order to accelerate, decelerate and/or maintain a desired speed. The operator is required to judge the speed of the locomotive and modulate the throttle and/or brake levers to control the movement of the locomotive. Therefore, the operator must possess a good understanding of the track dynamics, the braking characteristics of the train, etc. in order to remotely operate the locomotive in a safe manner.

OBJECT AND STATEMENT OF THE INVENTION

An object of the invention is to provide a remote locomotive control system allowing the operator to command a desired speed and responding by appropriately controlling the throttle or brake to achieve and maintain that speed.

Another object of the invention is to provide a remote locomotive control system allowing for control of the locomotive from one of two different transmitters.

Yet another object of the invention is to provide a remote locomotive control system having the ability to perform a number of safety verifications in order to automatically default the locomotive to a safe state should a malfunction be detected.

SUMMARY OF THE INVENTION

As embodied and broadly described herein the invention provides a locomotive remote control system. The system has a transmitter capable of generating a binary coded radio frequency signal representing commands to be executed by the locomotive and a slave controller for mounting on-board the locomotive. The slave controller has

    • a) a receiver for sensing the radio frequency signal;
    • b) a processor for receiving the radio frequency signal; and
    • c) a velocity sensor for generating data representing velocity of the locomotive. The processor responds to the velocity sensor and to the RF signal to actuate either one of a brake of a locomotive or a tractive power of the locomotive in order to attempt maintaining a requested speed.

As embodied and broadly described herein the invention also provides a locomotive control system which has

    • a) a transmitter for generating a binary coded RF signal; and
    • b) a slave controller mounted on-board the locomotive for receiving that signal, the slave controller selectively accepting commands from a first transmitter or from a second transmitter.

As embodied and broadly described herein the invention further provides a remote control system for a locomotive which has

    • a) a transmitter for generating an RF binary coded signal; and
    • b) a slave controller mounted on-board the locomotive.
      The slave controller includes
    • a first sensor responsive to pressure of compressed air in a main tank of the locomotive; and
    • a second sensor responsive to flow of compressed air in a pneumatic brake line. The slave controller responds to output of the sensors to enable application of tractive power to the locomotive only when a pressure in the main tank is above a predetermined level and a flow of air in the brake line is below a predetermined level.
DESCRIPTION OF THE DRAWINGS

FIG. 1 is a top plan view of the portable transmitter of the remote locomotive control system in accordance with the invention;

FIGS. 2 and 4 are side elevational views of the portable transmitter;

FIG. 3 is a front elevational view of the portable transmitter;

FIG. 5 is a functional block diagram of the portable transmitter;

FIG. 6 is a diagram of the signal transmission protocol between the portable transmitter and a slave controller mounted on-board the locomotive;

FIG. 7 is a functional block diagram of the slave controller mounted on-board the locomotive;

FIG. 8 is a diagram illustrating the temporal relationship between the signal transmission and the operation of the receiver of the slave controller;

FIG. 9 is a diagram illustrating the temporal relationship between signal transmission from two portable transmitters and the operation of the receiver of the slave controller;

FIG. 10 is a detailed functional block diagram of the slave controller mounted on-board the locomotive;

FIG. 11 is a side elevational view of a velocity sensor for generating a pulse signal whose frequency is correlated to the speed of the locomotive;

FIG. 12 is a side elevational view of the velocity sensor shown in FIG. 11;

FIG. 13 illustrates the pulse output of the velocity sensor shown in FIGS. 11 and 12;

FIGS. 14a to 14d are a flow charts of the logic implemented to control the speed of the locomotive;

FIGS. 15a and 15b are diagrams illustrating the variation with respect to time of the velocity of the locomotive and of variables used to calculate a throttle or brake correction signal;

FIG. 16a is a flow chart illustrating the logic for controlling the speed of the locomotive in a COAST speed setting;

FIG. 16b is a flow chart illustrating the logic for controlling the speed in COAST WITH BRAKE setting;

FIGS. 17a and 17b are flow charts of the logic for transferring the command authority from one remote control transmitter to another; and

FIG. 18 is a flow chart of the safety diagnostic routine performed on the braking system of the locomotive.

DESCRIPTION OF PREFERRED EMBODIMENTS

With reference to the annexed drawings, the locomotive control system in accordance with the invention includes a portable transmitter 10 which generates a digitally encoded radio frequency (RF) signal to convey commands to a slave controller mounted on-board the locomotive. The slave controller decodes the transmission and operates various actuators on the locomotive to carry into effect the commands remotely issued by the operator.

FIGS. 1 to 4 illustrate the physical layout of the portable transmitter 10. The unit comprises a housing 12 enclosing the electronic circuitry and a battery supplying electric power to operate the system. A plurality of manually operable levers and switches projecting outside the housing 12 are provided to dial-in locomotive speed, brake and horn settings, among others.

The various controls on the portable transmitter are defined in the following table:

REFER-
ENCE TYPE OF
NUMERAL FUNCTION ACTUATOR
14 Locomotive Speed Control Multi-Position Lever
16 Locomotive Override Brake Multi-Position Lever
Control
18 Reset Push-Button
20 Direction (Forward/Reverse/ Multi-Position Switch
Neutral)
22 Ring Bell/Horn Toggle Switch
24 Train Brake Control Toggle Switch
26 Power on/Lights Dim/Bright Multi-Position Switch
28 Status Request Push-Button
30 Time Extend Push-Button
32 Relinquish Control to Companion Push-Button
Portable Transmitter

A detailed description of the various functions summarized in the above table is provided later in this specification.

On the top surface of the housing 12 is provided a display panel 34 that visually echoes the control settings of the portable transmitter 10. The display panel 34 includes an array of individual light sources 36, such as light emitting diodes (LED), corresponding to the various operative conditions of the locomotive that can be selected by the operator. Hence, a simple visual observation of the active LED's 36 allows the operator to determine the current position of the controls.

FIG. 5 provides a functional diagram of the portable transmitter 10. The various manually operable switches and levers briefly described above are constituted by electric contacts whose state of conduction is altered when the control settings are changed. For instance, the push-button 18, 28, 30 and 32, and the toggle switches 22 and 24 have electric contacts that can assume either a closed condition or as opened condition. The multi-position levers 14 and 16, and the multi-position switches 20 and 26, have a set of electric contact pairs, only a single pair being closed at each position of the lever or switch. By reading the conduction state of the individual electric contact pairs, the commands issued by the operator can be determined.

An encoder 38 scans at short intervals the state of conduction of each pair of contacts. The scan results allow the encoder to assembly a binary locomotive status word that represents the requested operative state of the locomotive being controlled. The following table provides the number of bits in the locomotive status word required for each function:

NUMBER OF BITS IN
LOCOMOTIVE STATUS
WORD FUNCTION
3 Locomotive Speed Control
3 Locomotive Brake Control
1 Reset
2 Direction (Forward/Reverse/
Neutral)
2 Ring Bell/Horn
3 Train Brake Control
1 Lights Dim/Bright
1 Status Request
1 Time Extend
1 Relinquish Control to Companion
Portable Transmitter

The locomotive status word also contains an identifier segment that uniquely represents the transmitter designated to control the locomotive. The purpose of this feature is to ensure that the locomotive will only accent the commands issued by the transmitter generating the proper identifier.

Most preferably, the encoder 38 includes a microprocessor programmed to intelligently assemble the locomotive status word. The microprocessor continuously scans the electric contacts of the transmitter controls and records their state of conduction. On the basis of the identity of the closed contacts, the program will produce the function component of the locomotive status word which is the string of bits that uniquely represents the functions to be performed by the locomotive. The program then appends to the function component the locomotive identifier component and preferably a data security code enabling the receiver on-board the locomotive to check for transmission errors.

In a different form of construction, the encoder may be constituted by an array of hardwired logic gates that generate the locomotive status word upon actuation of the controls.

A transmitter 40 receives the locomotive status word and generates an RF signal for transmission of the coded sequence by frequency shift keying. In essence, the frequency of a carrier is shifted to a first value to signal a logical 1 and to a second value to signal a logical 0. The transmission protocol is best shown in FIG. 6. Each transmission begins with a burst of the carrier frequency 42 for a duration of eight (8) bits (the actual time frame is established on the basis of the transmission baud rate allowed by the equipment). Each bit of the data stream is then sent by shifting the frequency to the first or the second value depending on the value of the bit, during a predetermined time slot 44.

The transmitter 40 sends out the locomotive status word in repetition at a fixed rate selected in the range from two (2) to five (5) times per second. By providing the transmitter with a unique repetition rate, the likelihood of transmission errors is reduced when several portable transmitters in close proximity broadcast control signals to individual locomotives, as described below.

FIG. 7 provides a diagrammatic representation of the slave controller mounted on board the locomotive. The slave controller identified comprehensively by the reference numeral 46 has three main components, namely a receiver unit 48, a processing unit 50 and a driver unit 52. More particularly, the receiver unit 48 senses the locomotive status word sent out from the portable transmitter 10, decodes the transmission and supplies the resulting binary sequence to the processing unit 50. To achieve a reliable communication link, the receiver 48 is synchronized with the transmitter 40 at three different levels. First, the receiver circuitry defines a signal acceptance window than opens itself at the rate at which the locomotive status word is sent out by the respective controlling transmitter 40. Second, the receiver 48 will observe the frequency value of the transmission in order to decode the binary sequence at intervals precisely corresponding to the time slots 44. Third, the acceptance window opens in phase with the signal transmission.

The first two levels of synchronization are established through hardware design, by setting the transmitter 40 and the receiver 48 to the same period of transmission/reception. On the other hand, the phasing of the receiver to the incoming locomotive status word transmission is effected through observation of the burst of carrier frequency 42 that begins each transmission cycle. The diagram in FIG. 8 graphically illustrates the relationship between the signal transmission and the signal reception. The time line 54 shows the successive transmission of the locomotive status word as a series of blocks 56. The activity of the receiver 48 is shown on the time line 58. The hatched areas correspond to the time intervals during which the receiver is not listening. At time t=0 the first locomotive status word is sent out by the transmitter 40. The burst of the carrier frequency 42 sensed by the receiver 48 which then activates the sequence of opening and closing of the signal acceptance window which is fully synchronized (in period and phase) with the signal transmission.

This characteristic is particularly advantageous when several transmitters broadcast simultaneously control signals to different locomotives in close proximity to one another. By setting each transmitter (and the companion receiver) at a unique transmission/reception period, secure communication links can be maintained even when all the transmitters use the same carrier frequency. FIG. 9 illustrates this feature. Time line 60 shows the transmission pattern of a first portable transmitter. The time line 62 depicts the window of acceptance of the companion receiver. The numeral 64 identifies the transmission pattern of a second portable transmitter. Assuming that both portable transmitters are actuated exactly at t=0, the signal received during the first opening of the window of acceptance will be corrupted since two locomotive status word transmissions are concurrent in time. However, the third and the seventh locomotive status word transmissions from the first portable transmitter will be clearly received since there is no overlap with the locomotive status words sent out by the second portable transmitter. Hence the purpose of providing each transmitter with a unique signal repetition rate reduces the likelihood of transmission conflicts.

It should be noted that the receiver 48 can, and probably will, correctly receive from time to time a locomotive status word from an unrelated transmitter. This status word will be rejected, however, because the transmitter identifier will not match the value stored in the memory of the slave controller.

The transmitter/receiver gear of the remote locomotive control system has been described above in terms of function of the principal parts of the system and their interaction. The components and interconnections of the electric network necessary to carry into effect the desired functions are not being specified because such details are well within the read of a man skilled in the art.

FIG. 10 provides a functional diagram of the processing unit 50. A central processing unit (CPU) 66 communicates with a memory through a bus 70. A reserved portion memory 68 contains the program that directs the CPU 66 to control the locomotive depending on the several inputs that will be discussed later. The memory also contains a section allowing temporary storage of data used by the CPU when handling hardware events.

The current locomotive status and the commands issued from the remote transmitter are directed to the CPU through an interface 72 communicating with the bus 70. The interface 72 receives input signals from the following sources:

    • a) A speed direction sensor 74 providing locomotive velocity and direction of movement data;
    • b) A speed sensor 76 providing solely locomotive velocity data. The speed sensor 76 provides the CPU 66 with redundant velocity data allowing the CPU 66 to detect a possible failure of the main speed sensor 74.
    • c) A pressure sensor 78 observing the air pressure in the locomotive brake system;
    • d) A pressure sensor 79 observing the air pressure in the main reservoir;
    • e) A pressure sensor 80 observing the air pressure in the train brake system;
    • f) A sensor 82 observing the flow rate of air in the brake system of the train; and
    • g) The decoded locomotive status word generated by the receiver 48.

The structure of the speed/direction sensor 74 is illustrated in FIGS. 11 and 12. The sensor includes a disk 84 mounted to an axle 86 of the locomotive. When the locomotive is moving the disk 84 turns at the same angular speed as the axle 86. The disk 84 is provided with a layer of reflective coating 85 deposited to form on the periphery of the disk equidistant and alternating reflective zones 87 and substantially non-reflective zones 89. A pair of opto-electric sensors 92 and 94 are mounted in a spaced apart relationship adjacent the periphery of the disk 84. The sensor 92 comprises an emitter 92a generating a light beam perpendicular to the plane of the disk 84, and a receiver 92b producing an electric signal when sensing the reflection of the light beam on the reflective zones 87. However, when a substantially non-reflective surface 89 registers with the sensor 92, the output of the receiver is null or very low. The structure and operation of the opto-electric sensor 94 is identical to the sensor 92. Thus, the sensor 94 comprises an emitter 94a and a receiver 94b.

The spacing between the opto-electric sensors 92 and 94 is such that they generate output pulses due to the periodic change in reflectivity of the disk surface, occurring at different instants in time. As best shown in FIG. 10, and assuming that the disk 84 rotates in the counter clockwise direction, when the sensor 92 switches “on” as a result of a reflective zone 87 registering with the emitter 92a and the receiver 92b, the sensor 94 is still in a stable on condition and can be caused to switch off only by further rotating the disk 84.

Preferably, the disk 84 and the sensors 92 and 94 are mounted in a hermetically sealed housing to protect the assembly against contamination by water or dirt.

FIG. 13 illustrates the signal waveforms produced by the opto-electric sensors 92 and 94. Both outputs are pulse trains having the same frequency but out of phase by an angle a which depends upon the spacing of the sensors 92 and 94. When the locomotive moves forward the disk 84 rotates in a given direction, say clockwise. In this case, the pulse train from sensor 94 leads the public train from sensor 92 by angle a. When the locomotive is in reverse, then the output of sensor 92 leads the output of sensor 94 by angle a (this possibility is not shown in FIG. 13). The processing unit 50 observes the occurrence of the leading pulse edges from the sensors 92 and 94 with relation to time to determine the identity of the leading signal, which allows deriviation of the direction of movement of the locomotive.

Velocity data is derived by measuring the rate of fluctuation of the signal form any one of sensors 92 and 92. It has been found practical to determine the velocity at low locomotive speeds by measuring the period of the signal. However, at higher speeds the frequency of the signal is being measured since the period shortens which may introduce non-negligible measurement errors.

The speed sensor 76 is similar to sensor 74 described above with two exceptions. First, a single opto-electric sensor may be used since all that is required is velocity data. Second, the speed sensor 76 is mounted to a different axle of the locomotive.

The pressure sensors 78 and 79 are switches mounted to the main reservoir and to the pneumatic line that supplies working fluid to the locomotive independent braking mechanism, and produce an electric signal in response to pressure. These sensors merely indicate the presence of pressure, not its magnitude. In essence, each sensor produces an output when the air pressure exceeds a preset level, indicating whether the reserve of compressed air is sufficient for reliable braking. Unlike the sensors 78 and 79, the pressure sensor 80 is a transducer that generates a signal indicative of presence and magnitude of pressure in the train brake air line.

The airflow sensor 82 observes the volume of air circulating in the pneumatic lines of the train brake system. The results of this measurement along with the output of pressure sensor 78 provide an indication of the state of charge of the pneumatic network. It is considered normal for a long pneumatic path to experience some air leaks due primarily to imperfect unions in pipe couplings between cars of the train. However, when a considerable volume of air leaks, the airflow sensor 82 enables the processing unit to sense such condition and to implement corrective measures, as will be discussed later.

The interface 72 receives the signals produced by the sensors 74, 76, 78, 79, 80, and 82 and digitizes them where required so they can be directly processed by the CPU 66. The locomotive status word issued by the receiver 48 requires no conversion since it is already in the proper binary format.

The binary signals generated by the CPU 66 that control the various functions of the locomotive are supplied through the bus 70 and the interface 72. The following control signals are being issued:

    • a) A signal 98 to set the lights of the locomotive to off/low intensity/high intensity. The signal is constituted by one (1) bit, each operative condition of the locomotive lights being represented by a different bit state;
    • b) A two (2) bit signal 100 to operate the bell or the horn of the locomotive;
    • c) A five (5) bit signal 102 for traction control. Four bits are used to communicate the throttle settings (only eight (8) settings are possible) and one bit for the power contacts of the electric traction motors;
    • d) An eight (8) bit signal 104 for train brake control. The number of bits used allows 256 possible brake settings; and
    • e) A seven (7) bit signal 106 for independent brake control. The number of bits used allows 128 possible brake settings.

The interface 72 will convert at least some of the signals 98, 100, 102, 104, and 106 from the binary form to a different form that the device at which the signals are directed can handle. This is described in more detail below.

The actuators for the lights and bell/horn are merely switches such as relays or solid state devices that energize or de-energize the desired circuit. The interface 72, in response to the CPU 66 instruction to set the lights/bell/horn in the desired operative position, will generate an electric signal that is amplified by the driver unit 52 and then directed to the respective relay or solid state switch.

With regard to the traction control it should be noted that most locomotive manufacturers will install on the diesel/electric engine as original equipment a series of actuators that control the fuel injection, power contacts and brakes among others, hence the traction power that the locomotive develops. This feature permits coupling several locomotives under control of one driver. By electrically and pneumatically interconnecting the actuators of all the locomotives, the throttle commands the driver issues in the cab of the mother engine are duplicated in all the slave locomotives. The locomotive remote control system in accordance with the invention makes use of the existing throttle/brake actuators in order to control power. The interface 72 converts the binary throttle settings issued by the CPU 66 to the standard signal protocol established by the industry for controlling throttle/brake actuators. This feature is particularly advantageous because the locomotive remote control system does not require the installation of any throttle/brake actuators. As in the case of the lights and bell/horn signals 98 and 100, respectively, the traction control signal 102 incoming from the interface 72 is amplified in the driver unit 52 before being directed to the throttle/brake actuators.

The train brake control signal 104 issued by the interface 72 is an eight (8) bit binary sequence applied to a value mounted in the train brake circuit to modulate the air pressure in the train line that controls the braking mechanism. The working fluid is supplied from a main reservoir whose integrity is monitored by the pressure sensor 79 described above. The independent locomotive brake is controlled in the same fashion with binary signal 106.

The operation of the locomotive control system will now be described with more detail.

SPEED CONTROL TASK

The flowchart of the speed control logic is shown in FIGS. 14a to 14d. The program execution begins by reading the velocity data generated from sensors 74 and 76 that are mounted at different axles of the locomotive. The data gathered from each sensor is stored in the memory 68 and then compared at step 124. If both sensors are functioning properly they should generate identical or nearly identical velocity values. In the event a significant difference is noted the CPU 66 concludes that a malfunction exists and issues a command (step 126) to fully apply the independent brake in order to bring the locomotive to a complete stop.

Assuming that no mismatch between the readings of sensors 74 and 76 is detected, the CPU 66 will compare the observed locomotive speed with the speed requested by the operator. The later variable is represented by a string of three (3) bits in the locomotive status word (the flowchart of FIGS. 14a to 14d assumes that the locomotive status word has been correctly received, has the proper identifier and has been stored in the memory 68). The operator can select on the portable transmitter 10 eight possible speed settings, each setting being represented by a different binary sequence. The speed settings are as follows:

1) STOP

2) COAST WITH BRAKE

3) COAST

4) COUPLE (1 MILE PER HOUR (MPH))

5) 4 MPH

6) 7 MPH

7) 10 MPH

8) 15 MPH

If any one of settings 4 to 8 have been selected, which require the locomotive to positively maintain a certain speed, the CPU 66 will effect a certain number of comparisons at steps 128 and 130 to determine if there is a variation between the actual speed and the selected speed along with the sign of the variation, i.e. whether the locomotive is overspeeding or moving too slowly. More particularly, if at step 128 the CPU 66 determines that the observed speed is in line with the desired speed no corrective measure is taken and the program execution initiates a new cycle. On the other hand, if the actual speed differs from the setting, the conditional test 130 is applied to determine the sign of the difference. Under a negative sign, i.e. the locomotive is moving too slowly, the program execution branches to processing thread A (shown in FIG. 14b). In this program segment the CPU 66 will determine at step 132 the velocity error by subtracting the actual velocity from the set point contained in the locomotive status word. A proportional plus derivative plus integral algorithm is then applied for calculating throttle setting intended for reducing the velocity error to zero. Essentially the CPU 66 will calculate the sum of the integral of the velocity error signal (calculated in step 145), of the derivative of the velocity error signal (calculated in step 147), and of a proportional factor (calculated in step 143). The latter is the velocity error signal multiplied by a predetermined constant. The result of this calculation provides a control signal that is used for modulating the throttle actuator of the locomotive through output signal 102 of the interface 72.

FIG. 15a is a diagram illustrating the variation of the current velocity signal, the set point, the velocity error, the velocity error integral, the velocity error derivative and velocity error proportional with respect to time.

With reference to FIG. 14d, when the new throttle setting has been implemented the program execution continues to steps 134 and 136 where the current direction of movement and speed of the locomotive are determined from the reading of sensor 74. In the event the CPU 66 observes a zero speed value for a time period of more than 20 seconds in spite of the fact that a tractive effort is being applied (step 138), it declares a malfunction and fully applies the independent locomotive brake. Normally, when a tractive effort is applied it causes the locomotive to accelerate. The movement, however, may occur after a certain delay following the application of the tractive effort especially if the locomotive is pulling a heavy consist. Still, if after a certain time period no movement is observed, some sort of malfunction is probably present. One possibility is that both sensors 74 and 76 have failed and register zero speed even when the locomotive is rolling. This is highly unlikely but not impossible. When such condition is encountered the CPU 66 immobilizes the locomotive immediately upon determination that a fault is present.

The 20 seconds waiting period before application of the independent brake is implemented by verifying the velocity data from sensor 74 during a certain number of program execution cycles. For instance, the current velocity value is compared to the velocity value observed during the previous execution cycle that has been stored in the memory 68. If a change is noted, i.e. the locomotive moves, then the step 138 is considered to have been successively passed. If, however, after 200 execution cycles that require about 20 seconds to be completed, no change with the previously observed velocity value is noted, the independent brake is fully applied.

Assuming that motion of the locomotive is detected at step 138, the program proceeds to step 140 where the direction of movement of the locomotive read from the output of sensor 74 is compared to the direction of movement specified by the operator. This value is represented by a four (4) bit string is the locomotive status word. If the locomotive is moving rearwardly while the operator has specified a forward movement, the CPU 66 detects a condition known as “rollback”. Such condition may occur when the locomotive is starting to move upwardly on a grade while pulling a heavy consist. Under the effect of gravity the train may move backward for a certain distance until the traction system of the locomotive has been able to build-up the pulling force necessary to reverse the movement. During a rollback condition the electric current in the traction motors of the locomotive increase beyond safe levels. Hence it is desirable to limit the rollback in order to avoid damaging the hardware. The program is designed to tolerate a rollback condition for no longer than 20 seconds. If the condition persists beyond this time period the independent brake is fully applied. The 20 seconds delay is implemented by comparing the evolution of the results of the comparison step 140 with the results obtained during the previous execution cycle; if the results do not change for 200 program execution cycles that require about 20 seconds of running time on the CPU 66, a fault is declared and the brake applied.

In the case where both tests 136 and 140 are successively passed, i.e. the locomotive is moving in the selected direction, the program execution returns to the beginning of the cycle as shown in FIG. 14a.

Referring back to step 130, if the conditional branch points toward processing thread B (see FIGS. 14a and 14c), which means that the locomotive is overspeeding, then the CPU 66 will calculate at step 142 the difference between the selected speed and the observed speed. The resulting error signal is then processed by using the proportional plus derivative plus integral algorithm described above to derive a new throttle setting. If by controlling the throttle (reducing the tractive effort developed by the engine) speed correction cannot be achieved, the brake is applied. The brake is modulated by using a proportional plus derivative plus integral algorithm. FIG. 15b illustrates the brake response, along with the actual brake, error, proportional, derivative, and integral signals with relation to time. The calculated brake setting is issued as binary signal 106 (see FIG. 10) that is directed to the braking mechanism on the locomotive.

The STOP, COAST WITH BRAKE and COAST settings will now be briefly described. The STOP setting, as the name implies, intends to bring and maintain the locomotive stationary. When the CPU 66 receives a locomotive status word containing a speed setting corresponding to STOP it immediately terminates the tractive effort and applies the independent locomotive brake at a controlled rate. The program logic to implement the COAST and COAST WITH BRAKE services is illustrated as flowcharts in FIGS. 16a and 16b, respectively. When the multi-position lever 14 is set to the COAST setting the program reads the velocity data from sensor 74 at step 144 and then compares it at step 146 to the velocity value recorded during the previous program execution cycle. If the consist accelerates under the effect of gravity down a grade (no tractive effort is applied by the system in the COAST and COAST WITH BRAKE settings) the observed velocity will show an increase. The CPU 66 will then apply the independent locomotive brake to slow the consist at step 148. The brake is modulated by using a proportional plus integral plus derivative (PID) algorithm. In the event that no velocity increase is observed the CPU 66 may set (depending upon the control signal resulting from the PID calculation) the independent brake to the release position at step 150 or keep the brake at the current setting.

The next step in the program execution is a test 152 which determines if the speed of the consist is below 0.5 MPH. In the affirmative the movement is stopped by full application of the independent brake at step 154. If the speed of the consist exceeds or is equal to 0.5 MPH then the program returns to step 144.

The COAST WITH BRAKE function, depicted in FIG. 16b is very similar to the COAST service described above. The only difference is that a minimum independent brake pressure of 15 pounds per square inch (psi) is always maintained. At step 156 the acceleration of the consist is determined by comparison of the current velocity with a previous velocity value. If a positive acceleration is observed, such as when the consist moves down a grade, the brake pressure is increased at step 158 (the control is made by a PID algorithm). During the next program execution cycle the acceleration is determined again. If no positive acceleration is sensed the brake pressure is returned to 15 psi at step 160. At step 162 the velocity of the consist is tested against the 0.5 MPH value. If the current speed is less than this limit a full independent brake application is effected in order to stop the consist, otherwise the program execution initiates a new cycle.

EXCHANGE OF COMMAND AUTHORITY BETWEEN REMOTE TRANSMITTERS

In some instances a single operator may effectively and safely control a consist that includes a limited number of cars remaining at all times well within the visual range of the operator. However, when the consist is long two operators may be required, each person being physically close to and monitoring one end of the train. The present invention provides a locomotive control system capable of receiving inputs from the selected one of two or more remote transmitters. In a two-operator arrangement, each person is provided with a portable transmitter 10 able to generate the complete range of locomotive control commands. In order to avoid confusion, however, the slave controller on-board the locomotive will accept at any point in time commands from a single designated transmitter. The only exception is a limited set of emergency and signalling commands that are available to both operators. The control function can be transferred from one transmitter to the other by following the logic depicted in the flowchart of FIGS. 17a and 17b.

Upon reception of a locomotive status word, the CPU will compare the identifier in the word to a list of two or more possible identifiers stored in the memory 68. The list of acceptable identifiers contains the identifiers of all the remote transmitters permitted to assume control of the locomotive. If the identifier in the locomotive status word does not correspond to any one of the identifiers in the list, then the system rejects the word and takes no action. Otherwise, the system will determine what are the requested functions that the locomotive should perform. If the locomotive status word requests application of the emergency brake or sounding the bell or horn, then the system complies with the request. Otherwise (step 179), if a new speed setting is requested for example, the system will comply only if the identifier in the locomotive status word matches a specific identifier in the list that designates the remote transmitter currently holding the command authority. If this step is verified, then the locomotive executes the command unless the command is a request to transfer command authority to another remote controller. The CPU 66 recognizes this request by checking the state of the bit reserved for this function in the locomotive status word. If the state of the bit is 1 (command transfer requested) the program execution continues at step 180 where the CPU 66 will perform a certain number of safety checks to determine if the command transfer can be made in a safe manner. More particularly, the CPU will determine if the locomotive is stopped and if the brake safety checks (to be described later) are verified. If the locomotive is moving or the brake safety checks fail, then no action is taken and the command remains with the portable transmitter currently in control. If this test is passed, then the CPU will monitor the reset bit of all the locomotive status words received that carry an identifier in the list stored in the memory 68 (the reset bit issued by the transmitter currently holding the controls is not considered). If within 10 seconds of the reception of the request to transfer control from the current transmitter the CPU observes a reset bit in the high position, which means that the operator of a remote transmitter in the pool of candidates able to acquire control has depressed the reset button, then the CPU 66 shifts in memory the identifier associated with the reset bit at high to the position of the current control holder. From now on the CPU 66 will accept commands (except the safety related functions of emergency brake and sounding the bell/born) only from the new authority. The procedure of checking the reset bit is used for safety purposes in order to transfer the control of the locomotive only when the target remote controller has effectively acknowledged acceptance of the control.

If within the 10 seconds no reset bit is set to the high position, the CPU 66 will abort the transfer function and resume normal execution of the program.

BRAKE SAFETY CHECKS

FIG. 18 is a flow chart of a program segment used to identify the state of readiness of the braking system before authorizing movement of the locomotive. When a command is received to move the locomotive forward, the CPU 66 will check the pressure in the main tank that supplies compressed air to both the independent locomotive and to the train brake. If the pressure is below a preset level, the command to move the locomotive forward is aborted and no action is taken. A second/verification step is required to allow movement of a locomotive which is a measurement of the flow rate of compressed air in the train brake line. The traction control signal 102 is issued only when the compressed air flow rate is below a predetermined level. As briefly discussed earlier, it is normal for a train brake line to exhibit a certain leakage due to imperfect couplings in unions between cars. However, when this leakage exceeds a predetermined level, either there is a major leak or the system is discharged and it is currently being pumped with air. In both cases the train should not be operated for obvious safety reasons.

The scope of the present invention is not limited by the description, examples and suggestive uses herein as modification and refinements can be made without departing from the spirit of the invention. Thus, it is intended that the present invention covers the modification and variations of this invention provided they come within the scope of the appended claims and their equivalents.

Patent Citations
Cited PatentFiling datePublication dateApplicantTitle
US733035Aug 22, 1902Jul 7, 1903Henry M HardingMeans for varying the speed of overhead electric carriers.
US1360150Apr 17, 1920Nov 23, 1920 And one-thied
US1437637Mar 1, 1921Dec 5, 1922Dunkelberger Milton SDistant electrical control means
US1515948Jan 6, 1920Nov 18, 1924Jr John Hays HammondToy locomotive
US1653172Jun 11, 1920Dec 20, 1927Jr John Hays HammondRadiocontrol of engine speed
US1765173Jul 11, 1928Jun 17, 1930Dean S MorrowRemote control means for cranes
US1788815Mar 19, 1930Jan 13, 1931Tubach Friedrich AVariable-speed gear mechanism
US1816628Apr 3, 1925Jul 28, 1931Williams Frank CTrain stopping and speed controlling mechanism
US1923499Feb 24, 1932Aug 22, 1933William NakenAutomatic train control
US1929297May 4, 1932Oct 3, 1933Gen ElectricRemote control system
US2235112Feb 7, 1940Mar 18, 1941Pulaski Sidney SSpeed control for vehicles
US2257473Apr 15, 1938Sep 30, 1941Marx & Co LouisRemote control system for toys
US2278358Dec 13, 1939Mar 31, 1942Marx & Co LouisRemote control system for toys
US2331003Mar 24, 1941Oct 5, 1943Gilbert Co A CRemote control circuit
US2447669Feb 8, 1943Aug 24, 1948Westinghouse Electric CorpRemote-control system
US2513342Aug 28, 1945Jul 4, 1950Us ArmyRadio remote-control system
US2523662May 31, 1946Sep 26, 1950Motoview IncRemotely controlled photographic apparatus movable along a track
US2576424Oct 9, 1948Nov 27, 1951Philco CorpAutomatic speed control for railguided vehicles
US2643369Sep 28, 1945Jun 23, 1953Robert P CherpeskiModulated pulse remote control
US2649835Sep 15, 1949Aug 25, 1953John T LierleyAutomatic control of the movement of picturemaking equipment
US2708885Sep 14, 1949May 24, 1955Gilbert Co A CSeparate remote control of toy train and carried accessory
US2709773Oct 19, 1945May 31, 1955Lee L DavenportRemote control system with position indicating means
US2743678Jul 11, 1950May 1, 1956Alvin D WertMethod of and system for the remote control of model railroads
US2768331Jun 21, 1954Oct 23, 1956Sperry Rand CorpFail-safe speed control system
US2769601Aug 18, 1950Nov 6, 1956Northrop Aircraft IncAutomatic radio control system
US2780300Aug 9, 1955Feb 5, 1957Beyer Millard LRemote variable control of vehicle speed
US2832426Dec 20, 1951Apr 29, 1958William A SeargeantTeledynamic system for the control of self-propelled vehicles
US2948234Sep 30, 1957Aug 9, 1960Gen Railway Signal CoRemote control organization for a locomotive
US2951452Apr 5, 1957Sep 6, 1960Gen Railway Signal CoRemote control system for a trimming locomotive
US2961640Jun 16, 1958Nov 22, 1960Westinghouse Air Brake CoAutomatic radio-transmitted brake application and release signalling apparatus for railway trains
US2993299Jan 23, 1958Jul 25, 1961Dickinson Thorn WRemotely controlled trackless vehicle
US2998513Jun 22, 1959Aug 29, 1961Westinghouse Air Brake CoTrain control system
US3029893Aug 25, 1958Apr 17, 1962Gen Motors CorpAutomatic vehicle control system
US3072785Apr 21, 1960Jan 8, 1963Gen Railway Signal CoRemote control system for vehicles
US3086319Apr 25, 1960Apr 23, 1963Gilbert Co A CRoad traffic toy remote controlled
US3096056Jan 25, 1961Jul 2, 1963Westinghouse Air Brake CoLocomotive remote control system
US3201899Mar 30, 1962Aug 24, 1965Amt CorpRemotely controlled toy and track arrangement therefor
US3205618Jun 17, 1963Sep 14, 1965Solomon HeytowRemote control system for toy automobiles
US3218454Oct 24, 1960Nov 16, 1965Gen Signal CorpVehicle control system
US3227870Nov 16, 1960Jan 4, 1966 Automatic control for trains and other vehicles
US3229086Nov 8, 1960Jan 11, 1966 Automatic train operation systems
US3239962Mar 29, 1962Mar 15, 1966Amt CorpRemotely controlled electrically driven and steered toy vehicle
US3253143Dec 9, 1960May 24, 1966Gen Signal CorpLocomotive control system
US3263625Nov 29, 1961Aug 2, 1966IttElectrical control systems for point-to-point transit systems
US3268727Mar 25, 1964Aug 23, 1966Gibbs & Hill IncComputer control for transit system
US3293549Sep 23, 1963Dec 20, 1966Gen Signal CorpRadio communication system for control of locomotives
US3304501Aug 20, 1964Feb 14, 1967Motorola IncTime delay circuit for briefly holding a selective call transmitter energized
US3312818Oct 12, 1964Apr 4, 1967 Speed control system
US3315613Jul 22, 1963Apr 25, 1967Leslie Res CoRemote control for model train system
US3328580Jul 14, 1964Jun 27, 1967Westinghouse Air Brake CoRapid transit speed control system
US3355584Oct 1, 1965Nov 28, 1967Westinghouse Air Brake CoTrain speed control system
US3355643Jan 28, 1964Nov 28, 1967Gen ElectricPlural remote controllers for plural motors using a common power connection
US3361082Jul 11, 1966Jan 2, 1968Donald J. LeslieModel train control system
US3368073Oct 1, 1965Feb 6, 1968Westinghouse Air Brake CoTrain speed control system
US3374035Jul 1, 1966Mar 19, 1968Gen Signal CorpBrake control systems for multiple unit trains
US3378817Dec 9, 1964Apr 16, 1968Gen ElectricSignalling systems
US3380399Jun 30, 1965Apr 30, 1968North Electric CoRemote control and supervision system for a railroad train
US3384033May 25, 1967May 21, 1968Douglass RuffSemi-automatic locomotive control system
US3402972Aug 11, 1966Sep 24, 1968Gen ElectricContinuous pressure control system
US3530434 *Jun 14, 1967Sep 22, 1970Sylvania Electric ProdCoded frequency vehicle identification system
US3539226Feb 10, 1969Nov 10, 1970Gen Signal CorpOverride-nullifying scheme for train control system
US3553449Jul 1, 1968Jan 5, 1971Westinghouse Air Brake CoCentral office control circuits for remote control systems
US3583771Sep 2, 1969Jun 8, 1971Westinghouse Air Brake CoLocomotive brake control apparatus suited for remote multiple-unit operation
US3593293Jul 1, 1968Jul 13, 1971Bjorn A RorholtRemote control and data logging system
US3601605Aug 28, 1969Aug 24, 1971Westinghouse Air Brake CoCab signal and speed control for locomotives
US3610363Nov 29, 1968Oct 5, 1971Hartley Frederick WalterAutomatic vehicle guidance system
US3628463Feb 20, 1970Dec 21, 1971Interlake Steel CorpSpeed-control device
US3639755Jan 2, 1970Feb 1, 1972Gen Signal CorpRemote control of a locomotive
US3646613Oct 21, 1968Feb 29, 1972Tsubakimoto Chain CoAutomatic carrying system
US3650216Aug 11, 1969Mar 21, 1972Rex Chainbelt IncRailway car speed control transportation system
US3652937Nov 2, 1970Mar 28, 1972Garrott William LSpeed and fault indicator for a model vehicle
US3655962Apr 1, 1969Apr 11, 1972Melpar IncDigital automatic speed control for railway vehicles
US3660653Jun 5, 1970May 2, 1972Pullman IncRailroad car speed control mechanism
US3686447Feb 24, 1971Aug 22, 1972Kauko Armas TakaloRemote controlled miniature-vehicle
US3687082 *Sep 10, 1970Aug 29, 1972Avco CorpAutomatic electric power supply and speed control system for automated driverless vehicles
US3694650Nov 27, 1970Sep 26, 1972Westinghouse Air Brake CoCar coupling maximum speed control system
US3696758Dec 18, 1969Oct 10, 1972Genisco Technology CorpLocomotive signaling and control system
US3728565Jul 21, 1971Apr 17, 1973Eaton CorpDevice for sensing the direction and speed of a shaft
US3811112Oct 10, 1972May 14, 1974Saab Scania AbControl command security in binary remote control
US3840736Oct 27, 1972Oct 8, 1974Mitsubishi Electric CorpApparatus for controlling vehicles at junction points
US3870939Jun 22, 1972Mar 11, 1975Matra EnginsMethod for controlling acceleration and deceleration of a traction motor
US3880088Jul 23, 1973Apr 29, 1975Goodyear Tire & RubberVehicle control system and method
US3885137May 8, 1972May 20, 1975Aisin SeikiMethod and system for constant-speed running of vehicles
US3904249Mar 6, 1972Sep 9, 1975Westinghouse Brake & SignalRemote control braking apparatus including jerk control
US3906348 *Aug 20, 1973Sep 16, 1975Chamberlain Mfg CorpDigital radio control
US3937431Sep 12, 1974Feb 10, 1976Siemens AktiengesellshaftPostioning apparatus for tracked transport vehicles with linear motor propulsion
US3941202Apr 30, 1970Mar 2, 1976Trw Inc.Digital speed control
US3964701May 27, 1975Jun 22, 1976John KacerekModel railroad train control system
US3980261Feb 3, 1975Sep 14, 1976London Transport ExecutiveSpeed governors
US3994237Oct 6, 1975Nov 30, 1976Heath CompanyPower supply for realistic control of model railroad engines
US4002314Jul 7, 1975Jan 11, 1977Westinghouse Electric CorporationTrain vehicle speed control signal providing apparatus
US4005837May 27, 1975Feb 1, 1977Westinghouse Air Brake CompanyCircuit arrangement for controlling the propulsion, braking and station stopping function for a rapid transit train
US4005838May 27, 1975Feb 1, 1977Westinghouse Air Brake CompanyStation stop and speed regulation system for trains
US4013323Jun 9, 1976Mar 22, 1977Westinghouse Air Brake CompanyRemote control brake system for a railway train
US4015082Mar 13, 1975Mar 29, 1977Westinghouse Electric CorporationMulti-channel signal decoder
US4041470Jan 16, 1976Aug 9, 1977Industrial Solid State Controls, Inc.Fault monitoring and reporting system for trains
US4056286Jun 8, 1976Nov 1, 1977Westinghouse Air Brake CompanyRemote control brake system for a railway train
US4063784Feb 11, 1977Dec 20, 1977Knorr-Bremse GmbhTwo-pressure brake control valve for airbrakes
US4066299May 17, 1977Jan 3, 1978Southern Pacific Transportation CompanyApparatus for locating a malfunctioning brake control valve on train
US4067264Jan 15, 1976Jan 10, 1978Hoogovens Ijmuiden B.V.Locomotive cab running boards
US4087066Jun 10, 1977May 2, 1978Siemens AktiengesellschaftTrain protection and control system
US4162486 *Jan 7, 1977Jul 24, 1979Tre CorporationEncoded electrical control systems
US4241331 *Oct 10, 1979Dec 23, 1980Siemens AktiengesellschaftRemote control system with proportional value transmission
US4519002 *Oct 20, 1981May 21, 1985Sony CorporationControlling the operations of at least two devices
US4687258 *Dec 11, 1985Aug 18, 1987Canadian National Railway CompanyRemote control system for a locomotive
US5039038 *Oct 3, 1989Aug 13, 1991Harris CorporationRailroad communication system
US5284097 *Oct 31, 1991Feb 8, 1994Loram Maintenance Of Way, Inc.Ballast distribution, regulation and reclaiming railroad maintenance device
US5479156 *Dec 20, 1994Dec 26, 1995Magnadyne CorporationVehicle security system responsive to short and long range transmitters
USRE28306Oct 1, 1973Jan 21, 1975 Automatic electric power supply and speed control system for automated driverless vehicles
Non-Patent Citations
Reference
1"CN Technical Research, Flat Yard Beltpack System (FYBS) Presentation," dated Jan. 15, 1992, pp. 1-2, context diagram, and Figure 4.2.
2"Flat Yard Beltpack System-External Design Report," CANAC International Inc., dated Jan. 22, 1993, pp. 1-4 (errata sheets); pp. 1-4; 1-1-1-2; 2-1; 3-1-3-4; 4-1-4-30; 5-1-5-2; 6-1-6-12; 7-1-7-4; 8-1-8-3; A1-1-A1-10; A2-1-A2-2.
3Angold, J. A., Experience with a Long Distance Unit Coal Train, Contributed by the Intersociety Committee on Transportation for presentation at the Intersociety Conference on Transportation, Atlanta, Georgia, Jul. 14-18, 1975, pp. 1-7.
4Armstrong, John H., Industrial Car Movers: New Power in an Old Package, Railway Age, Mar. 10, 1980, pp. 25-26.
5ATCS Advances-Slowly, Railway Age, Feb. 1991, pp. -3.
6Azouaoui, Youssef, Tough Environment Dictates Standards of Electrification, Railway Gazette International, Jun. 1980, pp. 501-505.
7Biesenbaen, Von Wolfgang and Backer, Kurt, Funkfernsteuerung von Rangierlokomotiven mit tragbarem Sendegerät, pp. 295-302, (no date).
8Canada's Troubled Railroads, Railway Age, Feb. 1991, pp. -3.
9Canadian National Contract Proposal by Theimeg USA, Inc., dated Feb. 15, 1991 (87 pages).
10Carlson, Frederick G., & Hawthorne, Keith L., Train Braking Systems, Now and Into the Future, Railway Age, Copyright Simmons-Boardman Publishing Corp. 1992, Jan. 1, 1992, pp. 1-8.
11CN Technical Research Centre, "Flat Yard Switching Project, Minutes of Status Meeting #1 with Transportion-Technological Development," dated Apr. 10, 1989, pp. 1-2.
12CN Technoligical Development (LCS BP Presentation) "Locomotive Control System LCS-Beltpack", (fax dated Oct. 11, 1994) pp. 1-13.
13Copy of business card of John T. Bruere (1 page); letter to Canadian National Railway Company from John T. Bruere dated Jan. 25, 1991 (1 page), with a copy of the enclosures (Proposal Flat Yard Beltpack System Canadian National Railways)(44 pages).
14Cut Your Fuel Costs Without Throttling Performance, Transportation Technology Worldwide, p. -1, (no date).
15Davis, Harold, Thin Seam Yields High Output, Coal Age, Jul. 1979, pp. 104-107.
16Escher, Roland, Remote Control and Transmission of Data by Radio, Technische Mitteilungen AEG-Telefunken, vol. 64, No. 4, 1974, pp. 129-131.
17Fax Cover (1 page) to ATSE from CN North America dated Oct. 22, 1992, with Locomotive Control System LCS-Beltpack Flat Yard Application CN Rail (11 pages).
18Fax cover sheet from F. Horst to G. C. Hutt dated Jul. 6, 1990 with attachments: (1) letter from F. Horst to G. C. Hutt dated Jul. 5, 1990 regarding Flat Yard Beltpack Demonstration Unit Loco #7530-1 page; (2) letter from R. Schreyer to W. N. Caldwell dated Jul. 5, 1990, including Vectran Specification #900235 Modifications to CNR Equipments-4 pages.
19Fax Cover to Canadian National Railways from Richard C. Seeman dated Dec. 18, 1991, with invoice No. 12320 and requisition item (3 pages).
20Fax Cover to Glen W. Masleck from John G. Risch dated Nov. 23, 1992 (1 page) with letter to Doug Arsineau from John G. Risch dated Nov. 23, 1992 (1 page), and letter to Glenn W. Masleck from John Risch dated Nov. 23, 1992 (9 pages).
21Fax Cover to Glen. W. Masleck from Jeffrey A. McCann dated Dec. 7, 1992, with revised quoation No. 920384-3 (4 pages).
22Fax cover to Glenn W. Masleck from Jeffrey A. McCann dated Dec. 7, 1992, with quotation No. 920384-4, and fax to G. Patterson from Doug Arsineau dated Dec. 8, 1992 (5 pages).
23FCC Grants Petition on Tone Modulation, Railway System Controls, Jul. 1972, pp. 11-12.
24Fischer, K., Radio-Telephone for Railroads and Local Traffic, Glasers Ann, vol. 94, Nr. 12, Dec. 1970, pp. 387-393.
25Frank, W., Automatic Radio Control for Train Running, Signal und Draht, vol. 69, No. 4, Apr. 1977, pp. 69-76.
26Gabriel, Jiri, Vyu{hacek over (zití bezdrátového p{hacek over (renosu k dálkovému {hacek over (rízení posunovacich lokomotiv, Elektrotechn. obzor 69, (1980), pp. 452-454.
27Go, G.B., A Modular-Built Warning System to Warn Track Maintenance Gangs of Approaching Trains, Signal und Draht, vol. 69, Nr. 1/2, 1977, pp. 29-31.
28Grolms, R. And Schmidt, M., Radio Remote Control of the Hump Locomotives at the Munich (North) Marshalling Yard, Signal und Draht, vol. 82, No. 12, 1990, pp. 231-235.
29Grolms, Reinhard and Mickler, Günther, Humping Control System Using 32-bit Technology for the Munich-North Marshalling Yard, Signal und Draht, 1989, pp. 206-214.
30Gunther, J., et al., Fu BR 80 Type-a novel radio-remote control facility for brake test plants, Signal und Draht, vol. 75, No. 11, pp. 202-209, (no date).
31Huybrechts, J.C.R., Telecommunications and Remote Control in Underground Workings (German/French document), Annales des Mines de Belgique, Jun. 1980, pp. 637-651.
32Implementation Officers Play Key Role (Association of American Railroads Vehicle Track Systems Newsletter), Railway Age, Copyright Simmons-Boardman Publishing Corp. 1990, Jun. 1, 1990, pp. 1-4.
33Japanese Document, Maruzen IEEE, ISBN4-621-03400-6 C3554, 1989, p. 596.
34KCS Extends Remote Controlled Locomotive Operation and CTC, Railway System Controls, Dec. 1972, pp. 28-29.
35Koerbs, Thorald, Radio Remote Control for VPS Shunting Operations, Zeitschrift fuer Eisenbahnwesen und Verkehrstechnik-Glasara Annalen, vol. 109, Nr. 2-3, Feb.-Mar. 1985, pp. 142-148.
36 *LCS BP Presentation, "Locomotive Control System Symington Yard," Sep., 1991 (pp. 1-15).
37Letter (in German) dated Aug. 14, 1991, to Theimeg USA from Ingrid Lange regarding travel plan and tickets for CN personnel (translation included)(7 pages).
38Letter dated Apr. 21, 1992, to J.W. Armstrong from D.H. Grant regarding flat yard testing (2 pages).
39Letter dated Jul. 7, 1989, to Cliff Johnstone from Fredrick Goy regarding THEIMEG Remote Control and Data Transmission systems for railroads (2 pages).
40Letter dated Sep. 18, 1991, to Mr. G.C. Hutt from John G. Risch regarding translation from Deutsche Bundesbahn (2 pages).
41Letter dated Sep. 9, 1991, to Theimeg Electronikgerate from John Risch regarding Canadian National-Feedback from Cliff Johnstone (1 page).
42Letter from N. Caldwell to G. C. Hutt dated Oct. 10, 1990 with attached "External Design Report for CN7530 Demonstration Upgrade," CN Techincal Research Center, dated Oct. 1990 (Title page, contents page, pp. 1-10).
43Letter to Glen W. Masleck and Doug Arsineau from Jeffrey A. McCann dated Dec. 4, 1992 (1 page), with Vectran quotation No. 920384-2 (3 pages).
44Letter to Glenn Masleck from Robert R. O'Farrell dated Feb. 13, 1991 (1 page), with Vectran Proposal 910140 (32 pages).
45Letter to Glenn W. Masleck from Jeffrey A. McCann dated Nov. 4, 1992 (1 page), with quotation No. 920384 (5 pages).
46Letter to H.C. Henry from G. Patterson dated Dec. 18, 1992 (1 page), letter to R.M. Schmidt from G. Patterson dated Apr. 1, 1993 (2 pages), with a copy of the enclosures (Proposal to ATSF Railway Co. for Application of a Beltpack Locomotive Control System at Argentine Yard-Mar. 1993 proposed 904A)(16 pages), Canac International Inc. Railroad Technologies Division Humping Procedures (2 pages)and LCS ATSF Argentine Yard Mar. 1993 (1 page) and System Price (1 page).
47Linde, Helmut et al., Ferngesteuerte Thyristor-Grubenlokomotiven für den Erzbergbau, Techn. Mitt AEG-Telefunken 60 (1970) 4, pp. 239-246.
48Linker, W., and Schliebus, K., Locally-Operated Electric Switch. Mode of Operation and Possible Uses, Signal und Draht, vol. 72, No. 1-2, Jan.-Feb. 1980, pp. 35-38.
49LITERATURE, Railway Age, Mar. 1991, pp. -3.
50Macro Benefits From Microprocessors, Railway Age, Mar. 1989, pp. 38-40.
51Massie, Herbert L., Channel Utilization by Remote Locomotive Control Systems Using Digital Transmission, Atchison, Topeka & Sante Fe Railway Company, pp. 134-137, (no date).
52Mcqueen, W.M. & Co. Pty Ltd., Deep Seam-Face Automation Stage 3-Continuous Haulage and Miner Remote Control, Commonwealth of Australia, National Energy Research, Development & Demonstration Program, End of Grant Report No. 752, May 1988, pp. -284.
53Meier, Felix and Kraähenbühl, Von Peter, Rationalisierung durch Lok-Fernsteuerung, Funkanlagen, Apr. 1981, pp. 360-364.
54Memo dated Aug. 13, 1991, to H. Plum from H. Rische regarding CN topics of discussion (1 page).
55Memo dated Sep. 2, 1991, to GF from T (signed by Hans-Jurgen Wunderer) regarding description of the actual Vectran-CN-System for meeting on Aug. 30, 1991 with Mr. Horst (4 pages).
56Miller, Luther S., ATCS Advances in Canada, Railway Age, Mar. 1989, pp. 41-43.
57New Concepts in Today's Track Mines, E/MJ Mining Guidebook, Jun. 1970, pp. 164-167.
58Parker, C.W., Design and Operation of Remote-Controlled Locomotives in Freight Trains, Jan. 1974, pp. 29-38.
59Products Report, Railway Age, Aug. 1989, pp. 73-74.
60Program (in German) dated Oct. 5, 1989, for visit of Cliff Johnstone (translation included)(6 pages).
61Purchase Order No. 00-6677 dated Dec. 22, 1992, with letter to Jeffrey A. McCann dated Dec. 21, 1992, with Command Confirmation Report (3 pages).
62Quantum-VMV Trainmaster(TM) Locomotive Control System, Paducahbilt, http://www.paducahbilt.com/Pages/trainmaster_new.htm, Feb. 27, 2002, pp. 1-4.
63Quotation No. 920384-1 dated Nov. 4, 1992, to Glenn W. Masleck (5 pages).
64Radio Controlled Mine Locomotive, Measurement and Control, vol. 9, Jul. 1975, p. 256.
65Radio-Controlled Locomotives, BBC Summary of World Broadcasts, Copyright 1986 The British Broadcasting Corporation, Jul. 12, 1986, p. -1.
66Rail Update, Railway Age, Sep. 1992, pp. -2.
67Remote Control of Slave Locomotives, The Railway Gazette, Sep. 6, 1968, pp. 672-673.
68Republic of South Africa Application for a Patent Acknowledgement of Receipt entitled "Data Transmission Systems," dated Jul. 2, 1982, Hans-Arnim Lange; Patent Application No. 824733, pp. -14.
69Richter, R., Radio-Remote Control of Locomotives on Factory Sites, Journal Berg-Huettenmaenn. Monatsh, Jan. 1980, 125 (1), pp. 29-36.
70Rieger, Franz, Operation with Diesel Locomotives on the German Federal Railways, Eisennahningenieur, vol. 36, No. 12, Dec. 1985, pp. 561-566.
71Rockwell International, If You Knew What Rockwell ATCS Could Do For Your Bottom Line, We'd Already Be Talking, Railway Age, Jun. 1989, pp. -4.
72S.D. Zaets & A.M. Shul'Ga, Braking System for Remotely and Automatically Controlled Electric Locomotives, Koksi Khimiya, No. 3, pp. 43-44, (no date).
73Sapahob, et al., Chctema Teaeynpabaehhr Aokomothbom "TA-76", Astomstinka, pp. 14-17, (no date).
74Schematic Wiring Diagram, Mar. 7, 1990 (30 pages).
75Schiefar, Werner and Stubler, Heinz, Use of remote-controlled locomotives in an iron and steel works, Stahl u. Eisen 95 (1975) Nr. 20, pp. 931-936.
76Schmidt, M. and Schurmans, P., Radio Remote-Controlled Humping Locos-Signalling Elements, Signal und Draht, vol. 80, No. 9, Sep. 1988, pp. 205-207.
77Schmidt, Manfred, Funkferngesteuerte Abdrüklokmotiven, Eisenbahningenieur 1981, pp. 527-535.
78SMET Automatic Control System for Multiple Trains, BBC Summary of World Broadcasts, Copyright 1986 The British Broadcasting Corporation, Sep. 12, 1986, pp. -3.
79Stephens, Bill, Running Trains by Remote Control, Trains, Mar. 1994, pp. 45-49.
80Streit, Von Manfred, Funk-Fernsteuerung von Rangierlokomotiven, 1977, pp. -3.
81Streit, Von Manfred, Funk-Fernsteuerung von Rangierlokomotiven, Apr. 1977, pp. -3.
82Summary of information to gather during visit to Theimeg (2 pages), (no date).
83Tatematau, Osamu et al., Radio Control System of Diesel Hydraulic Locomotive, UDC 625 282-519, 1970, pp. 671-675.
84Thomas, Karl, Funkfernsteuerung von Dieselrangierlokomotiven bei der Deutschen Bundesbahn, ISSN 0342-8753, 1981-82, pp. 26-34.
85Tougyuam, Lia, et al., Application of Locomotive Radio Remote Control Technique to Heavy Haul Combined Train in Mountainous Region, pp. 102-109.
86Tukaoka, Tudush, et al., Automatic Train Operation Equipment Remote Control Type for the Shunting Locomotive in Ironworks, 1974, pp. 49-54.
87Ullrich, Gerhard, Fernsteuerung von Industrielokomotiven am Entladebunker des Kraftwerkes Scholven der Hibernia AG, Techn. Mitt AEG-Telefunken 60 (1970) 4, pp. 246-250.
88Update, Woodward's Complete Locomotive Control, Railway Age, Jul. 1990, pp. 3.
89Vantuono, William C., Lirr: Customer-Focused. (Long Island Railroad; Includes A Related Article on The Railroad's Freight Business), Railway Age, Copyright Simmons-Boardman Publishing Company 1992, Oct. 1, 1992, pp. 1-7.
90Vectran Corp. (Relocates), Railway Age; Copyright Simmons-Boardman Publishing Company 1994, Mar. 1, 1994, p. -1.
91Verlagsbuchhandlung, Georg Siemens, Present state of development of radio-controlled locomotive operation, ZEV-Glas. Ann. 107 (1983) Nr. 11, pp. 380-385.
92Welty, Gus, ATCS: More Than "Train Control," Railway Age, Aug. 1988, pp. 45-49.
93Welty, Gus, Putting The Pieces Together. (High-Tech Railroading), Railway Age, Copyright Simmons-Boardman Publishing Corp. 1990, Sep. 1, 1990, pp. 2-6.
94What's Holding up ATCS?, Railway Age, Apr. 1990, pp. 39-41.
95Wilson, Mark, CN to Axe 10,000 Workers Over 3 Years, 2002 Southam Inc., Vancouver Province, Dec. 11, 1992, pp. -2.
96Wolf, K.H., Efficient Shunting With Consideration of the Physical Stress on the Crew, Shahl und Eisen, vol. 97, Nr. 17, 1977, pp. 810-814.
97Yukatsu Sijustso (Hydraulic & Pneumatics), Special Issue: Radio Control of Industrial Equipment. Radio Control of Equipment at Steel Works, 1993, vol. 32, No. 12, pp. 43-47.
98Zirouhov, EI And Levin, IG, Remote Control of Locomotives Hauling Heavy Trains, Zheleznodorozhnyi Transport, No. 6, 1977, pp. 49-53.
99Zolle, Gunther, Heutiger Stand der Funkfernsteuerung von Industerielokomotiven in einem Huttenwerk, Stahl u. Eisen 102 (1982) Nr. 24, pp. 1237-1238.
100Zölle, Von Gunther, Funkfernsteuerung von Industsrielokomotiven in der Bundesrepublik Deutschland, Zeitschrift fuer Eisenbahnwesen und Verkahrstechnik, 109 (2-3), 1985, pp. 122-130.
Referenced by
Citing PatentFiling datePublication dateApplicantTitle
US8280569 *Sep 21, 2006Oct 2, 2012General Electric CompanyMethods and systems for improved throttle control and coupling control for locomotive and associated train
US8290646May 12, 2009Oct 16, 2012Hetronic International, Inc.Remote control system implementing haptic technology for controlling a railway vehicle
US8295992Mar 27, 2008Oct 23, 2012Hetronic International, Inc.Remote control system having a touchscreen for controlling a railway vehicle
US8380363Jun 21, 2011Feb 19, 2013Hetronic International, Inc.Remote control system having a touchscreen for controlling a railway vehicle
US8483887Jun 21, 2011Jul 9, 2013Hetronic International, Inc.Remote control system having a touchscreen for controlling a railway vehicle
US8509964Jun 21, 2011Aug 13, 2013Hetronic International, Inc.Remote control system having a touchscreen for controlling a railway vehicle
US8649916 *Jul 1, 2011Feb 11, 2014General Electric CompanyControl system
US20080077285 *Sep 21, 2006Mar 27, 2008Kumar Ajith KMethods and Systems for Improved Throttle Control and Coupling Control for Locomotive and Associated Train
US20130006443 *Jul 1, 2011Jan 3, 2013Woo Derek KControl system
Classifications
U.S. Classification246/187.00A, 340/12.51, 340/425.5
International ClassificationB61L3/12, B61L17/00, B61L3/00
Cooperative ClassificationB61L17/00, B61L3/126, B61L3/127
European ClassificationB61L3/12C, B61L17/00, B61L3/12D
Legal Events
DateCodeEventDescription
Dec 12, 2006CCCertificate of correction
Jan 20, 2005ASAssignment
Owner name: CATTRON INTELLECTUAL PROPERTY CORPORATION, PENNSYL
Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:BELTPACK CORPORATION;REEL/FRAME:015587/0725
Effective date: 20041015
Dec 29, 2004ASAssignment
Owner name: ARGOSY INVESTMENT PARTNERS II, L.P., PENNSYLVANIA
Free format text: SECURITY INTEREST;ASSIGNOR:CATTRON INTELLECTUAL PROPERTY CORPORATION;REEL/FRAME:016116/0653
Effective date: 20041015
Aug 12, 2004ASAssignment
Owner name: BELTPACK CORPORATION, CANADA
Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:CANAC INC.;REEL/FRAME:015036/0543
Effective date: 20040430
Jun 14, 2004ASAssignment
Owner name: BELTPACK CORPORATION, CANADA
Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:CANAC, INC.;REEL/FRAME:014728/0256
Effective date: 20040430