WO2001062603A3 - Integrated reservoir optimization - Google Patents
Integrated reservoir optimization Download PDFInfo
- Publication number
- WO2001062603A3 WO2001062603A3 PCT/US2001/004620 US0104620W WO0162603A3 WO 2001062603 A3 WO2001062603 A3 WO 2001062603A3 US 0104620 W US0104620 W US 0104620W WO 0162603 A3 WO0162603 A3 WO 0162603A3
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- reservoir
- integrated reservoir
- item
- reservoir optimization
- optimization
- Prior art date
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/02—Agriculture; Fishing; Mining
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V11/00—Prospecting or detecting by methods combining techniques covered by two or more of main groups G01V1/00 - G01V9/00
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V2210/00—Details of seismic processing or analysis
- G01V2210/60—Analysis
- G01V2210/61—Analysis by combining or comparing a seismic data set with other data
- G01V2210/612—Previously recorded data, e.g. time-lapse or 4D
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/80—Management or planning
- Y02P90/84—Greenhouse gas [GHG] management systems
Abstract
Priority Applications (11)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020027011007A KR100756684B1 (en) | 2000-02-22 | 2001-02-14 | Integrated reservoir optimization |
BRBR122013023833-6A BR122013023833B1 (en) | 2000-02-22 | 2001-02-14 | Method of conducting numerical model studies |
BRPI0108571A BRPI0108571B1 (en) | 2000-02-22 | 2001-02-14 | method of managing a fluid and / or gas reservoir that assimilates various data |
MXPA02008197A MXPA02008197A (en) | 2000-02-22 | 2001-02-14 | Integrated reservoir optimization. |
JP2001561626A JP4593051B2 (en) | 2000-02-22 | 2001-02-14 | Integrated reservoir optimization |
DE60119087T DE60119087D1 (en) | 2000-02-22 | 2001-02-14 | INTEGRATED OPTIMIZATION OF A RESERVOIR |
AU2001235010A AU2001235010A1 (en) | 2000-02-22 | 2001-02-14 | Integrated reservoir optimization |
EP01907207A EP1263653B1 (en) | 2000-02-22 | 2001-02-14 | Integrated reservoir optimization |
KZ20021550A KZ19059A (en) | 2000-02-22 | 2001-02-14 | |
CA002400796A CA2400796A1 (en) | 2000-02-22 | 2001-02-14 | Integrated reservoir optimization |
NO20023904A NO333783B1 (en) | 2000-02-22 | 2002-08-16 | Integrated reservoir optimization |
Applications Claiming Priority (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US18383600P | 2000-02-22 | 2000-02-22 | |
US60/183,836 | 2000-02-22 | ||
US09/659,951 US6980940B1 (en) | 2000-02-22 | 2000-09-12 | Intergrated reservoir optimization |
US09/659,951 | 2000-09-12 |
Publications (2)
Publication Number | Publication Date |
---|---|
WO2001062603A2 WO2001062603A2 (en) | 2001-08-30 |
WO2001062603A3 true WO2001062603A3 (en) | 2002-05-30 |
Family
ID=26879562
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/US2001/004620 WO2001062603A2 (en) | 2000-02-22 | 2001-02-14 | Integrated reservoir optimization |
Country Status (16)
Country | Link |
---|---|
US (4) | US6980940B1 (en) |
EP (6) | EP1679424A3 (en) |
JP (1) | JP4593051B2 (en) |
KR (1) | KR100756684B1 (en) |
CN (2) | CN101221634A (en) |
AT (1) | ATE324327T1 (en) |
AU (1) | AU2001235010A1 (en) |
BR (3) | BR122013023833B1 (en) |
CA (3) | CA2605860A1 (en) |
DE (1) | DE60119087D1 (en) |
KZ (1) | KZ19059A (en) |
MX (1) | MXPA02008197A (en) |
NO (1) | NO333783B1 (en) |
RU (1) | RU2281384C2 (en) |
SG (1) | SG127743A1 (en) |
WO (1) | WO2001062603A2 (en) |
Families Citing this family (517)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20080262737A1 (en) * | 2007-04-19 | 2008-10-23 | Baker Hughes Incorporated | System and Method for Monitoring and Controlling Production from Wells |
US6853921B2 (en) | 1999-07-20 | 2005-02-08 | Halliburton Energy Services, Inc. | System and method for real time reservoir management |
JP2002099674A (en) * | 2000-09-21 | 2002-04-05 | Ricoh Co Ltd | Environmental load information system and environmental load information providing method |
US20020049575A1 (en) * | 2000-09-28 | 2002-04-25 | Younes Jalali | Well planning and design |
FR2842321B1 (en) * | 2002-07-11 | 2008-12-05 | Inst Francais Du Petrole | METHOD FOR CONSTRAINING A FIELD OF HETEROGENEOUS PERMEABILITY REPRESENTING A UNDERGROUND RESERVOIR BY DYNAMIC DATA |
FR2831917B1 (en) * | 2001-11-08 | 2004-01-02 | Schlumberger Services Petrol | METHOD FOR DETERMINING THE VARIATION IN PERMEABILITY RELATING TO AT LEAST ONE FLUID FROM A FLUID-CONTAINING TANK BASED ON THE SATURATION IN ONE OF THEM |
US7512543B2 (en) * | 2002-05-29 | 2009-03-31 | Schlumberger Technology Corporation | Tools for decision-making in reservoir risk management |
US20030229476A1 (en) * | 2002-06-07 | 2003-12-11 | Lohitsa, Inc. | Enhancing dynamic characteristics in an analytical model |
US7725301B2 (en) * | 2002-11-04 | 2010-05-25 | Welldynamics, B.V. | System and method for estimating multi-phase fluid rates in a subterranean well |
US7584165B2 (en) | 2003-01-30 | 2009-09-01 | Landmark Graphics Corporation | Support apparatus, method and system for real time operations and maintenance |
US7200540B2 (en) * | 2003-01-31 | 2007-04-03 | Landmark Graphics Corporation | System and method for automated platform generation |
WO2004095077A1 (en) * | 2003-04-23 | 2004-11-04 | Commonwealth Scientific And Industrial Research Organisation | Method for predicting pore pressure |
US7835893B2 (en) * | 2003-04-30 | 2010-11-16 | Landmark Graphics Corporation | Method and system for scenario and case decision management |
WO2004099917A2 (en) * | 2003-04-30 | 2004-11-18 | Landmark Graphics Corporation | Stochastically generating facility and well schedules |
FR2855631A1 (en) * | 2003-06-02 | 2004-12-03 | Inst Francais Du Petrole | METHOD FOR OPTIMIZING THE PRODUCTION OF AN OIL DEPOSIT IN THE PRESENCE OF UNCERTAINTIES |
NL1024444C2 (en) * | 2003-10-03 | 2005-04-08 | J O A Beheer B V | Method, device, computer program and data carrier for modeling a multi-dimensional heterogeneous structure with a digital processing unit. |
US8126689B2 (en) * | 2003-12-04 | 2012-02-28 | Halliburton Energy Services, Inc. | Methods for geomechanical fracture modeling |
GB2410102B (en) | 2004-01-13 | 2007-11-28 | Weatherford Lamb | A system for evaluating over and underbalanced drilling operations |
US7844430B2 (en) * | 2004-01-30 | 2010-11-30 | Exxonmobil Upstream Research Co. | Reservoir model building methods |
US7783462B2 (en) * | 2004-01-30 | 2010-08-24 | Exxonmobil Upstream Research Co. | Reservoir evaluation methods |
GB2413403B (en) * | 2004-04-19 | 2008-01-09 | Halliburton Energy Serv Inc | Field synthesis system and method for optimizing drilling operations |
US7627461B2 (en) * | 2004-05-25 | 2009-12-01 | Chevron U.S.A. Inc. | Method for field scale production optimization by enhancing the allocation of well flow rates |
BRPI0512548A (en) | 2004-06-25 | 2008-03-25 | Shell Int Research | hydrocarbon fluid production control method from an underground formation |
US20060045461A1 (en) * | 2004-08-06 | 2006-03-02 | Microsoft Corporation | Methods and apparatus for project management |
US7636671B2 (en) * | 2004-08-30 | 2009-12-22 | Halliburton Energy Services, Inc. | Determining, pricing, and/or providing well servicing treatments and data processing systems therefor |
US7870047B2 (en) * | 2004-09-17 | 2011-01-11 | International Business Machines Corporation | System, method for deploying computing infrastructure, and method for identifying customers at risk of revenue change |
US7809537B2 (en) * | 2004-10-15 | 2010-10-05 | Saudi Arabian Oil Company | Generalized well management in parallel reservoir simulation |
US20060153005A1 (en) * | 2005-01-07 | 2006-07-13 | Herwanger Jorg V | Determination of anisotropic physical characteristics in and around reservoirs |
US7859943B2 (en) * | 2005-01-07 | 2010-12-28 | Westerngeco L.L.C. | Processing a seismic monitor survey |
US7305306B2 (en) * | 2005-01-11 | 2007-12-04 | Schlumberger Technology Corporation | System and methods of deriving fluid properties of downhole fluids and uncertainty thereof |
US7398159B2 (en) * | 2005-01-11 | 2008-07-08 | Schlumberger Technology Corporation | System and methods of deriving differential fluid properties of downhole fluids |
US7596480B2 (en) * | 2005-04-14 | 2009-09-29 | Saudi Arabian Oil Company | Solution method and apparatus for large-scale simulation of layered formations |
US8209202B2 (en) * | 2005-04-29 | 2012-06-26 | Landmark Graphics Corporation | Analysis of multiple assets in view of uncertainties |
EA010952B1 (en) * | 2005-05-26 | 2008-12-30 | Эксонмобил Апстрим Рисерч Компани | A rapid method for reservoir connectivity analysis using a fast marching method |
US20070016389A1 (en) * | 2005-06-24 | 2007-01-18 | Cetin Ozgen | Method and system for accelerating and improving the history matching of a reservoir simulation model |
CA2616816A1 (en) * | 2005-07-27 | 2007-02-15 | Exxonmobil Upstream Research Company | Well modeling associated with extraction of hydrocarbons from subsurface formations |
CA2613817C (en) * | 2005-07-27 | 2015-11-24 | Exxonmobil Upstream Research Company | Well modeling associated with extraction of hydrocarbons from subsurface formations |
CN101238465B (en) | 2005-07-27 | 2010-10-27 | 埃克森美孚上游研究公司 | Well modeling associated with extraction of hydrocarbons from subsurface formations |
US7280918B2 (en) * | 2005-08-08 | 2007-10-09 | Knowledge Systems, Inc. | Method and system for combining seismic data and basin modeling |
US8145463B2 (en) * | 2005-09-15 | 2012-03-27 | Schlumberger Technology Corporation | Gas reservoir evaluation and assessment tool method and apparatus and program storage device |
CA2630411C (en) * | 2005-11-21 | 2015-04-21 | Chevron U.S.A. Inc. | Method for field scale production optimization |
US7966164B2 (en) * | 2005-12-05 | 2011-06-21 | Shell Oil Company | Method for selecting enhanced oil recovery candidate |
US20070174154A1 (en) * | 2005-12-30 | 2007-07-26 | Halliburton Energy Services, Inc. | Methods and systems for aligning business interests |
US7809538B2 (en) | 2006-01-13 | 2010-10-05 | Halliburton Energy Services, Inc. | Real time monitoring and control of thermal recovery operations for heavy oil reservoirs |
MX2008009308A (en) * | 2006-01-20 | 2008-10-03 | Landmark Graphics Corp | Dynamic production system management. |
US8504341B2 (en) * | 2006-01-31 | 2013-08-06 | Landmark Graphics Corporation | Methods, systems, and computer readable media for fast updating of oil and gas field production models with physical and proxy simulators |
US20070179767A1 (en) * | 2006-01-31 | 2007-08-02 | Alvin Stanley Cullick | Methods, systems, and computer-readable media for fast updating of oil and gas field production models with physical and proxy simulators |
DE602007013530D1 (en) * | 2006-01-31 | 2011-05-12 | Landmark Graphics Corp | METHODS, SYSTEMS AND COMPUTER-READABLE MEDIA FOR OX AND GAS TELEPHONE PRODUCTION OPTIMIZATION IN REAL TIME WITH A PROXY-SIMULATOR |
US8812334B2 (en) * | 2006-02-27 | 2014-08-19 | Schlumberger Technology Corporation | Well planning system and method |
US8776895B2 (en) * | 2006-03-02 | 2014-07-15 | Exxonmobil Upstream Research Company | Method for quantifying reservoir connectivity using fluid travel times |
US7346457B2 (en) * | 2006-03-24 | 2008-03-18 | Schlumberger Technology Corporation | Method for identification of inhibited wells in the mature fields |
US7793718B2 (en) | 2006-03-30 | 2010-09-14 | Schlumberger Technology Corporation | Communicating electrical energy with an electrical device in a well |
US8056619B2 (en) | 2006-03-30 | 2011-11-15 | Schlumberger Technology Corporation | Aligning inductive couplers in a well |
US7712524B2 (en) | 2006-03-30 | 2010-05-11 | Schlumberger Technology Corporation | Measuring a characteristic of a well proximate a region to be gravel packed |
WO2007130551A2 (en) * | 2006-05-03 | 2007-11-15 | Exxonmobil Upstream Research Company | Data adaptive vibratory source acquisition method |
AU2007248882B2 (en) * | 2006-05-04 | 2011-01-27 | Exxonmobil Upstream Research Company | Time lapse analysis with electromagnetic data |
US7716028B2 (en) * | 2006-05-24 | 2010-05-11 | Schlumberger Technology Corporation | Method for modeling a reservoir using a 3D wettability map generated from a wettability logging tool |
US8620715B2 (en) * | 2006-06-10 | 2013-12-31 | Schlumberger Technology Corporation | Method including a field management framework for optimization of field development and planning and operation |
AU2007265695B2 (en) * | 2006-06-26 | 2012-05-24 | Exxonmobil Upstream Research Company | Method for comparing and back allocating production |
NO325315B1 (en) * | 2006-08-29 | 2008-03-25 | Abb As | Process in a system for producing oil and / or gas |
US9043188B2 (en) * | 2006-09-01 | 2015-05-26 | Chevron U.S.A. Inc. | System and method for forecasting production from a hydrocarbon reservoir |
US8335677B2 (en) * | 2006-09-01 | 2012-12-18 | Chevron U.S.A. Inc. | Method for history matching and uncertainty quantification assisted by global optimization techniques utilizing proxies |
US20080065362A1 (en) * | 2006-09-08 | 2008-03-13 | Lee Jim H | Well completion modeling and management of well completion |
US7877246B2 (en) * | 2006-09-22 | 2011-01-25 | Schlumberger Technology Corporation | System and method for performing oilfield simulation operations |
US7832482B2 (en) | 2006-10-10 | 2010-11-16 | Halliburton Energy Services, Inc. | Producing resources using steam injection |
US7895241B2 (en) * | 2006-10-16 | 2011-02-22 | Schlumberger Technology Corp. | Method and apparatus for oilfield data repository |
US20100318337A1 (en) * | 2006-10-30 | 2010-12-16 | Bailey William J | Method, apparatus and system for modeled carbon sequestration |
GB2457823B (en) * | 2006-10-30 | 2012-03-21 | Logined Bv | System and method for performing oilfield simulation operations |
BRPI0720188B1 (en) * | 2006-10-31 | 2018-10-16 | Exxonmobil Upstream Res Co | modeling method of a computer-readable storage system and reservoir system |
US8145464B2 (en) * | 2006-11-02 | 2012-03-27 | Schlumberger Technology Corporation | Oilfield operational system and method |
US20080114630A1 (en) * | 2006-11-15 | 2008-05-15 | Accenture Global Services Gmbh | Aerospace and defense program analysis tool |
US20080126168A1 (en) * | 2006-11-15 | 2008-05-29 | Schlumberger Technology Corporation | Oilfield management system |
US7860593B2 (en) * | 2007-05-10 | 2010-12-28 | Canrig Drilling Technology Ltd. | Well prog execution facilitation system and method |
US7953584B2 (en) * | 2006-12-07 | 2011-05-31 | Schlumberger Technology Corp | Method for optimal lift gas allocation |
CA2671367C (en) * | 2006-12-07 | 2016-07-12 | Schlumberger Canada Limited | A method for performing oilfield production operations |
US8078444B2 (en) * | 2006-12-07 | 2011-12-13 | Schlumberger Technology Corporation | Method for performing oilfield production operations |
US8122965B2 (en) * | 2006-12-08 | 2012-02-28 | Horton Wison Deepwater, Inc. | Methods for development of an offshore oil and gas field |
US8244471B2 (en) * | 2006-12-27 | 2012-08-14 | Schlumberger Technology Corporation | Oilfield analysis system and method |
WO2008083004A2 (en) * | 2006-12-28 | 2008-07-10 | Chevron U.S.A. Inc. | History matching and forecasting of hydrocarbon-bearing reservoirs utilizing proxies for likelihood functions |
US7533725B2 (en) * | 2006-12-29 | 2009-05-19 | Schlumberger Technology Corp. | Method and system for altering pore pressure in a fracturing operation |
US8086479B2 (en) * | 2006-12-29 | 2011-12-27 | Schlumberger Technology Corporation | Oilfield management system and method |
US7577527B2 (en) * | 2006-12-29 | 2009-08-18 | Schlumberger Technology Corporation | Bayesian production analysis technique for multistage fracture wells |
US7467044B2 (en) * | 2007-01-15 | 2008-12-16 | Chevron U.S.A. Inc | Method and system for assessing exploration prospect risk and uncertainty |
US7606666B2 (en) * | 2007-01-29 | 2009-10-20 | Schlumberger Technology Corporation | System and method for performing oilfield drilling operations using visualization techniques |
US8412500B2 (en) | 2007-01-29 | 2013-04-02 | Schlumberger Technology Corporation | Simulations for hydraulic fracturing treatments and methods of fracturing naturally fractured formation |
US9135475B2 (en) * | 2007-01-29 | 2015-09-15 | Sclumberger Technology Corporation | System and method for performing downhole stimulation operations |
US8170801B2 (en) | 2007-02-26 | 2012-05-01 | Bp Exploration Operating Company Limited | Determining fluid rate and phase information for a hydrocarbon well using predictive models |
US8131470B2 (en) * | 2007-02-26 | 2012-03-06 | Bp Exploration Operating Company Limited | Managing flow testing and the results thereof for hydrocarbon wells |
WO2008106476A1 (en) * | 2007-02-27 | 2008-09-04 | Schlumberger Technology Corporation | System and method for waterflood performance monitoring |
WO2008112929A1 (en) * | 2007-03-13 | 2008-09-18 | Schlumberger Canada Limited | Method and system for managing information |
US8346695B2 (en) * | 2007-03-29 | 2013-01-01 | Schlumberger Technology Corporation | System and method for multiple volume segmentation |
US8014987B2 (en) * | 2007-04-13 | 2011-09-06 | Schlumberger Technology Corp. | Modeling the transient behavior of BHA/drill string while drilling |
US8688487B2 (en) * | 2007-04-18 | 2014-04-01 | Schlumberger Technology Corporation | Method and system for measuring technology maturity |
US20080257544A1 (en) * | 2007-04-19 | 2008-10-23 | Baker Hughes Incorporated | System and Method for Crossflow Detection and Intervention in Production Wellbores |
US8285531B2 (en) * | 2007-04-19 | 2012-10-09 | Smith International, Inc. | Neural net for use in drilling simulation |
US8117016B2 (en) * | 2007-04-19 | 2012-02-14 | Schlumberger Technology Corporation | System and method for oilfield production operations |
CA2614669C (en) * | 2007-05-03 | 2008-12-30 | Imperial Oil Resources Limited | An improved process for recovering solvent from asphaltene containing tailings resulting from a separation process |
EP2153246B1 (en) * | 2007-05-09 | 2015-09-16 | ExxonMobil Upstream Research Company | Inversion of 4d seismic data |
US7814989B2 (en) * | 2007-05-21 | 2010-10-19 | Schlumberger Technology Corporation | System and method for performing a drilling operation in an oilfield |
US8005658B2 (en) * | 2007-05-31 | 2011-08-23 | Schlumberger Technology Corporation | Automated field development planning of well and drainage locations |
US9175547B2 (en) * | 2007-06-05 | 2015-11-03 | Schlumberger Technology Corporation | System and method for performing oilfield production operations |
US20080319726A1 (en) | 2007-06-19 | 2008-12-25 | Schlumberger Technology Corporation | System and method for performing oilfield simulation operations |
CA2592725C (en) * | 2007-06-26 | 2009-04-14 | Imperial Oil Resources Limited | A method for cleaning fouled vessels in the paraffinic froth treatment process |
FR2918178B1 (en) * | 2007-06-29 | 2009-10-09 | Inst Francais Du Petrole | METHOD FOR ADJUSTING A SEISMIC WAVE SPEED MODEL BASED ON INFORMATION RECORDED AT WELLS |
US8775141B2 (en) * | 2007-07-02 | 2014-07-08 | Schlumberger Technology Corporation | System and method for performing oilfield simulation operations |
CA2691241C (en) * | 2007-07-02 | 2014-03-25 | Schlumberger Canada Limited | System and method for performing oilfield simulation operations |
WO2009012454A1 (en) * | 2007-07-18 | 2009-01-22 | Chevron U.S.A. Inc. | Systems and methods for increasing safety and efficiency in oil field operations |
US8214243B2 (en) * | 2007-07-18 | 2012-07-03 | Chevron U.S.A. Inc. | Systems and methods for managing large oil field operations |
CA2594205C (en) * | 2007-07-20 | 2009-11-24 | Imperial Oil Resources Limited | Use of a fluorocarbon polymer as a surface of a vessel or conduit used in a paraffinic froth treatment process for reducing fouling |
US8046314B2 (en) * | 2007-07-20 | 2011-10-25 | Schlumberger Technology Corporation | Apparatus, method and system for stochastic workflow in oilfield operations |
US8332194B2 (en) * | 2007-07-30 | 2012-12-11 | Schlumberger Technology Corporation | Method and system to obtain a compositional model of produced fluids using separator discharge data analysis |
CA2595336C (en) * | 2007-07-31 | 2009-09-15 | Imperial Oil Resources Limited | Reducing foulant carry-over or build-up in a paraffinic froth treatment process |
US8073800B2 (en) * | 2007-07-31 | 2011-12-06 | Schlumberger Technology Corporation | Valuing future information under uncertainty |
US8244509B2 (en) * | 2007-08-01 | 2012-08-14 | Schlumberger Technology Corporation | Method for managing production from a hydrocarbon producing reservoir in real-time |
US7900700B2 (en) * | 2007-08-02 | 2011-03-08 | Schlumberger Technology Corporation | Method and system for cleat characterization in coal bed methane wells for completion optimization |
FR2919932B1 (en) * | 2007-08-06 | 2009-12-04 | Inst Francais Du Petrole | METHOD FOR EVALUATING A PRODUCTION SCHEME FOR UNDERGROUND GROWTH, TAKING INTO ACCOUNT UNCERTAINTIES |
US8612194B2 (en) * | 2007-08-08 | 2013-12-17 | Westerngeco L.L.C. | Updating a subterranean model using at least electromagnetic data |
US20090149981A1 (en) * | 2007-08-14 | 2009-06-11 | Wayne Errol Evans | System and methods for continuous, online monitoring of a chemical plant or refinery |
US8204693B2 (en) * | 2007-08-17 | 2012-06-19 | Shell Oil Company | Method for virtual metering of injection wells and allocation and control of multi-zonal injection wells |
CA2690992C (en) * | 2007-08-24 | 2014-07-29 | Exxonmobil Upstream Research Company | Method for predicting well reliability by computer simulation |
US8423337B2 (en) * | 2007-08-24 | 2013-04-16 | Exxonmobil Upstream Research Company | Method for multi-scale geomechanical model analysis by computer simulation |
US8768672B2 (en) | 2007-08-24 | 2014-07-01 | ExxonMobil. Upstream Research Company | Method for predicting time-lapse seismic timeshifts by computer simulation |
US8548782B2 (en) | 2007-08-24 | 2013-10-01 | Exxonmobil Upstream Research Company | Method for modeling deformation in subsurface strata |
US9070172B2 (en) * | 2007-08-27 | 2015-06-30 | Schlumberger Technology Corporation | Method and system for data context service |
US8156131B2 (en) * | 2007-08-27 | 2012-04-10 | Schlumberger Technology Corporation | Quality measure for a data context service |
NO327688B1 (en) | 2007-09-07 | 2009-09-14 | Abb As | Method and prediction system in an oil / gas production system |
WO2009032416A1 (en) * | 2007-09-07 | 2009-03-12 | Exxonmobill Upstream Research Company | Well performance modeling in a collaborative well planning environment |
US20090076632A1 (en) * | 2007-09-18 | 2009-03-19 | Groundswell Technologies, Inc. | Integrated resource monitoring system with interactive logic control |
US8892221B2 (en) * | 2007-09-18 | 2014-11-18 | Groundswell Technologies, Inc. | Integrated resource monitoring system with interactive logic control for well water extraction |
US20090076873A1 (en) * | 2007-09-19 | 2009-03-19 | General Electric Company | Method and system to improve engineered system decisions and transfer risk |
US20110161133A1 (en) * | 2007-09-29 | 2011-06-30 | Schlumberger Technology Corporation | Planning and Performing Drilling Operations |
US8103493B2 (en) * | 2007-09-29 | 2012-01-24 | Schlumberger Technology Corporation | System and method for performing oilfield operations |
US8140310B2 (en) | 2007-11-01 | 2012-03-20 | Schlumberger Technology Corporation | Reservoir fracture simulation |
US8024123B2 (en) * | 2007-11-07 | 2011-09-20 | Schlumberger Technology Corporation | Subterranean formation properties prediction |
EP2605191A3 (en) * | 2007-11-10 | 2013-08-21 | Landmark Graphics Corporation, A Halliburton Company | Systems and methods for workflow automation, adaptation and integration |
WO2009070365A1 (en) * | 2007-11-27 | 2009-06-04 | Exxonmobil Upstream Research Company | Method for determining the properties of hydrocarbon reservoirs from geophysical data |
US8121790B2 (en) * | 2007-11-27 | 2012-02-21 | Schlumberger Technology Corporation | Combining reservoir modeling with downhole sensors and inductive coupling |
US7668707B2 (en) * | 2007-11-28 | 2010-02-23 | Landmark Graphics Corporation | Systems and methods for the determination of active constraints in a network using slack variables and plurality of slack variable multipliers |
US20090151933A1 (en) * | 2007-12-12 | 2009-06-18 | Conocophillips Company | Lost profit reduction process and system |
CA2703072C (en) | 2007-12-13 | 2016-01-26 | Exxonmobil Upstream Research Company | Iterative reservoir surveillance |
BRPI0820870A2 (en) | 2007-12-13 | 2015-06-16 | Exxonmobil Upstream Res Co | Method for simulating a reservoir model. |
WO2009079570A2 (en) * | 2007-12-17 | 2009-06-25 | Landmark Graphics Corporation, A Halliburton Company | Systems and methods for optimization of real time production operations |
US7878268B2 (en) * | 2007-12-17 | 2011-02-01 | Schlumberger Technology Corporation | Oilfield well planning and operation |
EP2235500B1 (en) * | 2007-12-18 | 2018-10-31 | Exxonmobil Upstream Research Company | Determining connectivity architecture in 2-d and 3-d heterogeneous data |
FR2925726B1 (en) * | 2007-12-20 | 2010-04-23 | Inst Francais Du Petrole | METHOD FOR OPTIMIZING THE OPERATION OF A FLUID DEPOSITION BY TAKING INTO ACCOUNT A TERM OF GEOLOGICAL AND TRANSIENT EXCHANGE BETWEEN MATRIX BLOCKS AND FRACTURES |
AU2008340399B2 (en) | 2007-12-21 | 2013-09-26 | Exxonmobil Upstream Research Company | Method and apparatus for analyzing three-dimensional data |
US8744817B2 (en) * | 2007-12-21 | 2014-06-03 | Schlumberger Technology Corporation | Method for upscaling a reservoir model using deep reading measurements |
US8738341B2 (en) * | 2007-12-21 | 2014-05-27 | Schlumberger Technology Corporation | Method for reservoir characterization and monitoring including deep reading quad combo measurements |
US8751164B2 (en) * | 2007-12-21 | 2014-06-10 | Schlumberger Technology Corporation | Production by actual loss allocation |
US20110087471A1 (en) * | 2007-12-31 | 2011-04-14 | Exxonmobil Upstream Research Company | Methods and Systems For Determining Near-Wellbore Characteristics and Reservoir Properties |
US8099267B2 (en) * | 2008-01-11 | 2012-01-17 | Schlumberger Technology Corporation | Input deck migrator for simulators |
US9074454B2 (en) | 2008-01-15 | 2015-07-07 | Schlumberger Technology Corporation | Dynamic reservoir engineering |
EP2235566A1 (en) * | 2008-01-22 | 2010-10-06 | Exxonmobil Upstream Research Company | Dynamic connectivity analysis |
US9223041B2 (en) | 2008-01-23 | 2015-12-29 | Schlubmerger Technology Corporation | Three-dimensional mechanical earth modeling |
US8255816B2 (en) * | 2008-01-25 | 2012-08-28 | Schlumberger Technology Corporation | Modifying a magnified field model |
US7894991B2 (en) * | 2008-02-01 | 2011-02-22 | Schlumberger Technology Corp. | Statistical determination of historical oilfield data |
US20100312536A1 (en) * | 2008-02-05 | 2010-12-09 | Schlumberger Technology Corporation | Integrating field data |
US20090200210A1 (en) * | 2008-02-11 | 2009-08-13 | Hommema Scott E | Method Of Removing Solids From Bitumen Froth |
US7963327B1 (en) * | 2008-02-25 | 2011-06-21 | QRI Group, LLC | Method for dynamically assessing petroleum reservoir competency and increasing production and recovery through asymmetric analysis of performance metrics |
US8073665B2 (en) * | 2008-03-07 | 2011-12-06 | Schlumberger Technology Corporation | Analyzing an oilfield network for oilfield production |
CA2710809C (en) | 2008-03-10 | 2017-06-13 | Exxonmobil Upstream Research Company | Method for determining distinct alternative paths between two object sets in 2-d and 3-d heterogeneous data |
US8705318B2 (en) | 2008-03-10 | 2014-04-22 | Schlumberger Technology Corporation | Data aggregation for drilling operations |
US20090234623A1 (en) * | 2008-03-12 | 2009-09-17 | Schlumberger Technology Corporation | Validating field data |
US8285532B2 (en) * | 2008-03-14 | 2012-10-09 | Schlumberger Technology Corporation | Providing a simplified subterranean model |
EP2279329A2 (en) * | 2008-03-20 | 2011-02-02 | BP Corporation North America Inc. | Management of measurement data being applied to reservoir models |
US8592351B2 (en) * | 2008-03-20 | 2013-11-26 | Exxonmobil Upstream Research Company | Enhancing emulsion stability |
US8803878B2 (en) * | 2008-03-28 | 2014-08-12 | Schlumberger Technology Corporation | Visualizing region growing in three dimensional voxel volumes |
CA2719937C (en) | 2008-04-04 | 2017-03-28 | Landmark Graphics Corporation, A Halliburton Company | Systems and methods for correlating meta-data model representations and asset-logic model representations |
US10552391B2 (en) * | 2008-04-04 | 2020-02-04 | Landmark Graphics Corporation | Systems and methods for real time data management in a collaborative environment |
WO2009145960A1 (en) * | 2008-04-17 | 2009-12-03 | Exxonmobil Upstream Research Company | Robust optimization-based decision support tool for reservoir development planning |
US7966166B2 (en) * | 2008-04-18 | 2011-06-21 | Schlumberger Technology Corp. | Method for determining a set of net present values to influence the drilling of a wellbore and increase production |
US8793111B2 (en) * | 2009-01-20 | 2014-07-29 | Schlumberger Technology Corporation | Automated field development planning |
EP2291761A4 (en) * | 2008-04-18 | 2013-01-16 | Exxonmobil Upstream Res Co | Markov decision process-based decision support tool for reservoir development planning |
US8527248B2 (en) | 2008-04-18 | 2013-09-03 | Westerngeco L.L.C. | System and method for performing an adaptive drilling operation |
US8775361B2 (en) * | 2008-04-21 | 2014-07-08 | Exxonmobil Upstream Research Company | Stochastic programming-based decision support tool for reservoir development planning |
US8185311B2 (en) * | 2008-04-22 | 2012-05-22 | Schlumberger Technology Corporation | Multiuser oilfield domain analysis and data management |
CA2717353C (en) * | 2008-04-22 | 2016-06-21 | Exxonmobil Upstream Research Company | Functional-based knowledge analysis in a 2d and 3d visual environment |
US9372943B2 (en) | 2008-05-05 | 2016-06-21 | Exxonmobil Upstream Research Company | Modeling dynamic systems by visualizing and narrowing a parameter space |
US8898017B2 (en) * | 2008-05-05 | 2014-11-25 | Bp Corporation North America Inc. | Automated hydrocarbon reservoir pressure estimation |
CA2717514C (en) | 2008-05-05 | 2016-07-26 | Exxonmobil Upstream Research Company | Systems and methods for connectivity analysis using functional objects |
US20110067871A1 (en) * | 2008-05-22 | 2011-03-24 | Burdette Jason A | Methods For Regulating Flow In Multi-Zone Intervals |
US8061444B2 (en) * | 2008-05-22 | 2011-11-22 | Schlumberger Technology Corporation | Methods and apparatus to form a well |
US7924001B2 (en) * | 2008-05-23 | 2011-04-12 | Schlumberger Technology Corp. | Determination of oil viscosity and continuous gas oil ratio from nuclear magnetic resonance logs |
US8527203B2 (en) | 2008-05-27 | 2013-09-03 | Schlumberger Technology Corporation | Method for selecting well measurements |
US8095349B2 (en) * | 2008-05-30 | 2012-01-10 | Kelkar And Associates, Inc. | Dynamic updating of simulation models |
US8825408B2 (en) * | 2008-06-13 | 2014-09-02 | Schlumberger Technology Corporation | Using models for equilibrium distributions of asphaltenes in the prescence of GOR gradients to determine sampling procedures |
US9488044B2 (en) | 2008-06-23 | 2016-11-08 | Schlumberger Technology Corporation | Valuing future well test under uncertainty |
US8252170B2 (en) | 2008-06-27 | 2012-08-28 | Exxonmobil Upstream Research Company | Optimizing feed mixer performance in a paraffinic froth treatment process |
US9830563B2 (en) | 2008-06-27 | 2017-11-28 | International Business Machines Corporation | System and method for managing legal obligations for data |
US8515924B2 (en) | 2008-06-30 | 2013-08-20 | International Business Machines Corporation | Method and apparatus for handling edge-cases of event-driven disposition |
US8484069B2 (en) * | 2008-06-30 | 2013-07-09 | International Business Machines Corporation | Forecasting discovery costs based on complex and incomplete facts |
US7873476B2 (en) * | 2008-07-02 | 2011-01-18 | Chevron U.S.A. Inc. | Well log correlation |
US8311743B2 (en) * | 2008-07-03 | 2012-11-13 | Schlumberger Technology Corporation | Method for generating an estimation of incremental recovery from a selected enhanced oil recovery (EOR) process |
US8670966B2 (en) * | 2008-08-04 | 2014-03-11 | Schlumberger Technology Corporation | Methods and systems for performing oilfield production operations |
US8499829B2 (en) * | 2008-08-22 | 2013-08-06 | Schlumberger Technology Corporation | Oilfield application framework |
US8260595B2 (en) * | 2008-09-02 | 2012-09-04 | Schlumberger Technology Corporation | Intelligent completion design for a reservoir |
US20100076740A1 (en) * | 2008-09-08 | 2010-03-25 | Schlumberger Technology Corporation | System and method for well test design and interpretation |
US8533152B2 (en) * | 2008-09-18 | 2013-09-10 | University Of Southern California | System and method for data provenance management |
US8145427B1 (en) | 2008-09-29 | 2012-03-27 | QRI Group, LLC | Assessing petroleum reservoir production and potential for increasing production rate |
US8145428B1 (en) | 2008-09-29 | 2012-03-27 | QRI Group, LLC | Assessing petroleum reservoir reserves and potential for increasing ultimate recovery |
US8892407B2 (en) * | 2008-10-01 | 2014-11-18 | Exxonmobil Upstream Research Company | Robust well trajectory planning |
US8280709B2 (en) * | 2008-10-03 | 2012-10-02 | Schlumberger Technology Corporation | Fully coupled simulation for fluid flow and geomechanical properties in oilfield simulation operations |
US9228415B2 (en) * | 2008-10-06 | 2016-01-05 | Schlumberger Technology Corporation | Multidimensional data repository for modeling oilfield operations |
US8706541B2 (en) * | 2008-10-06 | 2014-04-22 | Schlumberger Technology Corporation | Reservoir management linking |
US8306842B2 (en) * | 2008-10-16 | 2012-11-06 | Schlumberger Technology Corporation | Project planning and management |
AU2009311619B2 (en) * | 2008-11-06 | 2015-10-01 | Exxonmobil Upstream Research Company | System and method for planning a drilling operation |
US8374836B2 (en) * | 2008-11-12 | 2013-02-12 | Geoscape Analytics, Inc. | Methods and systems for constructing and using a subterranean geomechanics model spanning local to zonal scale in complex geological environments |
AU2009314461B2 (en) | 2008-11-14 | 2015-11-05 | Exxonmobil Upstream Research Company | Forming a model of a subsurface region |
US8301426B2 (en) * | 2008-11-17 | 2012-10-30 | Landmark Graphics Corporation | Systems and methods for dynamically developing wellbore plans with a reservoir simulator |
CA2739590C (en) * | 2008-11-20 | 2017-01-03 | Exxonmobil Upstream Research Company | Sand and fluid production and injection modeling methods |
US8849623B2 (en) * | 2008-12-16 | 2014-09-30 | Exxonmobil Upstream Research Company | Systems and methods for reservoir development and management optimization |
US8705317B2 (en) | 2008-12-17 | 2014-04-22 | Exxonmobil Upstream Research Company | Method for imaging of targeted reflectors |
US9146329B2 (en) | 2008-12-17 | 2015-09-29 | Exxonmobil Upstream Research Company | System and method for reconstruction of time-lapse data |
US8724429B2 (en) | 2008-12-17 | 2014-05-13 | Exxonmobil Upstream Research Company | System and method for performing time-lapse monitor surverying using sparse monitor data |
US9552462B2 (en) * | 2008-12-23 | 2017-01-24 | Exxonmobil Upstream Research Company | Method for predicting composition of petroleum |
US8352228B2 (en) * | 2008-12-23 | 2013-01-08 | Exxonmobil Upstream Research Company | Method for predicting petroleum expulsion |
CN102282562B (en) * | 2009-01-13 | 2015-09-23 | 埃克森美孚上游研究公司 | Optimizing well operating plans |
WO2010101593A1 (en) * | 2009-03-05 | 2010-09-10 | Exxonmobil Upstream Research Company | Optimizing reservoir performance under uncertainty |
WO2010104535A1 (en) | 2009-03-13 | 2010-09-16 | Exxonmobil Upstream Research Company | Method for predicting fluid flow |
US20100243243A1 (en) * | 2009-03-31 | 2010-09-30 | Schlumberger Technology Corporation | Active In-Situ Controlled Permanent Downhole Device |
US20100257004A1 (en) * | 2009-04-01 | 2010-10-07 | Chervon U.S.A. Inc. | Method and system for conducting geologic basin analysis |
US20100256964A1 (en) * | 2009-04-07 | 2010-10-07 | Schlumberger Technology Corporation | System and technique to quantify a fracture system |
US9128212B2 (en) | 2009-04-20 | 2015-09-08 | Exxonmobil Upstream Research Company | Method for predicting fluid flow |
US20100299123A1 (en) * | 2009-05-21 | 2010-11-25 | Schlumberger Technology Corporation | Well placement in a volume |
US8463585B2 (en) * | 2009-05-22 | 2013-06-11 | Baker Hughes Incorporated | Apparatus and method for modeling well designs and well performance |
US8332154B2 (en) | 2009-06-02 | 2012-12-11 | Exxonmobil Upstream Research Company | Estimating reservoir properties from 4D seismic data |
US8781747B2 (en) * | 2009-06-09 | 2014-07-15 | Schlumberger Technology Corporation | Method of determining parameters of a layered reservoir |
GB2471139A (en) * | 2009-06-19 | 2010-12-22 | Kongsberg Maritime As Oil And Gas | Method for providing reconciled estimates of three phase flow for individual wells and at individual locations in a hydrocarbon production process facility |
US20120109604A1 (en) * | 2009-07-01 | 2012-05-03 | Halliburton Energy Services, Inc. | Estimating Mineral Content Using Geochemical Data |
CA2672004C (en) * | 2009-07-14 | 2012-03-27 | Imperial Oil Resources Limited | Feed delivery system for a solid-liquid separation vessel |
US9129256B2 (en) * | 2009-07-24 | 2015-09-08 | Oracle International Corporation | Enabling collaboration on a project plan |
US9043189B2 (en) * | 2009-07-29 | 2015-05-26 | ExxonMobil Upstream Research—Law Department | Space-time surrogate models of subterranean regions |
US8306801B2 (en) * | 2009-08-12 | 2012-11-06 | Schlumberger Technology Corporation | Virtual reservoir sensor |
EP2464824B1 (en) * | 2009-08-14 | 2018-10-03 | BP Corporation North America Inc. | Reservoir architecture and connectivity analysis |
US8548783B2 (en) * | 2009-09-17 | 2013-10-01 | Chevron U.S.A. Inc. | Computer-implemented systems and methods for controlling sand production in a geomechanical reservoir system |
US9482077B2 (en) * | 2009-09-22 | 2016-11-01 | Baker Hughes Incorporated | Method for controlling fluid production from a wellbore by using a script |
US20110067882A1 (en) * | 2009-09-22 | 2011-03-24 | Baker Hughes Incorporated | System and Method for Monitoring and Controlling Wellbore Parameters |
NO20101371A1 (en) * | 2009-10-05 | 2011-04-06 | Logined Bv | Method, system and apparatus for modeling uncertainty in production system networks |
US8839850B2 (en) | 2009-10-07 | 2014-09-23 | Schlumberger Technology Corporation | Active integrated completion installation system and method |
US9085957B2 (en) | 2009-10-07 | 2015-07-21 | Exxonmobil Upstream Research Company | Discretized physics-based models and simulations of subterranean regions, and methods for creating and using the same |
EP2491431A1 (en) | 2009-10-20 | 2012-08-29 | Exxonmobil Upstream Research Company | Method for quantitatively assessing connectivity for well pairs at varying frequencies |
US10061060B2 (en) | 2009-11-12 | 2018-08-28 | Exxonmobil Upstream Research Company | Method and apparatus for generating a three-dimensional simulation grid for a reservoir model |
US8898044B2 (en) * | 2009-11-25 | 2014-11-25 | Halliburton Energy Services, Inc. | Simulating subterranean fracture propagation |
US9176245B2 (en) | 2009-11-25 | 2015-11-03 | Halliburton Energy Services, Inc. | Refining information on subterranean fractures |
WO2011066021A1 (en) | 2009-11-30 | 2011-06-03 | Exxonmobil Upstream Research Company | Adaptive newton's method for reservoir simulation |
US20110131201A1 (en) * | 2009-11-30 | 2011-06-02 | Universal Carbon Control Technology Co., Ltd. | Supply Chain Digital Map Management System and Integrating Method Therefor |
US8469090B2 (en) * | 2009-12-01 | 2013-06-25 | Schlumberger Technology Corporation | Method for monitoring hydrocarbon production |
WO2011071651A1 (en) | 2009-12-07 | 2011-06-16 | Exxonmobil Upstream Research Company | Solvent surveillance in solvent-based heavy oil recovery processes |
US8613312B2 (en) * | 2009-12-11 | 2013-12-24 | Technological Research Ltd | Method and apparatus for stimulating wells |
US8655856B2 (en) * | 2009-12-22 | 2014-02-18 | International Business Machines Corporation | Method and apparatus for policy distribution |
RU2012135549A (en) * | 2010-01-20 | 2014-02-27 | Шелл Интернэшнл Рисерч Маатсхаппий Б.В. | SYSTEMS AND METHOD FOR OIL AND / OR GAS PRODUCTION |
WO2011097055A2 (en) * | 2010-02-02 | 2011-08-11 | Conocophillips Company | Multilevel percolation aggregation solver for petroleum reservoir simulations |
WO2011096964A1 (en) * | 2010-02-03 | 2011-08-11 | Exxonmobil Upstream Research Company | Method for using dynamic target region for well path/drill center optimization |
BR112012017278A2 (en) | 2010-02-12 | 2016-04-26 | Exxonmobil Upstream Res Co | Method and system for creating historical fit simulation models |
IN2012DN05167A (en) | 2010-02-12 | 2015-10-23 | Exxonmobil Upstream Res Co | |
CA2693640C (en) | 2010-02-17 | 2013-10-01 | Exxonmobil Upstream Research Company | Solvent separation in a solvent-dominated recovery process |
AU2010347724B2 (en) | 2010-03-12 | 2016-06-23 | Exxonmobil Upstream Research Company | Dynamic grouping of domain objects via smart groups |
CA2696638C (en) | 2010-03-16 | 2012-08-07 | Exxonmobil Upstream Research Company | Use of a solvent-external emulsion for in situ oil recovery |
WO2011136861A1 (en) | 2010-04-30 | 2011-11-03 | Exxonmobil Upstream Research Company | Method and system for finite volume simulation of flow |
US8775142B2 (en) | 2010-05-14 | 2014-07-08 | Conocophillips Company | Stochastic downscaling algorithm and applications to geological model downscaling |
US9243476B2 (en) | 2010-05-19 | 2016-01-26 | Schlumberger Technology Corporation | System and method for simulating oilfield operations |
CA2705643C (en) | 2010-05-26 | 2016-11-01 | Imperial Oil Resources Limited | Optimization of solvent-dominated recovery |
CA2801386A1 (en) | 2010-06-15 | 2011-12-22 | Exxonmobil Upstream Research Company | Method and system for stabilizing formulation methods |
US8532968B2 (en) * | 2010-06-16 | 2013-09-10 | Foroil | Method of improving the production of a mature gas or oil field |
US8412501B2 (en) * | 2010-06-16 | 2013-04-02 | Foroil | Production simulator for simulating a mature hydrocarbon field |
US8463586B2 (en) | 2010-06-22 | 2013-06-11 | Saudi Arabian Oil Company | Machine, program product, and computer-implemented method to simulate reservoirs as 2.5D unstructured grids |
US8832148B2 (en) | 2010-06-29 | 2014-09-09 | International Business Machines Corporation | Enterprise evidence repository |
US8566903B2 (en) | 2010-06-29 | 2013-10-22 | International Business Machines Corporation | Enterprise evidence repository providing access control to collected artifacts |
EP2588952A4 (en) | 2010-06-29 | 2017-10-04 | Exxonmobil Upstream Research Company | Method and system for parallel simulation models |
AU2011283193B2 (en) | 2010-07-29 | 2014-07-17 | Exxonmobil Upstream Research Company | Methods and systems for machine-learning based simulation of flow |
AU2011283190A1 (en) | 2010-07-29 | 2013-02-07 | Exxonmobil Upstream Research Company | Methods and systems for machine-learning based simulation of flow |
AU2011283196B2 (en) | 2010-07-29 | 2014-07-31 | Exxonmobil Upstream Research Company | Method and system for reservoir modeling |
US9665836B2 (en) | 2010-08-10 | 2017-05-30 | X Systems, Llc | System and method for analyzing data |
US8849638B2 (en) | 2010-08-10 | 2014-09-30 | X Systems, Llc | System and method for analyzing data |
US9652726B2 (en) | 2010-08-10 | 2017-05-16 | X Systems, Llc | System and method for analyzing data |
US9176979B2 (en) | 2010-08-10 | 2015-11-03 | X Systems, Llc | System and method for analyzing data |
US9665916B2 (en) | 2010-08-10 | 2017-05-30 | X Systems, Llc | System and method for analyzing data |
US9593558B2 (en) | 2010-08-24 | 2017-03-14 | Exxonmobil Upstream Research Company | System and method for planning a well path |
US8838695B2 (en) * | 2010-08-26 | 2014-09-16 | Bp Corporation North America Inc. | Hydrocarbon well information portal |
US8386227B2 (en) | 2010-09-07 | 2013-02-26 | Saudi Arabian Oil Company | Machine, computer program product and method to generate unstructured grids and carry out parallel reservoir simulation |
US8433551B2 (en) | 2010-11-29 | 2013-04-30 | Saudi Arabian Oil Company | Machine, computer program product and method to carry out parallel reservoir simulation |
AU2011299495B2 (en) * | 2010-09-10 | 2016-09-29 | Exxonmobil Upstream Research Company | System and method for simultaneous visualization of fluid flow within well completions and a reservoir |
EP2431767A3 (en) | 2010-09-17 | 2016-11-30 | Services Pétroliers Schlumberger | Dynamic subsurface engineering |
GB2502432B (en) | 2010-09-20 | 2018-08-01 | Exxonmobil Upstream Res Co | Flexible and adaptive formulations for complex reservoir simulations |
CA2714842C (en) | 2010-09-22 | 2012-05-29 | Imperial Oil Resources Limited | Controlling bitumen quality in solvent-assisted bitumen extraction |
US10428626B2 (en) * | 2010-10-18 | 2019-10-01 | Schlumberger Technology Corporation | Production estimation in subterranean formations |
US8788252B2 (en) * | 2010-10-26 | 2014-07-22 | Schlumberger Technology Corporation | Multi-well time-lapse nodal analysis of transient production systems |
US8781879B2 (en) * | 2010-11-04 | 2014-07-15 | Schlumberger Technology Corporation | System and method of facilitating petroleum engineering analysis |
CA2762261C (en) * | 2010-11-18 | 2014-01-28 | Suncor Energy Inc. | Process for determining mobile water saturation in a reservoir formation |
AU2011332274B2 (en) * | 2010-11-23 | 2017-02-23 | Exxonmobil Upstream Research Company | Variable discretization method for flow simulation on complex geological models |
KR101148835B1 (en) * | 2010-11-29 | 2012-05-29 | 한국지질자원연구원 | Prediction system and method for subsurface lithology in oil sands reservoir using statistical analysis of well logging data |
EP2646927A4 (en) | 2010-11-30 | 2016-06-15 | Landmark Graphics Corp | Systems and methods for reducing reservoir simulator model run time |
US20120143577A1 (en) * | 2010-12-02 | 2012-06-07 | Matthew Szyndel | Prioritizing well drilling propositions |
WO2012078238A1 (en) * | 2010-12-09 | 2012-06-14 | Exxonmobil Upstream Company | Optimal design system for development planning of hydrocarbon resources |
US9316096B2 (en) * | 2010-12-10 | 2016-04-19 | Conocophillips Company | Enhanced oil recovery screening model |
MX2013007039A (en) * | 2010-12-20 | 2013-12-06 | Schlumberger Technology Bv | Method of utilizing subterranean formation data for improving treatment operations. |
US9229603B2 (en) * | 2010-12-28 | 2016-01-05 | Schlumberger Technology Corporation | Methods, systems, apparatuses, and computer-readable mediums for provisioning petrotechnical workflows in a cloud computing environment |
US20130140031A1 (en) * | 2010-12-30 | 2013-06-06 | Schlumberger Technology Corporation | System and method for performing optimized downhole stimulation operations |
AU2011350663B2 (en) * | 2010-12-30 | 2015-09-03 | Schlumberger Technology B.V. | System and method for performing downhole stimulation operations |
EP2668641B1 (en) | 2011-01-26 | 2020-04-15 | Exxonmobil Upstream Research Company | Method of reservoir compartment analysis using topological structure in 3d earth model |
US8994549B2 (en) * | 2011-01-28 | 2015-03-31 | Schlumberger Technology Corporation | System and method of facilitating oilfield operations utilizing auditory information |
US20120215364A1 (en) * | 2011-02-18 | 2012-08-23 | David John Rossi | Field lift optimization using distributed intelligence and single-variable slope control |
US9874648B2 (en) | 2011-02-21 | 2018-01-23 | Exxonmobil Upstream Research Company | Reservoir connectivity analysis in a 3D earth model |
US8924029B2 (en) * | 2011-02-23 | 2014-12-30 | Honeywell International Inc. | Apparatus and method for increasing the ultimate recovery of natural gas contained in shale and other tight gas reservoirs |
US10534871B2 (en) * | 2011-03-09 | 2020-01-14 | Schlumberger Technology Corporation | Method and systems for reservoir modeling, evaluation and simulation |
CA2734811C (en) | 2011-03-29 | 2012-11-20 | Imperial Oil Resources Limited | Feedwell system for a separation vessel |
WO2012134497A1 (en) * | 2011-04-01 | 2012-10-04 | QRI Group, LLC | Method for dynamically assessing petroleum reservoir competency and increasing production and recovery through asymmetric analysis of performance metrics |
US9488047B2 (en) | 2011-04-04 | 2016-11-08 | Conocophillips Company | Reservoir calibration parameterization method |
US20120278053A1 (en) * | 2011-04-28 | 2012-11-01 | Baker Hughes Incorporated | Method of Providing Flow Control Devices for a Production Wellbore |
WO2013006226A1 (en) | 2011-07-01 | 2013-01-10 | Exxonmobil Upstream Research Company | Plug-in installer framework |
CN103703425B (en) * | 2011-07-11 | 2017-06-09 | 维美德自动化有限公司 | The method for monitoring industrial process |
CN103827897B (en) * | 2011-08-30 | 2018-08-07 | 哈里伯顿能源服务公司 | The method and system of integrated control for sub-terrain operations |
US20130056201A1 (en) * | 2011-09-02 | 2013-03-07 | William David Chandler, JR. | Method for evaluating hydrocarbon-containing subterrean formations penetrated by a directional wellbore |
WO2013039606A1 (en) | 2011-09-15 | 2013-03-21 | Exxonmobil Upstream Research Company | Optimized matrix and vector operations in instruction limited algorithms that perform eos calculations |
US9249559B2 (en) | 2011-10-04 | 2016-02-02 | Schlumberger Technology Corporation | Providing equipment in lateral branches of a well |
CA2852953C (en) | 2011-10-06 | 2018-04-03 | Landmark Graphics Corporation | Systems and methods for subsurface oil recovery optimization |
AU2012326237B2 (en) * | 2011-10-18 | 2017-09-14 | Saudi Arabian Oil Company | Reservoir modeling with 4D saturation models and simulation models |
CA2850833A1 (en) * | 2011-10-18 | 2013-04-25 | Saudi Arabian Oil Company | 4d saturation modeling |
US9708899B2 (en) * | 2011-10-20 | 2017-07-18 | Schlumberger Technology Corporation | Optimization of a multi-period model for valuation applied to flow control valves |
US10508520B2 (en) | 2011-10-26 | 2019-12-17 | QRI Group, LLC | Systems and methods for increasing recovery efficiency of petroleum reservoirs |
US9946986B1 (en) | 2011-10-26 | 2018-04-17 | QRI Group, LLC | Petroleum reservoir operation using geotechnical analysis |
US9767421B2 (en) | 2011-10-26 | 2017-09-19 | QRI Group, LLC | Determining and considering petroleum reservoir reserves and production characteristics when valuing petroleum production capital projects |
US20130110474A1 (en) | 2011-10-26 | 2013-05-02 | Nansen G. Saleri | Determining and considering a premium related to petroleum reserves and production characteristics when valuing petroleum production capital projects |
US9710766B2 (en) | 2011-10-26 | 2017-07-18 | QRI Group, LLC | Identifying field development opportunities for increasing recovery efficiency of petroleum reservoirs |
US20130110483A1 (en) * | 2011-10-31 | 2013-05-02 | Nikita V. Chugunov | Method for measurement screening under reservoir uncertainty |
US20140081613A1 (en) * | 2011-11-01 | 2014-03-20 | Austin Geomodeling, Inc. | Method, system and computer readable medium for scenario mangement of dynamic, three-dimensional geological interpretation and modeling |
US10450860B2 (en) | 2011-11-01 | 2019-10-22 | Schlumberger Technology Corporation | Integrating reservoir modeling with modeling a perturbation |
US20130116994A1 (en) * | 2011-11-03 | 2013-05-09 | International Business Machines Corporation | Water management |
US9644476B2 (en) | 2012-01-23 | 2017-05-09 | Schlumberger Technology Corporation | Structures having cavities containing coupler portions |
US9175560B2 (en) | 2012-01-26 | 2015-11-03 | Schlumberger Technology Corporation | Providing coupler portions along a structure |
US20130204534A1 (en) * | 2012-01-27 | 2013-08-08 | Schlumberger Technology Corporation | Method Of Estimating A Subterranean Formation Property |
US9938823B2 (en) | 2012-02-15 | 2018-04-10 | Schlumberger Technology Corporation | Communicating power and data to a component in a well |
US9753180B2 (en) | 2012-03-28 | 2017-09-05 | Exxonmobil Upstream Research Company | Method for multiphase flow upscaling |
US9595129B2 (en) | 2012-05-08 | 2017-03-14 | Exxonmobil Upstream Research Company | Canvas control for 3D data volume processing |
AU2013263330B2 (en) | 2012-05-14 | 2016-05-26 | Landmark Graphics Corporation | Method and system of predicting future hydrocarbon production |
RU2593678C2 (en) * | 2012-05-30 | 2016-08-10 | Лэндмарк Графикс Корпорейшн | System and method for optimising reservoir simulation modelling |
US10352134B2 (en) | 2012-05-30 | 2019-07-16 | Landmark Graphics Corporation | Oil or gas production using computer simulation of oil or gas fields and production facilities |
US20130325349A1 (en) * | 2012-05-31 | 2013-12-05 | Chevron U.S.A. Inc. | Methods for Generating Depofacies Classifications for Subsurface Oil or Gas Reservoirs or Fields |
US10036234B2 (en) | 2012-06-08 | 2018-07-31 | Schlumberger Technology Corporation | Lateral wellbore completion apparatus and method |
US9619592B2 (en) | 2012-08-31 | 2017-04-11 | Schlumberger Technology Corporation | Analysis of enhanced oil recovery (EOR) processes for naturally-fractured reservoirs |
US9835017B2 (en) * | 2012-09-24 | 2017-12-05 | Schlumberger Technology Corporation | Seismic monitoring system and method |
US20140088878A1 (en) * | 2012-09-27 | 2014-03-27 | Jinhong Chen | Isotherm and gas-in-place estimation considering capillary condensation in shale gas reservoir |
CA2883169C (en) | 2012-09-28 | 2021-06-15 | Exxonmobil Upstream Research Company | Fault removal in geological models |
US20140129296A1 (en) * | 2012-11-07 | 2014-05-08 | Schlumberger Technology Corporation | Method and system for offering and procuring well services |
FR2997721B1 (en) * | 2012-11-08 | 2015-05-15 | Storengy | RADONIP: A NEW METHODOLOGY FOR DETERMINING PRODUCTIVITY CURVES OF STORAGE WELLS AND DEPOSITS OF COMPRESSIBLE FLUIDS |
US20140157172A1 (en) * | 2012-11-30 | 2014-06-05 | Drillmap | Geographic layout of petroleum drilling data and methods for processing data |
US10026133B2 (en) * | 2012-12-11 | 2018-07-17 | Landmark Graphics Corporation | Method and system of analyzing wells of a mature field |
WO2014116249A1 (en) * | 2013-01-28 | 2014-07-31 | Halliburton Energy Services, Inc. | Systems and methods for monitoring wellbore fluids using microanalysis of real-time pumping data |
US9798042B2 (en) * | 2013-02-01 | 2017-10-24 | Halliburton Energy Services, Inc. | Simulating an injection treatment of a subterranean zone |
US9229127B2 (en) * | 2013-02-21 | 2016-01-05 | Saudi Arabian Oil Company | Methods program code, computer readable media, and apparatus for predicting matrix permeability by optimization and variance correction of K-nearest neighbors |
US9727928B2 (en) * | 2013-03-14 | 2017-08-08 | National Technology & Engineering Solutions Of Sandia, Llc | Financial methods for waterflooding injectate design |
US20160063150A1 (en) * | 2013-04-12 | 2016-03-03 | Schlumberger Technology Corporation | Enhanced oil recovery using digital core sample |
MY182947A (en) * | 2013-06-06 | 2021-02-05 | Shell Int Research | Deepwater low-rate appraisal production systems |
EP2811107A1 (en) * | 2013-06-06 | 2014-12-10 | Repsol, S.A. | Method for selecting and optimizing oil field controls for production plateau |
AU2014278645B2 (en) | 2013-06-10 | 2016-07-28 | Exxonmobil Upstream Research Company | Interactively planning a well site |
MX2015016558A (en) * | 2013-07-02 | 2016-05-16 | Landmark Graphics Corp | 3d stadia algorithm for discrete network meshing. |
EP2823952A1 (en) * | 2013-07-09 | 2015-01-14 | Siemens Aktiengesellschaft | Adaptation method and production method for components produced by means of SLM |
US20150032377A1 (en) * | 2013-07-29 | 2015-01-29 | Chevron U.S.A. Inc. | System and method for remaining resource mapping |
EP3033484B1 (en) * | 2013-08-13 | 2023-03-15 | Services Pétroliers Schlumberger | Digital core sensitivity analysis |
GB2531195B (en) * | 2013-08-16 | 2018-06-27 | Landmark Graphics Corp | Converting reserve estimates in a reservoir model to a standard format for dynamic comparison |
US10378329B2 (en) | 2013-08-20 | 2019-08-13 | Nabors Drilling Technologies Usa, Inc. | Rig control system and methods |
US10689965B2 (en) * | 2013-08-26 | 2020-06-23 | Repsol, S.A. | Field development plan selection system, method and program product |
US20150062300A1 (en) * | 2013-08-30 | 2015-03-05 | Halliburton Energy Services, Inc. | Wormhole Structure Digital Characterization and Stimulation |
US9864098B2 (en) | 2013-09-30 | 2018-01-09 | Exxonmobil Upstream Research Company | Method and system of interactive drill center and well planning evaluation and optimization |
US10570663B2 (en) * | 2013-10-03 | 2020-02-25 | Landmark Graphics Corporation | Automated range-based sensitivity analysis for hydrocarbon reservoir modeling |
US9569521B2 (en) | 2013-11-08 | 2017-02-14 | James W. Crafton | System and method for analyzing and validating oil and gas well production data |
CA2926788C (en) * | 2013-11-11 | 2022-09-13 | Halliburton Energy Services, Inc. | Designing wellbore completion intervals |
US10054712B2 (en) | 2013-12-30 | 2018-08-21 | Saudi Arabian Oil Company | Computer-implemented methods for reservoir simulation with automated well completions and reservoir grid data quality assurance |
CA2935421A1 (en) | 2014-01-06 | 2015-07-09 | Schlumberger Canada Limited | Multistage oilfield design optimization under uncertainty |
US9283674B2 (en) | 2014-01-07 | 2016-03-15 | Irobot Corporation | Remotely operating a mobile robot |
US10119396B2 (en) | 2014-02-18 | 2018-11-06 | Saudi Arabian Oil Company | Measuring behind casing hydraulic conductivity between reservoir layers |
US9417970B2 (en) * | 2014-02-27 | 2016-08-16 | Halliburton Energy Services, Inc. | Data file processing for a well job data archive |
WO2015138131A1 (en) * | 2014-03-11 | 2015-09-17 | Exxonmobil Upstream Research Company | Risk measure-based decision support tool for reservoir development |
RU2016129956A (en) * | 2014-03-12 | 2018-01-25 | Лэндмарк Графикс Корпорейшн | RATING CLASSIFICATION OF PLACES OF WELLS AMONG SHALE DEPOSITS |
US9957781B2 (en) | 2014-03-31 | 2018-05-01 | Hitachi, Ltd. | Oil and gas rig data aggregation and modeling system |
CN103953854B (en) * | 2014-04-02 | 2017-07-28 | 中国石油大学(北京) | Wax-containing oil pipe method for determining operation parameters and device |
US20160260181A1 (en) * | 2014-04-30 | 2016-09-08 | Landmark Graphics Corporation | Forecasting Production Data for Existing Wells and New Wells |
US20170067323A1 (en) * | 2014-05-07 | 2017-03-09 | King Abdullah University Of Science And Technology | Multi data reservoir history matching and uncertainty quantification framework |
US9945703B2 (en) | 2014-05-30 | 2018-04-17 | QRI Group, LLC | Multi-tank material balance model |
US11120371B2 (en) * | 2014-06-23 | 2021-09-14 | Sensia Netherlands B.V. | Systems and methods for cloud-based asset management and analysis regarding well devices |
FR3023316B1 (en) * | 2014-07-04 | 2016-08-19 | Ifp Energies Now | METHOD FOR OPERATING A PETROLEUM STORAGE FROM A WELL POSITIONING TECHNIQUE |
US9816366B2 (en) * | 2014-07-14 | 2017-11-14 | Saudi Arabian Oil Company | Methods, systems, and computer medium having computer programs stored thereon to optimize reservoir management decisions |
WO2016018723A1 (en) | 2014-07-30 | 2016-02-04 | Exxonmobil Upstream Research Company | Method for volumetric grid generation in a domain with heterogeneous material properties |
US10359523B2 (en) | 2014-08-05 | 2019-07-23 | Exxonmobil Upstream Research Company | Exploration and extraction method and system for hydrocarbons |
US10443358B2 (en) | 2014-08-22 | 2019-10-15 | Schlumberger Technology Corporation | Oilfield-wide production optimization |
US9951601B2 (en) | 2014-08-22 | 2018-04-24 | Schlumberger Technology Corporation | Distributed real-time processing for gas lift optimization |
US10508532B1 (en) | 2014-08-27 | 2019-12-17 | QRI Group, LLC | Efficient recovery of petroleum from reservoir and optimized well design and operation through well-based production and automated decline curve analysis |
WO2016046455A1 (en) * | 2014-09-25 | 2016-03-31 | Total S.A. | Production of hydrocarbons with test separator |
DK3198113T3 (en) * | 2014-09-25 | 2020-07-13 | Total Sa | PRODUCTION OF CARBOHYDRIDS WITH MEASUREMENT COUNTER |
WO2016053238A1 (en) * | 2014-09-29 | 2016-04-07 | Hewlett Packard Enterprise Development Lp | Seismic based fracking fluid disposal |
US10331288B2 (en) * | 2014-10-02 | 2019-06-25 | Schlumberger Technology Corporation | Method and system for generating oilfield objects |
US10221659B2 (en) * | 2014-10-08 | 2019-03-05 | Chevron U.S.A. Inc. | Automated well placement for reservoir evaluation |
US10288766B2 (en) * | 2014-10-09 | 2019-05-14 | Chevron U.S.A. Inc. | Conditioning of object or event based reservior models using local multiple-point statistics simulations |
AU2015339883B2 (en) | 2014-10-31 | 2018-03-29 | Exxonmobil Upstream Research Company | Methods to handle discontinuity in constructing design space for faulted subsurface model using moving least squares |
US10803534B2 (en) | 2014-10-31 | 2020-10-13 | Exxonmobil Upstream Research Company | Handling domain discontinuity with the help of grid optimization techniques |
EP3213127A1 (en) | 2014-10-31 | 2017-09-06 | Exxonmobil Upstream Research Company | Managing discontinuities in geologic models |
GB2547128B (en) * | 2014-11-26 | 2021-03-03 | Halliburton Energy Services Inc | Determining depth of loss zones in subterranean formations |
KR101639693B1 (en) * | 2014-11-28 | 2016-07-14 | 공주대학교 산학협력단 | Method for estimating recovery factor of carbonate reservoirs and method for assessing carbonate reservoirs using thereof |
RU2597229C2 (en) * | 2014-12-09 | 2016-09-10 | Общество с ограниченной ответственностью "ТатАСУ" | System for identification of inter-well conductivities |
US10392922B2 (en) | 2015-01-13 | 2019-08-27 | Saudi Arabian Oil Company | Measuring inter-reservoir cross flow rate between adjacent reservoir layers from transient pressure tests |
US10815758B2 (en) * | 2015-01-16 | 2020-10-27 | Schlumberger Technology Corporation | Oilfield service selector |
US10180057B2 (en) | 2015-01-21 | 2019-01-15 | Saudi Arabian Oil Company | Measuring inter-reservoir cross flow rate through unintended leaks in zonal isolation cement sheaths in offset wells |
US10401808B2 (en) * | 2015-01-28 | 2019-09-03 | Schlumberger Technology Corporation | Methods and computing systems for processing and transforming collected data to improve drilling productivity |
US10934812B2 (en) * | 2015-01-30 | 2021-03-02 | Landmark Graphics Corporation | Integrated a priori uncertainty parameter architecture in simulation model creation |
US20180032356A1 (en) * | 2015-02-03 | 2018-02-01 | Schlumberger Technology Corporation | Enhanced Oil Recovery (EOR) Chemical Coreflood Simulation Study Workflow |
US10094202B2 (en) | 2015-02-04 | 2018-10-09 | Saudi Arabian Oil Company | Estimating measures of formation flow capacity and phase mobility from pressure transient data under segregated oil and water flow conditions |
KR101647921B1 (en) * | 2015-03-27 | 2016-08-12 | 서울대학교산학협력단 | Method for selecting model similar to real gas production and method for predicting gas production from oil and gas reservoir |
AR104396A1 (en) * | 2015-04-24 | 2017-07-19 | W D Von Gonten Laboratories Llc | SIDE POSITIONING AND COMPLETE DESIGN FOR IMPROVED WELL PERFORMANCE OF UNCONVENTIONAL RESERVES |
KR101658730B1 (en) * | 2015-05-22 | 2016-09-22 | 동아대학교 산학협력단 | Method for optimal design of aquifer injection-pumping system |
RU2017145776A (en) * | 2015-06-05 | 2019-07-09 | Репсоль, С.А. | METHOD OF CREATING A STRATEGY FOR PRODUCTION TO DEVELOP A HYDROCARBON PLAY IN THE NATURAL ENVIRONMENT |
CN105257252A (en) * | 2015-06-08 | 2016-01-20 | 中国石油集团川庆钻探工程有限公司 | Method for optimally selecting shale gas horizontal well clustering perforation well section by utilizing logging data |
US10502047B2 (en) * | 2015-06-30 | 2019-12-10 | Magnetic Variation Services LLC | Reservoir recovery simulation process and system |
CN106353804B (en) * | 2015-07-14 | 2018-11-23 | 中国石油化工股份有限公司 | The prediction technique of the seismic properties of river reservoir |
EP3329085A4 (en) | 2015-07-31 | 2019-05-15 | Services Petroliers Schlumberger | A method and apparatus of determining a state of a system |
US10563914B2 (en) * | 2015-08-06 | 2020-02-18 | L'air Liquide Societe Anonyme Pour L'etude Et L'exploitation Des Procedes Georges Claude | Methods and systems for integration of industrial site efficiency losses to produce LNG and/or LIN |
WO2017027068A1 (en) * | 2015-08-07 | 2017-02-16 | Schlumberger Technology Corporation | Well management on cloud computing system |
WO2017039660A1 (en) * | 2015-09-02 | 2017-03-09 | Hitachi, Ltd. | A method to compute composite distance matrix from a multitude of data attributes |
CN105372716B (en) * | 2015-10-28 | 2018-03-23 | 中国石油大学(华东) | The evaluation method of carbonate rock table life karst reservoir distribution |
US10337315B2 (en) * | 2015-11-25 | 2019-07-02 | International Business Machines Corporation | Methods and apparatus for computing zonal flow rates in reservoir wells |
WO2017106867A1 (en) * | 2015-12-18 | 2017-06-22 | Schlumberger Technology Corporation | Method of performing a perforation using selective stress logging |
JP6461779B2 (en) * | 2015-12-21 | 2019-01-30 | 株式会社日立製作所 | Plan adjustment system and plan adjustment method |
KR101766917B1 (en) * | 2015-12-23 | 2017-08-11 | 한국지질자원연구원 | Apparatus and method for evaluating economics of bitumen |
WO2017120447A1 (en) * | 2016-01-08 | 2017-07-13 | Nature Conservancy, The | Techniques for positioning energy infrastructure |
CN105719097A (en) * | 2016-01-27 | 2016-06-29 | 中国石油化工股份有限公司 | Dynamic analysis and waterflooding management system of fractured-vuggy type reservoir |
US10613488B2 (en) | 2016-02-18 | 2020-04-07 | General Electric Co. | System and method for generating a schedule to extract a resource fluid from a reservoir |
US10450511B2 (en) * | 2016-02-23 | 2019-10-22 | Suncor Energy Inc. | Production of hydrocarbon product and selective rejection of low quality hydrocarbons from bitumen material |
WO2017151838A1 (en) * | 2016-03-04 | 2017-09-08 | Saudi Arabian Oil Company | Sequential fully implicit well model with tridiagonal matrix structure for reservoir simulation |
WO2017165949A1 (en) * | 2016-03-30 | 2017-10-05 | Nexen Energy Ulc | Methods, systems and devices for modelling reservoir properties |
US10713398B2 (en) | 2016-05-23 | 2020-07-14 | Saudi Arabian Oil Company | Iterative and repeatable workflow for comprehensive data and processes integration for petroleum exploration and production assessments |
RU2636821C1 (en) * | 2016-05-27 | 2017-11-28 | Шлюмберже Текнолоджи Б.В. | Method for determination of mechanical properties of reservoir rock |
AU2017272367A1 (en) * | 2016-06-02 | 2018-12-06 | Baker Hughes Esp, Inc. | System and method for well lifecycle planning visualization |
US10458207B1 (en) | 2016-06-09 | 2019-10-29 | QRI Group, LLC | Reduced-physics, data-driven secondary recovery optimization |
US10590752B2 (en) | 2016-06-13 | 2020-03-17 | Saudi Arabian Oil Company | Automated preventive and predictive maintenance of downhole valves |
US10060227B2 (en) | 2016-08-02 | 2018-08-28 | Saudi Arabian Oil Company | Systems and methods for developing hydrocarbon reservoirs |
CN106295210B (en) * | 2016-08-16 | 2018-10-23 | 中国石油化工股份有限公司 | A kind of quantitative evaluation method and system for carrying out reserves blank tape Exploration Potential |
MY197826A (en) * | 2016-10-19 | 2023-07-19 | Halliburton Energy Services Inc | Avoiding geological formation boundaries during drilling operations |
US10678967B2 (en) * | 2016-10-21 | 2020-06-09 | International Business Machines Corporation | Adaptive resource reservoir development |
CA3039470C (en) | 2016-12-07 | 2022-03-29 | Landmark Graphics Corporation | Intelligent, real-time response to changes in oilfield equilibrium |
HUE064459T2 (en) | 2016-12-23 | 2024-03-28 | Exxonmobil Technology & Engineering Company | Method and system for stable and efficient reservoir simulation using stability proxies |
CN106640084B (en) * | 2017-01-25 | 2018-05-01 | 中国地质大学(武汉) | A kind of deep intelligence mining methods based on GGD theories |
US11137514B2 (en) * | 2017-03-29 | 2021-10-05 | International Business Machines Corporation | Method for determining a drilling plan for a plurality of new wells in a reservoir |
CN108729911A (en) * | 2017-04-24 | 2018-11-02 | 通用电气公司 | Optimization devices, systems, and methods for resource production system |
WO2018210925A1 (en) * | 2017-05-16 | 2018-11-22 | Bp Corporation North America Inc | Tools for selecting and sequencing operating parameter changes to control a hydrocarbon production system |
US11041976B2 (en) | 2017-05-30 | 2021-06-22 | Exxonmobil Upstream Research Company | Method and system for creating and using a subsurface model in hydrocarbon operations |
US10612370B2 (en) | 2017-08-01 | 2020-04-07 | Saudi Arabian Oil Company | Open smart completion |
AU2018317320B2 (en) * | 2017-08-15 | 2021-10-21 | Exxonmobil Upstream Research Company | Reservoir materiality bounds from seismic inversion |
KR101819957B1 (en) | 2017-09-15 | 2018-01-19 | 한국지질자원연구원 | Shale gas sampling device and that sample method |
CN107762461B (en) * | 2017-09-20 | 2019-09-06 | 中国石油天然气股份有限公司 | A kind of polymer flooding oil-extraction technical risk evaluation method |
US10597988B2 (en) * | 2017-11-28 | 2020-03-24 | Saudi Arabian Oil Company | Systems and methods for operating downhole inflow control valves |
RU2670801C9 (en) * | 2017-12-29 | 2018-11-26 | Публичное акционерное общество "Газпром нефть" | System of integrated conceptual design of hydrocarbon fields |
US11346215B2 (en) | 2018-01-23 | 2022-05-31 | Baker Hughes Holdings Llc | Methods of evaluating drilling performance, methods of improving drilling performance, and related systems for drilling using such methods |
CN110068862B (en) * | 2018-01-24 | 2021-03-30 | 中国石油天然气股份有限公司 | Prediction method and device for high-quality reservoir of salt ultra-deep fractured anticline oil and gas reservoir |
US11126762B2 (en) | 2018-02-28 | 2021-09-21 | Saudi Arabian Oil Company | Locating new hydrocarbon fields and predicting reservoir performance from hydrocarbon migration |
US11466554B2 (en) | 2018-03-20 | 2022-10-11 | QRI Group, LLC | Data-driven methods and systems for improving oil and gas drilling and completion processes |
US10914140B2 (en) | 2018-04-04 | 2021-02-09 | Sim Tech Llc | Systems, methods, and apparatus for discrete fracture simulation of complex subsurface fracture geometries |
US11506052B1 (en) | 2018-06-26 | 2022-11-22 | QRI Group, LLC | Framework and interface for assessing reservoir management competency |
US20200059539A1 (en) * | 2018-08-20 | 2020-02-20 | Landmark Graphics Corporation | Cloud-native reservoir simulation |
US20210374638A1 (en) * | 2018-09-19 | 2021-12-02 | Schlumberger Technology Corporation | Plan deviations visualization and interpretation |
WO2020065374A1 (en) * | 2018-09-25 | 2020-04-02 | Abu Dhabi National Oil Company | Integrated reservoir management system |
US11321788B2 (en) * | 2018-10-22 | 2022-05-03 | Schlumberger Technology Corporation | Systems and methods for rig scheduling with optimal fleet sizing |
CN109268005A (en) * | 2018-10-30 | 2019-01-25 | 中国石油大学(华东) | A kind of Method for Remaining Oil Prediction and industrialization process based on reservoir time variation |
US11506805B2 (en) | 2018-12-07 | 2022-11-22 | Sim Tech Llc | Systems, methods, and apparatus for transient flow simulation in complex subsurface fracture geometries |
US11499425B2 (en) * | 2018-12-12 | 2022-11-15 | Halliburton Energy Services, Inc. | Borehole gravity analysis for reservoir management |
US10808517B2 (en) | 2018-12-17 | 2020-10-20 | Baker Hughes Holdings Llc | Earth-boring systems and methods for controlling earth-boring systems |
KR102597540B1 (en) | 2018-12-21 | 2023-11-03 | 동아대학교 산학협력단 | Flowline network optimization method considering gas well productivity using artificial neural network |
US11180976B2 (en) | 2018-12-21 | 2021-11-23 | Exxonmobil Upstream Research Company | Method and system for unconventional gas lift optimization |
US20200211127A1 (en) * | 2018-12-31 | 2020-07-02 | Exxonmobil Upstream Research Company | Methods and Systems for Performing Decision Scenario Analysis |
US11441556B2 (en) * | 2019-04-12 | 2022-09-13 | Accenture Global Solutions Limited | Utilizing analytical models to identify wells in which to install plunger lift for improved well production |
GB2596943A (en) * | 2019-04-25 | 2022-01-12 | Landmark Graphics Corp | Systems and methods for determining grid cell count for reservoir simulation |
US11105944B2 (en) * | 2019-04-30 | 2021-08-31 | Chevron U.S.A. Inc. | System and method for lateral statistical estimation of rock and fluid properties in a subsurface formation |
US20220220828A1 (en) * | 2019-06-21 | 2022-07-14 | Schlumberger Technology Corporation | Field development planning based on deep reinforcement learning |
US11487032B2 (en) * | 2019-07-16 | 2022-11-01 | Saudi Arabian Oil Company | Characterizing low-permeability reservoirs by using numerical models of short-time well test data |
CN110609319B (en) * | 2019-08-20 | 2021-12-10 | 中国石油大学(华东) | Method for establishing time domain sequence stratigraphic section by using forward modeling of sedimentation |
US11591936B2 (en) | 2019-09-04 | 2023-02-28 | Saudi Arabian Oil Company | Systems and methods for proactive operation of process facilities based on historical operations data |
US11372123B2 (en) | 2019-10-07 | 2022-06-28 | Exxonmobil Upstream Research Company | Method for determining convergence in full wavefield inversion of 4D seismic data |
CN110700821B (en) * | 2019-10-24 | 2023-03-07 | 中国海洋石油集团有限公司 | Offshore reservoir connectivity evaluation method and application thereof in reserve calculation |
US11442974B2 (en) * | 2019-11-01 | 2022-09-13 | Chevron U.S.A. Inc. | Aggregation and presentation of information for well analysis |
CN110821453B (en) * | 2019-11-07 | 2021-11-23 | 成都北方石油勘探开发技术有限公司 | Gas injection oil reservoir development scheme design method based on three-dimensional geological numerical model |
CA3204793A1 (en) * | 2019-11-25 | 2021-06-03 | Cold Bore Technology Inc. | Automated detection of plug and perforate completions, wellheads and wellsite operation status |
US11846278B2 (en) * | 2019-12-31 | 2023-12-19 | Schneider Electric Systems Usa, Inc. | Systems and methods for centralized optimization of reservoir production |
US11754746B2 (en) | 2020-02-21 | 2023-09-12 | Saudi Arabian Oil Company | Systems and methods for creating 4D guided history matched models |
US11668165B2 (en) * | 2020-03-04 | 2023-06-06 | Saudi Arabian Oil Company | Method and system for simulating well performance using wellhead measurements |
US11815650B2 (en) | 2020-04-09 | 2023-11-14 | Saudi Arabian Oil Company | Optimization of well-planning process for identifying hydrocarbon reserves using an integrated multi-dimensional geological model |
US11486230B2 (en) * | 2020-04-09 | 2022-11-01 | Saudi Arabian Oil Company | Allocating resources for implementing a well-planning process |
US11693140B2 (en) | 2020-04-09 | 2023-07-04 | Saudi Arabian Oil Company | Identifying hydrocarbon reserves of a subterranean region using a reservoir earth model that models characteristics of the region |
US11180982B2 (en) | 2020-04-21 | 2021-11-23 | Saudi Arabian Oil Company | Systems and methods to safeguard well integrity from hydraulic fracturing |
US11231520B2 (en) | 2020-05-06 | 2022-01-25 | Saudi Arabian Oil Company | Dynamic hydrocarbon well skin modeling and operation |
US11549359B2 (en) * | 2020-05-11 | 2023-01-10 | Saudi Arabian Oil Company | Systems and methods to identify and quantify field development opportunities through integration of surface and sub-surface data |
US11802989B2 (en) * | 2020-05-11 | 2023-10-31 | Saudi Arabian Oil Company | Systems and methods for generating vertical and lateral heterogeneity indices of reservoirs |
US11352873B2 (en) | 2020-05-11 | 2022-06-07 | Saudi Arabian Oil Company | System and method to identify water management candidates at asset level |
US11713666B2 (en) | 2020-05-11 | 2023-08-01 | Saudi Arabian Oil Company | Systems and methods for determining fluid saturation associated with reservoir depths |
US11867054B2 (en) | 2020-05-11 | 2024-01-09 | Saudi Arabian Oil Company | Systems and methods for estimating well parameters and drilling wells |
US11193370B1 (en) | 2020-06-05 | 2021-12-07 | Saudi Arabian Oil Company | Systems and methods for transient testing of hydrocarbon wells |
US11320555B2 (en) | 2020-06-08 | 2022-05-03 | Sim Tech Llc | Systems and methods for calibration of indeterministic subsurface discrete fracture network models |
RU2738558C1 (en) * | 2020-06-10 | 2020-12-14 | Публичное акционерное общество «Татнефть» имени В.Д. Шашина | Method for development of low-permeability headers |
US11692415B2 (en) | 2020-06-22 | 2023-07-04 | Saudi Arabian Oil Company | Hydrocarbon well stimulation based on skin profiles |
US11790320B2 (en) * | 2020-06-25 | 2023-10-17 | Schlumberger Technology Corporation | Approaches to creating and evaluating multiple candidate well plans |
US11341830B2 (en) | 2020-08-06 | 2022-05-24 | Saudi Arabian Oil Company | Infrastructure construction digital integrated twin (ICDIT) |
CN111946311B (en) * | 2020-08-13 | 2022-04-22 | 海默潘多拉数据科技(深圳)有限公司 | Separated injection and production simulation method |
CN111878074A (en) * | 2020-08-24 | 2020-11-03 | 西南石油大学 | Optimization method of shale oil reservoir development scheme |
CN111794743B (en) * | 2020-08-28 | 2022-10-21 | 四川长宁天然气开发有限责任公司 | Shale gas well engineering tracking deduction method |
CN112199456B (en) * | 2020-09-17 | 2022-03-25 | 西南科技大学 | Basin water resource management method based on supply type hydrological ecosystem service |
RU2758278C1 (en) * | 2020-12-07 | 2021-10-28 | Общество С Ограниченной Ответственностью "Газпром Добыча Надым" | Method for natural gas production at late stage of field development |
US11668847B2 (en) | 2021-01-04 | 2023-06-06 | Saudi Arabian Oil Company | Generating synthetic geological formation images based on rock fragment images |
CN112727440B (en) * | 2021-01-11 | 2022-02-01 | 西南石油大学 | Reservoir identification method of fracture-cavity oil and gas reservoir based on drilling time data |
US20220228483A1 (en) * | 2021-01-20 | 2022-07-21 | Saudi Arabian Oil Company | Systems and methods for updating reservoir static models |
US11687053B2 (en) | 2021-03-08 | 2023-06-27 | Saudi Arabian Oil Company | Intelligent safety motor control center (ISMCC) |
US11674379B2 (en) | 2021-03-11 | 2023-06-13 | Saudi Arabian Oil Company | Method and system for managing gas supplies |
CN113065705B (en) * | 2021-04-07 | 2023-12-08 | 中海石油(中国)有限公司 | Multi-layer production encryption well recoverable reserve prediction method for offshore thin interbed sandstone reservoir |
CN112983397B (en) * | 2021-05-14 | 2021-09-14 | 西南石油大学 | Physical simulation device for scaling ion source of high-temperature high-pressure water producing gas well |
US11680480B2 (en) | 2021-05-25 | 2023-06-20 | Saudi Arabian Oil Company | Multi-layer gas reservoir field development system and method |
US11905807B2 (en) | 2021-06-30 | 2024-02-20 | Saudi Arabian Oil Company | Workflow to model and condition water distribution in a hydrocarbon reservoir |
US11613957B1 (en) | 2022-01-28 | 2023-03-28 | Saudi Arabian Oil Company | Method and system for high shut-in pressure wells |
US11913333B2 (en) | 2022-02-08 | 2024-02-27 | Saudi Arabian Oil Company | Determination of three-phase fluid saturations from production and pressure measurements from a well |
US20230351527A1 (en) * | 2022-04-28 | 2023-11-02 | Conocophillips Company | Integrated development optimization platform for well sequencing and unconventional reservoir management |
WO2024006412A1 (en) * | 2022-06-30 | 2024-01-04 | Schlumberger Technology Corporation | Systems and methods for optimizing hydraulic fracturing |
CN115759786A (en) * | 2022-12-09 | 2023-03-07 | 昆仑数智科技有限责任公司 | Method, device, equipment and storage medium for determining oil and gas reservoir development scheme |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5148365A (en) * | 1989-08-15 | 1992-09-15 | Dembo Ron S | Scenario optimization |
US5764515A (en) * | 1995-05-12 | 1998-06-09 | Institute Francais Du Petrole | Method for predicting, by means of an inversion technique, the evolution of the production of an underground reservoir |
US6266619B1 (en) * | 1999-07-20 | 2001-07-24 | Halliburton Energy Services, Inc. | System and method for real time reservoir management |
Family Cites Families (34)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4501325A (en) * | 1981-09-25 | 1985-02-26 | Texaco Inc. | Method for predicting workovers and shut-ins from analyzing the annulus effluent of a well |
US4435756A (en) | 1981-12-03 | 1984-03-06 | Burroughs Corporation | Branch predicting computer |
US4633954A (en) | 1983-12-05 | 1987-01-06 | Otis Engineering Corporation | Well production controller system |
FR2582048B1 (en) | 1985-05-15 | 1988-09-16 | Elf Aquitaine | DEVICE FOR CONTROLLING AND MONITORING A WELL HEAD UNDERWATER IN A LIQUID |
FR2652180B1 (en) | 1989-09-20 | 1991-12-27 | Mallet Jean Laurent | METHOD FOR MODELING A SURFACE AND DEVICE FOR IMPLEMENTING SAME. |
US4969130A (en) | 1989-09-29 | 1990-11-06 | Scientific Software Intercomp, Inc. | System for monitoring the changes in fluid content of a petroleum reservoir |
US5132904A (en) | 1990-03-07 | 1992-07-21 | Lamp Lawrence R | Remote well head controller with secure communications port |
US5305209A (en) | 1991-01-31 | 1994-04-19 | Amoco Corporation | Method for characterizing subterranean reservoirs |
JP3183886B2 (en) * | 1991-12-16 | 2001-07-09 | アンスティテュ フランセ デュ ペトロール | Stationary device for active and / or passive monitoring of underground deposits |
US5251286A (en) * | 1992-03-16 | 1993-10-05 | Texaco, Inc. | Method for estimating formation permeability from wireline logs using neural networks |
JPH06167406A (en) * | 1992-11-27 | 1994-06-14 | Oyo Corp | Differential pressure type pressure change measuring device |
US5444619A (en) * | 1993-09-27 | 1995-08-22 | Schlumberger Technology Corporation | System and method of predicting reservoir properties |
FR2712626B1 (en) | 1993-11-17 | 1996-01-05 | Schlumberger Services Petrol | Method and device for monitoring and controlling land formations constituting a reservoir of fluids. |
FR2712627B1 (en) | 1993-11-17 | 1996-01-05 | Schlumberger Services Petrol | Method and device for monitoring and / or studying a hydrocarbon reservoir crossed by a well. |
US5905036A (en) | 1995-01-23 | 1999-05-18 | Board Of Regents, The University Of Texas System | Characterization of organic contaminants and assessment of remediation performance in subsurface formations |
GB2333791B (en) | 1995-02-09 | 1999-09-08 | Baker Hughes Inc | A remotely actuated tool stop |
US5732776A (en) | 1995-02-09 | 1998-03-31 | Baker Hughes Incorporated | Downhole production well control system and method |
US5730219A (en) | 1995-02-09 | 1998-03-24 | Baker Hughes Incorporated | Production wells having permanent downhole formation evaluation sensors |
US5706896A (en) | 1995-02-09 | 1998-01-13 | Baker Hughes Incorporated | Method and apparatus for the remote control and monitoring of production wells |
US5829520A (en) | 1995-02-14 | 1998-11-03 | Baker Hughes Incorporated | Method and apparatus for testing, completion and/or maintaining wellbores using a sensor device |
US5586082A (en) | 1995-03-02 | 1996-12-17 | The Trustees Of Columbia University In The City Of New York | Method for identifying subsurface fluid migration and drainage pathways in and among oil and gas reservoirs using 3-D and 4-D seismic imaging |
JPH0946833A (en) * | 1995-08-03 | 1997-02-14 | Toshiba Corp | Transforming facility |
US5794210A (en) | 1995-12-11 | 1998-08-11 | Cybergold, Inc. | Attention brokerage |
FR2742794B1 (en) | 1995-12-22 | 1998-01-30 | Inst Francais Du Petrole | METHOD FOR MODELING THE EFFECTS OF WELL INTERACTIONS ON THE AQUEOUS FRACTION PRODUCED BY AN UNDERGROUND HYDROCARBON DEPOSIT |
US5946662A (en) | 1996-03-29 | 1999-08-31 | International Business Machines Corporation | Method for providing inventory optimization |
US5823262A (en) | 1996-04-10 | 1998-10-20 | Micro Motion, Inc. | Coriolis pump-off controller |
US5798982A (en) | 1996-04-29 | 1998-08-25 | The Trustees Of Columbia University In The City Of New York | Method for inverting reflection trace data from 3-D and 4-D seismic surveys and identifying subsurface fluid and pathways in and among hydrocarbon reservoirs based on impedance models |
US5897620A (en) | 1997-07-08 | 1999-04-27 | Priceline.Com Inc. | Method and apparatus for the sale of airline-specified flight tickets |
CN1224515A (en) | 1997-02-21 | 1999-07-28 | 贝克·休斯公司 | Adaptive object-oriented optimization software system |
US6002985A (en) * | 1997-05-06 | 1999-12-14 | Halliburton Energy Services, Inc. | Method of controlling development of an oil or gas reservoir |
US5841280A (en) | 1997-06-24 | 1998-11-24 | Western Atlas International, Inc. | Apparatus and method for combined acoustic and seismoelectric logging measurements |
US5992519A (en) | 1997-09-29 | 1999-11-30 | Schlumberger Technology Corporation | Real time monitoring and control of downhole reservoirs |
US6549879B1 (en) * | 1999-09-21 | 2003-04-15 | Mobil Oil Corporation | Determining optimal well locations from a 3D reservoir model |
GB2382408B (en) * | 2000-06-19 | 2004-06-02 | Halliburton Energy Systems Inc | Apparatus and methods for applying time lapse VSP to monitor a reservoir |
-
2000
- 2000-09-12 US US09/659,951 patent/US6980940B1/en not_active Expired - Lifetime
-
2001
- 2001-02-14 EP EP06008449A patent/EP1679424A3/en not_active Withdrawn
- 2001-02-14 EP EP06008431A patent/EP1684096A3/en not_active Withdrawn
- 2001-02-14 RU RU2002122397/03A patent/RU2281384C2/en not_active IP Right Cessation
- 2001-02-14 CA CA002605860A patent/CA2605860A1/en not_active Abandoned
- 2001-02-14 BR BRBR122013023833-6A patent/BR122013023833B1/en not_active IP Right Cessation
- 2001-02-14 CN CNA2007101849059A patent/CN101221634A/en active Pending
- 2001-02-14 CA CA002602280A patent/CA2602280A1/en not_active Abandoned
- 2001-02-14 JP JP2001561626A patent/JP4593051B2/en not_active Expired - Fee Related
- 2001-02-14 CN CN01807228A patent/CN1419677A/en active Pending
- 2001-02-14 KZ KZ20021550A patent/KZ19059A/xx unknown
- 2001-02-14 MX MXPA02008197A patent/MXPA02008197A/en active IP Right Grant
- 2001-02-14 AT AT01907207T patent/ATE324327T1/en active
- 2001-02-14 BR BRBR122013023852-2A patent/BR122013023852B1/en not_active IP Right Cessation
- 2001-02-14 DE DE60119087T patent/DE60119087D1/en not_active Expired - Lifetime
- 2001-02-14 EP EP06008430A patent/EP1691032A3/en not_active Withdrawn
- 2001-02-14 EP EP01907207A patent/EP1263653B1/en not_active Expired - Lifetime
- 2001-02-14 AU AU2001235010A patent/AU2001235010A1/en not_active Abandoned
- 2001-02-14 SG SG200407253A patent/SG127743A1/en unknown
- 2001-02-14 KR KR1020027011007A patent/KR100756684B1/en not_active IP Right Cessation
- 2001-02-14 EP EP06008415A patent/EP1701001A1/en not_active Withdrawn
- 2001-02-14 WO PCT/US2001/004620 patent/WO2001062603A2/en active IP Right Grant
- 2001-02-14 BR BRPI0108571A patent/BRPI0108571B1/en not_active IP Right Cessation
- 2001-02-14 EP EP06008414A patent/EP1691031A3/en not_active Withdrawn
- 2001-02-14 CA CA002400796A patent/CA2400796A1/en not_active Abandoned
-
2002
- 2002-08-16 NO NO20023904A patent/NO333783B1/en not_active IP Right Cessation
-
2005
- 2005-03-02 US US11/070,457 patent/US7478024B2/en not_active Expired - Fee Related
-
2007
- 2007-03-05 US US11/714,033 patent/US7953585B2/en not_active Expired - Lifetime
- 2007-10-26 US US11/978,062 patent/US7739089B2/en not_active Expired - Fee Related
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5148365A (en) * | 1989-08-15 | 1992-09-15 | Dembo Ron S | Scenario optimization |
US5764515A (en) * | 1995-05-12 | 1998-06-09 | Institute Francais Du Petrole | Method for predicting, by means of an inversion technique, the evolution of the production of an underground reservoir |
US6266619B1 (en) * | 1999-07-20 | 2001-07-24 | Halliburton Energy Services, Inc. | System and method for real time reservoir management |
Non-Patent Citations (3)
Title |
---|
IVANENKO B. ET AL.: "Application of neural networks for analysis, imitation modelling and optimal control of oil fields", PROCEEDINGS OF THE 4TH KOREA-RUSSIA INT'L SYMPOSIUM ON SCIENCE AND TECHNOLOGY, 2000, pages 17 - 20, XP002908186 * |
OSTEBO R.: "System-effectiveness assessment in offshore field development using life-cycle performance simulation", RELIABILITY AND MAINTAINABILITY SYMPOSIUM, PROCEEDINGS, 1993, pages 375 - 385, XP010110150 * |
ULLO J.: "Recent developments in siesmic exploration and reservoir characterization", ULTRASONICS SYMPOSIUM, IEEE, PROCEEDINGS, vol. 1, 1997, pages 787 - 796, XP010271271 * |
Also Published As
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2001062603A3 (en) | Integrated reservoir optimization | |
WO2002077782A3 (en) | Method, system and storage medium for an iconic language communication tool | |
AU2001257519A1 (en) | Methods, systems and computer program for use of a hash-ordered database | |
WO2001082068A8 (en) | Methods and systems for identifying dependencies between object-oriented elements | |
CA2270162A1 (en) | Deformed multiple well template and process of use | |
IT1314010B1 (en) | NMR TOOL WITHIN A DRILLING HOLE WITH A PROGRAMMABLE IMPULSE SEQUENCER. | |
WO1998033104A3 (en) | Method and apparatus for attribute selection | |
EP1020808A3 (en) | System and method for integrating schedule and design environments | |
WO2004013723A3 (en) | Model and parameter selection for optical metrology | |
EP0757156A3 (en) | Shifting tool for a subterranean completion structure | |
WO2006111973A3 (en) | A three dimensional optical information carrier and a method of manufacturing thereof | |
WO2003058022A3 (en) | Seal receptacle using expandable liner hanger | |
AU2001276316A1 (en) | Method for linking geographical and commercial data and providing the same | |
AU2001251527A1 (en) | Framework for creation, update, query, and view navigation of data objects and textual annotations of relations between data objects | |
WO2002091004A3 (en) | Test and on-board programming station | |
EP1073000A3 (en) | Produce recognition system and method | |
CA2326340A1 (en) | Valve for pressurized containers | |
EP1237318A3 (en) | A latch control for crossing clock domains | |
AU2001261838A1 (en) | Method and system for self-replicating manufacturing stations | |
HUP0301970A3 (en) | Method for providing an additional use of a consumer item, consumer item and database | |
ZA200107319B (en) | An optical feature, in particular for documents of value, and a manufacturing method for the later individualisation or data storage. | |
Ehrlich et al. | Data mining is key strategy for next cycle of North American exploration | |
NO20033024D0 (en) | Data transmission in pipeline systems | |
AU2001274168A1 (en) | Method for structuring, transferring and interpreting a data set for designing graphic interfaces | |
AU2002216013A1 (en) | Method for exchanging data between a first data processing device and a second data processing device, device for carrying out this method, computer program for carrying out the same, and data carrier on which this computer program is stored |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AK | Designated states |
Kind code of ref document: A2 Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BY BZ CA CH CN CR CU CZ DE DK DM DZ EE ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NO NZ PL PT RO RU SD SE SG SI SK SL TJ TM TR TT TZ UA UG UZ VN YU ZA ZW |
|
AL | Designated countries for regional patents |
Kind code of ref document: A2 Designated state(s): GH GM KE LS MW MZ SD SL SZ TZ UG ZW AM AZ BY KG KZ MD RU TJ TM AT BE CH CY DE DK ES FI FR GB GR IE IT LU MC NL PT SE TR BF BJ CF CG CI CM GA GN GW ML MR NE SN TD TG |
|
121 | Ep: the epo has been informed by wipo that ep was designated in this application | ||
AK | Designated states |
Kind code of ref document: A3 Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BY BZ CA CH CN CR CU CZ DE DK DM DZ EE ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NO NZ PL PT RO RU SD SE SG SI SK SL TJ TM TR TT TZ UA UG UZ VN YU ZA ZW |
|
AL | Designated countries for regional patents |
Kind code of ref document: A3 Designated state(s): GH GM KE LS MW MZ SD SL SZ TZ UG ZW AM AZ BY KG KZ MD RU TJ TM AT BE CH CY DE DK ES FI FR GB GR IE IT LU MC NL PT SE TR BF BJ CF CG CI CM GA GN GW ML MR NE SN TD TG |
|
REG | Reference to national code |
Ref country code: DE Ref legal event code: 8642 |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2400796 Country of ref document: CA Ref document number: 2001235010 Country of ref document: AU |
|
DFPE | Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101) | ||
ENP | Entry into the national phase |
Ref document number: 2001 561626 Country of ref document: JP Kind code of ref document: A |
|
WWE | Wipo information: entry into national phase |
Ref document number: PA/a/2002/008197 Country of ref document: MX Ref document number: 1020027011007 Country of ref document: KR |
|
ENP | Entry into the national phase |
Ref document number: 2002 2002122397 Country of ref document: RU Kind code of ref document: A |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2001907207 Country of ref document: EP |
|
WWE | Wipo information: entry into national phase |
Ref document number: 018072283 Country of ref document: CN |
|
WWP | Wipo information: published in national office |
Ref document number: 2001907207 Country of ref document: EP |
|
WWP | Wipo information: published in national office |
Ref document number: 1020027011007 Country of ref document: KR |
|
WWG | Wipo information: grant in national office |
Ref document number: 2001907207 Country of ref document: EP |