WO1999018039A1 - Apparatus and method for automatic congruent control of multiple boilers - Google Patents

Apparatus and method for automatic congruent control of multiple boilers Download PDF

Info

Publication number
WO1999018039A1
WO1999018039A1 PCT/US1998/016767 US9816767W WO9918039A1 WO 1999018039 A1 WO1999018039 A1 WO 1999018039A1 US 9816767 W US9816767 W US 9816767W WO 9918039 A1 WO9918039 A1 WO 9918039A1
Authority
WO
WIPO (PCT)
Prior art keywords
phosphate
boiler
fluids
sodium
fluid
Prior art date
Application number
PCT/US1998/016767
Other languages
French (fr)
Inventor
John C. Gunther
Haiwen Chen
John A. Muccitelli
Original Assignee
Betzdearborn Inc.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Betzdearborn Inc. filed Critical Betzdearborn Inc.
Priority to AU88278/98A priority Critical patent/AU8827898A/en
Publication of WO1999018039A1 publication Critical patent/WO1999018039A1/en

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N33/00Investigating or analysing materials by specific methods not covered by groups G01N1/00 - G01N31/00
    • G01N33/18Water
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F5/00Softening water; Preventing scale; Adding scale preventatives or scale removers to water, e.g. adding sequestering agents
    • C02F5/02Softening water by precipitation of the hardness
    • C02F5/025Hot-water softening devices
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05DSYSTEMS FOR CONTROLLING OR REGULATING NON-ELECTRIC VARIABLES
    • G05D21/00Control of chemical or physico-chemical variables, e.g. pH value
    • G05D21/02Control of chemical or physico-chemical variables, e.g. pH value characterised by the use of electric means

Definitions

  • the invention pertains to automatic control systems for continuously stirred tank reactors (CSTRs) .
  • the invention pertains to automatic control systems for realizing optimum congruency and phosphate concentration required to minimize corrosion in industrial high pressure boilers.
  • Industrial boilers heat up highly purified feedwater to generate steam for power generation, heating, etc.
  • a natural consequence of steam production is the "cycling up” in concentration of chemicals which enter the boiler inadvertently (e.g., acid leaks) or intentionally (e.g., corrosion inhibitors) .
  • a small portion of the boiler water is "blown down” (i.e., removal of concentrated boiler water from the boiler) to keep the concentrations of non-volatile chemicals (i.e., chemicals that do not flow out with the steam but rather remain substantially in the boiler water) at acceptable levels.
  • the rate of blowdown is defined by the "cycles of concentration.”
  • cycles of concentration is defined as the sum of the steam and blowdown flowrates divided by the blowdown flowrate. Cycles in high pressure boilers range from less than 10 to 100 or more. Thus a chemical added at a low concentration (e.g., 0.5 ppm) in the feedwater can cycle up to fairly high boiler concentrations (e.g., 30 ppm).
  • boilers are susceptible to, among other things, corrosion.
  • phosphate control programs typically, in phosphate control programs, a sodium phosphate salt is fed into the solution in order to buffer the solution and to maintain that pH with sodium.
  • the objective of these phosphate control programs is to maintain the measured variables, phosphate and pH, within certain stated guidelines, which are dependent upon boiler pressure by controlling the sodium, phosphate and resultant pH within the boiler water. See “Sodium Phosphate Solutions at Boiler Conditions: Solubility, Phase Equilibria, and Interactions with Magnetite," by G. economy, A.J. Panson, Chia-tsun Liu, J.N. Esposito, and .T. Lindsay, Jr. , Proc. Intl. Water Conf . , 1975, pp. 161-173.
  • the concentration of sodium within the boiler water (which is given by the pH, i.e., pH is proportional to effective sodium) is divided by the concentration of phosphate within the boiler water, there exists a range of optimum sodium-to- phosphate (Na/P0 4 ) ratios that, if achieved and maintained within the boiler water, will minimize corrosion.
  • Na/P0 4 sodium-to- phosphate
  • the boiler water is operated and maintained at a Na/PO, ratio that is below 3.0:1
  • the boiler is said to be operating with coordinated phosphate/pH control (also known as "captive alkalinity") .
  • the boiler water is operated and maintained at a Na/PO., ratio that is between 2.2:1 and 2.8:1
  • the boiler is said to be operating with congruent control.
  • the boiler is water is operated at a Na/POg ratio that is above 3.0, a boiler is said to be operating with "equilibrium phosphate control.” All three types of control can be attained and maintained with
  • the boiler uses phosphate as the major buffering agent. Additionally, sodium and phosphate concentrations are interdependent variables that must either be controlled simultaneously, or one subservient to the other. They cannot be controlled independently .
  • boiler systems are extremely slow systems because they comprise large volumes.
  • a 280,000 pound water boiler having a blowdown rate of 3000 pounds/hour takes over three days to remove and replenish the boiler water. Many things can happen during that time that can alter the operator's initial guess at what concentrations should be added to manually correct control problems.
  • the methods generally require one of two sets of conditions be maintained, either of which are difficult to achieve in an operating boiler.
  • the boiler chemistry In one general tuning method, the boiler chemistry must be held constant for multiples of the first order time constant defined by the volume of the boiler divided by its blowdown flow rate. In real-life applications, such a steady-state cannot be established for that length of time due to small perturbations in feedwater contaminants concentrations.
  • the boiler chemistry In the other general tuning method, the boiler chemistry must be driven out of the region normally considered to be non-corrosive to derive the tuning constants. This negates the beneficial effect of the treatment. Since any change in blowdown flow rate (a normal part of boiler operations) will render the measured tuning constant invalid, tuning must be repeated for each blowdown flow setting.
  • the Niemi patent discloses an automatic system for controlling the pH and other concentration variables in a chemical reactor.
  • use of that system would not be adaptable to an industrial boiler for the following reasons.
  • the system utilizes a method that requires a steady state that is reached rapidly, which, as discussed previously, an industrial boiler does not exhibit. Consequently, the Niemi patent teaches controlling pH by use of a PID controller, which, as discussed previously, would be difficult to use in Corrosion Control Phosphate (CCP) programs described above.
  • CCP Corrosion Control Phosphate
  • the Niemi et al. patent discloses an automatic system for controlling the pH in a continuous flow vessel.
  • this system is also not adaptable to industrial boilers for the following reasons.
  • the known tuning methods do not apply for the reasons described above. If the residence time distribution is known, then simulation of tuning methods requires a perfect match of a simulator and reality. The assumptions of linear processes of first order reactions is not applicable. Therefore, the method listed in Niemi et al . will only work for systems with small perturbations. Industrial boilers exhibit larger deviations.
  • Niemi et al . identifies proportional, proportional-integral and proportional- integral-derivative controls along with an adjustable gain controller. Limitations on feed concentrations versus system volume will make any adjustable gain ineffective when bounded by limitations in a "pumpable region.” Finally, the same pumpable limitations will make integral windup a serious problem in a large volume system.
  • the Boeke patent discloses an automatic control system for the adjustment of pH that is described using the term "on-off". However, this is not an ON/OFF controller.
  • the series of solenoids that actuate flow across different size orifices produce a signal proportional to feedback.
  • the series of solenoids provides proportional response that is discreet within a specific flow window. This is analogous to a stepwise integration of a continuous function.
  • the Gulaian patent discloses an automatic system for controlling pH and utilizing an estimation for a pH titration curve in the adaptive control of pH.
  • this system is also relegated to short residence times and the use of proportional-integral control.
  • the patent does not discuss limitations from integral windup.
  • the Stana patent discloses an automatic system for controlling a phosphoric acid plant.
  • this system does not involve a model of the system but rather teaches a target feed where the system is compensated for its chemical deficit and then placed in steady state.
  • the algorithm utilized by the system contains predetermined constants that are unique to a particular phosphoric acid plant, and are therefore, not readily adaptable to a variety of phosphoric acid plants (e.g., different plant volumes would require that new constants be calculated and inserted into the algorithm) .
  • this system controls only ⁇ ulfuric acid feed and does not try to control two interdependent variables.
  • the Severin patent discloses an automatic chlorine and pH control apparatus for swimming pools.
  • the apparatus controls two variables, i.e., chlorine and pH, under the assumption that the two are not interrelated.
  • chlorine affects pH
  • chlorine has a minor effect on pH and can be isolated and controlled separately. This is because in a swimming pool, chlorine is not the only buffering agent. Its contribution to the pH is masked by the high concentration of anions from the makeup water and atmosphere. This allows the pH to be controlled independent of the chlorine concentration.
  • a congruent controlled boiler uses phosphate as the major buffering agent, and the pH and phosphate are interdependent variables that must either be controlled simultaneously, or one subservient to the other. They cannot be controlled independently.
  • the Severin apparatus also ignores the cycle time of a swimming pool and assumes that the control is constant through the system. It does not account for lag and residence time effects and probably cycles up and down drastically when in operation. Finally, the pH control range is anticipated as narrow, and works on the assumption that pH is linear in the chosen range.
  • the Wall patent discloses a system for continuously monitoring and controlling the pH and free halogen in swimming pool water. Although this patent mentions the concept of two- sided control (i.e., monitoring whether pH or halogen or both fall within or without predetermined ranges) , the control of the pH of swimming pools and the control of pH in a boiler are not interchangeable, as described above.
  • the Schulenberg patent discloses an automatic system treatment of cooling circuit water. Although this system describes on/off pH control of a single component to provide one sided control and the system adds other components according to vaporous loss, the chemistry is different from that of a boiler.
  • the chlorine in the Schulenberg patent is not the major buffer, and no attempt is made to maintain the CO, alkalinity.
  • this system cannot control two interdependent variables.
  • the corrosion inhibitor and the pH are not interdependent as are the phosphate (similar to a corrosion inhibitor) and pH.
  • the Jerome patent discloses a reactant concentration control method and apparatus for precipitation reactions.
  • the system does base feed one reagent and adjusts the second.
  • the method and apparatus assume that the system is near steady state at all times.
  • the calculations are linearized and performed incrementally to make the calculations simpler.
  • the model used in the method/apparatus is not a true continuously stirred tank reactor (as is the model for industrial boilers) .
  • CSTRs continuously stirred tank reactors
  • a respective target region of the at least two interdependent chemicals is associated with each of the CSTRs and wherein each of the respective target regions is scaled according to the respective cycles of the CSTRs.
  • the control system comprises input means for receipt of fluid parameters and control means responsive to the input means.
  • the control means uses non-proportional control for automatically minimizing the time that said at least two interdependent chemicals in the fluids spend outside of a common normalized target region formed by the intersection of the respective target regions of the at least two CSTRs.
  • a second automatic control system and method for controlling a respective sodium-to-phosphate ratio of at least two boiler fluids of respective industrial boilers that are fed through a common feedwater.
  • the industrial boilers have respective blowdown flows and steam rate flows that define respective cycles for each boiler fluid.
  • the system comprises input means for receipt of a boiler fluid parameter for each of the at least two boiler fluids and a parameter indicative of the cycles of each of the industrial boilers.
  • the system comprises control means responsive to the input means for automatically driving the respective sodium-to- phosphate ratios of the at least two boiler fluids to a desired sodium-to-phosphate ratio region.
  • Fig. 1 is a block diagram of the Model Adaptive Congruent Control (MACC) system for use with multiple boilers;
  • MEC Model Adaptive Congruent Control
  • Fig. 2 is a boiler state space diagram showing the similarity of MACC pumpable regions for parallel boilers
  • Fig. 3 is a boiler state space diagram showing the formation of a common normalized target region (CNTR) ;
  • Fig. 4 is an enlarged boiler state space diagram of Fig. 3 showing the formation of a common normalized pumpable region (CNPR) ;
  • CNPR common normalized pumpable region
  • Fig. 4A shows the CNPR and CNTR of the boiler state space of Fig. 4 and a portion of the candidate shortest-time feedrate trajectories for boiler 2;
  • Fig. 5 is a block diagram of the ON/OFF control system for use with multiple boilers
  • Fig. 6 is the boiler state space diagram for multiple boilers using a common feedline with ON/OFF control, and assuming similar upper and lower phosphate control limits among all of the boilers;
  • Fig. 7 is similar to Fig. 6 but depicting multiple boilers (e.g., three) having respective upper and lower phosphate control limits.
  • the MACC system 320 uses models of industrial boilers to predict the feed rates of particular mixtures of two chemicals, e.g., sodium and phosphate, to achieve and maintain an acceptable range of sodium-to-phosphate congruencies and phosphate concentrations where these congruencies are defined by the sodium-to-phosphate ratio being between high and low limits defined by the boilers' operating conditions, and then checks itself against its prediction and adapts its model to improve its control. The check is provided for by a laboratory pH and P0 4 analysis, rather than with the use of any on-line pH analyzers or PO., analyzers.
  • the targeted range of congruency and phosphate is referred to as the target region and the specific congruency and phosphate desired is referred to as the setpoint. Operation of the MACC system 20 for use with a single boiler is disclosed in A.S.N. 08/321,338, which is incorporated by reference herein, and will not be discussed any further except with respect to the multiple boiler operation.
  • the MACC system 320 requires the determination of the cycles for each of the boilers, i.e., the ratio of the total feedwater to the blowdown flow.
  • the most common method employs the use of steam flowmeters for each boiler, as shown (only one 29A which is shown) in Fig. 1.
  • the present invention 320 is not limited to the use of steam flowmeters.
  • individual feedwater flowmeters could be coupled to the individual feedwater inputs to every boiler; or, alternatively, both steam flowmeters and feedwater flowmeters could be used.
  • the reference number 348 refers to the MACC software 48 of MACC system 20 but which also includes the multiple boiler algorithms discussed below.
  • Each boiler has a respective steam output 31A, 31B and 31C, a respective blowdown flow 26A, 26B and 26C and a respective blowdown flow valve 28A, 28B, 28C; as with the MACC system 20, the MACC system 320 also does not control the blowdown flow of any of these boilers, although it should be understood the MACC system 320 could be operated where the boilers's cycles are fixed, i.e., their blowdown flows are controlled.
  • the boilers may operate at different pressures with respect to one another.
  • each boiler has its own input means, similar to input means 40 for boiler 22A, for analyzing the respective blowdown flow 26A-28C and then providing such analysis data to the computer 42.
  • the input means 40 also includes a blowdown flow meter (BDM) 33A that transmits a blowdown flow signal to the computer 42.
  • BDM blowdown flow meter
  • this invention can be viewed as providing an optimized congruent control for all the boilers, in the sense defined by the original MACC algorithm, subject to the additional constraints implied by the single, common feedwater line and feed point.
  • Blrl's pumpable region 62A would be scaled uniformly down by a factor or two, but otherwise shaped just like Blr2's pumpable region 62B, as shown in Fig. 2.
  • target regions of Blrl and Blr2 in Fig. 2 are assumed to be the same, indicated by target region 60; however, the methods described herein are just as appropriate where the target region for each boiler is different.
  • the MACC "target region" 60 has been superimposed on these pumpable regions 62A and 62B.
  • two points, 54A and 54B representing the current concentrations of Blrl and Blr2 , respectively. These current concentration points have been deliberately placed at an ideal position: they are both in the same position relative to their corresponding pumpable region 62A and 62B.
  • Blr2 ' s current concentration point 54B is related to Blrl's current concentration 54A point by the same scale factor that relates points corresponding to the same feed rates in the two pumpable regions 62A and 62B.
  • each such pumpable region 62A and 62B that intersects its corresponding target region 60 represents, for each boiler, the steady-state concentrations that are both in control and reachable via pump adjustments.
  • each target region 60 is intersected with its corresponding pumpable region 62A and 62B;
  • both these variously clipped target regions and their associated pumpable regions are uniformly stretched so as to superimpose all of the pumpable regions 62A and 62B on each other, thereby forming a single pumpable region 71.
  • Fig. 3 succinctly summarizes the one-to-one correspondence between points in the pumpable regions of the different boilers.
  • Fig. 3 depicts the normalized form of the previous state space diagram (Fig. 2).
  • the concentration axes i.e., Na and P0 4
  • Points in the common normalized target region 73 are both "pumpable" (correspond to steady-state points) and, if reached, imply every boiler is within its target region.
  • pumpable correspond to steady-state points
  • the CNTR could be the basis of the following control method:
  • stage one MACC adjustment that gets the next boiler into the CNTR 73 in the least time, and use its feed rates as the basis for the feed rate at the common feed point;
  • Stage two (see “stage two" defined in A.S.N. 08/321,338) adjustments could use a nested target region for each boiler and then repeat stage 1 (step 3 above) .
  • a possible generalization would use scalable target regions for each boiler; hence, a conceptually infinite number of nested target regions.
  • a discrete number of pre-defined target regions would be easier to program, and might provide nearly as good control; it also has the advantage of forcing the user to define the "emergency zone" and the "true target zone” for each boiler and the ability to raise specific alarms related to these specific user defined zones, which would presumably have a connection to the appropriate congruent control region for each boiler, based on its pressure.
  • the CNPR 75 is established by projecting feedrate trajectories from the current boiler concentration to the extreme vertices (e.g., as shown in Fig. 4, extreme vertices 63 and 65 as opposed to inner vertices 67 and 69) of the CNTR 73 and beyond for every boiler.
  • extreme vertices e.g., as shown in Fig. 4, extreme vertices 63 and 65 as opposed to inner vertices 67 and 69
  • CNPR 75 is defined as the common normalized pumpable region, CNPR 75.
  • the next step is to select that boiler whose optimal trajectory gets into the CNTR 73 first.
  • This optimal trajectory determines the initial feed rates into the common header shared by all of the boilers.
  • the optimal trajectory is determined by calculating the stage 1 feedrates (f al , f bl ) and the associated stage 1 feed time ( dtJ for every boiler in accordance with A.S.N. 08/321,338 for every boiler by substituting the CNTR 73 for the target region of A.S.N. 08/321,338 and substituting the CNPR 75 for the pumpable region of A.S.N. 08/321,338 (see Fig. 4A) .
  • the optimal trajectory selected is that one which comprises stage 1 feedrates (f alm ⁇ n , f ⁇ mecanic u matter) having the minimum stage 1 feed time (dt lm ⁇ n ) .
  • the next step is to determine the longest time, dt MB (where
  • MB means "multiple boiler" to feed at the selected feedrates
  • the feedstreams are then fed at the feedrates f alm ⁇ n , f b ⁇ m ⁇ n for either (1) dt MB or (2) the time it takes for new data to arrive, whichever is smaller.
  • the other boilers can be aggressively pushed into the CNTR 73 until the boilers already in the CNTR 73 "bump up against an edge of the CNTR 73," and more accurately, until such points are pushed into a "corner" of the CNTR 73. At that point, "the play in the system” has been exhausted and any further control reduces to the CNTR 73 algorithm, described in the previous section.
  • the CNPR 75 algorithm handles well is the "slow boiler and the fast boiler.” For example, it is assumed that one boiler has a very large characteristic time and another has a very small characteristic time, and they are both in the CNTR 75 when a sharp step in contaminants is observed. The fast boiler goes well-beyond its own target region but the slow boiler barely moves by the next time the operator enters the pH and P04 for the boilers. Because the slow boiler moves so slowly inside the CNTR 73, the CNPR 75 algorithm essentially reduces to a single boiler MACC control on the fast boiler, since it properly recognizes the fact that such aggressive adjustments will get the fast boiler into line long before the MACC controller has a chance to push the slow boiler out of the CNTR 73. By contrast, the first, CNTR 73 algorithm would not have exploited this "inertial advantage" of the slow boiler so aggressively and, as a result, the fast boiler would have been out of control much longer than it needed to be.
  • the method for moving into the CNTR 73 is:
  • this preferred MACC multi-boiler algorithm is given by:
  • InnerCNTR as a region nested within CNTR 73. Note that if InnerCNTR is defined as a region consisting of a single point, the centroid of the CNTR 73, then subsequent controller actions that use InnerCNTR as ActiveCNTR will, in the single boiler case, correspond to stages 2 and 3 of A.S.N. 08/321,338. (2) If (all boiler state space points within CNTR) then
  • stage 1 feed rates and stage 1 time, dt : For each boiler outside of the ActiveCNTR, compute the stage 1 feed rates and stage 1 time, dt : , as described in A.S.N. 08/321,338 but where ActiveCNTR and CNPR are used in lieu of the ordinary target region and pumpable region. Of the up to N such stage 1 feedrates, choose those stage 1 feedrates (f ⁇ m ⁇ r ⁇ , fi m ii.) which have the minimum associated stage 1 feed time, dt lm ⁇ n .
  • CNTR common normalized target region
  • Fig. 5 a second embodiment of an automatic congruent controller system 420, hereinafter known as the ON/OFF control system 420.
  • the ON/OFF control system 420 controls two interdependent variables, namely, phosphate and sodium, the latter by way of monitoring the pH.
  • the ON/OFF control system 220 is arranged to control water treatment chemicals to be introduced into a single boiler 222.
  • the boiler 222 has an effluent flow (hereinafter known as blowdown flow 226) and a blowdown valve 228.
  • the ON/OFF control system 220 does not control the blowdown flow 226 via the blowdown valve 228.
  • one of the distinguishing features of the ON/OFF control system 420 over conventional boiler fluid control systems is that the blowdown flow 226 can be varied independently of the ON/OFF control system 420.
  • the ON/OFF control system 420 of the present invention can also operate where the boilers' cycles (discussed next) are fixed, i.e., their blowdown flows are controlled.
  • the ON/OFF control system 420 requires the determination of the cycles for each of the boilers, i.e., the ratio of the total feedwater to blowdown flow.
  • the most common method employs the use of steam and blowdown flowmeters for each boiler, as shown (only one 429A which is shown) in Fig. 1.
  • the present invention 420 is not limited to the use of steam flowmeters.
  • individual feedwater flowmeters could be coupled to the individual feedwater inputs to every boiler. The important point is that some method of determining the cycles for each boiler is required in the present invention 420.
  • the reference number 448 refers to the ON/OFF control system software 248 of ON/OFF control system 220 but also includes the multiple boiler algorithms discussed below.
  • the ON/OFF control system 420 basically comprises a first chemical feed stream 230A, a second chemical feedstream 230B, a control means 232 and an input means 240.
  • the first chemical feedstream 230A and the second chemical feedstream 230B are each connected to the common feedwater line 224.
  • the first chemical feedstream 230A is arranged to deliver a first fluid treatment material or chemical, e.g., a sodium phosphate mixture having a particular sodium-to-phosphate ratio and a known phosphate concentration, to the water in theboilers 222A-222C.
  • the second chemical feedstream 230B is arranged to deliver a second fluid treatment material or chemical, e.g., a sodium phosphate mixture having a particular sodium-to-phosphate ratio and a known phosphate concentration to the water in the boilers 222A-222C.
  • a second fluid treatment material or chemical e.g., a sodium phosphate mixture having a particular sodium-to-phosphate ratio and a known phosphate concentration
  • the particular sodium-to-phosphate ratio determines a particular pH for that fluid treatment material.
  • the different sodium concentrations (Na) in each feedstream determine the pH (high or low) of each fluid treatment material.
  • the importance of the pH is that the pH of the boiler water, at a fixed phosphate concentration, is indicative of the sodium concentration in the boiler waters.
  • monitoring the pH of the boiler waters provides an effective method of monitoring the sodium-to-phosphate ratio of the boiler waters and then in determining which of the two feedstream sodium phosphate mixtures is to be fed to the boiler waters to adjust the sodium- to-phosphate ratio of the boiler waters, as will be described below.
  • Fig. 6 by fixing the amount of phosphate in the boilers 222A-222C, varying the amount of sodium permits the sodium-to-phosphate ratio of the boiler waters to be controlled.
  • FeedRate is the flow rate from the currently selected feed tank
  • FeedP04 the phosphate concentration in the feed tanks (for simplicity, as with single boiler ON/OFF, assumed to be the same in both tanks)
  • NaP04Ratio Hlg i, and NaP04Ratio Luw are the Na:P04 ratios of the two chemical feed tanks 236A and 236B
  • TotalFeedWater is the feed water flow rate in the common, shared, feed water header, L Na
  • Cycles (i) is the instantaneous cycle given by the ordinary definition of boiler cycles for the "ith" boiler:
  • Fig. 6 depicts the possible steady-state feed-rates associated with each of the boilers sharing a common feed water line, and using an ON/OFF pumping configuration into that line.
  • the vertical vector, V represents the steady-state, contaminant determined, effective sodium levels associated with one of the boilers (i.e., the Na concentration, if both high and low NA:P04 ratio tanks 236A and 236B, respectively, were turned off for a long time) .
  • the vector A represents the increase in steady-state concentrations, beyond those from the contaminant, associated with feeding from the high Na:P04 ratio tank 236A; the vector B, the corresponding increase associated with feeding, instead from the low Na:P04 ratio tank 236B. It should be understood that Fig.
  • the two dotted lines represent all of the various steady-state concentrations that could be associated with feeding from either tank to any other boilers that might be present in the system 420, each with possibly different cycles of concentration. For example, if a boiler's cycles were half that of the original boiler whose vectors are shown, then, all else being equal, the corresponding steady-state concentrations for high and low Na:P04 ratio feed would be half the distances along each dotted line, measured from the origin, as they were for the original boiler whose vectors are shown; a boiler with double the cycles would have its two corresponding steady-state concentrations along the same dotted lines, only twice as far from the origin, as for the original boiler, etc.
  • the ON/OFF control system 420 is also designed to operate where these values are different for each boiler, i.e., P04Bound l ⁇ n(1 , and P04Bound rr ⁇ av. ) .
  • One way to choose the particular Feedrate is to choose that feedrate such that the range between the lowest P04(i) and the highest P04(i) is centered in the middle of the phosphate control limits of the CPPC target region (between P04Bound singate strig and
  • FeedRate is sought such that:
  • P04(iMin) is the smallest steady-state boiler concentration and P04(iMax) the largest (which correspond to the boilers with the smallest and largest cycles, as per the above equations for P04(i)).
  • FeedRate (TotalFeedWater/FeedP04) *
  • Cycles (iMax) /Cycles (iMin) ⁇ P04Bound il: .,/P04Bound Min , where Cycles ( iMax) represents the maximum instantaneous cycle of all of the boilers and Cycles (iMin) represents the minimum instantaneous cycle of all of the boilers;
  • the maximum and minimum cycles for some or all boilers would be known in advance.
  • the Cycles (i) for each boiler is allowed to vary freely (either due to load swings or blowdown flow adjustments) so long as the maximum cycles ratio constraint given above is not violated.
  • the feed rate is constantly updated to reflect the most recently computed maximum and minimum cycles, and as long as the above constraint is never violated, one can show that, apart from start-up transients or violations of the assumptions of the basic CSTR model (e.g. , the presence of P04 not from the feed tanks) , the P04 levels for all boilers will always remain within their control limits as well.
  • a fixed cycles boiler i.e., a boiler that comprises a controller, not shown, that maintains the boiler at a fixed cycle
  • a variable cycles boiler at 90 cycles, which would put the steady-state concentrations at 10 and 30 ppm, respectively, if the feed rate formula given had been used.
  • the feed rate formula implies that the steady-state phosphate concentrations of both boilers would be interchanged, and, as both boilers assumed their new positions at opposite ends of the phosphate control range, they would pass through intermediary phosphate levels, all of which would also be within the control range.
  • phosphate will be maintained within that range as well.
  • the selection of the feedrate as per the above equation guarantees that these conditions, apart from possible transients, uncharacterized sources or sinks of phosphate, etc., will be satisfied.
  • a more generalized form of the phosphate control can be made where the phosphate bounds for the particular boilers are different, as shown in Fig. 7.
  • FeedWater(i) * FeedP04conc/Blowdown (i) (a) where FeedP04 cone Total Feed P04/Total FeedWater.
  • FeedP04concmin ( i) P04Bound among ⁇ resort , *Blowdown ( i) /FeedWater ( i)
  • FeedP04concmax ( i) P04Bound ma (1) *Blowdown ( i) /FeedWater ( i)
  • FeedP04conc a*max(FeedP04concmin(i) ) + (1-a)
  • inequality (d) can be simplified as
  • FeedP04conc min (Cycle (i) )/ (max(Cycle (i) +min (Cycle ( i) ) ) *
  • Figs. 6 and 7 depict common normalized target regions, all of these representing a simple case of the common normalized target region of the multiple boiler MACC system 20 discussed earlier. In particular, only one dimension, namely the phosphate concentration, varies in the present ON/OFF control system 420. The common normalized target regions in Figs. 6 and 7 are scaled by being divided by the cycles. Back-Calculating Na
  • P04Est(i, t+dt) (l-e "dt/Tau,i) ) *P04 (i) +P04Est (i, t) * e ⁇ d Tau(1 '
  • P04Est(i, t) is the estimated concentration of the boiler at time t (the "initial concentration") and P04(i) is, as before, the steady-state phosphate concentration (the "final, steady-state, concentration”).
  • Tau(i) is the boiler's characteristic time, given as Mass ( i) /Blowdown (i) (where Mass(i) is the boiler water mass of the ith boiler) and dt is the time interval between samples. For cases in which the blowdown and mass of the boiler and sampling interval, dt, are fixed, this reduces to a simple EWMA (exponentially-weighted moving average) of the steady-state concentrations, with a ⁇ of (1 - exp(- dt/Tau(i)).
  • P04Est(i, t) can be initialized via an initial measurement of the concentration of phosphate in each of the boilers. An alarm should be raised if this projected phosphate is outside of the phosphate control limits. In analogy with currently recommended single boiler ON/OFF control practices, this projected phosphate should be compared periodically to a manual phosphate measurement on each boiler in order to detect possible flow meter calibration errors, etc.
  • NaP04Ratio (jMin) , NaP04Ratio (jMax) are the largest and smallest estimated Na:P04 ratios.
  • Warnings are sounded if the following constraint is violated: max(P04Boundation, ⁇ (1) /Cycle (i) ) ⁇ min (P04Bound, rule J (l) /Cycle (i) ) .
  • FeedRate (TotalFeedWater/FeedP04 ) *
  • Warnings are sounded if the following maximum cycle ratio constraint is violated:
  • NaP04Ratio(i) Na effe . tlv ⁇ (i) /P04Est(i, t)
  • NaP04RatioBound M ⁇ n +NaP04RatioBound Ha use high Na:P04 ratio tank else use low Na:P04 ratio tank
  • Alarms are sounded if these minimum or maximum congruency ratios are not within their corresponding bounds.

Abstract

Two control methods and systems for automatically achieving and maintaining a desired sodium/phosphate ratio and phosphate concentration of the boiler waters in a plurality of parallel industrial boilers (22A, 22B and 22C) linked by a common feedwater line (24) for minimizing corrosion. The first control system (320) uses an adaptive controller that models the boilers which enables the system to prodict boiler pH and phosphate concentrations at any future time given the feed rates, feed concentrations of high and low sodium/phosphate stocks, blowdown rate, mass of the boiler water, initial boiler phosphate concentration and initial pH. The second control system (420) monitors a maximum cycle boiler ratio to keep the boiler waters within the phosphate control range of the system.

Description

APPARATUS AND METHOD FOR AUTOMATIC CONGRUENT CONTROL OF MULTIPLE BOILERS
SPECIFICATION FIELD OF THE INVENTION
The invention pertains to automatic control systems for continuously stirred tank reactors (CSTRs) . In particular, the invention pertains to automatic control systems for realizing optimum congruency and phosphate concentration required to minimize corrosion in industrial high pressure boilers.
BACKGROUND OF INVENTION
Industrial boilers heat up highly purified feedwater to generate steam for power generation, heating, etc.
A natural consequence of steam production is the "cycling up" in concentration of chemicals which enter the boiler inadvertently (e.g., acid leaks) or intentionally (e.g., corrosion inhibitors) . A small portion of the boiler water is "blown down" (i.e., removal of concentrated boiler water from the boiler) to keep the concentrations of non-volatile chemicals (i.e., chemicals that do not flow out with the steam but rather remain substantially in the boiler water) at acceptable levels. The rate of blowdown is defined by the "cycles of concentration." The term "cycles of concentration" is defined as the sum of the steam and blowdown flowrates divided by the blowdown flowrate. Cycles in high pressure boilers range from less than 10 to 100 or more. Thus a chemical added at a low concentration (e.g., 0.5 ppm) in the feedwater can cycle up to fairly high boiler concentrations (e.g., 30 ppm).
These boilers are susceptible to, among other things, corrosion. To minimize corrosion, one basic type of corrosion control program that is practiced in the United States within these boilers is phosphate control programs. Typically, in phosphate control programs, a sodium phosphate salt is fed into the solution in order to buffer the solution and to maintain that pH with sodium. The objective of these phosphate control programs is to maintain the measured variables, phosphate and pH, within certain stated guidelines, which are dependent upon boiler pressure by controlling the sodium, phosphate and resultant pH within the boiler water. See "Sodium Phosphate Solutions at Boiler Conditions: Solubility, Phase Equilibria, and Interactions with Magnetite," by G. Economy, A.J. Panson, Chia-tsun Liu, J.N. Esposito, and .T. Lindsay, Jr. , Proc. Intl. Water Conf . , 1975, pp. 161-173.
If the concentration of sodium within the boiler water (which is given by the pH, i.e., pH is proportional to effective sodium) is divided by the concentration of phosphate within the boiler water, there exists a range of optimum sodium-to- phosphate (Na/P04) ratios that, if achieved and maintained within the boiler water, will minimize corrosion. Where the boiler water is operated and maintained at a Na/PO,, ratio that is below 3.0:1 , the boiler is said to be operating with coordinated phosphate/pH control (also known as "captive alkalinity") . Where the boiler water is operated and maintained at a Na/PO., ratio that is between 2.2:1 and 2.8:1, the boiler is said to be operating with congruent control. Where the boiler is water is operated at a Na/POg ratio that is above 3.0, a boiler is said to be operating with "equilibrium phosphate control." All three types of control can be attained and maintained with the instant invention.
With any of these corrosion control programs, the boiler uses phosphate as the major buffering agent. Additionally, sodium and phosphate concentrations are interdependent variables that must either be controlled simultaneously, or one subservient to the other. They cannot be controlled independently .
Furthermore, boiler systems are extremely slow systems because they comprise large volumes. As an example, a 280,000 pound water boiler having a blowdown rate of 3000 pounds/hour takes over three days to remove and replenish the boiler water. Many things can happen during that time that can alter the operator's initial guess at what concentrations should be added to manually correct control problems.
The applicants have found that conventional control schemes like Proportional Integral Derivative (PID) control are insufficient to provide practical, universally applicable automatic control of this boiler chemistry for a number of reasons. First, setpoint overshoot is a problem when attempting to control pH in a large volume system. Limitations in pumping capacity inherent in a real-life pumping scheme make "integral windup" a serious problem. Integral windup causes a control system to overshoot its setpoint. Overshoot is also a problem in controlling pH with PID control due to the asymmetric nature of pH control. Although this problem could potentially be avoided using blowdown flow controllers, these devices are expensive and difficult to maintain and calibrate.
Second, tuning such a PID loop is very difficult. Although tuning can be done in many ways, the methods generally require one of two sets of conditions be maintained, either of which are difficult to achieve in an operating boiler. In one general tuning method, the boiler chemistry must be held constant for multiples of the first order time constant defined by the volume of the boiler divided by its blowdown flow rate. In real-life applications, such a steady-state cannot be established for that length of time due to small perturbations in feedwater contaminants concentrations. In the other general tuning method, the boiler chemistry must be driven out of the region normally considered to be non-corrosive to derive the tuning constants. This negates the beneficial effect of the treatment. Since any change in blowdown flow rate (a normal part of boiler operations) will render the measured tuning constant invalid, tuning must be repeated for each blowdown flow setting.
There is one reference to sodium/phosphate control in the literature which demonstrates the difficulties of this method and its shortcomings. In "A Practical Approach to Real Time Data Acquisition and Automated Chemical Feed at a Fossil Fueled Cycling Duty Station", by C.E. Frederick presented at the International Conference on Cycle Chemistry in Fossil Plants, June 4-6, 1991, the boiler system was tuned using a semi- empirical method to a specific boiler, rather than being adaptable to various types and sizes of industrial boilers. Furthermore, the system disclosed in that reference requires the use of phosphate analyzers which are expensive and require frequent re-calibrations and maintenance. The closest art to automatically controlling the Na/P04 ratio in the water of an industrial boiler is in automated pH control systems. The control of pH is in itself a difficult task, as discussed in U.S. Patent No. 5,132,916 (Gulaian et al.) .
The following U.S. Patents disclose examples of automated pH control systems: 4,053,743 (Niemi) , 4,239,493 (Niemi et al . ) , 4,181,951 (Boeke) , 5,132,916 (Gulaian), 5,262,963 (Stana) , 4,016,079 (Severin) , 5,248,577 (Jerome), 4,033,871 (Wall) and 5,057,229 (Schulenberg) .
The Niemi patent discloses an automatic system for controlling the pH and other concentration variables in a chemical reactor. However, use of that system would not be adaptable to an industrial boiler for the following reasons. The system utilizes a method that requires a steady state that is reached rapidly, which, as discussed previously, an industrial boiler does not exhibit. Consequently, the Niemi patent teaches controlling pH by use of a PID controller, which, as discussed previously, would be difficult to use in Corrosion Control Phosphate (CCP) programs described above.
The Niemi et al. patent discloses an automatic system for controlling the pH in a continuous flow vessel. However, this system is also not adaptable to industrial boilers for the following reasons. For boiler systems, the known tuning methods do not apply for the reasons described above. If the residence time distribution is known, then simulation of tuning methods requires a perfect match of a simulator and reality. The assumptions of linear processes of first order reactions is not applicable. Therefore, the method listed in Niemi et al . will only work for systems with small perturbations. Industrial boilers exhibit larger deviations. Furthermore, Niemi et al . identifies proportional, proportional-integral and proportional- integral-derivative controls along with an adjustable gain controller. Limitations on feed concentrations versus system volume will make any adjustable gain ineffective when bounded by limitations in a "pumpable region." Finally, the same pumpable limitations will make integral windup a serious problem in a large volume system.
The Boeke patent discloses an automatic control system for the adjustment of pH that is described using the term "on-off". However, this is not an ON/OFF controller. The series of solenoids that actuate flow across different size orifices produce a signal proportional to feedback. The series of solenoids provides proportional response that is discreet within a specific flow window. This is analogous to a stepwise integration of a continuous function.
The Gulaian patent discloses an automatic system for controlling pH and utilizing an estimation for a pH titration curve in the adaptive control of pH. However, this system is also relegated to short residence times and the use of proportional-integral control. Furthermore, the patent does not discuss limitations from integral windup.
The Stana patent discloses an automatic system for controlling a phosphoric acid plant. However, this system does not involve a model of the system but rather teaches a target feed where the system is compensated for its chemical deficit and then placed in steady state. The algorithm utilized by the system contains predetermined constants that are unique to a particular phosphoric acid plant, and are therefore, not readily adaptable to a variety of phosphoric acid plants (e.g., different plant volumes would require that new constants be calculated and inserted into the algorithm) . Moreover, this system controls only εulfuric acid feed and does not try to control two interdependent variables.
The Severin patent discloses an automatic chlorine and pH control apparatus for swimming pools. The apparatus controls two variables, i.e., chlorine and pH, under the assumption that the two are not interrelated. Although chlorine affects pH, chlorine has a minor effect on pH and can be isolated and controlled separately. This is because in a swimming pool, chlorine is not the only buffering agent. Its contribution to the pH is masked by the high concentration of anions from the makeup water and atmosphere. This allows the pH to be controlled independent of the chlorine concentration. In contrast, as discussed earlier, a congruent controlled boiler uses phosphate as the major buffering agent, and the pH and phosphate are interdependent variables that must either be controlled simultaneously, or one subservient to the other. They cannot be controlled independently. In addition, the Severin apparatus also ignores the cycle time of a swimming pool and assumes that the control is constant through the system. It does not account for lag and residence time effects and probably cycles up and down drastically when in operation. Finally, the pH control range is anticipated as narrow, and works on the assumption that pH is linear in the chosen range.
The Wall patent discloses a system for continuously monitoring and controlling the pH and free halogen in swimming pool water. Although this patent mentions the concept of two- sided control (i.e., monitoring whether pH or halogen or both fall within or without predetermined ranges) , the control of the pH of swimming pools and the control of pH in a boiler are not interchangeable, as described above.
The Schulenberg patent discloses an automatic system treatment of cooling circuit water. Although this system describes on/off pH control of a single component to provide one sided control and the system adds other components according to vaporous loss, the chemistry is different from that of a boiler. The chlorine in the Schulenberg patent is not the major buffer, and no attempt is made to maintain the CO, alkalinity. In addition, this system cannot control two interdependent variables. The corrosion inhibitor and the pH are not interdependent as are the phosphate (similar to a corrosion inhibitor) and pH.
The Jerome patent discloses a reactant concentration control method and apparatus for precipitation reactions. The system does base feed one reagent and adjusts the second. However, the method and apparatus assume that the system is near steady state at all times. The calculations are linearized and performed incrementally to make the calculations simpler. The model used in the method/apparatus is not a true continuously stirred tank reactor (as is the model for industrial boilers) .
U.S. Patent No. 5,141,716 (Muccitelli) , which is owned by the same Assignee of the present patent application discloses a method of reducing corrosion in a boiler using coordinated phosphate control. However, this method calls for the administering of particular hydroxyethyl piperazines in specific ratios with phosphate, i.e. , there is no automatic apparatus nor methods disclosed of conducting this feed.
Two other references which discuss coordinated phosphate control are: Justification and Engineering Design for the On-Line Monitoring and Automation of a Congruent Phosphate/pH Program, by Michael E. Rogers, Ian Verhappen and Stephen Porter, Paper No. 413, The NACE Annual Conference and Corrosion Show 1992; Expert System Helps Fine-Tune Boiler-Water Chemistry, by Leyon O. Bretsel and Lon C. Brouse, Power Magazine 1987. In the former reference, although a proposal is discussed for controlling phosphate feed to the feedwater while controlling conductivity in the boiler water, there is no disclosure of any automatic simultaneous control of phosphate and congruency (Na/P0 ratio) . With regard to the latter reference, although there is a discussion of providing the operator with chemical feed adjustments, there is no real-time, automatic control system that is disclosed for controlling the chemical pumps in order to control congruency.
Therefore the prior art does not disclose an effective method for controlling two interdependent and non-volatile chemicals, e.g., sodium and phosphate, in a multi-boiler system using a common feedwater line whereby each of the boilers are rarely at steady state. None of the above cited art have devised an apparatus nor a method for achieving an automatic coordinated sodium/phosphate control system for a variety of industrial boilers without the need to introduce separate feed pumps/feed lines for each boiler. OBJECTS OF THE INVENTION
Accordingly, it is the general object of this invention to provide an automatic system for coordinated, equilibrium and congruent sodium/phosphate control for a plurality of industrial boilers fed by a common feed line which improves upon and overcomes the disadvantages of the prior art.
It is another object of this invention to provide an automatic system for sodium/phosphate control that requires no tuning procedure.
It is still another object of the preferred embodiment of this invention to provide an automatic system for sodium/phosphate control that can be implemented universally, that is easily adapted to a multiple boiler system that is fed from a common feedwater line.
It is yet another object of this invention to function as an advisory system, instructing the operator what to do, or to directly control congruency.
It is still yet another object of this invention to control any number of chemicals used in controlling congruency, e.g., polymer or chelant feeds as well as sodium and phosphate.
It is still yet a further object of this invention to control chemical concentrations when precipitation or volatilization is occurring.
It is still even a further object of this invention to control more than one boiler system simultaneously.
It is another object of this invention to provide an efficient method to achieve a common normalized congruency control (target) region of all of the boiler waters while minimizing the time spent outside of this control region by all of the boiler waters.
It is still yet a further object of this invention to provide an alternative means of determining the contribution to boiler water pH from ionic feedwater contaminant ingresses without having to use chemical analyzers and feedwater flow meters .
It is still a further object of this invention to provide a controller having a well-defined response for those situations where controllers using conventional general purpose equation solvers would simply conclude that there is no possible response.
It is further object of this invention to provide a chemical feed system which minimizes dead time while maximizing controllability.
SUMMARY OF THE INVENTION
These and other objects of the instant invention are achieved by providing an automatic control system and method for controlling at least two interdependent chemicals in the fluids of at least two continuously stirred tank reactors (CSTRs) linked in parallel by a common feedwater line and wherein each CSTR includes a respective blowdown flow and steam rate flow that define respective cycles for each of the CSTRs. In addition, a respective target region of the at least two interdependent chemicals is associated with each of the CSTRs and wherein each of the respective target regions is scaled according to the respective cycles of the CSTRs. The control system comprises input means for receipt of fluid parameters and control means responsive to the input means. Furthermore, the control means uses non-proportional control for automatically minimizing the time that said at least two interdependent chemicals in the fluids spend outside of a common normalized target region formed by the intersection of the respective target regions of the at least two CSTRs.
In addition, a second automatic control system and method is provided for controlling a respective sodium-to-phosphate ratio of at least two boiler fluids of respective industrial boilers that are fed through a common feedwater. The industrial boilers have respective blowdown flows and steam rate flows that define respective cycles for each boiler fluid. The system comprises input means for receipt of a boiler fluid parameter for each of the at least two boiler fluids and a parameter indicative of the cycles of each of the industrial boilers. Furthermore, the system comprises control means responsive to the input means for automatically driving the respective sodium-to- phosphate ratios of the at least two boiler fluids to a desired sodium-to-phosphate ratio region.
DESCRIPTION OF THE DRAWINGS
Other objects and many of the attendant advantages of this invention will be readily appreciated as the same becomes better understood by reference to the following detailed description when considered in connection with the accompanying drawings wherein:
Fig. 1 is a block diagram of the Model Adaptive Congruent Control (MACC) system for use with multiple boilers;
Fig. 2 is a boiler state space diagram showing the similarity of MACC pumpable regions for parallel boilers;
Fig. 3 is a boiler state space diagram showing the formation of a common normalized target region (CNTR) ;
Fig. 4 is an enlarged boiler state space diagram of Fig. 3 showing the formation of a common normalized pumpable region (CNPR) ;
Fig. 4A shows the CNPR and CNTR of the boiler state space of Fig. 4 and a portion of the candidate shortest-time feedrate trajectories for boiler 2;
Fig. 5 is a block diagram of the ON/OFF control system for use with multiple boilers;
Fig. 6 is the boiler state space diagram for multiple boilers using a common feedline with ON/OFF control, and assuming similar upper and lower phosphate control limits among all of the boilers; and
Fig. 7 is similar to Fig. 6 but depicting multiple boilers (e.g., three) having respective upper and lower phosphate control limits.
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENT
Unless otherwise specified, all references to sodium or sodium-to-phosphate ratio (Na/PO.) refer to that sodium which interacts with the phosphate to maintain the boiler water so as to inhibit corrosion. This is also referred to as "effective sodium" or the "effective sodium-to-phosphate ratio." Referring now in detail to the various figures of the drawing wherein like reference characters refer to like parts, there is shown at 320 in Fig. 1, the preferred embodiment of the model adaptive congruent controller system of the present invention (hereinafter known as the MACC system) . Generally, the MACC system 320 uses models of industrial boilers to predict the feed rates of particular mixtures of two chemicals, e.g., sodium and phosphate, to achieve and maintain an acceptable range of sodium-to-phosphate congruencies and phosphate concentrations where these congruencies are defined by the sodium-to-phosphate ratio being between high and low limits defined by the boilers' operating conditions, and then checks itself against its prediction and adapts its model to improve its control. The check is provided for by a laboratory pH and P04 analysis, rather than with the use of any on-line pH analyzers or PO., analyzers. Hereinafter, the targeted range of congruency and phosphate is referred to as the target region and the specific congruency and phosphate desired is referred to as the setpoint. Operation of the MACC system 20 for use with a single boiler is disclosed in A.S.N. 08/321,338, which is incorporated by reference herein, and will not be discussed any further except with respect to the multiple boiler operation.
In particular, unlike the single boiler operation described in 08/321,338, the MACC system 320 requires the determination of the cycles for each of the boilers, i.e., the ratio of the total feedwater to the blowdown flow. Although there are many methods for determining the cycles for each boiler, the most common method employs the use of steam flowmeters for each boiler, as shown (only one 29A which is shown) in Fig. 1. However, it should be understood that the present invention 320 is not limited to the use of steam flowmeters. For example, instead of steam flowmeters, individual feedwater flowmeters (not shown) could be coupled to the individual feedwater inputs to every boiler; or, alternatively, both steam flowmeters and feedwater flowmeters could be used. The important point is that some method of determining the cycles for each boiler is required in the present invention 320. Since the patentable distinction between the present invention 320 and the MACC system 20 of A.S.N. 08/321,338 resides not in the hardware (other than the use of multiple boilers, e.g., 22A-22C) but in the MACC software, the reference number 348 refers to the MACC software 48 of MACC system 20 but which also includes the multiple boiler algorithms discussed below.
As shown in Fig. 1, a plurality of industrial boilers, e.g., three (i.e., N=3 , although the present invention is not limited to three) is shown by references 22A, 22B and 22C that are fed by a common feedwater 24 from a common feedpoint comprising feedstreams 30A and 30B. Each boiler has a respective steam output 31A, 31B and 31C, a respective blowdown flow 26A, 26B and 26C and a respective blowdown flow valve 28A, 28B, 28C; as with the MACC system 20, the MACC system 320 also does not control the blowdown flow of any of these boilers, although it should be understood the MACC system 320 could be operated where the boilers's cycles are fixed, i.e., their blowdown flows are controlled. The boilers may operate at different pressures with respect to one another.
It should be understood that in this parallel boiler configuration, the chemical feed affects all the boilers, i.e., there can be no independent boiler control . This is a real world configuration in that operators do not have the luxury of a separate feedwater line for each boiler but rather must couple multiple boilers to a single feed line. Thus, it is not an obvious modification of the MACC system 20 of 08/321,338 to provide for such congruent control of multiple boilers from a single feedwater and the solution to this problem forms the subject matter of the present invention. The following discussion explains how the MACC algorithm can be implemented so as to provide the best possible congruent control to all the boilers 22A-22C simultaneously. It is assumed that the information required to perform individual MACC control on each boiler, which includes regular pH and phosphate measurements for each boiler, is conducted in accordance with 08/321,338; thus, each boiler has its own input means, similar to input means 40 for boiler 22A, for analyzing the respective blowdown flow 26A-28C and then providing such analysis data to the computer 42.
In the present invention 320, the input means 40 also includes a blowdown flow meter (BDM) 33A that transmits a blowdown flow signal to the computer 42.
Next, if it is assumed that if all but one of the boilers were disconnected from the feedwater line, then the resulting single boiler system would be a good candidate for single boiler MACC control. Thus, from the point of view of optimizing the congruent control of the boilers involved, this invention can be viewed as providing an optimized congruent control for all the boilers, in the sense defined by the original MACC algorithm, subject to the additional constraints implied by the single, common feedwater line and feed point.
In general, these additional constraints can be expected to degrade control since, after all, there is no independent adjustment of the treatment feed rates into each boiler. However, there are certain special cases in which the control is no worse than if each boiler had had its own feed point. For example, a highly idealized system is assumed in which each boiler were physically identical in all respects, i.e., each had the same chemical concentrations, mass, blowdown flow rate, and feedwater flow rate (or equivalently , steaming rate), etc. Since all boilers would, by assumption, have the same pH and phosphate at all times, the single boiler MACC algorithm could be used to determine the appropriate feed rates into each of these boilers and then these feed rates could be multiplied by "N" to obtain the appropriate feed rates for the common, upstream, feed point. Somewhat more generally, it can be shown that if the characteristic times (ratio of boiler water mass to blowdown rate) and cycles (ratio of feed-water flow rate to blowdown flow rate) of all boilers are the same, then if any one of the boilers is chosen as the "lead boiler", the MACC-based feedrates are computed as usual for this boiler using:
(FractionOfTotalSteamlntoLeadBoiler) x (f .,„.,,, fa„,α , f\ ,ul„ & fhll3l) , in lieu of famiM, fαlllJ , flιαι, & f,,,,, as in the single boiler in A.S.N. 08/321, 338.
If these single, lead boiler feed rates are then scaled up by a factor (FractionOfTotalSteamFlowIntoLeadBoiler) ~ l and used as the feed rates for the common feed point, all the boilers would, apart from startup transients, experience optimized control in the sense of defined by the MACC algorithm.
The preceding example, though an extremely special case, nonetheless illustrates the main idea of the present invention: exploiting the similarity of boilers exposed to a common feedwater line for control purposes. This similarity is a consequence of the basic mathematical structure of single boiler MACC control, as well as of the assumption that the concentrations in the feedwater entering each boiler are the same (e.g., that the feedwater is well-mixed before being split between the boilers) . This similarity can be exploited to reduce the "boilers in parallel" control problem to a series of equivalent, coupled, single boiler MACC control problems, even when cycles and/or characteristic times of the boilers are different. Similarity of the Boiler Systems in Parallel
From the point of view of single boiler MACC control, the control experienced by boiler systems in parallel is similar in that:
1) Under the assumption that treatment chemicals and contaminants are well-mixed in the common feedwater line before being split into separate feedwater lines for each boiler, the amount of feed and contaminant chemical flow into each boiler will be the same, apart from a scaling factor proportional to the fraction of the total, common, feedwater header flow that each boiler receives. In particular, note that the ratio of the sodium to the phosphate mass flow into all boilers will be the same; 2) The flow of chemical out of each boiler will be proportional to its blowdown flow rate; this is based on the non-volatility assumption of MACC control that all chemical flows out of the boiler are via the blowdown flow.
In the terminology of the MACC algorithm, the above facts imply that the MACC "pumpable region" (62A and 62B, Fig. 2, for boiler 22A (Blr 1) and boiler 22B (Blr 2)) for each of the boilers has the same shape apart from a scale factor which uniformly expands/contracts each of these pumpable regions relative to the others. This scale factor depends only on blowdown flow rate and the relative proportion of the total feedwater flow fed to each boiler (which in turn depends primarily on the relative steam load of each boiler) . This can be seen mathematically from the steady-state concentrations equations (Equation #4 and #5 of A.S.N. 08/321,338) that define the "pumpable region" :
P04 = (fa*P04a + f*P04b)/B (Equation #4)
Na = (fa*Naa + fb*Nat, + L)/B (Equation #5)
If the above equations are repeated for each of the N boilers, the fact that feed flows (fa, f, ) and contaminant flows (L) are all in the same relative proportions, and that blowdown flow rate (B) for each boiler divides every term on the right hand side of both equations, implies that the shape of each pumpable region 62A and 62B is the same apart from a scale factor, proportional to the ratio of the feedwater flow into the boiler divided by its blowdown flow rate. For example, in a two boiler system, if Blrl gets 1/3 of the feed-water and Blr2 gets 2/3, and Blrl's blowdown flow rate is half that of Blr2 , then the pumpable regions for both boilers are identical, since the common factor of two that multiplies all of the flow rates into Blr2 relative to those into Blrl is exactly cancelled out by the factor of two arising in the denominator of Blr2's equations, due to its greater blowdown flow rate. Intuitively, in steady- state, the extra feed/contaminants are exactly cancelled by the extra blowdown. On the other hand, if relative feedwater flows were as before but instead both boilers had the same blowdown flow rates, then Blrl's pumpable region 62A would be scaled uniformly down by a factor or two, but otherwise shaped just like Blr2's pumpable region 62B, as shown in Fig. 2.
It should be noted that for simplicity, the target regions of Blrl and Blr2 in Fig. 2 are assumed to be the same, indicated by target region 60; however, the methods described herein are just as appropriate where the target region for each boiler is different.
In Fig. 2, the MACC "target region" 60 has been superimposed on these pumpable regions 62A and 62B. Also shown are two points, 54A and 54B, representing the current concentrations of Blrl and Blr2 , respectively. These current concentration points have been deliberately placed at an ideal position: they are both in the same position relative to their corresponding pumpable region 62A and 62B. In other words, Blr2 ' s current concentration point 54B is related to Blrl's current concentration 54A point by the same scale factor that relates points corresponding to the same feed rates in the two pumpable regions 62A and 62B. When this occurs, and in addition, the time constants of the boilers (Mass/BlowdownFlow) are the same, the similarity is complete, and not only the steady-state points but also the dynamic state-space trajectories will be similar.
If, in addition to this dynamic similarity, the ratio of feed-water flow rate to blowdown flow rate (e.g., the "cycles of concentration" for each boiler) were the same, then the pumpable regions 62A and 62B, as well as the dynamics of, both boilers would be the same. This extreme form of similarity makes it possible to use the "lead boiler" generalization of MACC, described in the previous section. Apart from startup transients which would die out exponentially in times proportional to the characteristic time of the boilers, all of these similar boilers would automatically experience optimized control in the sense defined by the MACC algorithm.
However, in the real world, the cycles and characteristic times of all boilers are not the same. How to incorporate such boiler-to-boiler differences, while still exploiting the basic underlying similarity of "boilers in parallel, is discussed below.
Notwithstanding such generalizations, it is recommended that, in practicing this invention, the cycles and characteristic times of all boilers be adjusted to be as close to equal as possible: this minimizes the unavoidable degradation of control, relative to N independently controlled MACC boilers, experienced by the system as a consequence of the single feed point constraint. The Common Normalized Target Region
When a specific combination of feed rates is fed for a long time, and assuming that over that time both the relative * feed water flow and the blowdown flow rate of each boiler remain fixed, the resulting steady-state boiler concentrations reached in each boiler will be similar, i.e., in the same positions relative to their corresponding pumpable regions. Thus, a one- to-one correspondence between similar points in the pumpable regions of each boiler can be established.
The part of each such pumpable region 62A and 62B that intersects its corresponding target region 60 represents, for each boiler, the steady-state concentrations that are both in control and reachable via pump adjustments. In particular,
(1) each target region 60 is intersected with its corresponding pumpable region 62A and 62B; and
(2) both these variously clipped target regions and their associated pumpable regions are uniformly stretched so as to superimpose all of the pumpable regions 62A and 62B on each other, thereby forming a single pumpable region 71.
The result of this process is shown in Fig. 3. Fig. 3 succinctly summarizes the one-to-one correspondence between points in the pumpable regions of the different boilers. In particular, Fig. 3 depicts the normalized form of the previous state space diagram (Fig. 2). The concentration axes (i.e., Na and P04) represent "normalized concentrations", concentrations relative to the range of steady-state concentrations corresponding to each boiler. Points in the common normalized target region 73 are both "pumpable" (correspond to steady-state points) and, if reached, imply every boiler is within its target region. Thus, if the chemical feed is maintained at these points, and nothing else changes, all boilers will be within their individual target regions when the final steady-state is reached.
A Control Scheme Based Directly on a common Normalized
Target Region (CNTR) Algorithm
Once the common normalized target region (CNTR) 73 is established, the CNTR could be the basis of the following control method:
(1) Replace the single pumpable region 71 with the CNTR 73, which forms "an adjusted pumpable region"; .
(2) Using this adjusted pumpable region, which also is simultaneously the target region, perform MACC control on each boiler in turn;
(3) Of those boiler points that are not already in the CNTR 73, choose that stage one (see "stage one" defined in A.S.N. 08/321,338) MACC adjustment that gets the next boiler into the CNTR 73 in the least time, and use its feed rates as the basis for the feed rate at the common feed point;
(4) Continue in this manner until all boilers are within the CNTR 73. Note that once in the CNTR 73, boilers will stay there, since a point in the CNTR 73 cannot be moved out of the CNTR 73 by feeding at a point within it (this follows because the CNTR 73 is an intersection of convex regions and, therefore, is itself convex; convex target regions are required by the original MACC algorithm) .
(5) Stage two (see "stage two" defined in A.S.N. 08/321,338) adjustments could use a nested target region for each boiler and then repeat stage 1 (step 3 above) .
(6) The final stage feeds the centroid of the smallest common normalized target region into which all of the boilers can be placed at once.
One of the disadvantages of using the above approach (CNTR algorithm) is that it does not fully exploit the capabilities of the pumps 34A and 34B; if the CNTR 73 is small, then the rate of concentration adjustment will be slower than it needs to be. This problem can be somewhat alleviated by a nesting of target regions, using gross target regions that, (1) push the "problem boilers" into a broad control region quickly (and possibly push some boilers out of the narrower, true control region as a consequence, but never out of their gross target region) ;
(2) and then, once all boilers are at least within their gross target regions, the method proceeds as before with the narrower target regions.
Because the gross target regions are larger, a wider range of allowed pumping rates is obtainable, and therefore more aggressive control can be used during this initial period. A possible generalization would use scalable target regions for each boiler; hence, a conceptually infinite number of nested target regions. A discrete number of pre-defined target regions would be easier to program, and might provide nearly as good control; it also has the advantage of forcing the user to define the "emergency zone" and the "true target zone" for each boiler and the ability to raise specific alarms related to these specific user defined zones, which would presumably have a connection to the appropriate congruent control region for each boiler, based on its pressure.
Ultimately, however, restricting the pumpable region to the CNTR 73, though convenient in that it simplifies the algorithm, tends to make this approach more sluggish in its response to problems than it really needs to be.
In the preferred approach, discussed next, this sluggishness can be overcome by using an algorithm that more aggressively exploits the full range of the pumpable region, and can be shown to be optimal in accordance with a reasonable definition of optimality for such systems. It should be noted that this preferred approach can still be used in conjunction with the nested target regions approach discussed above. Common Normalized Pumpable Region (CNPR) Based Algorithm
Consider, in the normalized space, the regions formed by the endpoints (on the single pumpable region 71) of all chemical feed trajectories that move a specific boiler into the previously defined CNTR 73. The intersection of all N such regions formed by considering each of the boilers in turn always contain (at least) the CNTR 73 described earlier. However, if the normalized points are, as shown in Fig. 2, in similar positions, then in general a much larger region of the intersection will be formed. This region of intersection is referred to as the "common normalized pumpable region" (CNPR 75), shown in Fig. 4. In particular, the CNPR 75 is established by projecting feedrate trajectories from the current boiler concentration to the extreme vertices (e.g., as shown in Fig. 4, extreme vertices 63 and 65 as opposed to inner vertices 67 and 69) of the CNTR 73 and beyond for every boiler. Thus, for each boiler, a region is formed by the endpoints of all trajectories that puts the particular boiler water into the CNTR 73. The region formed by the intersection of all such regions is defined as the common normalized pumpable region, CNPR 75. By construction, each point within the CNPR 75 moves every boiler closer to the common normalized target region, CNTR 73.
Once the CNPR 75 is established, the next step is to select that boiler whose optimal trajectory gets into the CNTR 73 first. This optimal trajectory then determines the initial feed rates into the common header shared by all of the boilers. The optimal trajectory is determined by calculating the stage 1 feedrates (fal, fbl) and the associated stage 1 feed time ( dtJ for every boiler in accordance with A.S.N. 08/321,338 for every boiler by substituting the CNTR 73 for the target region of A.S.N. 08/321,338 and substituting the CNPR 75 for the pumpable region of A.S.N. 08/321,338 (see Fig. 4A) . The optimal trajectory selected is that one which comprises stage 1 feedrates (falmιn, fιu„) having the minimum stage 1 feed time (dtlmιn) .
The next step is to determine the longest time, dtMB (where
MB means "multiple boiler") to feed at the selected feedrates
(faiπun,- fbimin) • This is accomplished by:
(1) constructing state space trajectories between each boiler's current boiler concentration point and the corresponding steady state point associated with the selected feedrates, falmιn, f, lmιn ; (2) for each such trajectory, determining the point at which the trajectory first intersects a CNTR 73 perimeter edge that does not contact the initial point of the trajectory; and then using the equations of A.S.N. 08/321,338 to determine the time it takes for each boiler to reach its corresponding intersection point (if any) ;
(3) setting dtMB to the minimum of the times just computed; it should be noted that dtMB< dtlmιn.
Once dtMB is set, the feedstreams are then fed at the feedrates falmιn, fbιmιn for either (1) dtMB or (2) the time it takes for new data to arrive, whichever is smaller.
With the first boiler "in" (i.e., in the CNTR 73), the computation repeats until all boilers are in the CNTR 73. Once any boilers are "in", the candidate trajectories made on other boilers are limited by the requirement that boilers already "in" cannot be pushed out again, as long as there is a CNPR 75. This limitation is a consequence of step 2, discussed above.
This scheme exploits the full range of the pumps 34A and 34B to greater advantage. When all the boilers are outside of the CNTR 73, by construction, each trajectory from any boiler's current point that ends within the CNPR 75 will cross into the CNTR 73. Since the one trajectory is selected, of all such trajectories, that gets one boiler into the CNTR 73 fastest, there is no possibility of overshoot of the other boilers-the boilers are moving in the correct direction too, only they take longer to reach the CNTR 73 than the "fastest" boiler (the "fastest" boiler could actually be the closest) . And once at least one boiler is in the CNTR 73, the other boilers can be aggressively pushed into the CNTR 73 until the boilers already in the CNTR 73 "bump up against an edge of the CNTR 73," and more accurately, until such points are pushed into a "corner" of the CNTR 73. At that point, "the play in the system" has been exhausted and any further control reduces to the CNTR 73 algorithm, described in the previous section.
An important special case that the CNPR 75 algorithm handles well is the "slow boiler and the fast boiler." For example, it is assumed that one boiler has a very large characteristic time and another has a very small characteristic time, and they are both in the CNTR 75 when a sharp step in contaminants is observed. The fast boiler goes well-beyond its own target region but the slow boiler barely moves by the next time the operator enters the pH and P04 for the boilers. Because the slow boiler moves so slowly inside the CNTR 73, the CNPR 75 algorithm essentially reduces to a single boiler MACC control on the fast boiler, since it properly recognizes the fact that such aggressive adjustments will get the fast boiler into line long before the MACC controller has a chance to push the slow boiler out of the CNTR 73. By contrast, the first, CNTR 73 algorithm would not have exploited this "inertial advantage" of the slow boiler so aggressively and, as a result, the fast boiler would have been out of control much longer than it needed to be.
As a summary, the method for moving into the CNTR 73 is:
1) find the fastest trajectory into the CNTR 73;
2) determine how long to feed at that fastest rate which is determined by the shortest of either,
(a) which boiler water gets in first; or
(b) which boiler water gets pushed to the edge of the CNTR 73 that it is not already on.
In particular, this preferred MACC multi-boiler algorithm is given by:
(1) If (new data is available) then { a) update each boiler's state space (the "scale the map" of
A.S.N. 08/321,338) and state space point to reflect new measurements; b) recompute the CNTR 73 to reflect these updates; c) define InnerCNTR as a region nested within CNTR 73. Note that if InnerCNTR is defined as a region consisting of a single point, the centroid of the CNTR 73, then subsequent controller actions that use InnerCNTR as ActiveCNTR will, in the single boiler case, correspond to stages 2 and 3 of A.S.N. 08/321,338. (2) If (all boiler state space points within CNTR) then
ActiveCNTR = InnerCNTR else
ActiveCNTR - CNTR
(3) Recompute the CNPR using ActiveCNTR in lieu of CNTR. (Note that, for purposes of this calculation, any boilers on the perimeter of the ActiveCNTR are treated as if they are just outside of the ActiveCNTR. This helps to incorporate the constraint that boilers already in the ActiveCNTR should not be pushed out again.)
(4) For each boiler outside of the ActiveCNTR, compute the stage 1 feed rates and stage 1 time, dt:, as described in A.S.N. 08/321,338 but where ActiveCNTR and CNPR are used in lieu of the ordinary target region and pumpable region. Of the up to N such stage 1 feedrates, choose those stage 1 feedrates (fαιmιrι, fimii.) which have the minimum associated stage 1 feed time, dtlmιn.
(5) Determine the longest time, dtnB, to feed at these rates by:
(a) constructing state space trajectories between each boiler's current point and the corresponding steady state point associated with the (fallιun, f,lnιin) of step 4.
(b) for each such trajectory, determining the point at which the trajectory first intersects an ActiveCNTR perimeter edge that does not touch the initial point of the trajectory. Use the equations of A.S.N. 08/321,338 to determine the time it takes for each boiler to reach its corresponding intersection point (if any).
(c) set dtMB to the minimum of the times computed in (b) above. Note that dtπμ < dtlnun.
(6) Feed at the feedrates (fun, f, •„,,.„) determined in step 4 for the smaller of:
(a) the time dtHB computed in step 5;
(b) the time it takes for new data to arrive.
Advance each boiler's state space point along its state space rajectory an amount consistent with feeding for this length of time, using the equations of A.S.N. 08/321,338. ( 7 ) Go to Step 1 .
It should be noted that the steps above are defined with just two nested target regions: CNTR and InnerCNTR. The above is easily generalized to employ a sequence of nested target regions, CNTR, InnerCNTR, for i = 1, 2,...
The use of a common normalized target region (CNTR) focuses on getting all boilers into a jointly sustainable part of their target regions. The term "jointly sustainable" is defined by the condition that if the current cycles and characteristic times for each boiler were to remain in effect indefinitely, then all boilers could be kept within their respective target regions indefinitely as well. In other words, it is not enough to have all boilers in control now, but it is desirable to place them into a position in which, if nothing else changes, all of them can be simultaneously maintained in control forever.
Given this concept of jointly sustainable target regions, the multi-boiler generalization of MACC control described in the preceding section is optimal if the criterion for "best" control is defined as follows:
At each point in time, minimize the time required to get one more of the out-of-control boilers into a jointly sustainable part of its target region, subject to the constraints that:
1) all boilers already in a jointly sustainable part of their target region are never pushed out of it, and
2) all boilers not yet in the jointly sustainable part of their target region are at least always moved closer to it.
This optimality criterion agrees with the common sense notion that it is desirable to bring an out of control boiler into its target region as quickly as possible, provided that such aggressive adjustment does not result in pushing any of the other boilers out of their target regions, or in pushing any other out-of-control boilers even further away from their target regions. There is shown in Fig. 5 a second embodiment of an automatic congruent controller system 420, hereinafter known as the ON/OFF control system 420. As with the MACC system 320, the ON/OFF control system 420 controls two interdependent variables, namely, phosphate and sodium, the latter by way of monitoring the pH.
As stated earlier with respect to the MACC system 320, all subsequent references to sodium and/or to the sodium-to- phosphate ratio (Na/P04) of the boiler water refers to that sodium which interacts with the phosphate to maintain the boiler water so as to inhibit corrosion. This is also referred to as the "effective sodium" or the "effective sodium- to-phosphate ratio."
As discussed in detail in A.S.N. 08/321,338, which is incorporated by reference herein, the ON/OFF control system 220 is arranged to control water treatment chemicals to be introduced into a single boiler 222. The boiler 222 has an effluent flow (hereinafter known as blowdown flow 226) and a blowdown valve 228. The ON/OFF control system 220 does not control the blowdown flow 226 via the blowdown valve 228. In fact, one of the distinguishing features of the ON/OFF control system 420 over conventional boiler fluid control systems is that the blowdown flow 226 can be varied independently of the ON/OFF control system 420. However, it should be understood that the ON/OFF control system 420 of the present invention can also operate where the boilers' cycles (discussed next) are fixed, i.e., their blowdown flows are controlled.
Furthermore, unlike the single boiler operation described in 08/321,338, the ON/OFF control system 420 requires the determination of the cycles for each of the boilers, i.e., the ratio of the total feedwater to blowdown flow. Although there are many methods for determining the cycles for each boiler, the most common method employs the use of steam and blowdown flowmeters for each boiler, as shown (only one 429A which is shown) in Fig. 1. However, it should be understood that the present invention 420 is not limited to the use of steam flowmeters. For example, instead of steam flowmeters, individual feedwater flowmeters (not shown) could be coupled to the individual feedwater inputs to every boiler. The important point is that some method of determining the cycles for each boiler is required in the present invention 420.
Since the patentable distinction between the present ON/OFF control system 420 and the ON/OFF control system 220 for use with a single boiler resides not in the hardware (other than the use of multiple boilers, e.g. , 222A-222C) but in the ON/OFF control system software, the reference number 448 (Fig. 5) refers to the ON/OFF control system software 248 of ON/OFF control system 220 but also includes the multiple boiler algorithms discussed below.
The ON/OFF control system 420 basically comprises a first chemical feed stream 230A, a second chemical feedstream 230B, a control means 232 and an input means 240. The first chemical feedstream 230A and the second chemical feedstream 230B are each connected to the common feedwater line 224. The first chemical feedstream 230A is arranged to deliver a first fluid treatment material or chemical, e.g., a sodium phosphate mixture having a particular sodium-to-phosphate ratio and a known phosphate concentration, to the water in theboilers 222A-222C. Similarly, the second chemical feedstream 230B is arranged to deliver a second fluid treatment material or chemical, e.g., a sodium phosphate mixture having a particular sodium-to-phosphate ratio and a known phosphate concentration to the water in the boilers 222A-222C. It is important to note at this juncture that the sodium-to-phosphate ratio in the first chemical feedstream 230A must be different from the sodium-to-phosphate ratio in the second chemical feedstream 230B while the respective known phosphate concentrations in the feedstreams can, in certain circumstances, be identical. The particular sodium-to-phosphate ratio (Na/P04) determines a particular pH for that fluid treatment material. Where the known phosphate concentration (PO,,) in both feedstreams is identical, then the different sodium concentrations (Na) in each feedstream determine the pH (high or low) of each fluid treatment material. The importance of the pH is that the pH of the boiler water, at a fixed phosphate concentration, is indicative of the sodium concentration in the boiler waters. Thus, monitoring the pH of the boiler waters provides an effective method of monitoring the sodium-to-phosphate ratio of the boiler waters and then in determining which of the two feedstream sodium phosphate mixtures is to be fed to the boiler waters to adjust the sodium- to-phosphate ratio of the boiler waters, as will be described below. As shown in Fig. 6, by fixing the amount of phosphate in the boilers 222A-222C, varying the amount of sodium permits the sodium-to-phosphate ratio of the boiler waters to be controlled.
Further details as to the operation of the ON/OFF control system are set forth in A.S.N. 08/321,388 and will not be discussed any further except with respect to multiple boiler operation. It should be understood that the single blowdown flow 226 and blowdown valve 228 of ON/OFF control system 220 have been replaced with blowdown flows 226A-226C and blowdown valves 228A-228C. Although only one input means 240 is shown in Fig. 5, it should be understood that each boiler 222A-222C has its own input means 240.
In the system 420, the steady-state phosphate associated with either feed tank 236A or 236B, and the steady-state sodium concentrations associated with the high and low Na:P04 ratio feed tanks 236A and 236B are given, for the "ith" boiler, by:
P04(i) = FeedRate*FeedP04* Cycles ( i) /Total Feed ater (for both tanks/feed tanks)
NaH]_αh(i) = (L„a +FeedRate*NaP04RatioHι ll*FeedP04) * Cycles (i) /TotalFeedWater
NaLow (i) = (LNd +FeedRate*NaP04RatioL(,„ *FeedP04) * Cycles ( i) /TotalFeedWater
Here FeedRate is the flow rate from the currently selected feed tank, FeedP04 the phosphate concentration in the feed tanks (for simplicity, as with single boiler ON/OFF, assumed to be the same in both tanks) , NaP04RatioHlgi, and NaP04RatioLuw are the Na:P04 ratios of the two chemical feed tanks 236A and 236B, TotalFeedWater is the feed water flow rate in the common, shared, feed water header, LNa, is the total sodium leak (feedwater contaminant ingress) into the shared feedwater header, and Cycles (i) is the instantaneous cycle given by the ordinary definition of boiler cycles for the "ith" boiler:
Cycles(i) = (Steam(i) + Blowdown (i) ) /Blowdown ( i)
Noting that (Steam(i) + Blowdown ( i) ) /TotalFeedWater is the fraction of the total feedwater (and hence, of treatment chemical and contaminant) that flows into each boiler, the above equations are a consequence of the assumed non-volatility of the treatment chemicals and contaminants, the assumed "good mixing" in the common feedwater line, and the application of mass balance around each boiler.
The important point to note about the above equations is that each boiler's steady-state concentrations are the product of a value which is the same for all of the boilers and the cycles of each boiler. Based on that, Fig. 6 depicts the possible steady-state feed-rates associated with each of the boilers sharing a common feed water line, and using an ON/OFF pumping configuration into that line.
The vertical vector, V, represents the steady-state, contaminant determined, effective sodium levels associated with one of the boilers (i.e., the Na concentration, if both high and low NA:P04 ratio tanks 236A and 236B, respectively, were turned off for a long time) . The vector A represents the increase in steady-state concentrations, beyond those from the contaminant, associated with feeding from the high Na:P04 ratio tank 236A; the vector B, the corresponding increase associated with feeding, instead from the low Na:P04 ratio tank 236B. It should be understood that Fig. 6 depicts an ON/OFF control system whereby the feed tanks 236A and 236B contain the same concentration of phosphate, which is why the P04 component of both of these vectors is the same; however, as stated earlier, it is not necessary that both tanks contain the same amount of P04.
The two dotted lines, on the other hand, represent all of the various steady-state concentrations that could be associated with feeding from either tank to any other boilers that might be present in the system 420, each with possibly different cycles of concentration. For example, if a boiler's cycles were half that of the original boiler whose vectors are shown, then, all else being equal, the corresponding steady-state concentrations for high and low Na:P04 ratio feed would be half the distances along each dotted line, measured from the origin, as they were for the original boiler whose vectors are shown; a boiler with double the cycles would have its two corresponding steady-state concentrations along the same dotted lines, only twice as far from the origin, as for the original boiler, etc.
In general, since all steady-state equations for the boilers differ only via the multiplicative factor of Cycles (i) , the steady-state concentrations for all boilers lie on the dotted lines shown in the Fig. 6. In addition, since both tanks 236A and 236B have the same phosphate concentrations, each boiler's high and low Na:P04 ratio steady-state concentrations will be on the intersection of a vertical line, corresponding to the steady-state phosphate for that boiler, with these two dotted lines.
It should be noted that if the target region does not overlap the region between the dotted lines, maintaining congruency is impossible. Maximum Cycle-Ratio Based Phosphate Control
Given the Cycles (i) for each boiler, the next step is to choose that FeedRate such that all of the steady-state P04(i) are between P04Bound,,u„ and P04Bound„ιa , where these two values are predetermined and loaded into the ON/OFF controller 242. P04Boundmιn and P04Boundma< are predetermined values that depend basically on the operating pressure of the boilers and are inputted to the ON/OFF controller 242 by the operator. The following discussion assumes that P04Bound,„Ui values for each boiler and the P04Boundma values for each boiler are the same. However, as will be discussed later, the ON/OFF control system 420 is also designed to operate where these values are different for each boiler, i.e., P04Boundlι n(1, and P04Boundrrιav. ) .
One way to choose the particular Feedrate is to choose that feedrate such that the range between the lowest P04(i) and the highest P04(i) is centered in the middle of the phosphate control limits of the CPPC target region (between P04Bound„ „ and
P04Boundmax) . That is, a FeedRate is sought such that:
P04BoundMl„ <= P04(iMin) and P04(iMax) <= P04BoundMa and P04(iMin) - P04Boundnun = P04Boundma - P04(iMax)
Here P04(iMin) is the smallest steady-state boiler concentration and P04(iMax) the largest (which correspond to the boilers with the smallest and largest cycles, as per the above equations for P04(i)). Substituting the equation for the steady-state phosphate concentration, P04(i), into the last equation above and solving for FeedRate:
FeedRate = (TotalFeedWater/FeedP04) *
(P04Boundnιa + P04Boundmιn)/ (Cycles (iMax) + Cycles ( iMin) )
As a check, note that when the cycles in all of the "N" boilers are equal and have equal blowdown flow rates, this equation reduces to the expected result that "N times more" feed is needed to attain the midpoint of the control range than is required for just one such boiler.
By feeding at this rate, the average of the steady-state P04 concentrations of the highest and lowest cycle boilers will, over a period of time, be right in the middle of the control range for phosphate. And, provided it is possible to maintain all of the boilers within their control range, this will also guarantee that these two boilers' steady-state P04 concentrations, and, therefore, every other boiler's steady- state concentrations (which also lie between these two limits) , will lie within the control range as well. In general, it will be possible to retain, in steady-state, all of the boiler steady-state concentrations within their control range provided that:
Cycles (iMax) /Cycles (iMin) <= P04Boundil:.,/P04BoundMin, where Cycles ( iMax) represents the maximum instantaneous cycle of all of the boilers and Cycles (iMin) represents the minimum instantaneous cycle of all of the boilers;
On the other hand, if this condition is violated for an extended period, phosphate control with such a control system will be impossible. The above condition is a consequence of the two phosphate limit based inequalities and the equation for steady-state phosphate give above. This upper bound on the ratio of cycles between any two boilers is referred to as "the maximum cycles ratio" for the system. The controller should raise a warning whenever this maximum cycles ratio is exceeded, since it means that if current conditions were to continue indefinitely, keeping phosphate in the box for all of the boilers would be impossible. In particular, if the cycles ratio equals the maximum cycles ratio then the minimum and maximum steady-state concentrations, P04(iMin) and P04(iMax), will exactly equal P04BoundMιn and P04BoundMa , making it just barely possible to keep all of the boilers within their phosphate bounds. Note that in general, iMax and iMin (the indexes of the boilers with the maximum and minimum cycles) will vary depending upon load swings, blowdown adjustments, etc.
In special cases, the maximum and minimum cycles for some or all boilers would be known in advance. Consider, however, the general case in which the Cycles (i) for each boiler is allowed to vary freely (either due to load swings or blowdown flow adjustments) so long as the maximum cycles ratio constraint given above is not violated. As long as the feed rate is constantly updated to reflect the most recently computed maximum and minimum cycles, and as long as the above constraint is never violated, one can show that, apart from start-up transients or violations of the assumptions of the basic CSTR model (e.g. , the presence of P04 not from the feed tanks) , the P04 levels for all boilers will always remain within their control limits as well.
For example, suppose that the control limits on phosphate are 10 ppm (P04BoundHllL) to 30 ppm (P04Boundn„ ) , thus implying a maximum cycles ratio of 3. Suppose that, initially, a fixed cycles boiler (i.e., a boiler that comprises a controller, not shown, that maintains the boiler at a fixed cycle) is being operated at 30 cycles and a variable cycles boiler at 90 cycles, which would put the steady-state concentrations at 10 and 30 ppm, respectively, if the feed rate formula given had been used. If the variable cycle boiler suddenly dropped to 10 cycles, the feed rate formula implies that the steady-state phosphate concentrations of both boilers would be interchanged, and, as both boilers assumed their new positions at opposite ends of the phosphate control range, they would pass through intermediary phosphate levels, all of which would also be within the control range. In general, as long as the current steady-state phosphate concentrations and the projected steady-state concentrations are in the control range, phosphate will be maintained within that range as well. The selection of the feedrate as per the above equation guarantees that these conditions, apart from possible transients, uncharacterized sources or sinks of phosphate, etc., will be satisfied.
The above maximum cycle-ratio based phosphate control was discussed under the assumption that the phosphate bounds for the particular boilers are identical, i.e.,
PO4Boundraιn(1)=P04Boundmιn(2)= ... P04Boundml„ ,,,,-= P04Boundn , and P04Boundmax(1)=P04Boundma:,,2,= ... P04Bound,,,-, .;„,= P04Bound,„a,..
However, a more generalized form of the phosphate control can be made where the phosphate bounds for the particular boilers are different, as shown in Fig. 7.
To that end, under the assumption of a steady-state condition, the chemical concentration in the ith boiler, P04(i) , is given by the following equation:
P04(i) = FeedWater(i) * FeedP04conc/Blowdown (i) (a) where FeedP04 cone = Total Feed P04/Total FeedWater.
This eguation can be used to back calculate the proper FeedP04 cone. As a result, to maintain P04(i) within its minimal bound
P04Bound,„ln(1) , and maximal bound P04Bound,,,., ,, the FeedP04conc should be in between:
FeedP04concmin ( i) =P04Bound„α„ , *Blowdown ( i) /FeedWater ( i)
=P04Bound„ „(1)/Cycle(i) (b) and
FeedP04concmax ( i) =P04Boundma (1) *Blowdown ( i) /FeedWater ( i)
=P04Bounda.(l)/Cycle(i) (c) This gives an interval for FeedP04conc to ensure that P04(i) is under control. It is thus apparent that in order to have all
P04(i) under control, it is necessary to have all intervals determined by equations (b) and (c) fall within a common interval , i.e.,: max(FeedP04concmin(i) ) < min (FeedP04concma ( i) ) . (d)
Under this condition, any value of FeedP04conc in the interval bounded by the above inequality will keep all boilers in their control regions for P04.
Thus, the generalized form of this phosphate control can be written:
FeedP04conc=a*max(FeedP04concmin(i) ) + (1-a)
*min(FeedP04concmax(i) ) (e) where 0 < a < 1. The default value of a is 0.5.
In the special case, where all P04Boundml., ) are egual , and all P04Boundma (1) are equal, inequality (d) can be simplified as
(using equations (b) and (c) ) : max (P04Boundmιn )/Cycle ( i) ) < min (P04Bound,llα (1./Cycle ( i) ) =* max (P04Boundmιn/Cycle ( i) ) < min (P04Bound, 3 /Cycle ( i) ) and using the principles that: max (k*b = k*max(b , where k is a constant; and max(l/b1)= l/min(b =-» P04Bound,„ln/min (Cycle ( i) ) < P04Bo nds /max (Cycle ( i) ) =» max(Cycle(i) ) /min (Cycle ( i) ) < P04Bound„ , /P04Bound„, (f) which is the criterion set forth earlier with max(Cycle(i) ) ^Cycles (iMax) and min (Cycle ( i) ) =Cycles (iMin) .
To obtain this special case where:
P04Boundmιn(1)=P04Bound,nιn(2)= ... P04Boundlll)= P04Bound and P04Boundma (1)=P04Bound ,:)= ... P04Bound,„, „,= P04Bound„l3 , using equation (e) , a is appropriately chosen. In particular,
FeedP04conc=a*max(FeedP0 concmin ( i) ) + ( la) * minFeedP04concmax(i) ) =a*max (P04Bound,lllll /Cycle (i) ) + (1- a) *min(P04Boundma (1)/Cycle(i) ) =a*P04Bound,nln/min (Cycle (i) ) + (1-a) *P04Bound1Ud /max (Cycle ( i) ) (g)
Choosing a=min (Cycle ( i) )/ (ma (Cycle (i) +min (Cycle (i) ) ) , and l-a=max (Cycle (i) )/ (max (Cycle (i) + min (Cycle ( i) )), and then substituting into equation (g) ,
FeedP04conc =min (Cycle (i) )/ (max(Cycle (i) +min (Cycle ( i) ) ) *
P04BoundmlI,/min (Cycle (i) ) + max(cycle(i) )/ (max (Cycle (i) +min(Cycle(i) ) ) ) * P04Bound,„a /max (Cycle (i) ) =P04Boundmιn/ (max (Cycle (i) +min (Cycle ( i) ) ) + P04Boundmax/ (max (Cycle (i) + min (Cycle (i) ) )
= (P04Boundmιn + P04Bound„ιaj)/ (max (Cycle (i) + min(Cycle(i) ) ) , (h) which is the condition set forth earlier.
In terms of feedrate, it can be shown that the desired feedrate
(FeedRate) is given by:
FeedRate=a*max(FeedRatemιn(1) ) ) + (1-a) *min (FeedRatema (1) ) (e') where 0 < a < 1; the default value of a is 0.5, and where FeedRatemιn )=P04Bound,„ιr,(1)/Cycle (i) * (TotalFeedWater) /FeedP04, & FeedRatemax(1)=P04Boundmax(1)/Cycle(i) * (TotalFeedWater) /FeedP04 under the condition that: max(P04Bound„llπ )/Cycle(i) ) <min (P04Bound,„, (J ,/Cycle (i) ) . (dJ
Under this condition, any value of FeedRate in the interval defined in equation d' will maintain all the boilers in their control regions for P04.
It should be noted that Figs. 6 and 7 depict common normalized target regions, all of these representing a simple case of the common normalized target region of the multiple boiler MACC system 20 discussed earlier. In particular, only one dimension, namely the phosphate concentration, varies in the present ON/OFF control system 420. The common normalized target regions in Figs. 6 and 7 are scaled by being divided by the cycles. Back-Calculating Na
As in A.S.N. 08/328,331 and as discussed earlier with respect to the MACC system 320, assuming electroneutrality in the boiler waters, a charge balance equation is used to compute effective Na concentration given P04 and pH.
In the single boiler ON/OFF controller of A.S.N. 08/321,338, it is not necessary to actually compute this Na concentration, since it is assumed that because the phosphate feed rate is proportional to blowdown flow rate, the boiler water would always be at the single, setpoint, P04 and hence one could simply compute the pH associated with congruency ratios of 2.8:1 at that P04 level once and for all and then use this pH setpoint as the basis for determining if the high or low Na:P04 ratio tank were to be used.
However, at least in the general case in which all the Cycles (i) are free to "float" subject only to the above "maximum cycle ratio" constraint, it can no longer be assumed that any particular boiler will be at any particular, fixed, phosphate level; even if that boiler is not one of the boilers whose cycles change. The example at the end of the last section makes this clear: the boiler whose cycles remained fixed nonetheless moved from the lowest to the highest limit of P04 whereas the boiler whose cycles changed did just the opposite. As with the ON/OFF controller of A.S.N. 08/321,338 where an on-line P04 meter (analyzer) 256 was not assumed to be available (hence, the broken line 460 shown between the P04 analyzer 256 and the computer 242 in Fig. 5), it is necessary to alternatively determine the P04 level. The P04 level is then used to back calculate Na for the various boilers so as to determine if the pumps 234A and 234B should be turned on or off under the same constraints.
One approach would be to use the steady-state P04(i) as given by the above equations. The problem with this approach is that, during the periods in which P04 levels are "readjusting" to a change in cycles, the Na computed would be in error and thus the boiler water could be driven a considerable distance away from the correct congruency ratio during such periods as a result. It is therefore better to use, not the steady-state P04 for a boiler, but rather the "model projected" P04 in that boiler, which can be updated each time new on-line information becomes available by using the solution of the differential equation for the P04 mass balance around the boiler (the well-known CSTR "exponential approach to equilibrium") :
P04Est(i, t+dt) = (l-e"dt/Tau,i)) *P04 (i) +P04Est (i, t) *e ~d Tau(1'
In the above P04Est(i, t) is the estimated concentration of the boiler at time t (the "initial concentration") and P04(i) is, as before, the steady-state phosphate concentration (the "final, steady-state, concentration"). Tau(i) is the boiler's characteristic time, given as Mass ( i) /Blowdown (i) (where Mass(i) is the boiler water mass of the ith boiler) and dt is the time interval between samples. For cases in which the blowdown and mass of the boiler and sampling interval, dt, are fixed, this reduces to a simple EWMA (exponentially-weighted moving average) of the steady-state concentrations, with a λ of (1 - exp(- dt/Tau(i)). P04Est(i, t) can be initialized via an initial measurement of the concentration of phosphate in each of the boilers. An alarm should be raised if this projected phosphate is outside of the phosphate control limits. In analogy with currently recommended single boiler ON/OFF control practices, this projected phosphate should be compared periodically to a manual phosphate measurement on each boiler in order to detect possible flow meter calibration errors, etc.
Note: many of the guantities, like P04(i), Tau(i), etc., above and in what follows are also functions of time, but for simplicity this time dependence is not shown explicitly except in the case of P04Est(i, t) . Controlling Congruency
In this ON/OFF generalization, on-line pH meters are required in every boiler, and a repetition of the P04 projection and "pH to Na conversion" calculations described above for each boiler as well. With these numbers in hand, the Na:P04 ratio of each boiler is computed, and the high or low Na:P04 ratio tank is chosen based on the minimum and maximum Na:P04 ratio among the various boilers, using NaP04RatioBoundH,p. and NaP04RatioBoundMa., in an analogous manner to how P04Bound|.Ull and P04BoundMa, were used before, so that the range of congruencies of the boilers is centered within the congruency control range. Namely: if (NaP04Ratio( jMin) +NaP04Ratio (jMax) <=
NaP04RatioBound,1ιn+NaP04RatioBoundH3. ) use high Na:P04 ratio feed tank else use low Na:P04 ratio feed tank Here NaP04Ratio (jMin) , NaP04Ratio (jMax) are the largest and smallest estimated Na:P04 ratios.
It should be noted that the normal requirements for single boiler ON/OFF control, related to the need to limit the amount that the concentrations in a boiler can change in "deadtime hours", must be satisfied for each of the boilers in the multiple boiler configuration.
This results in control actions that move the range of congruency ratios for all boilers towards the center of the congruency range, which center is assumed to be the congruency setpoint. When cycles remain unchanged for extended periods of time, and assuming the "uniform impact of feedwater contaminants on each boiler" model is correct, it can be shown that this approach will eventually bring all of the boilers to within a "single boiler ON/OFF bounce" of the optimal congruency setpoint. (The "bounce" in the ON/OFF control system represents the largest amount that the boiler water concentration can change during the deadtime) . And in many cases the controller will perform better than expected, due to the tendency of the boilers to respond in similar ways to various feed rates.
Under normal circumstances, all of the boilers should be within the congruency control range, and an alarm should be sounded if the minimum or maximum congruency ratio is beyond the corresponding Na:P04 ratio bound. Boiler to boiler differences in the impact of contaminants on boiler water pH, phosphate hideout, etc. , could result in differences from boiler to boiler that would be sufficient to sound such an alarm. If such differences are sufficiently large (e.g., lots of volatile contaminants, difference rates of breakdown, etc.) it could make controlling congruency within the limitations imposed by a common feedpoint in a common feedwater impossible. However, for totally ionized, and therefore non-volatile, contaminants, this should not be an issue.
At first blush, an alternative approach would be to only measure pH on one of the boilers and use that pH to estimate the sodium leak in the feedwater line, and then use this leak along with known sodium feedrates, to project the sodium, and hence the sodium phosphate ratio, in all the boilers, without the need to actually have a pH meter on each boiler. However, a potential problem with doing that is that it depends too heavily on the idea that all feedwater contaminants, once they reach the boiler water, have the same impact on boiler water effective sodium regardless of boiler conditions. For example, if a certain contaminant is a volatile chemical, its contribution to the "effective sodium leak" that would show up in the pH of a boiler would vary depending upon the volatility of the chemical (which, in turn, would depend on such things as the temperature and pH of the boiler water) . This "uniform boiler water impact" is a much more dubious assumption upon which to estimate "effective sodium" in the boiler water than the assumptions behind our phosphate estimation method. Moreover, these phosphate estimation assumptions have at least partially been validated by the current ON/OFF controller, something the "uniform boiler water impact assumption" cannot claim.
Furthermore, it would appear that one could safely rely upon the similarity of the response of all of the boilers as they move between the corresponding high and low Na:P04 ratio lines, to base the congruency control action on just one, lead boiler. At first glance, it may appear desirable to use a simple-lead-boiler type of congruency control, in conjunction with the ratioed approach to controlling overall feed rate given above. But there are a number of potential problems to this approach, including:
• The rate at which concentrations of each boiler change in response to switching between the two feed tanks will differ, and if only the lead boiler's congruency ratio is monitored, the difference in the size of the "ON/OFF bounce" that this difference in responsiveness causes could create problems with keeping all boilers in the box.
• It can be shown that if cycle changes are large, this approach can lead to large excursions out of the box during that period when the steady-state phosphate concentrations have not yet re-adjusted to the new levels associated with the new cycles, because the "high" and "low" feed tank steady-state concentrations toward which the boiler waters are moving have already assumed their new, and sometimes dramatically different in impact on congruency, positions. In such conditions, the congruency response of each boiler can be very different until the new steady-state P04 concentrations are reached. The result is that during load swings, such a lead boiler controller could appear to "be out of control" (e.g., driving certain boilers way out of the box) until the new steady-state phosphate concentrations were reached.
Moreover, the same objections regarding the over-dependence on the uniform impact of feedwater contaminants made above would apply to this lead boiler approach as well. In general, a "lead boiler" though it is often a good "role model" for the other boiler's to follow, is probably just different enough to make this idea unworkable. With certain, less demandingly-variable systems, a lead boiler approach is possible, but in the general case, the boiler's performance would tend to be bumped way out of its congruency range during a rapid load swing, etc. Such boiler behavior would be undesirable to customer satisfaction.
Therefore, the more conservative strategy of actually measuring pH and computing congruency in every boiler (using only the model projected phosphate), and basing the congruency portion of the controller directly on these congruency ratios, appears more reliable. In addition, this method permits display of on-line pH, cycles, estimated phosphate and estimated congruency ratio for each boiler, all of which are desirable information for customer use. This approach also avoids having to actually select one boiler over another which may not always be an easy choice to make. Summary of the Multi-Boiler ON/OFF Control Method:
1) Use the same configuration of pumps and feed tank concentrations currently in use for single boiler ON/OFF defined in A.S.N. 08/321,338, with the pumping into the common feedwater header performed in such a manner that concentrations are well-mixed before the header splits into the various individual boiler feed lines. Also, the dead-time requirements for single boiler ON/OFF (related to the length of pH samples lines, frequency of sampling, etc.) need to be satisfied for each boiler in the multiple boiler system individually.
2) Each boiler needs an on-line pH, and on-line blowdown flow, and an on-line steam flow measurement (These flow rates can be summed to provide the on-line total feedwater flow required by the algorithm) . 3) The total feed rate from the currently selected feed tank is given by the formula:
FeedRate=a*max(FeedRate,lll(1)) ) + (1-a) *min (FeedRate,„a ) ) where 0<a<l;the default value of a is 0.5, and where FeedRatemιn(1)=P04Bound„,ln(,)/Cycle (i) * (TotalFeedWater) /FeedP04 , & FeedRatema, (1)=P04Bound,„a )/Cycle(i) * (TotalFeedWater) /FeedP04
Warnings are sounded if the following constraint is violated: max(P04Bound„,ιπ(1)/Cycle (i) ) < min (P04Bound,„J (l)/Cycle (i) ) .
Or, where P04Bound(1 =P04Bound,„ll ,_, = ... P04Boundmln,„ . = P04Boundn n and
P04Bound,„a (1,=P04 Bound,,,, )= ... P04Bound„,d, ,„, = P04Bound„,,
FeedRate = (TotalFeedWater/FeedP04 ) *
(P04 Bounds + P04BoundMi„)/ (Cycles (iMax) + Cycles ( iMin) )
Warnings are sounded if the following maximum cycle ratio constraint is violated:
Cycles (iMax) /Cycles (iMin) < = P04Bound,,3 /P04Bound
4) The steady-state phosphate of each boiler is calculated, and estimates for the current P04 concentration of each boiler updated:
Steady-state concentration:
P04(i) = FeedRate*FeedP04* Cycles ( i) /TotalFeedWater
(Note: despite the name, this steady-state concentration will in general vary each time new measurements become available) .
Current phosphate estimate in each boiler updated via the "EWMA-like" formula:
P04Est(i, t+dt) = (1 - e"df/1""' ' ) *P04 ( i) +P04Est ( i , t)*e" "1" "
The above equation is initialized by a manual sample from each boiler, from which the initial phosphate concentration is measured. (Periodic manual samples to check blowdown flow meter calibration, etc., as currently practiced with single boiler ON/OFF, should be done on each boiler as well) . Alarms are sounded if any of these projected phosphates are outside of the phosphate control limits. Note that Tau (i) =M(i) /B ( i) is a function of blowdown, and will therefore change over time.
5) The measured pH and estimated phosphate of each boiler is used in a charge balance equation, assuming electroneutrality in the boiler waters, to estimate the effective Na concentration and to determine the Na : P04 ratio of each boiler:
NaP04Ratio(i) = Naeffe.tlvβ(i) /P04Est(i, t)
6) The high or low Na:P04 ratio feed tank is selected based on if the middle of the range spanned by all the estimated Na:P04 ratios is above or below the middle of the range of allowed congruency ratios: if (NaP04Ratio(jMin)+NaP04Ratio(jMax) <=
NaP04RatioBoundMιn+NaP04RatioBoundHa ) use high Na:P04 ratio tank else use low Na:P04 ratio tank
Alarms are sounded if these minimum or maximum congruency ratios are not within their corresponding bounds.
Without further elaboration, the foregoing will so fully illustrate our invention that others may, by applying current or future knowledge, readily adopt the same for use under various conditions of service.

Claims

CLAIMSWe claim:
1. A method for controlling at least two interdependent chemicals in the fluids of at least two continuously stirred tank reactors (CSTRs) having respective blowdown flows and steam rate flows defining respective cycles for each of said CSTRs, said at least two interdependent chemicals being fed to said fluids through a common feedwater to each of said at least two CSTRs, said method comprising the steps of:
(a) establishing a respective mathematical model of each of said CSTRs;
(b) monitoring the concentration of one of said at' least two interdependent chemicals in each of the fluids, the temperature at which the pH is measured in each of the fluids, the respective blowdown flow and the respective steam rate flow;
(c) updating the models based on the concentration of said one of said at least two interdependent chemicals in each of the fluids, the pH of each of the fluids, the temperature at which the pH is measured in each of the fluids, the respective blowdown flow and the respective steam rate flow;
(d) defining a respective target region of said at least two interdependent chemicals in said respective continuously stirred tank reactors and wherein said respective target regions are scaled according to the respective cycles, said respective target regions establishing a state of congruency for each of the fluids;
(e) providing a feedstream of a high-pH fluid treatment material comprising a mixture of said at least two interdependent chemicals and a feedstream of a low-pH fluid treatment material comprising a mixture of said at least two interdependent chemicals for feeding, at respective feed rates, to the fluids; and
(f) developing an optimum feed rate program for controlling said feedstreams to automatically minimize the time that said at least two interdependent chemicals in the fluids spend outside of a common normalized target region formed by the intersection of said respective target regions.
2. The method of Claim 1 wherein each of said fluids has associated therewith a respective pumpable region in a CSTR state space that defines all reachable concentrations of said at least two interdependent chemicals in the respective fluid and including therein said respective target region for defining congruency of said at least two interdependent chemicals in said respective pumpable region, said respective pumpable region also being scaled according to said respective cycles, said step of developing an optimum feed rate program comprising overlaying said respective pumpable regions and said respective target regions to define a single pumpable region and to establish said common normalized target region defined by the intersection of said overlayed respective target regions.
3. The method of Claim 2 wherein said fluids comprise respective current concentrations of said at least two interdependent chemicals and wherein said step of developing an optimum feed rate program comprises the steps of:
(a) establishing a respective region formed by the endpoints of all feed trajectories that move said respective current concentrations of said fluids into said common normalized target region;
(b) selecting that region formed by the intersection of said respective regions, said region formed by the intersection of said respective regions defining a common normalized pumpable region.
4. The method of Claim 3 wherein said common normalized target region comprises vertices, including extreme vertices, and edges and wherein said step of establishing a respective region comprises the respective region formed by feed trajectories that originate from said current concentrations and intersect said extreme vertices.
5. The method of Claim 4 wherein said step of developing an optimum feed rate program further comprises the step of evaluating, for each of said continuously stirred tank reactors, sets of feed rate trajectories between the current concentrations of said at least two interdependent chemicals and said common normalized target region to determine the time required to move said current concentrations into said common normalized target region.
6. The method of Claim 5 wherein common normalized pumpable region comprises vertices and edges and wherein said step of evaluating comprises the steps of:
(a) determining the time associated with driving the current concentrations of said at least two interdependent chemicals in each of said fluids along a first set of feed rate trajectories formed between the current concentrations and said vertices of said common normalized pumpable region;
(b) determining the time associated with driving the current concentrations of said at least two interdependent chemicals in each of said fluids along a second set of feed rate trajectories formed between said current concentrations and said common normalized target region vertices, said second set of feed rates being projected until they intersect said common normalized pumpable region perimeter, if at all, thereby defining a third set of feed rate trajectories; and
(c) selecting one feed rate trajectory, from all of said first and third sets of feed rate trajectories from each of said fluids, that requires the least amount of time for at least one fluid to reach an edge of said common normalized target region.
7. The method of Claim 6 further comprising the step of determining how long to feed said first and second feedstreams at said selected one feedrate trajectory, said step of determining how long to feed said first and second feedstreams comprises the steps of:
(a) for each of said other fluids, establishing a respective feed rate trajectory defined by a line from said respective current concentrations of said at least two interdependent chemicals to said selected feed rates;
(b) for each of said other fluids, determining the point at which said respective feed rate trajectory intersects an edge of said common normalized target region and determining the time associated with moving said current concentrations to said point, said intersected edge being a common normalized target region edge different from said edge reached by said at least one fluid in the least amount of time; and
(c) selecting the minimum of those times associated with moving said current concentrations to said point.
8. The method of Claim 7 further comprising the step of feeding said first and second feedstreams at said selected feed rate trajectory for an amount of time corresponding to said selected minimum of those times associated with moving said current concentrations to said point.
9. The method of Claim 8 wherein each of said fluid state spaces are updated based on said feeding said first and second feedstreams at said selected feed rate trajectory for said selected minimum of those times associated with moving said current concentrations to said point.
10. The method of Claim 7 further comprising the step of feeding said first and second feedstream at said selected feed rate trajectory for an amount of time corresponding to the time it takes for new data to be available, said data being defined as said concentration of said one of said at least two interdependent chemicals in the fluids, said pH of said fluids, said temperature at which the pH is measured, said blowdown flow and said steam rate flow.
11. The method of Claim 10 wherein each of said fluid state spaces are updated based on said feeding said first and second feedstreams at said selected feed rate trajectory for said amount of time corresponding to the time it takes for new data to be available.
12. The method of Claim 10 wherein a new common normalized target region is recomputed based on said new data.
13. The method of Claim 9 further comprising the steps of:
(a) establishing a new common normalized target region that is nested within said common normalized target region; and (b) repeating the steps of selecting one feed rate trajectory that requires the least amount of time for at least one fluid to reach an edge of said new common normalized target region; and
(c) repeating the steps for determining how long to feed said first and second feedstreams.
14. The method of Claim 2 wherein said fluids comprise respective current concentrations of at least two interdependent chemicals and wherein said step of developing an optimum feed rate program comprises the steps of:
(a) evaluating, for each of said CSTRs, sets of feed rate trajectories between the current concentrations of said at least two interdependent chemicals and said common normalized target region to determine the time required to move said current concentrations into said common normalized target region;
(b) selecting that feed rate trajectory that moves at least one fluid current concentrations into said common normalized target region in the least amount of time; and
(c) feeding said first and second feedstreams at said selected feed rate trajectory.
15. The method of Claim 14 further comprising the steps of:
(a) establishing a new common normalized target region that is nested within said common normalized target region; and
(b) repeating the steps of selecting one feed rate trajectory that requires the least amount of time for at least one fluid to reach said new common normalized target region until all of said fluids are in said new common normalized target region.
16. The method of Claim 1 wherein each of said CSTRs is an industrial boiler having a boiler fluid.
17. The method of Claim 16 wherein said one of said at least two interdependent chemicals is phosphate.
18. The method of Claim 17 wherein said one of said at least two interdependent chemicals is sodium.
19. The method of Claim 18 wherein said method further includes the step of estimating the blowdown flow.
20. The method of Claim 19 wherein said method further includes the steps of calculating the phosphate concentration and the sodium concentration in the boiler fluid.
21. The method of Claim 20 wherein said method further includes the step of estimating a feedwater contaminant ingress.
22. The method of Claim 21 wherein said feedwater contaminant ingress is sodium.
23. The method of Claim 21 wherein said steps of estimating a blowdown flow and a feedwater contaminant ingress are based on a series of phosphate and pH measurements of the boiler fluid wherein the system uses small sample intervals.
24. The method of Claim 1 wherein said method further includes a step that accounts for dead time in each of the continuously stirred tank reactors.
25. The method of Claim 1 wherein said method further comprises the step of controlling the blowdown flow of each of said CSTRs.
26. An automatic control system for controlling at least two interdependent chemicals in the fluids of at least two continuously stirred tank reactors (CSTRs) linked in parallel by a common feedwater line and wherein each CSTR includes a respective blowdown flow and steam rate flow that define respective cycles for each of said CSTRs and wherein each CSTR has associated therewith a respective target region of said at least two interdependent chemicals, said respective target regions being scaled according to the respective cycles of said CSTRs, said control system comprising: input means for receipt of fluid parameters and control means responsive to said input means; said control means using non-proportional control for automatically minimizing the time that said at least two interdependent chemicals in the fluids spend outside of a common normalized target region formed by the intersection of said respective target regions of said at least two CSTRs.
27. The control system of Claim 26 wherein one of said fluid parameters comprises the pH of the fluid and wherein said input means comprises means for determining the pH value of each of the fluids.
28. The control system of Claim 27 wherein said control means comprises a first feedstream and a second feedstream for feeding first and second fluid treatment materials, respectively, to the common feedwater at respectively determined feed rates, said first material comprising a mixture of sodium and phosphate having a first predetermined sodium-to-phosphate ratio and said second material comprising a mixture of sodium and phosphate having a second predetermined sodium-to-phosphate ratio.
29. The control system of Claim 28 wherein said control means further comprises an adaptive controller, said adaptive controller modeling of each of said at least two CSTRs.
30. The control system of Claim 29 wherein said control means further comprises monitoring means for monitoring the concentration of said at least two interdependent chemicals in said fluids, the temperature at which the pH is measured, the blowdown flow and the steam rate flow, said monitoring means being coupled to said adaptive controller in order to update said modeling means, the concentration of said at least two interdependent chemicals in said fluids, the temperature at which the pH is measured, the blowdown flow and the steam rate flow being defined as data.
31. The control system of Claim 30 wherein said adaptive controller generates said respective target regions of congruency in a CSTR state space for each of said at least two CSTRs.
32. The control system of Claim 31 wherein said adaptive controller overlays said respective target regions to generate said common normalized target region of congruency.
33. The control system of Claim 32 wherein each fluid comprises a current concentration for each of said at least two interdependent chemicals and wherein said adaptive controller analyzes all feed rate trajectories of said first and second feedstreams that will drive said current concentrations in each of said fluids from said current concentrations to concentrations within said common normalized target region in said fluid state space, said analyzation determining a respective region for each of said fluids that is formed by the endpoints of all said feed rate trajectories.
34. The control system of Claim 33 wherein said adaptive controller selects that region in said CSTR state space that is formed by the intersection of said respective regions, said selected region forming a common normalized pumpable region that defines all reachable concentrations of said at least two interdependent chemicals among said at least two CSTR fluids, said common normalized pumpable region comprising a first set of edges and a first set of vertices.
35. The control system of Claim 34 wherein said common normalized target region comprises a second set of vertices and second set of edges, said adaptive controller determining for each of said CSTRs:
(a) the time associated with driving said current concentrations of said at least two interdependent chemicals along a first set of feed rate trajectories formed between said current concentrations and said second set of vertices; and
(b) the time associated with driving said current concentrations of said at least two interdependent chemicals along a second set of feed rate trajectories formed between said current concentrations and said second set of vertices, said second set of feedrates being projected until they intersect said first set of edges, thereby defining a third set of feedrates, said adaptive controller selecting one feedrate trajectory from all of said first and third sets of feedrate trajectories that requires the least amount of time for at least one fluid to reach one of said second set of edges.
36. The control system of Claim 35 wherein said adaptive controller calculates how long to feed said first and second feedstreams at said selected feedrates of said selected feedrate trajectory, said adaptive controller:
(a) establishing, for the other CSTRs whose current concentrations have not reached one of said second set of edges, a respective feedrate trajectory between said current concentrations and said selected feedrates;
(b) said adaptive controller determining, for the other CSTRs whose current concentrations have not reached one of said second set of edges, the point at which each of said respective feedrate trajectories intersects one of said second set of edges and determining the time associated with moving said current concentrations to said point, said intersected edge being a common normalized target region edge different from said edge reached by said at least one CSTR fluid in the least amount of time, said adaptive controller selecting the minimum of those times associated with moving said current concentrations to said point and feeding said first and second feedstreams at said selected feedrates for said selected minimum time.
37. The control system of Claim 36 wherein said monitoring means updates said fluid state spaces for each of said CSTRs based on said adaptive controller feeding said first and second feedstreams at said selected feedrate trajectories for said selected minimum time.
38. The control system of Claim 35 wherein said adaptive controller feeds said first and second feedstreams at said selected feedrates for an amount of time corresponding to the time it takes for new data to be available.
39. The control system of Claim 38 wherein said monitoring means updates said CSTR state spaces for each of said CSTRs based on said adaptive controller feeding said first and second feedstreams at said selected feedrate trajectories for said time it takes for new data to be available.
40. The control system of Claim 39 wherein said adaptive controller recomputes a new common normalized target region based on said new data.
41. The control system of Claim 37 wherein said adaptive controller establishes a new common normalized target region that is nested within said common normalized target region and wherein said adaptive controller determines one feedrate trajectory that requires the least amount of time for at least one of said CSTRs to reach an edge of said new common normalized target region and determines how long to feed said first and second feedstreams at said one feedrate trajectory.
42. The control system of Claim 26 wherein said system controls the blowdown flow of each of said CSTRs.
43. A method for controlling the sodium-to-phosphate ratio of the fluids of at least two continuously stirred tank reactors (CSTRs) having respective blowdown flows and steam rate flows defining respective cycles for each of said at least two continuously stirred tank reactor, said fluids of said at least two CSTRs being fed a through a common feedwater, said method comprising the steps of:
(a) providing a supply of a first sodium phosphate fluid treatment material to said common feedwater, said first sodium phosphate fluid treatment material having a first predetermined sodium-to-phosphate ratio and a first known phosphate concentration ;
(b) providing a supply of a second sodium phosphate fluid treatment material to said common feedwater, said second sodium phosphate fluid treatment material having a second predetermined sodium-to-phosphate ratio and a second known phosphate concentration ;
(c) measuring a fluid parameter of each of said fluids substantially continuously;
(d) determining the cycle of each of said at least two CSTRs substantially continuously;
(e) estimating the phosphate concentration in each of said fluids ; (f) determining the effective sodium in each of said fluids ;
(g) determining the sodium-to-phosphate ratio in each of said fluids and identifying a maximum sodium-to-phosphate ratio and a minimum sodium-to-phosphate ratio among said fluids, said minimum and maximum sodium-to-phosphate ratios defining a first range having a first midpoint; and
(h) feeding said first sodium phosphate fluid treatment material if said first midpoint is less than or equal to a second midpoint of a predetermined ratio range of sodium-to- phosphate, or feeding said second sodium phosphate fluid treatment material if said first midpoint is greater than said second midpoint.
44. The method of Claim 43 wherein said step of determining the cycle of each of said at least two CSTRs substantially continuously comprises the steps of:
(a) measuring each of said blowdown flows substantially continuously; and
(b) measuring the total feedwater flow substantially continuously.
45. The method of Claim 44 wherein said step of feeding said first sodium phosphate fluid treatment material or said second sodium phosphate fluid treatment material comprises feeding said first or second sodium phosphate fluid treatment material at a rate which maintains the respective phosphate concentration of each boiler fluid between a respective predetermined upper phosphate control limit and a respective predetermined lower phosphate control limit.
46. The method of Claim 45 wherein said respective predetermined upper phosphate control limits are identical, thereby forming a first phosphate control limit, and wherein said respective predetermined lower phosphate control limits are identical, thereby forming a second phosphate control limit.
47. The method of Claim 45 wherein said step of feeding said first sodium phosphate fluid treatment material or said second sodium phosphate fluid treatment material is fed at a rate given by:
FeedRate=a*max(FeedRatemin(1) ) + (1-a) *min (FeedRateme,x(1, ) , where 0 < a ≤ 1; FeedRatemιnU)=P04Boundmιn )/Cycle(i) * (TotalFeedWater) /FeedP04 ; FeedRatemax(1)=P04BoundmaxU)/Cycle (i) * (TotalFeedWater) /FeedP04 TotalFeedWater is said total feedwater flow; FeedP04 is said first known phosphate concentration or said second known phosphate concentration, depending on which fluid treatment material is being fed; P04Boundmax(1) is said respective predetermined upper phosphate control limit; P04BoundmιnU) is said respective predetermined lower phosphate control limit; and Cycle(i) is defined as:
, ,., (Steam (i) +Bl owdown (i) ) Cycl e { ι ) =
Bl owdown (i )
48. The method of Claim 47 wherein said step of feeding said first sodium phosphate fluid treatment material or said second sodium phosphate fluid treatment at said rate whenever the following condition is met: max(P04Boundmιn(1)/Cycle(i) ) < min (P04Boundma (1)/Cycle (i) ) .
49. The method of Claim 46 wherein said step of feeding said first sodium phosphate fluid treatment material or said second sodium phosphate fluid treatment material is fed at a rate given by:
,.- ,. ,, , TotalFeedWa ter , ( P04Boundm3> +P04Boundm Feedra te= ( —
FeedP04 { Cycl es l ina , + Cy -' cl es l m )
where
TotalFeedWater is said total feedwater flow; FeedP04 is said first known phosphate concentration or said second known phosphate concentration, depending on which fluid treatment material is being fed; P04Boundmax is said first phosphate control limit; P04Boundmιn is said second phosphate control limit; Cycleslmax is said CSTR having a maximum cycle value wherein said cycle is defined as: { Steam (i ) +Bl owdown (i ) )
Cycl e (i) =
Bl owdown (i )
and Cyclesiτnin is said CSTR having a minimum cycle value, Steam (i) is the steam flow rate for the "ith" boiler and Blowdown (i) is the blowdown flow for the "ith" CSTR.
50. The method of Claim 49 wherein said step of feeding said first sodium phosphate fluid treatment material or said second sodium phosphate fluid treatment material at said rate whenever the following condition is met:
Cyclesirnax/Cyclesilnin < P04Boundmax/P04Boundrain .
51. The method of Claim 48 wherein said step of determining the effective sodium in each of said fluids comprises back calculating sodium using a model projected phosphate concentration given by: dt dt
P04Est (i, t + dt ) = (1-e τ (J) ) P04 ( ) +P04Es t (i, t) e τ(2)
where P04Est(i,t) is the estimated concentration in the fluid at time t; P04(i) is the steady-state phosphate concentration ; τ is the characteristic time of the fluid; and dt is the time between interval samples.
52. The method of Claim 45 wherein said fluid parameter is the pH of the fluid.
53. The method of Claim 45 wherein said first known phosphate concentration is identical to said second known phosphate concentration.
54. The method of Claim 43 wherein said method further comprises the step of controlling the blowdown flow of each of said CSTRs.
55. A system for controlling a respective sodium-to- phosphate ratio of at least two boiler fluids of respective industrial boilers that are fed through a common feedwater, the industrial boilers having respective blowdown flows and steam rate flows that define respective cycles for each boiler fluid, said system comprising: input means for receipt of a boiler fluid parameter for each of the at least two boiler fluids and a parameter indicative of the cycles of each of said industrial boilers; and control means responsive to said input means for automatically driving the respective sodium-to-phosphate ratios of said at least two boiler fluids to a desired sodium-to- phosphate ratio region.
56. The system of Claim 55 wherein said boiler fluid parameter comprises the pH of the boiler fluid, the respective pH of each of the boiler fluids being defined by the respective sodium-to-phosphate ratio and the respective cycles and wherein said input means comprises a respective pH meter for determining the respective pH value of each of the boiler fluids and providing the respective pH value to said control means.
57. The system of Claim 55 wherein said input means further comprises :
(a) a respective blowdown flowmeter for monitoring the respective blowdown flows and for providing a respective signal indicative of the respective blowdown flow to said control means;
(b) a respective steam flow meter for monitoring the respective steam flow and for providing a respective signal indicative of the respective steam flow to said control means; and
(c) wherein said respective signal indicative of the respective blowdown flow and said signal indicative of the respective steam flow form said parameter indicative of the cycles of each the boiler fluids.
58. The system of Claim 55 wherein said control means comprises a first feedstream and a second feedstream for feeding first and second fluid treatment materials, respectively, to the common feedwater, said first material comprising a mixture of sodium and phosphate having a first pre-determined concentration of phosphate, said second material comprising a mixture of sodium and phosphate having a second predetermined sodium-to- phosphate ratio and a second concentration of phosphate.
59. The system of Claim 58 wherein said first predetermined concentration of phosphate and said second predetermined concentration of phosphate are identical .
60. The system of Claim 55 wherein said control means comprises feeding means for feeding said first feedstream or said second feedstream at a rate which maintains the respective phosphate concentration of each boiler fluid between a respective predetermined upper phosphate control limit and a respective predetermined lower phosphate control limit.
61. The system of Claim 60 wherein said respective predetermined upper phosphate control limits are identical, thereby forming a first phosphate control limit, and wherein said respective predetermined lower phosphate control limits are identical, thereby forming a second phosphate control limit.
62. The system of Claim 60 wherein said feeding means feeds said first feedstream or said second feedstream at a rate given by:
FeedRate=a*max ( FeedRatemln U , ) + ( 1-a ) *min ( FeedRate,,,, ( 1 ) ) , where 0 < a < 1 ; FeedRate„,ln(1)=P04Bound„un(1)/Cycle(i) * (TotalFeedWater) /FeedP04 ;
FeedRatema lJ=P04Boundma )/Cycle(i) * (TotalFeedWater) /FeedP04 TotalFeedWater is said total feedwater flow;
FeedP04 is said first known phosphate concentration or said second known phosphate concentration, depending on which fluid treatment material is being fed; P04Boundmax ) is said respective predetermined upper phosphate control limit ; P04Boundmιn(1) is said respective predetermined lower phosphate control limit; and Cycle(i) is defined as:
, ... { Steam ( ι ) +Bl owdown (i) ) Cycl e { ι ) =
Bl owdown { i )
63. The system of Claim 62 wherein said feeding means includes monitoring means that permits said feeding means to feed at said rate whenever the following condition is met: max(P04Boundmln(1)/Cycle(i) ) < min(P04Bound,„a.,,1)/Cycle(i) ) .
64. The system of Claim 61 wherein control means further comprises means for feeding said first feedstream or said second feedstream at a rate given by: where TotalFeedWater is said total feedwater flow;
FeedP04 is said first known phosphate concentration or said second known phosphate concentration; P04Boundmax is a predetermined maximum phosphate concentration ;
σ , _ , TotalFeedWa ter , ( P04Boundma +P04Bound ) Feedra te= { —
FeedP04 { Cy J cl es i mα + Cy J cl es l mi n )
P04Boundnιln is a predetermined minimum phosphate concentration ;
Cyclesιma, is said boiler having a maximum cycle value wherein said cycle is defined as:
, [ Steam { i ) +Bl owdown { i ) ) Cycl e =
Bl o wdo wn { i ) and Cyclesinιιn is said boiler having a minimum cycle value, Steam (i) is the steam flow rate for the "ith" boiler and Blowdown (i) is the blowdown flow for the "ith" boiler.
65. The system of Claim 64 wherein said feeding means includes monitoring means that permits said feeding means to feed at said rate whenever the following condition is met:
« Cyclesι aΛ/Cycleslmι„ < P04Bound,,,., /P04Boundnιιr, .
66. The system of Claim 63 wherein said control means further comprises means for estimating the phosphate concentration in each of the boiler fluids.
67. The system of Claim 66 wherein said control means further comprises means for back-calculating the sodium concentration in each of said boiler fluids.
68. The system of Claim 66 wherein said control means further comprises means for determining a sodium-to-phosphate ratio for each of said boiler fluids and for identifying a maximum sodium-to-phosphate ratio and a minimum sodium-to- phosphate ratio from all of said boiler fluids thereby defining a first range having first midpoint.
69. The system of Claim 66 wherein said feeding means feeds said first feedstream if said first midpoint is less than or equal to a second midpoint of a predetermined ratio range of sodium-to-phosphate, or feeding said second feedstream if said first midpoint is greater than said second midpoint.
70. The system of Claim 66 wherein said means for back- calculating the sodium concentration in each of said boiler fluids uses the following model projected phosphate concentration : dt dt
P04Es t { i f t + dt ) = { l - e τ I ) P04 (i) + P04Es t { i , t) e τ )
where P04Est(i,t) is the estimated concentration in the fluid at time t; P04(i) is the steady-state phosphate concentration; τ is the characteristic time of the fluid; and dt is the time between interval samples.
71. The system of Claim 55 wherein said system does not control the blowdown flow of each of said boilers.
72. The system of Claim 63 wherein said monitoring means alerts an operator if said condition is not met.
73. The system of Claim 65 wherein said monitoring means alerts an operator if said condition is not met.
AMENDED CLAIMS
[received by the International Bureau on 8 February 1999 (08 02 99)* original claims 3,4,6,7,9-11,14,15,23,28,30-33,35,36,44,46-51,55,58,61,62,64,68 and 70 amended; remaining claims unchanged (23 pages)]
CLAIMS We claim:
1. A method for controlling at least two interdependent chemicals in the fluids of at least two continuously stirred tank reactors (CSTRS) having respective blowdown flows and steam rate flows defining respective cycles for each of said CSTRS, said at least two 5 interdependent chemicals being fed to said fluids through a common feedwater to each of said at least two CSTRS, said method comprising the steps of:
(a) establishing a respective mathematical model of each of said CSTRS; lo (b) monitoring the concentration of one of said at least two interdependent chemicals in each of the fluids, the temperature at which the pH is measured in each of the fluids, the respective blowdown flow and the respective steam rate flow;
(c) updating the models based on the concentration of 15 said one of said at least two interdependent chemicals in each of the fluids, the pH of each of the fluids, the temperature at which the pH is measured in each of the fluids, the respective blowdown flow and the respective steam rate flow;
(d) defining a respective target region of said at least
20 two interdependent chemicals in said respective continuously stirred tank reactors and wherein said respective target regions are scaled according to the respective cycles, said respective target regions establishing a state of congruency for each of the fluids;
AMENDED SHEET (aARTICLE 19) (e) providing a feedstream of a high-pH fluid treatment material comprising a mixture of said at least two interdependent chemicals and a feedstream of a low-pH fluid treatment material comprising a mixture of said at least two interdependent chemicals for feeding, at respective feed rates, to the fluids, and
(f) developing an optimum feed rate program for controlling said feedstreams to automatically minimize the time that said at least two interdependent chemicals in the fluids spend outside of a common normalized target region formed by the intersection of said respective target regions
2 The method of Claim 1 wherein each of said fluids has associated therewith a respective pumpable region in a CSTR state space that defines all reachable concentrations of said at least two interdependent chemicals in the respective fluid and including therein said respective target region for defining congruency of said at least two interdependent chemicals in said respective pumpable region, said respective pumpable region also being scaled according to said respective cycles, said step of developing an optimum feed rate program comprising overlaying said respective pumpable regions and said respective target regions to define a single pumpable region and to establish said common normalized target region defined by the intersection of said overlayed respective target regions
3 The method of Claim 2 wherein said fluids comprise respective current concentrations of said at least two interdependent chemicals and wherein said step of developing an optimum feed rate program comprises the steps of (a) establishing a respective region formed by the endpoints of all feed trajectories that move said respective current concentrations of said fluids into said common normalized target region, (b) selecting a new region formed by the intersection of said respective regions, said new region formed by the intersection of said respective regions defining a common normalized pumpable region.
4. The method of Claim 3 wherein said common normalized target region comprises vertices, including extreme vertices, and edges and wherein said step of establishing a respective region comprises forming a respective region defined by feed trajectories that originate from said current concentrations and intersect said extreme vertices for each of said current concentrations of said fluids.
5. The method of Claim 4 wherein said step of developing an optimum feed rate program further comprises the step of evaluating, for each of said continuously stirred tank reactors, sets of feed rate trajectories between the current concentrations of said at least two interdependent chemicals and said common normalized target region to determine the time required to move said current concentrations into said common normalized target region.
6. The method of Claim 5 wherein said common normalized pumpable region comprises vertices and edges, together which define a common normalized pumpable region and wherein said step of evaluating comprises the steps of: (a) determining the time associated with driving the current concentrations of said at least two interdependent chemicals in each of said fluids along a first set of feed rate trajectories formed between the current concentrations and said vertices of said common normalized pumpable region; (b) determining the time associated with driving the current concentrations of said at least two interdependent chemicals in each of said fluids along a second set of feed rate trajectories formed between said current concentrations and said common normalized target region vertices, said second set of feed rates being projected until they intersect said common normalized pumpable region perimeter, if at ail, to define a third set of feed rate trajectories; and
(c) selecting one feed rate trajectory, from ail of said first and third sets of feed rate trajectories from each of said fluids, that requires the least amount of time for at least one fluid to reach an edge of said common normalized target region.
7. The method of Claim 6 wherein said feedstream of a high - pH fluid treatment material comprising a mixture of said at least two interdependent chemicals defines a first feedstream and wherein said feedstream of a low -pH fluid treatment material comprising a mixture of said at least two interdependent chemicals defines a second feedstream and wherein said selected one feed rate trajectory comprises an endpoint and wherein said method further comprising the step of determining how long to feed said first and second feedstreams at said selected one feedrate trajectory, said step of determining how long to feed said first and second feedstreams comprising the steps of:
(a) for each of said at least two CSTR fluids, establishing a respective feed rate trajectory defined by a line from said respective current concentrations of said at least two interdependent chemicals to the endpoint said selected one feed rate trajectory; (b) for each of said at least two CSTR fluids, determining the point at which said respective feed rate trajectory intersects an edge of said common normalized target region and determining the time associated with moving said current concentrations to said point, said intersected edge being a common normalized target region edge different from said edge reached by said at least one fluid in the least amount of time; and
(c) selecting the minimum of those times associated with moving said current concentrations to said point.
8. The method of Claim 7 further comprising the step of feeding said first and second feedstreams at said selected feed rate trajectory for an amount of time corresponding to said selected minimum of those times associated with moving said current concentrations to said point.
9. The method of Claim 8 wherein each of said CSTR state spaces are updated based on said feeding said first and second feedstreams at said selected one feed rate trajectory for said selected minimum of those times associated with moving said current concentrations to said point.
10. The method of Claim 7 further comprising the step of feeding said first and second feedstream at said selected one feed rate trajectory for an amount of time corresponding to the time it takes for new data to be available, said data being defined as said concentration of said one of said at least two interdependent chemicals in the fluids, said pH of said fluids, said temperature at which the pH is measured, said blowdown flow and said steam rate flow.
1 1. The method of Claim 10 wherein each of said fluid state spaces are updated based on said feeding said first and second feedstreams at said selected one feed rate trajectory for said amount of time corresponding to the time it takes for new data to be available.
12. The method of Claim 10 wherein a new common normalized target region is recomputed based on said new data.
13. The method of Claim 9 further comprising the steps of:
(a) establishing a new common normalized target region that is nested within said common normalized target region; and
(b) repeating the steps of selecting one feed rate trajectory that requires the least amount of time for at least one fluid to reach an edge of said new common normalized target region; and
(c) repeating the steps for determining how long to feed said first and second feedstreams.
14. The method of Claim 2 wherein said feedstream of a high - pH fluid treatment material comprising a mixture of said at least two interdependent chemicals defines a first feedstream and wherein said feedstream of a low -pH fluid treatment material comprising a mixture of said at least two interdependent chemicals defines a second feedstream and wherein said selected one feedrate trajectory comprises an endpoint and wherein said fluids comprise respective current concentrations of said at least two interdependent chemicals and wherein said step of developing an optimum feed rate program comprises the steps of:
(a) evaluating, for each of said CSTRS, sets of feed rate trajectories between the current concentrations of said at least two interdependent chemicals and said common normalized target region to determine the time required to move said current concentrations into said common normalized target region; (b) selecting that feed rate trajectory that moves at least one fluid current concentrations into said common normalized target region in the least amount of time; and
(c) feeding said first and second feedstreams at said selected feed rate trajectory.
15. The method of Claim 14 further comprising the steps of:
(a) establishing a new common normalized target region that is nested within said common normalized target region; and
(b) evaluating, for each of said CSTRS, sets of feed rate trajectories between the current concentrations of said at least two interdependent chemicals and said new common normalized target region to determine the time required to have said current concentrations into said new common normalized target region;
(c) selecting a feed rate trajectory that moves at least one fluid current concentration into said new common normalized target region in the least amount of time; and
(d) feeding said first and second feedstreams at said selected feed rate trajectory.
16. The method of Claim 1 wherein each of said CSTRS is an industrial boiler having a boiler fluid.
17. The method of Claim 16 wherein said one of said at least two interdependent chemicals is phosphate.
18. The method of Claim 17 wherein said one of said at II ~t two interdependent chemicals is sodium.
19. The method of Claim 18 wherein said method further includes the step of estimating the blowdown flow.
Figure imgf000067_0001
SHEET (<ARTICLE 19)
20. The method of Claim 19 wherein said method further includes the steps of calculating the phosphate concentration and the sodium concentration in the boiler fluid.
21. The method of Claim 20 wherein said method further includes the step of estimating a feedwater contaminant ingress.
22. The method of Claim 21 wherein said feedwater contaminant ingress is sodium.
23. The method of Claim 21 wherein said steps of estimating a blowdown flow and a feedwater contaminant ingress are based on a series of phosphate and pH measurements of the boiler fluid wherein said method uses small sample intervals.
24. The method of Claim 1 wherein said method further includes a step that accounts for dead time in each of the continuously stirred tank reactors.
25. The method of Claim 1 wherein said method further comprises the step of controlling the blowdown flow of each of said CSTRS.
26. An automatic control system for controlling at least two interdependent chemicals in the fluids of at least two continuously stirred tank reactors (CSTRS) linked in parallel by a common feedwater line and wherein each CSTR includes a respective blowdown flow and steam rate flow that define respective cycles for each of said CSTRS and wherein each CSTR has associated therewith a respective target region of said at least two interdependent chemicals, said respective target regions being scaled according to the respective cycles of said CSTRS, said control system comprising: input means for receipt of fluid parameters and control means responsive to said input means; said control means using non-proportional control for automatically minimizing the time that said at least two interdependent chemicals in the fluids spend outside of a common normalized target region formed by the intersection of said respective target regions of said at least two CSTRS.
27. The control system of Claim 26 wherein one of said fluid parameters comprises the pH of the fluid and wherein said input means comprises means for determining the pH value of each of the fluids.
28. The control system of Claim 27 wherein said control means comprises a first feedstream and a second feedstream for feeding first and second fluid treatment materials, respectively, to the common feedwater line at respectively determined feed rates, said first material comprising a mixture of sodium and phosphate having a first predetermined sodium-to-phosphate ratio and said second material comprising a mixture of sodium and phosphate having a second predetermined sodium-to-phosphate ratio.
29. The control system of Claim 28 wherein said control means further comprises an adaptive controller, said adaptive controller modeling of each of said at least two CSTRS.
30. The control system of Claim 29 wherein said control means further comprises monitoring means for monitoring the concentration of said at least two interdependent chemicals in said fluids, the temperature at which the pH is measured, the blowdown flow and the steam rate flow, said monitoring means being coupled to said adaptive controller in order to update said modeling of each of said at least two CSTRS, the concentration of said at least two interdependent chemicals in said fluids, the temperature at which the pH is measured, the blowdown flow and the steam rate flow being defined as data.
31. The control system of Claim 30 wherein said adaptive controller generates said respective target regions in a CSTR state space for each of said at least two CSTRS.
32. The control system of Claim 31 wherein said adaptive controller overlays said respective target regions to generate said common normalized target region.
33. The control system of Claim 32 wherein each fluid comprises a current concentration for each of said at least two interdependent chemicals and wherein said adaptive controller analyzes all fee rate trajectories of said first and second feedstreams that will drive said current concentrations in each of said fluids from said current concentrations to concentrations within said common normalized target region in said CSTR state space, said analyzation determining a respective region for each of said fluids that is formed by the endpoints of all said feed rate trajectories.
34. The control system of Claim 33 wherein said adaptive controller selects that region in said CSTR state space that is formed by the intersection of said respective regions, said selected region forming a common normalized pumpable region that defines all reachable concentrations of said at least two interdependent chemicals among said at least two CSTR fluids, said common normalized pumpable region comprising a first set of edges and a first set of vertices.
AMENDED SHEET (aARTICLE 19
35. The control system of Claim 34 wherein said common formalized target region comprises a second set of vertices and second set of edges, said adaptive controller determining for each of said CSTRS: (a) the time associated with driving said current concentrations of said at least two interdependent chemicals along a first set of feed rate trajectories formed between said current concentrations and said second set of vertices; and
(b) the time associated with driving said current concentrations of said at least two interdependent chemicals along a second set of feed rate trajectories formed between said current concentrations and said second set of vertices, said second set of feedrate trajectories being projected until they intersect said first set of edges of said common normalized pumpable region to define a third set of feedrates trajectories, said adaptive controller selecting one feedrate trajectory from all of said first and third sets of feedrate trajectories that requires the least amount of time for at least one fluid to reach one of said second set of edges.
36. The control system of Claim 35 wherein said adaptive controller calculates how long to feed said first and second feedstreams at said selected feedrate trajectory, said adaptive controller:
(a) establishing, for the other CSTRS of said at least two CSTRS whose current concentrations have not reached one of said second set of edges, a respective feedrate trajectory between said current concentrations and said selected feedrate trajectory;
(b) said adaptive controller determining, for the other CSTRS whose current concentrations have not reached one of said second set of edges, the point at which each of said respective feedrate trajectories intersects one of said second set of edges and determining the time associated with moving said current concentrations to said point, said intersected edge being a common normalized target region edge different from said edge of said common normalized target region reached by said at least one CSTR fluid in the least amount of time, said adaptive controller selecting the minimum of those times associated with moving said current concentrations to said point and feeding said first and second feedstreams at said selected feedrates for said selected minimum time.
37. The control system of Claim 36 wherein said monitoring means updates said fluid state spaces for each of said CSTRS based on said adaptive controller feeding said first and second feedstreams at said selected feedrate trajectories for said selected minimum time.
38. The control system of Claim 35 wherein said adaptive controller feeds said first and second feedstreams at said selected feedrates for an amount of time corresponding to the time it takes for new data to be available.
39. The control system of Claim 38 wherein said monitoring means updates said CSTR state spaces for each of said CSTRS based on said adaptive controller feeding said first and second feedstreams at said selected feedrate trajectories for said time it takes for new data to be available.
40. The control system of Claim 39 wherein said adaptive controller recomputes a new common normalized target region based on said new data.
AMENDED SHEET (.a-VRTICLE 19
41. The control system of Claim 37 wherein said adaptive controller establishes a new common normalized target region that is nested within said common normalized target region and wherein said adaptive controller determines one feedrate trajectory that requires the least amount of time for at least one of said CSTRS to reach an edge of said new common normalized target region and determines how long to feed said first and second feedstreams at said one feedrate trajectory.
42. The control system of Claim 26 wherein said system controls the blowdown flow of each of said CSTRS.
43. A method for controlling the sodium-to-phosphate ratio of the fluids of at least two continuously stirred tank reactors (CSTRS) having respective blowdown flows and steam rate flows defining respective cycles for each of said at least two continuously stirred tank reactor, said fluids of said at least two CSTRS being fed a through a common feedwater, said method comprising the steps of:
(a) providing a supply of a first sodium phosphate fluid treatment material to said common feedwater, said first sodium phosphate fluid treatment material having a first predetermined sodium-to-phosphate ratio and a first known phosphate concentration;
(b) providing a supply of a second sodium phosphate fluid treatment material to said common feedwater, said second sodium phosphate fluid treatment material having a second predetermined sodium-to-phosphate ratio and a second known phosphate concentration; (c) measuring a fluid parameter of each of said fluids substantially continuously;
(d) determining the cycle of each of said at least two CSTRS substantially continuously; (e) estimating the phosphate concentration in each of said fluids;
(f) determining the effective sodium in each of said fluids;
(g) determining the sodium-to-phosphate ratio in each of said fluids and identifying a maximum sodium-to-phosphate ratio and a minimum sodium-to-phosphate ratio among said fluids, said minimum and maximum sodium-to-phosphate ratios defining a first range having a first midpoint; and
(h) feeding said first sodium phosphate fluid treatment material if said first midpoint is less than or equal to a second midpoint of a predetermined ratio range of sodium-tophosphate, or feeding said second sodium phosphate fluid treatment material if said first midpoint is greater than said second midpoint.
44. The method of Claim 43 wherein said step of determining the cycle of each of said at least two CSTRS substantially continuously comprises the steps of:
(a) measuring each of said blowdown flows substantially continuously; and
(b) measuring the total feedwater line flow substantially continuously.
45. The method of Claim 44 wherein said step of feeding said first sodium phosphate fluid treatment material or said second sodium phosphate fluid treatment material comprises feeding said first or second sodium phosphate fluid treatment material at a rate which maintains the respective phosphate concentration of each boiler fluid between a respective predetermined upper phosphate control limit and a respective predetermined lower phosphate control limit.
46. The method of Claim 45 wherein said respective predetermined upper phosphate control limits are identical, and which form a first phosphate control limit, and wherein said respective predetermined lower phosphate control limits are identical and which form a second phosphate control limit.
47. The method of Claim 45 wherein said step of feeding said first sodium phosphate fluid treatment material or said second sodium phosphate fluid treatment material is fed at a rate given by:
FeedRate=a*max(FeedRatemin(,))+(1 -a) *min(FeedRatemaX(ι)), where 0 < a < 1 ; i = CSTR index for identifying a particular CSTR of said at least two CSTRs; FeedRatem,n(1)=PO4Boundmin(o/Cycle(i)*(TotalFeedWater)/FeedP04; FeedRatemaχ(1)=PO4Boundmaχ(1)/Cycle(i)*(TotalFeedWater)/ FeedPO4
TotaiFeedwater is said total feedwater flow;
FeedPO4 is said first known phosphate concentration or said second known phosphate concentration, depending on which fluid treatment material is being fed; PO4Boundmaχ( is said respective predetermined upper phosphate control limit; PO4Boundm,n( is said respective predetermined lower phosphate control limit; and Cycle(i) is defined as: Cycle (i) (Steam (I) + Blowdown(i))
Blowdown (i)
48. The method of Claim 47 wherein said step of feeding said first sodium phosphate fluid treatment material or said second sodium phosphate fluid treatment at said rate occurs as long as the following condition is met: max(PO4Boundmιn(,)/Cycle(i) ) < min (PO4 Boundmax(i)/Cycle(i) ) .
49. The method of Claim 46 wherein said step of feeding said first sodium phosphate fluid treatment material or said second sodium phosphate fluid treatment material is fed at a rate qiven by:
Feedwater ( TotalFeedWater ) (PO4Boundmay + PO4Boundm,n) FeedPO4 ( Cyclesιmax + Cycles imιn) where
TotalFeedWater is said total feedwater flow; FeedP04 is said first known phosphate concentration or said second known phosphate concentration, depending on which fluid treatment material is being fed;
P04Boundmax is said first phosphate control limit; P04Boundmιn is said second phosphate control limit; Cyclesιmax is said CSTR having a maximum cycle value wherein said cycle is defined as: Cycle (i)= (Steam(i) +Blowdown(i) )
Blowdown (i) and Cyclesιmιnis said CSTR having a minimum cycle value, Steam (i) is the steam flow rate for the "ith" boiler and Blowdown (i) is the blowdown flow for the "ith" CSTR and i = CSTR index for identifying a particular CSTR of said at least two CSTRs.
50. The method of Claim 49 wherein said step of feeding said first sodium phosphate fluid treatment material or said second sodium phosphate fluid treatment material at said rate occurs as long as the following condition is met: CycleSimax/CycleSjmin < PO4Boundmax/P04Boundmin.
51. The method of Claim 48 wherein said step of determining the effective sodium in each of said fluids comprises back calculating sodium using a model projected phosphate concentration qiven by: dt dt P04Est(i.t+dt) = (1-e t(l) ) PO4(i)+PO4Est (i,t)e ,(i) where PO4Est(i,t) is the estimated concentration in the fluid at time t; i = CSTR index for identifying a particular CSTR of said at least two CSTRs; PO4(i) is the steady-state phosphate concentration; t is the characteristic time of the fluid; and dt is the time between interval samples.
52. The method of Claim 45 wherein said fluid parameter is the pH of the fluid.
53. The method of Claim 45 wherein said first known phosphate concentration is identical to said second known phosphate concentration.
54. The method of Claim 43 wherein said method further comprises the step of controlling the blowdown flow of each of said CSTRS. /o
55. A system for simultaneously controlling respective sodium-to-phosphate ratios of at least two boiler fluids of respective industrial boilers that are fed through a common feedwater, the industrial boilers having respective blowdown flows and steam rate flows that define respective cycles for each boiler fluid, said system comprising: input means for receipt of a boiler fluid parameter for each of the at least two boiler fluids and a parameter indicative of the cycles of each of said industrial boilers; and control means responsive to said input means for automatically driving the respective sodium-to-phosphate ratios of said at least two boiler fluids to a desired sodium-to-phosphate ratio region said control means comprising model phosphate projecting means for estimating the sodium-to-phosphate ratios in each of said at least two boiler fluids.
56. The system of Claim 55 wherein said boiler fluid parameter comprises the pH of the boiler fluid, the respective pH of each of the boiler fluids being defined by the respective sodium-to-phosphate ratio and the respective cycles and wherein said input means comprises a respective pH meter for determining the respective pH value of each of the boiler fluids and providing the respective pH vaiue to said control means.
57. The system of Claim 55 wherein said input means further comprises:
(a) a respective blowdown flowmeter for monitoring the respective blowdown flows and for providing a respective signal indicative of the respective blowdown flow to said control means; (b) a respective steam flow meter for monitoring the respective steam flow and for providing a respective signal indicative of the respective steam flow to said control means; and
(c) wherein said respective signal indicative of the respective blowdown flow and said signal indicative of the respective steam flow form said parameter indicative of the cycles of each the boiler fluids.
58. The system of Claim 55 wherein said control means comprises a first feedstream and a second feedstream for feeding first and second fluid treatment materials, respectively, to the common feedwater, said first material comprising a mixture of sodium and phosphate having a first pre-determined sodium-to-phosphate ratio and a first predetermined concentration of phosphate, said second material comprising a mixture of sodium and phosphate having a second predetermined sodium-to-phosphate ratio and a second predetermined concentration of phosphate.
59. The system of Claim 58 wherein said first predetermined concentration of phosphate and said second predetermined concentration of phosphate are identical.
60. The system of Claim 55 wherein said control means comprises feeding means for feeding said first feedstream or said second feedstream at a rate which maintains the respective phosphate concentration of each boiler fluid between a respective predetermined upper phosphate control limit and a respective predetermined lower phosphate control limit.
61. The system of Claim 60 wherein said respective predetermined upper phosphate control limits are identical, referred to as a first phosphate control limit, and wherein said respective predetermined lower phosphate control limits are identical, referred to as a second phosphate control limit.
62. The system of Claim 60 wherein said feeding means feeds said first feedstream or said second feedstream at a rate given by:
FeedRate=a*max(FeedRatemin(i)) + (1-a)*min(FeedRatemaX(i)), where 0 < a < 1 ; i = boiler index for identifying a particular boiler of said at least two boilers;
FeedRatemiπ(i)=PO4Boundmin(i)/Cycle(i)*(TotalFeedwater)/
FeedP04;
FeedRatemax(i)=PO4Boundmax(i)/Cycle(i)*(TotalFeedwater)/ FeedP04
TotalFeedwater is the flow of said common feedwater;
FeedPO4 is said first known predetermined phosphate concentration or said second predetermined phosphate concentration, depending on which fluid treatment material is being fed;
PO4BoundmaX(i) is said respective predetermined upper phosphate control limit ;
PO4Boundmin(i) is said respective predetermined lower phosphate control limit; and Cycle(i) is defined as: Cycle(i) = (Steam(i) + Blowdown (i) )
Blowdown (i)
63. The system of Claim 62 wherein said feeding means includes monitoring means that permits said feeding means to feed at said rate whenever the following condition is met: max(PO4Boundmin(i)/Cycle(i)) < min(PO4Boundmax(i)/Cycle(i)).
64. The system of Claim 61 wherein said control means further comprises means for feeding said first feedstream or said second feedstream at a rate given by:
Feedrate=(Total Feedwater) (PO4Boundmay +P04Boundm.n. FeedPO4 (Cyclesimax + Cyclesimin) where Total Feedwater is the flow of said common feedwater;
FeedPO4 is said first predetermined phosphate concentration or said second predetermined phosphate concentration; PO4Boundmax is a predetermined maximum phosphate concentration:
PO4Boundmin is a predetermined minimum phosphate concentration:
Cycles^ is said boiler having a maximum cycle value wherein said cycle is defined as:
Cycle = (Steam(i)+Blowdown(i)) Blowdown(i) and CycleSimin is said boiler having a minimum cycle value,
Steam (i) is the steam flow rate for the "ith" boiler and Blowdown (i) is the blowdown flow for the "ith" boiler and i = boiler index for identifying a particular boiler of said at least two boilers.
65. The system of Claim 64 wherein said feeding means includes monitoring means that permits said feeding means to feed at said rate whenever the following condition is met:
Cyclesjmax.CycleSimin < PO4Boundmax/PO4Boundmin.
66. The system of Claim 63 wherein said control means further comprises means for estimating the phosphate concentration in each of the boiler fluids.
67. The system of Claim 66 wherein said control means further comprises means for back-calculating the sodium concentration in each of said boiler fluids.
68. The system of Claim 66 wherein said control means further comprises means for determining a sodium-to-phosphate ratio for each of said boiler fluids and for identifying a maximum sodium-to-phosphate ratio and a minimum sodium-to phosphate ratio from all of said boiler fluids to define a first range having a first midpoint.
69. The system of Claim 66 wherein said feeding means feeds said first feedstream if said first midpoint is less than or equal to a second midpoint of a predetermined ratio range of sodium-to-phosphate, or feeding said second feedstream if said first midpoint is greater than said second midpoint.
70. The system of Claim 66 wherein said means for back- calculating the sodium concentration in each of said boiler fluids uses the following model pro~-ected phosphate concentration:
- dt - dt
PO4Est(i,t+dt)=(1 -e ^ )PO4(i)+PO4Est(i,t)e w where P04Est(i,t) is the estimated concentration in the fluid at time t; i = boiler index for identifying a particular boiler of said at least two boilers; PO4(i) is the steady-state phosphate concentration; t is the characteristic time of the fluid; and dt is the time between interval samples.
71. The system of Claim 55 wherein said system does not control the blowdown flow of each of said boilers.
72. The system of Claim 63 wherein said monitoring means alerts an operator if said condition is not met.
73. The system of Claim 65 wherein said monitoring means alerts an operator if said condition is not met.
PCT/US1998/016767 1997-10-06 1998-08-13 Apparatus and method for automatic congruent control of multiple boilers WO1999018039A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
AU88278/98A AU8827898A (en) 1997-10-06 1998-08-13 Apparatus and method for automatic congruent control of multiple boilers

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US08/944,921 1997-10-06
US08/944,921 US5923571A (en) 1994-10-11 1997-10-06 Apparatus and method for automatic congruent control of multiple boilers sharing a common feedwater line and chemical feed point

Publications (1)

Publication Number Publication Date
WO1999018039A1 true WO1999018039A1 (en) 1999-04-15

Family

ID=25482295

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/US1998/016767 WO1999018039A1 (en) 1997-10-06 1998-08-13 Apparatus and method for automatic congruent control of multiple boilers

Country Status (5)

Country Link
US (1) US5923571A (en)
AU (1) AU8827898A (en)
TW (1) TW392052B (en)
WO (1) WO1999018039A1 (en)
ZA (1) ZA987120B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7624708B2 (en) 2004-07-09 2009-12-01 Siemens Aktiengesellschaft Process for operating a continuous steam generator

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6244098B1 (en) 1997-02-13 2001-06-12 Betzdearborn Inc. Methods and apparatus for monitoring water process equipment
US6609070B1 (en) 1998-06-19 2003-08-19 Rodi Systems Corp Fluid treatment apparatus
WO1999065596A1 (en) * 1998-06-19 1999-12-23 Rodi Systems Corp. Fluid treatment apparatus
US6068012A (en) * 1998-12-29 2000-05-30 Ashland, Inc. Performance-based control system
US8489240B2 (en) * 2007-08-03 2013-07-16 General Electric Company Control system for industrial water system and method for its use
WO2012021398A2 (en) 2010-08-11 2012-02-16 Huguenot Laboratories Bypass feeder device
JP6763831B2 (en) * 2017-07-03 2020-09-30 横河電機株式会社 Control system and control method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4053743A (en) * 1976-02-18 1977-10-11 Antti Johannes Niemi Method for controlling the ph and other concentration variables
US5486995A (en) * 1994-03-17 1996-01-23 Dow Benelux N.V. System for real time optimization

Family Cites Families (43)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3011709A (en) * 1955-03-24 1961-12-05 Honeywell Regulator Co Computer apparatus for rapidly changing the value of a process variable
US2842311A (en) * 1955-03-24 1958-07-08 Honeywell Regulator Co Control apparatus
US3462364A (en) * 1966-01-17 1969-08-19 Herbert Gustaf Carlson Method and apparatus for optimizing chemical treatment
US3891836A (en) * 1972-04-21 1975-06-24 Mobil Oil Corp Apparatus for optimizing multiunit processing systems
US3792244A (en) * 1972-06-02 1974-02-12 Fridrich Uhde Gmbh Circuit for ph value regulation
US3804253A (en) * 1973-01-29 1974-04-16 Waterguard Syst Inc System for automatically maintaining chlorine concentration and ph of swimming pool water at predetermined levels
JPS6037919B2 (en) * 1974-12-25 1985-08-29 株式会社東芝 Automatic operation control equipment for nuclear power plants
US4016079A (en) * 1975-09-16 1977-04-05 Aquasol, Inc. Automatic chlorine and pH control apparatus for swimming pools
US4033871A (en) * 1975-11-13 1977-07-05 Paddock Of California, Inc. Integrated monitor and control system for continuously monitoring and controlling pH and free halogen in swimming pool water
FI55414C (en) * 1977-06-07 1979-07-10 Niemi Antti Johannes FOERFARANDE OCH ANORDNING FOER REGLERING AV PH
US4181951A (en) * 1978-04-28 1980-01-01 Jan Boeke In-line pH and pIon controller
US4406794A (en) * 1979-02-05 1983-09-27 Brigante Miguel F External sludge collector for boiler bottom blowdown and automatic blowdown control initiated by conductivity probe within the boiler and method
US4349869A (en) * 1979-10-01 1982-09-14 Shell Oil Company Dynamic matrix control method
US4644479A (en) * 1984-07-31 1987-02-17 Westinghouse Electric Corp. Diagnostic apparatus
US4659459A (en) * 1985-07-18 1987-04-21 Betz Laboratories, Inc. Automated systems for introducing chemicals into water or other liquid treatment systems
US4736316A (en) * 1986-08-06 1988-04-05 Chevron Research Company Minimum time, optimizing and stabilizing multivariable control method and system using a constraint associated control code
US4833622A (en) * 1986-11-03 1989-05-23 Combustion Engineering, Inc. Intelligent chemistry management system
US4770843A (en) * 1987-04-08 1988-09-13 Westinghouse Electric Corp. Controlling fuel assembly stability in a boiling water reactor
DE3729270A1 (en) * 1987-09-02 1989-03-16 Henkel Kgaa COMPACT STATION FOR COOLING CIRCUIT TREATMENT
IE64511B1 (en) * 1988-03-11 1995-08-09 Takeda Chemical Industries Ltd Automated synthesizing apparatus
US4897797A (en) * 1988-04-25 1990-01-30 Betz Laboratories, Inc. Proportional chemical feeding system
US5038270A (en) * 1988-04-26 1991-08-06 Mitsubishi Kasei Corporation Method for controlling reactor system
US5041386A (en) * 1988-12-19 1991-08-20 Nalco Chemical Company Concentration cycles, percent life holding time and continuous treatment concentration monitoring in boiler systems by inert tracers
US5040725A (en) * 1988-12-20 1991-08-20 Butler Warren E Adaptive controller for forced hot water heating systems
US5083281A (en) * 1989-05-12 1992-01-21 Bell & Howell Phillipsburg Co. Insertion machine with speed optimization
US5288713A (en) * 1989-08-16 1994-02-22 Nalco Chemical Company Method for injecting treatment chemicals
US5141716A (en) * 1989-10-25 1992-08-25 Betz Laboratories, Inc. Method for mitigation of caustic corrosion in coordinated phosphate/ph treatment programs for boilers
FR2654849A1 (en) * 1989-11-23 1991-05-24 Atochem TECHNIQUE FOR DETERMINING THE OPTIMAL RELATION VARIABLES / PROPERTIES IN A METHOD AND / OR COMPOSITION.
US5132916A (en) * 1990-05-21 1992-07-21 Elsag International B.V. Methodology for ph titration curve estimation for adaptive control
US5248577A (en) * 1990-08-13 1993-09-28 Eastman Kodak Company Reactant concentration control method and apparatus for precipitation reactions
US5347446A (en) * 1991-02-08 1994-09-13 Kabushiki Kaisha Toshiba Model predictive control apparatus
US5262963A (en) * 1991-06-28 1993-11-16 Imc Fertilizer, Inc. Automatic control system for phosphoric acid plant
US5152252A (en) * 1992-01-23 1992-10-06 Autotrol Corporation Water treatment control system for a boiler
US5568377A (en) * 1992-10-29 1996-10-22 Johnson Service Company Fast automatic tuning of a feedback controller
FR2700026B1 (en) * 1992-12-30 1995-02-10 Framatome Sa Method and device for regulating a process.
US5422014A (en) * 1993-03-18 1995-06-06 Allen; Ross R. Automatic chemical monitor and control system
US5320967A (en) * 1993-04-20 1994-06-14 Nalco Chemical Company Boiler system leak detection
CA2118885C (en) * 1993-04-29 2005-05-24 Conrad K. Teran Process control system
US5424942A (en) * 1993-08-10 1995-06-13 Orbital Research Inc. Extended horizon adaptive block predictive controller with an efficient prediction system
JPH07145909A (en) * 1993-08-20 1995-06-06 Nalco Chem Co Control method of program of boiler system ph/phosphate
US5587897A (en) * 1993-12-27 1996-12-24 Nec Corporation Optimization device
US5516423A (en) * 1994-08-08 1996-05-14 Concorp, Inc. Variable residence time treatment system
US5519605A (en) * 1994-10-24 1996-05-21 Olin Corporation Model predictive control apparatus and method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4053743A (en) * 1976-02-18 1977-10-11 Antti Johannes Niemi Method for controlling the ph and other concentration variables
US5486995A (en) * 1994-03-17 1996-01-23 Dow Benelux N.V. System for real time optimization

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
ROGERS M E, VERHAPPEN I, PORTER S: "JUSTIFICATION AND ENGINEERING DESIGN FOR THE ON-LINE MONITORING ANDAUTOMATION OF A CONGRUENT PHOSPHATE/PH PROGRAM", CORROSION, NACE, 1 January 1992 (1992-01-01), pages 413/01 - 413/10, XP002913559, ISSN: 0010-9312 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7624708B2 (en) 2004-07-09 2009-12-01 Siemens Aktiengesellschaft Process for operating a continuous steam generator

Also Published As

Publication number Publication date
TW392052B (en) 2000-06-01
ZA987120B (en) 1999-02-09
AU8827898A (en) 1999-04-27
US5923571A (en) 1999-07-13

Similar Documents

Publication Publication Date Title
US5696696A (en) Apparatus and method for automatically achieving and maintaining congruent control in an industrial boiler
US5923571A (en) Apparatus and method for automatic congruent control of multiple boilers sharing a common feedwater line and chemical feed point
Raff et al. Nonlinear model predictive control of a four tank system: An experimental stability study
JP4614536B2 (en) System control method using robust steady state target calculation for model predictive control, system controller and controller, and program storage medium for executing system control method using robust steady state target calculation for model predictive control
EP1321836B1 (en) Controller, temperature controller and heat processor using same
RU2442207C2 (en) Method of operating and operation system for consumption regulation valve
EP2980584B1 (en) Method for checking water quality, water quality checking device, and hot-water feeder system
KR20100003335U (en) A producer of sodium hypochlorite with auto valve and flow sensor
Arellano-Garcia et al. Real-time feasibility of nonlinear model predictive control for semi-batch reactors subject to uncertainty and disturbances
Ibrahim Practical modelling and control implementation studies on a pH neutralization process pilot plant
US11550972B2 (en) Simulation method and system for the management of a pipeline network
WO1991010177A1 (en) Method and device for the consideration of varying volume and flow in the control of a continuous flow process
Mourad et al. Adaptive control of a water supply system
Haissig et al. An adaptive fuzzy algorithm for domestic hot water temperature control of a combi-boiler
JP5811610B2 (en) Boiler equipment
JP3115101B2 (en) Liquid neutralizer
Takekawa et al. An application of nonlinear model predictive control using C/GMRES method to a PH neutralization process
JP2018515321A (en) PH control method for UpA cell
Salam et al. Modelling and Control System design to control Water temperature in Heat Pump
Mushonga pH control using two continuous stirred tank reactors in series
Tudoroiu et al. STOCHASTIC OPTIMAL CONTROL OF pH NEUTRALISATION PROCESS IN A WATER TREATMENT PLANT
JP2020095945A (en) Fuel cell device, control program, and method for controlling fuel cell device
Kim et al. Performance evaluation of a full-scale advanced phase isolation ditch process by using real-time control strategies
De Souza et al. An evaluation of the suitability of the limestone based sidestream stabilization process for stabilization of waters of the Lesotho highlands scheme
Choi et al. Internal adaptive-model control of wastewater pH

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): AU BR CA CN ID JP KR MX

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LU MC NL PT SE

121 Ep: the epo has been informed by wipo that ep was designated in this application
DFPE Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101)
NENP Non-entry into the national phase

Ref country code: KR

122 Ep: pct application non-entry in european phase
NENP Non-entry into the national phase

Ref country code: CA