WO2004018839A2 - Fluid flow control device and method for use of same - Google Patents
Fluid flow control device and method for use of same Download PDFInfo
- Publication number
- WO2004018839A2 WO2004018839A2 PCT/US2003/024003 US0324003W WO2004018839A2 WO 2004018839 A2 WO2004018839 A2 WO 2004018839A2 US 0324003 W US0324003 W US 0324003W WO 2004018839 A2 WO2004018839 A2 WO 2004018839A2
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- fluid flow
- openings
- sleeve
- recited
- base pipe
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
- E21B43/08—Screens or liners
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/12—Methods or apparatus for controlling the flow of the obtained fluid to or in wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/09—Locating or determining the position of objects in boreholes or wells, e.g. the position of an extending arm; Identifying the free or blocked portions of pipes
Definitions
- This invention relates, in general, to controlling the inflow of formation fluids from a well that traverses a hydrocarbon bearing subterranean formation and, in particular, to a fluid flow control device for controlling the inflow of formation fluids and a method for use of the same.
- each section of the casing string is cemented within the wellbore before the next section of the wellbore is drilled.
- the completion process comprises numerous steps including creating hydraulic openings or perforations through the production casing string, the cement and a short distance into the desired formation or formations so that production fluids may enter the interior of the wellbore.
- the completion process may also include installing a production tubing string within the well casing which is used to produce the well by providing the conduit for formation fluids to travel from the formation depth to the surface.
- a production tubing string within the well casing which is used to produce the well by providing the conduit for formation fluids to travel from the formation depth to the surface.
- Typical sliding sleeve type flow control devices comprise a generally tubular body portion having side wall inlet openings formed therein and a tubular flow control sleeve coaxially and slidably disposed within the body portion.
- the sleeve is operable for axial movement relative to the body portion between a closed position, in which the sleeve blocks the body inlet ports, and an open position, in which the sleeve uncovers the ports to permit fluid to flow inwardly therethrough into the interior of the body and thus into the interior of the production tubing string.
- the sliding sleeves thus function as movable valve elements operable to selectively permit and prevent fluid inflow.
- cylindrical shifter tools coaxially lowered into the interior of the tubing string, are utilized to shift selected ones of the sliding sleeves from their closed positions to their open positions, or vice versa, to provide subsurface flow control in the well.
- the device includes a generally tubular body for placement into the wellbore.
- the tubular body has a sand control screen at an outer surface for preventing sand from entering into tubular body.
- a slidable sleeve on the labyrinth controls the fluid velocity therethrough.
- the slidable sleeve is moved by a remotely and electrically-operated device placed in the tubular body. The fluid leaving the labyrinth passes to the tubing string for carrying the fluid to the surface.
- the present invention disclosed herein comprises a fluid flow control device for controlling the inflow of formation fluids in completions requiring sand control and a method for use of the same.
- the fluid flow control device of the present invention is not difficult or expensive to manufacture, h addition, the fluid flow control device of the present invention is reliable in a variety of flow conditions.
- the fluid flow control device of the present invention comprises a sand control screen having abase pipe with a set of openings that allows the production fluids to flow therethrough.
- the fluid flow control device also includes a sleeve coaxially disposed adj acent to the base pipe.
- the sleeve also has a set of openings that allows the production fluids to flow therethrough.
- the sleeve is selectively positionable relatively to the base pipe and may form an annulus therebetween such that the pressure drop in the production fluids flowing therethrough is selectively controllable by adjusting the alignment of the set of openings of the sleeve relative to the set of openings of the base pipe.
- the sleeve is axially selectively positionable relative to the base pipe, hi another embodiment, the sleeve is rotatably selectively positionable relative to the base pipe, h yet another embodiment, the sleeve is axially and rotatably selectively positionable relative to the base pipe, h one embodiment of the fluid flow control device of the present invention, the sleeve is coaxially positioned interiorly relative to the base pipe. In another embodiment of the fluid flow control device of the present invention, the sleeve is coaxially positioned exteriorly relative to the base pipe.
- the set of openings of the sleeve has substantially the same geometry as the set of openings of the base pipe
- the set of openings of the sleeve has a different geometry than the set of openings of the base pipe
- the opemngs of the sleeve have substantially the same shape as the openings of the base pipe.
- the openings of the sleeve have a different shape than the openings of the base pipe.
- the fluid flow control device of the present invention has a fully open position wherein the pressure drop in the production fluids traveling through the set of openings of the sleeve, the annulus between the sleeve and the base pipe and the set of openings of the base pipe is at a minimum.
- most embodiments of the fluid flow control device of the present invention have partially open or choking positions wherein the pressure drop in the production fluids is increased.
- some embodiments of the fluid flow control device of the present invention have a fully closed position wherein the production fluids are prevented from traveling therethrough.
- the fluid flow control device of the present invention may be operated between its fully open position, its choking positions and its fully closed position using a variety of techniques such as using a mechanical shifting tool, using hydraulic pressure, using an electrically operated device or the like.
- downhole pressure sensors positioned exteriorly and interiorly of the fluid flow control device maybe used to determine the pressure drop in the production fluids. Such pressure readings maybe used by a downhole control circuit to automatically adjust the position of the sleeve relative to the base pipe to control the pressure drop in the production fluids.
- sensors may also be used in conjunction with the fluid flow control device of the present invention such as temperature sensors and fluid composition sensors that may be used to determine the constituents of the production fluids including, for example, the oil, gas, water, solids and fines content of the fluid as well as, for example, the API gravity of the fluid.
- a method for controlling the inflow of production fluids comprises providing a production conduit including a sand control screen having a base pipe with a first set of openings and a sleeve coaxially disposed adjacent to the base pipe having a second set of openings, installing the production conduit within the wellbore, producing the production fluids into the production conduit through the first set of openings of the base pipe and the second set of openings of the sleeve and selectively adjusting the sleeve relative to the base pipe such that the pressure drop in the production fluids is controlled by adjusting the alignment of the first set of openings relative to the second set of openings.
- the present invention also comprises a fluid flow control device that includes a tubular member having at least one fluid passageway in a sidewall section thereof.
- a sand control screen assembly is positioned exteriorly around the tubular member.
- the sand control screen assembly has a filter medium section that defines a first annular region with the tubular member and a housing section that defines a second annular region with the tubular member.
- a sleeve is slidably positioned within the second annular region. The sleeve has an open position wherein fluid communication is permitted between the second annular region and the fluid passageway and a closed position wherein fluid communication is prevented between the second annular region and the fluid passageway.
- the fluid flow control device also includes a hydraulic control line that extends from a surface location to the sand control screen assembly.
- the hydraulic control line has a first section with a terminus that is selectively in fluid communication with the sleeve to operate the sleeve from the open position to the closed position.
- a eutectic valve is positioned within the housing section to selectively prevent and permit fluid communication between the first section of the hydraulic control line and the sleeve.
- the hydraulic control line also has a second section that passes through the first annular region and extends downhole of the sand control screen assembly.
- the fluid flow control device has a sensor that maybe positioned on the housing section of the sand control screen assembly to sense at least one downhole parameter such as temperature, pressure, fluid composition or the like.
- An energy conductor that extends from the surface and passes through the sand control screen assembly is in communication with the eutectic valve and the sensor.
- energy is supplied to the eutectic valve in response to one of the sensed downhole parameters, which melts the eutectic valve and establishes fluid communication between the first section of the hydraulic control line and the sleeve, thereby operating the sleeve from the open position to the closed position.
- Figure 1 is a schematic illustration of an offshore oil and gas platform operating a plurality of fluid flow control devices according to the present invention
- Figure 2 is a half sectional view of a fluid flow control device according to the present invention positioned in its fully open position;
- Figure 3 is a half sectional view of a fluid flow control device according to the present invention positioned in a choking position;
- Figure 4 is a half sectional view of a fluid flow control device according to the present invention positioned in a choking position;
- Figure 5 is a half sectional view of a fluid flow control device according to the present invention positioned in a choking position
- Figure 6 is a half sectional view of a fluid flow control device according to the present invention positioned in its fully closed position
- Figure 7 is a half sectional view of a fluid flow control device according to the present invention positioned in its fully open position
- Figure 8 is a half sectional view of a fluid flow control device according to the present invention positioned in its open position
- Figure 9 is a half sectional view of a fluid flow control device according to the present invention positioned in its closed positions; and Figure 10 is a half sectional view of a fluid flow control device according to the present invention having a sleeve positioned exteriorly of the base pipe and positioned in its open position.
- an offshore oil and gas platform operating a plurality of fluid flow control devices is schematically illustrated and generally designated 10.
- a semi- submersible platform 12 is centered over submerged oil and gas formations 14, 16 located below sea floor 18.
- a subsea conduit 20 extends from a wellhead installation 22 to a subsea installation 24.
- a wellbore 26 extends through the various earth strata including formations 14, 16.
- a casing string 28 is cemented within wellbore 26 by cement 30.
- Casing string 28 includes perforations 32 and perforations 34 that respectively allow formation fluids from formations 14, 16 to enter the interior of casing string 28.
- tubing string 36 Positioned within casing string 28 and extending from wellhead installation 22 is a tubing string 36.
- Tubing string 36 provides a conduit for formation fluids to travel from formations 14, 16 to the surface.
- a pair of packers 38, 40 provide a fluid seal between tubing string 36 and casing string 28 and define a production interval adjacent to formation 14.
- packers 42, 44 provide a fluid seal between tubing string 36 and casing string 28 and define a production interval adjacent to formation 16.
- fluid flow control devices 46, 48 and 50 Positioned within tubing string 36 in the production interval adj acent to formation 14 are fluid flow control devices 46, 48 and 50.
- fluid flow control devices 52, 54 and 56 Positioned within tubing string 36 in the production interval adjacent to formation 16 are fluid flow control devices 52, 54 and 56.
- each of the fluid flow control devices 46-56 provides not only fluid flow control capability but also sand control capability.
- fluid flow control devices 46, 48, 50 may be used to choke the fluid flow from formation 14 to a greater extent than fluid flow control devices 52, 54, 56 will choke the fluid flow from formation 16.
- the fluid flow control devices of the present invention are independently controllable within each production interval.
- fluid flow control devices 46, 48, 50 may be used to choke or even close off certain sections of the production interval adjacent to formation 14 to prevent the production of water or other undesirable fluids.
- one or all of the fluid flow control devices associated with a particular production interval may be adjusted over time as the adjacent formation becomes depleted or as downhole equipment experiences wear. It should be understood by those skilled in the art that even though figure 1 has depicted three fluid flow control devices associated with each production interval, any number of fluid flow control devices either greater than or less than three may alternatively be used without departing from the principles of the present invention.
- fluid flow confrol devices of the present invention are equally well suited for use in wellbores having other directional configuration such as incline wellbores, deviated wellbores or horizontal wellbores.
- Fluid flow control device 60 includes a sand control screen assembly 62.
- Sand control assembly 62 includes a base pipe 64 that has a plurality of openings 66 that allow the flow of production fluids into the production tubing.
- openings 66 are depicted as round openings, it should be understood by those skilled in the art that openings of other configurations may alternatively be used and are considered within the scope of the present invention.
- openings 66 could alternatively have a non circular shape such as an oval shape, a square shape, a rectangular shape or other similar shapes.
- openings as used herein is intended to encompass any type of discontinuity in base pipe 64 that allows for the flow of fluids therethrough including, but not limited to, perforations, holes and slots of any configuration that are presently known in the art or subsequently discovered, hi addition, the exact number and size of opening 66 are not critical to the present invention, so long as sufficient area is provided for fluid production and the integrity of base pipe 64 is maintained. Openings 66 form a particular hole pattern in base pipe 64, the importance of which will be explained in more detail below.
- filter medium 68 Positioned around base pipe 64 is a filter medium 68.
- filter medium 68 is a fluid-porous, particulate restricting material such as a plurality of layers of a wire mesh that are diffusion bonded or sintered together to form a porous wire mesh screen designed to allow fluid flow therethrough but prevent the flow of particulate materials of a predetermined size from passing therethrough.
- Disposed around filter medium 68 is an outer shroud 70.
- Outer shroud 70 has a plurality of openings 72 which allow the flow of production fluids therethrough. The exact number, size and shape of openings 72 are not critical to the present invention, so long as sufficient area is provided for fluid production and the integrity of outer shroud 70 is maintained.
- Outer shroud 70 is designed to protect filter medium 68 during installation of fluid flow control device 60 into the wellbore as well as during production therethrough.
- a sleeve 74 Positioned coaxially within base pipe 64 is a sleeve 74.
- Sleeve 74 is slidable coupled within base pipe 64 using detents such as collets or pins (not pictured) or other suitable devices that are well known to those skilled in the art.
- Sleeve 74 has a plurality of openings 76. As with openings 66 of base pipe 64, openings 76 of sleeve 74 may have any geometric configuration that is suitable for allowing the flow of production fluids therethrough.
- openings 76 of sleeve 74 depicts openings 76 of sleeve 74 as having the same shape and size as opemngs 66 of base pipe 64, this relationship is not required by the present invention.
- a fluid flow control device of the present invention could have slotted openings in sleeve 74 while having round openings in base pipe 64.
- the hole pattern of openings 66 of base pipe 64 and openings 76 of sleeve 74 have substantially the same geometry.
- openings 66 of base pipe 64 and openings 76 of sleeve 74 are substantially aligned with one another.
- fluid flow control device 60 when fluid flow control device 60 is in the depicted configuration, the pressure drop in the production fluids traveling therethrough is at a minimum and fluid flow control device 60 is considered to be in its fully opened position. Specifically, to enter in the interior of fluid flow control device 60, the fluid must travel through an entry opening, one of the openings 66 of base pipe 64, an annulus 78 between base pipe 64 and sleeve 74 and an exit opening, one of the openings 76 of sleeve 74. As openings 66 of base pipe 64 and openings 76 of sleeve 74 are substantially aligned with one another, the distance the fluid is required to flow in annulus 78 is at a minimum.
- fluid flow control device 80 is substantially identical to the construction of fluid flow control device 60 of figure 2.
- Fluid flow confrol device 80 is operated using a mechanical shifter 82 that may be carried downhole on a wireline 84.
- shifter tool 84 may interact with sleeve 74, the interior side surfaces of sleeve 74 may have formed therein a longitudinally spaced series of annular, traversed notches, that receive a key set carried on mechanical shifter 82.
- sleeve 74 may be slidably shifted in the axial direction as can be seen by comparing the position of sleeve 74 relative to base pipe 64 in figures 2 and 3.
- sleeve 74 has been axially repositioned to increase the pressure drop experienced by production fluids traveling through annulus 78.
- the set of openings 66 of base pipe 64 and the set of openings 76 of sleeve 74 have substantially the same hole pattern, when openings 66 and openings 76 are axially misaligned, the distance the formation fluids must travel within annulus 78 is increased, thereby increasing the pressure drop in the formation fluids.
- the amount of this pressure drop or choking is determined based upon a number of factors including the extent of the misalignment of openings 66 relative to openings 76, the thickness of annulus 78, the viscosity of the formation fluids and the like, h addition, the surface characteristics of either the exterior of sleeve 74 or the interior of base pipe 64 or both may be configured to further control the pressure drop. For example, grooves, channels, knurling, other turbulizing surfaces or the like may be added to one or both of the surfaces to increase the turbulence in the fluid flow thereby increasing the pressure drop across a given distance.
- the desired amount of pressure drop maybe obtained by selectively misaligning openings 66 relative to openings 76 by axially shifting sleeve 74 relative to base pipe 64.
- sensors such as position sensors, pressure sensors, temperature sensors, fluid composition sensors and the like may be used in conjunction with mechanical shifter 82 to determined the desired extent of the misaligning of openings 66 relative to openings 76, as explained in greater detail below.
- Fluid flow control device 90 is constructed in a manner substantially identical to fluid flow control device 60 of figure 2.
- fluid flow control device 90 is operated by an electromechanical shifter 92 that is run downhole on an electric line 94.
- Electromechanical shifter 94 maybe received within sleeve 74 in a manner similar to that described above with reference to mechanical shifter 82 of figure 3.
- electromechanical shifter 92 may be energized via electric line 94 such that sleeve 74 may be rotatably shifted relative to base pipe 64.
- sleeve 74 has been rotated ninety degrees relative to base pipe 64. This rotation increases the distance between openings 76 of sleeve 74 and openings 66 of base pipe 64. Accordingly, the formation fluid being produced into fluid flow control device 90 must travel an increased distance in annulus 78 relative to the position shown in figure 2. This increased distance equates to an increased pressure drop in the formation fluids.
- the desired amount of pressure drop maybe achieved by selecting the amount of circumferential misalignment between openings 76 of sleeve 74 and openings 66 of base pipe 64.
- Fluid flow control device 100 is constructed in substantially the same manner as fluid flow control device 60 of figure 2. Fluid flow control device 100 is operated using a downhole electrical motor 102 that is positioned within annulus 78 between sleeve 74 and base pipe 64.
- Downhole electrical motor 102 receives power from energy conductors 104 that may extend to the surface or may extend to a downhole electrical power source such as a battery pack or a downhole electrical generator. Downhole electrical motor 102 includes a control circuit that commands downhole electrical motor 102 to shift sleeve 74 relative to base pipe 64 when it is desirable to adjust the pressure drop in the production fluids being produced therethrough. A pair of pressure sensors 106, 108 are used to monitor the pressure on the exterior of fluid flow control device 100 and the pressure on the interior of fluid flow control device 100, respectively.
- the pressure information may be carried to the surface via energy conductors 104 where it may be processed then command signals may be returned to the control circuit of downhole electrical motor 102 via energy conductors 104 to initiate the operation of downhole electrical motor 102.
- the pressure information may be sent directly to the control circuit of downhole electrical motor 102 from pressure sensors 106, 108 to initiate operation of downhole electrical motor 102.
- sleeve 74 may include a position sensor that identifies the relative position of sleeve 74 and base pipe 64 to further refine the operation of shifting sleeve 74.
- the position sensor may be powered by energy conductors 104 and may send signals to the surface or directly to the confrol circuit of downhole electric motor 102.
- downhole electrical motor 102 is operable to axially adjust the position of sleeve 74 relative to base pipe 64 and rotatably adjust the position of sleeve 74 relative to base pipe 64.
- sleeve 74 has been axially and rotatably adjusted relative to base pipe 64. Accordingly, the distance between openings 76 of sleeve 74 and openings 66 of base pipe 64 has been increased, which in turn increases the distance the production fluids must travel in annulus 78 resulting in an increase in the pressure drop in the production fluids.
- This embodiment of fluid flow control device 100 is particularly suitable for precision control of the pressure drop due to the interaction of pressure sensors 106, 108, the position sensor and the control circuit of downhole electrical motor 102.
- Fluid flow control device 110 is constructed in substantially the same manner as fluid flow control device 60 of figure 2 with the exception that fluid flow control device 110 includes a plurality of seals 112 carried by base pipe 64.
- the operation of fluid flow control device 110 is hydraulically controlled in a conventional manner by increasing and decreasing the pressure within hydraulic control lines 114, 116 which allows sleeve 74 to axially shift relative base pipe 64. As described above, as openings 76 of sleeve 74 become misaligned with openings 66 of base pipe 64, the pressure drop in the formation fluids being produced therethrough increases.
- fluid flow control device 110 can be operated from a fully opened position (see figure 2) to a fully closed positioned as well as various choking positions therebetween.
- Fluid flow control device 120 is constructed in substantially the same manner as fluid flow control device 60 of figure 2, however, sleeve 74 as depicted in figure 2 has been replaced with sleeve 122.
- Sleeve 122 includes a plurality of openings 124 that form a hole pattern with a geometry that is different from the hole pattern of openings 66 of base pipe 64.
- Fluid flow control device 120 is operated using a downhole electrical motor 126 which is operable to rotatably shift sleeve 122 relative to base pipe 64. This rotation aligns the various columns of openings 124 of sleeve 122 with openings 66 of base pipe 64.
- each opening 66 of base pipe 64 is aligned with an opening 124 of sleeve 122.
- sleeve 122 is rotated using downhole electrical motor 126, however, some of the openings 66 of base pipe 64 will no longer be aligned with an opening 124 of sleeve 122. Accordingly, the pressure drop in the production fluids is controlled by adjusting the relative alignment of openings 124 of sleeve 122 with openings 66 of base pipe 64.
- Fluid flow control device 130 includes a sand confrol screen assembly 132.
- Sand control screen assembly 132 includes abase pipe 134 that has a series of openings 136 that are circumferentially spaced therearound.
- Sand control screen assembly 132 has a pair of screen connectors 138, 140 that attach a sand confrol screen 142 to base pipe 134.
- Screen connectors 138, 140 maybe attached to base pipe 134 by welding or other suitable technique.
- Sand control screen 142 may comprise a screen wire wrapped around a plurality of ribs to form turns having gaps therebetween which allow the flow of formation fluids therethrough but which block the flow of particulate matter therethrough.
- the number of turns and the size of the gaps between the turns are determined based upon the characteristics of the formation from which fluid is being produced and the size of the gravel to be used during a gravel packing operation, if any.
- Screen connectors 138, 140 attach sand control screen 142 to base pipe 134 such that an annulus 144 is formed between sand control screen 142 and base pipe 134. It should be noted that centralizers or other support members maybe disposed within annulus 144 to support sand control screen 142 and maintain the standoff between sand control screen 142 and base pipe 134. Coupled to the upper end of screen connector 140 is a housing member 146. Housing member 146 forms an annulus 148 with base pipe 134 adjacent to openings 136.
- a sliding sleeve 150 Disposed within annulus 148 is a sliding sleeve 150 having a pair of seals 151 disposed on the interior side thereof to provide a seal against base pipe 134 and a pair of seals 153 disposed on the exterior side thereof to provide a seal against housing member 146.
- hydraulic fluid conduit 152 Disposed exteriorly of base pipe 134 and extending from the surface is a hydraulic fluid conduit 152.
- One portion of hydraulic fluid conduit 152 extends into a fluid passageway 154 within housing member 146.
- a valve 156 Disposed within fluid passageway 154 is a valve 156, such as a eutectic valve.
- Another portion of hydraulic fluid conduit 152 extends into and through housing member 146 and screen connector 140 into annulus 144. This portion of hydraulic fluid conduit 152 extends through annulus 144 to exit sand control screen assembly 132 through screen connector 138.
- this portion of hydraulic fluid conduit 152 runs within a recess or channel in housing member 146 and on the inside of sand control screen 142, instead of the outside of sand control screen 142, which removes the need to band hydraulic fluid conduit 152 to the exterior of sand control screen 142 which would block the inflow of formation fluids through those portions of sand control screen 142 covered by the banding material.
- this portion of hydraulic fluid conduit 152 is protected by having sand control screen 142 positioned exteriorly thereof.
- the channel on the exterior of housing member 146 could be extended along the exterior of sand confrol screen 142 such that hydraulic fluid conduit 152 could be positioned within the channel for protection.
- hydraulic fluid conduit 152 is capable of providing operating fluid to fluid flow control device 130 and is also capable of providing operating fluid to other devices downhole of fluid flow control device 130 such as additional fluid flow control devices positioned further downhole.
- a sensor 158 is positioned on the exterior of housing member 146. Sensor 158 may provide information relating to a variety of downhole parameters such as pressure, temperature, fluid composition or the like. Sensor 158 is in communication with the surface via energy conductors 160. Energy conductors 160 may provide power and communication capabilities to sensor 158 as well as to valve 156.
- valve 156 is a eutectic valve and it is desirable to operate fluid flow control device 130 to the closed position
- energy is conducted to valve 156 via energy conductors 160 to melt the eutectic material such that operating fluid from hydraulic fluid conduit 152 maybe communicated to sliding sleeve 150.
- Energy conductors 160 also extend through fluid flow control device 130 in a manner similar to hydraulic fluid conduit 152 bypassing through housing member 146, screen connector 140, annulus 144 and screen connector 138.
- energy conductors 160 may include a fiber optic cable which maybe used to obtain certain downhole parameters such as temperature and pressure at particular locations.
- fluid flow control device 130 is used to filter particulate matter out of production fluids and control the flow of fluids into the tubing string. More specifically, when fluid flow control device 130 is in its open position as depicted in figure 8, formation fluids are produced through sand control screen 142 into annulus 144. These formation fluids then travel upwardly through screen connector 140 that has a plurality of axially extending openings allowing the formation fluids to pass into annulus 148 above screen connector 140. From annulus 148, fluid communication is allowed through openings 136 such that the formation fluids may travel to the surface via the tubing string.
- fluid flow control device 130 may be operated to its closed position as depicted in figure 9. For example, if sensor 158 has sensed that the formation fluids are being produced through fluid flow control device 130 contain an undesirable percentage of water, then a signal may be sent to the surface via energy conductors 160 indicating such a fluid composition. Thereafter, power may be sent to valve 156 via energy conductors 160 and through appropriate switching or addressing circuitry such that the eutectic material of valve 156 is melted, thereby allowing fluid communication through fluid passageway 154. Thereafter, operating fluid from hydraulic fluid conduit 152 may act on sliding sleeve 150 such that openings 136 of base pipe 134 are no longer in communication with annulus 148. Once in this configuration, fluid flow control device 130 no longer permits formation fluids to flow therethrough.
- hydraulic fluid conduit 152 and energy conductors 160 pass through sand control screen assembly 132 such that similar operations may be conducted on fluid flow control devices or other devices that are positioned downhole of fluid flow control device 130.
- Fluid flow control device 170 includes a sand control screen assembly 172.
- Sand confrol screen assembly 172 includes a base pipe 174 that has a series of openings 176.
- Sand control screen assembly 172 also has a screen support member 178 that is attached by welding or other suitable technique at opposite ends to base pipe 174 and has a series of openings 180.
- the filter media of sand control screen assembly 172 is depicted as a wire wrapped screen 182 such as that described above with reference to figure 8.
- fluid flow control device 170 is constructed with a sleeve 184 coaxially positioned exteriorly of base pipe 174.
- Sleeve 184 has a plurality of openings 186 that have substantially the same geometry as openings 176 of base pipe 174.
- sleeve 184 is closely received around base pipe 174 such that there is a friction fit therebetween. This friction fit can operate substantially as a seal to provide significant resistance to flow between sleeve 184 and base pipe 174 when openings 186 are not aligned with openings 176.
- an annulus may be formed between sleeve 184 and base pipe 174 operating substantially as annulus 78 discussed above.
- the operation of fluid flow control device 170 is hydraulically controlled in a conventional manner by increasing and decreasing the pressure within hydraulic confrol lines 188, 190 which allows sleeve 184 to axially shift relative base pipe 174.
Abstract
Description
Claims
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
AU2003261322A AU2003261322A1 (en) | 2002-08-26 | 2003-07-31 | Fluid flow control device and method for use of same |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US10/227,935 | 2002-08-26 | ||
US10/227,935 US7055598B2 (en) | 2002-08-26 | 2002-08-26 | Fluid flow control device and method for use of same |
Publications (2)
Publication Number | Publication Date |
---|---|
WO2004018839A2 true WO2004018839A2 (en) | 2004-03-04 |
WO2004018839A3 WO2004018839A3 (en) | 2004-06-03 |
Family
ID=31887554
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/US2003/024003 WO2004018839A2 (en) | 2002-08-26 | 2003-07-31 | Fluid flow control device and method for use of same |
Country Status (5)
Country | Link |
---|---|
US (3) | US7055598B2 (en) |
AU (1) | AU2003261322A1 (en) |
ES (1) | ES2676544T3 (en) |
HU (1) | HUE038498T2 (en) |
WO (1) | WO2004018839A2 (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7419002B2 (en) | 2001-03-20 | 2008-09-02 | Reslink G.S. | Flow control device for choking inflowing fluids in a well |
US7543641B2 (en) | 2006-03-29 | 2009-06-09 | Schlumberger Technology Corporation | System and method for controlling wellbore pressure during gravel packing operations |
US7673678B2 (en) | 2004-12-21 | 2010-03-09 | Schlumberger Technology Corporation | Flow control device with a permeable membrane |
US7789145B2 (en) | 2007-06-20 | 2010-09-07 | Schlumberger Technology Corporation | Inflow control device |
US7857050B2 (en) | 2006-05-26 | 2010-12-28 | Schlumberger Technology Corporation | Flow control using a tortuous path |
US8025072B2 (en) | 2006-12-21 | 2011-09-27 | Schlumberger Technology Corporation | Developing a flow control system for a well |
US8196668B2 (en) | 2006-12-18 | 2012-06-12 | Schlumberger Technology Corporation | Method and apparatus for completing a well |
Families Citing this family (190)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6899176B2 (en) * | 2002-01-25 | 2005-05-31 | Halliburton Energy Services, Inc. | Sand control screen assembly and treatment method using the same |
US7096945B2 (en) * | 2002-01-25 | 2006-08-29 | Halliburton Energy Services, Inc. | Sand control screen assembly and treatment method using the same |
US7055598B2 (en) * | 2002-08-26 | 2006-06-06 | Halliburton Energy Services, Inc. | Fluid flow control device and method for use of same |
US7296461B2 (en) * | 2002-12-03 | 2007-11-20 | Ppg Industries Ohio, Inc. | Temperature compensated windshield moisture detector |
US6886634B2 (en) * | 2003-01-15 | 2005-05-03 | Halliburton Energy Services, Inc. | Sand control screen assembly having an internal isolation member and treatment method using the same |
US6857476B2 (en) * | 2003-01-15 | 2005-02-22 | Halliburton Energy Services, Inc. | Sand control screen assembly having an internal seal element and treatment method using the same |
US6978840B2 (en) * | 2003-02-05 | 2005-12-27 | Halliburton Energy Services, Inc. | Well screen assembly and system with controllable variable flow area and method of using same for oil well fluid production |
CA2520141C (en) * | 2003-03-28 | 2011-10-04 | Shell Canada Limited | Surface flow controlled valve and screen |
US7870898B2 (en) * | 2003-03-31 | 2011-01-18 | Exxonmobil Upstream Research Company | Well flow control systems and methods |
US6994170B2 (en) * | 2003-05-29 | 2006-02-07 | Halliburton Energy Services, Inc. | Expandable sand control screen assembly having fluid flow control capabilities and method for use of same |
US7416026B2 (en) * | 2004-02-10 | 2008-08-26 | Halliburton Energy Services, Inc. | Apparatus for changing flowbore fluid temperature |
CA2457329A1 (en) * | 2004-02-10 | 2005-08-10 | Richard T. Hay | Downhole drilling fluid heating apparatus and method |
GB0411121D0 (en) * | 2004-05-19 | 2004-06-23 | Omega Completion Technology | Method for signalling a downhole device in a flowing well |
US9027640B2 (en) | 2004-05-19 | 2015-05-12 | Omega Completion Technology Ltd. | Method for signalling a downhole device in a well |
US7299880B2 (en) * | 2004-07-16 | 2007-11-27 | Weatherford/Lamb, Inc. | Surge reduction bypass valve |
US7409999B2 (en) * | 2004-07-30 | 2008-08-12 | Baker Hughes Incorporated | Downhole inflow control device with shut-off feature |
US7191833B2 (en) * | 2004-08-24 | 2007-03-20 | Halliburton Energy Services, Inc. | Sand control screen assembly having fluid loss control capability and method for use of same |
US7210535B2 (en) * | 2005-01-12 | 2007-05-01 | Bj Services Company | Isolation system comprising a plug and a circulation valve and method of use |
GB0504055D0 (en) * | 2005-02-26 | 2005-04-06 | Red Spider Technology Ltd | Valve |
US7249525B1 (en) * | 2005-06-22 | 2007-07-31 | Cidra Corporation | Apparatus for measuring parameters of a fluid in a lined pipe |
US7451815B2 (en) * | 2005-08-22 | 2008-11-18 | Halliburton Energy Services, Inc. | Sand control screen assembly enhanced with disappearing sleeve and burst disc |
WO2007061864A1 (en) * | 2005-11-18 | 2007-05-31 | Kristian Brekke | Robust sand screen for oil and gas wells |
US8151874B2 (en) | 2006-02-27 | 2012-04-10 | Halliburton Energy Services, Inc. | Thermal recovery of shallow bitumen through increased permeability inclusions |
AU2007243920B2 (en) * | 2006-04-03 | 2012-06-14 | Exxonmobil Upstream Research Company | Wellbore method and apparatus for sand and inflow control during well operations |
US7793716B2 (en) * | 2006-04-21 | 2010-09-14 | Bj Services Company, U.S.A. | Apparatus and methods for limiting debris flow back into an underground base pipe of an injection well |
US7575062B2 (en) * | 2006-06-09 | 2009-08-18 | Halliburton Energy Services, Inc. | Methods and devices for treating multiple-interval well bores |
GB0621031D0 (en) | 2006-10-24 | 2006-11-29 | Red Spider Technology Ltd | Downhole apparatus and method |
US7543648B2 (en) * | 2006-11-02 | 2009-06-09 | Schlumberger Technology Corporation | System and method utilizing a compliant well screen |
US7661476B2 (en) * | 2006-11-15 | 2010-02-16 | Exxonmobil Upstream Research Company | Gravel packing methods |
US8056628B2 (en) | 2006-12-04 | 2011-11-15 | Schlumberger Technology Corporation | System and method for facilitating downhole operations |
US7814978B2 (en) * | 2006-12-14 | 2010-10-19 | Halliburton Energy Services, Inc. | Casing expansion and formation compression for permeability plane orientation |
DK178114B1 (en) * | 2006-12-29 | 2015-06-01 | Mærsk Olie Og Gas As | Ceramic display screen |
US8245782B2 (en) * | 2007-01-07 | 2012-08-21 | Schlumberger Technology Corporation | Tool and method of performing rigless sand control in multiple zones |
AU2007345288B2 (en) | 2007-01-25 | 2011-03-24 | Welldynamics, Inc. | Casing valves system for selective well stimulation and control |
US20120323494A1 (en) * | 2007-02-20 | 2012-12-20 | Schlumberger Technology Corporation | Identifying types of sensors based on sensor measurement data |
US8291979B2 (en) * | 2007-03-27 | 2012-10-23 | Schlumberger Technology Corporation | Controlling flows in a well |
US8186428B2 (en) * | 2007-04-03 | 2012-05-29 | Baker Hughes Incorporated | Fiber support arrangement for a downhole tool and method |
US7921915B2 (en) * | 2007-06-05 | 2011-04-12 | Baker Hughes Incorporated | Removable injection or production flow equalization valve |
US7640975B2 (en) * | 2007-08-01 | 2010-01-05 | Halliburton Energy Services, Inc. | Flow control for increased permeability planes in unconsolidated formations |
US7647966B2 (en) * | 2007-08-01 | 2010-01-19 | Halliburton Energy Services, Inc. | Method for drainage of heavy oil reservoir via horizontal wellbore |
US7640982B2 (en) * | 2007-08-01 | 2010-01-05 | Halliburton Energy Services, Inc. | Method of injection plane initiation in a well |
US7578343B2 (en) * | 2007-08-23 | 2009-08-25 | Baker Hughes Incorporated | Viscous oil inflow control device for equalizing screen flow |
US7814976B2 (en) * | 2007-08-30 | 2010-10-19 | Schlumberger Technology Corporation | Flow control device and method for a downhole oil-water separator |
US8006757B2 (en) * | 2007-08-30 | 2011-08-30 | Schlumberger Technology Corporation | Flow control system and method for downhole oil-water processing |
US7775284B2 (en) * | 2007-09-28 | 2010-08-17 | Halliburton Energy Services, Inc. | Apparatus for adjustably controlling the inflow of production fluids from a subterranean well |
US8312931B2 (en) | 2007-10-12 | 2012-11-20 | Baker Hughes Incorporated | Flow restriction device |
US20090095468A1 (en) * | 2007-10-12 | 2009-04-16 | Baker Hughes Incorporated | Method and apparatus for determining a parameter at an inflow control device in a well |
US7942206B2 (en) * | 2007-10-12 | 2011-05-17 | Baker Hughes Incorporated | In-flow control device utilizing a water sensitive media |
US20090101329A1 (en) * | 2007-10-19 | 2009-04-23 | Baker Hughes Incorporated | Water Sensing Adaptable Inflow Control Device Using a Powered System |
US8544548B2 (en) * | 2007-10-19 | 2013-10-01 | Baker Hughes Incorporated | Water dissolvable materials for activating inflow control devices that control flow of subsurface fluids |
US20090101354A1 (en) * | 2007-10-19 | 2009-04-23 | Baker Hughes Incorporated | Water Sensing Devices and Methods Utilizing Same to Control Flow of Subsurface Fluids |
US8069921B2 (en) * | 2007-10-19 | 2011-12-06 | Baker Hughes Incorporated | Adjustable flow control devices for use in hydrocarbon production |
US20090101344A1 (en) * | 2007-10-22 | 2009-04-23 | Baker Hughes Incorporated | Water Dissolvable Released Material Used as Inflow Control Device |
US7950461B2 (en) * | 2007-11-30 | 2011-05-31 | Welldynamics, Inc. | Screened valve system for selective well stimulation and control |
US7832477B2 (en) * | 2007-12-28 | 2010-11-16 | Halliburton Energy Services, Inc. | Casing deformation and control for inclusion propagation |
US7779910B2 (en) * | 2008-02-07 | 2010-08-24 | Halliburton Energy Services, Inc. | Expansion cone for expandable liner hanger |
US8899339B2 (en) | 2008-02-29 | 2014-12-02 | Exxonmobil Upstream Research Company | Systems and methods for regulating flow in a wellbore |
US8839849B2 (en) * | 2008-03-18 | 2014-09-23 | Baker Hughes Incorporated | Water sensitive variable counterweight device driven by osmosis |
US7836962B2 (en) * | 2008-03-28 | 2010-11-23 | Weatherford/Lamb, Inc. | Methods and apparatus for a downhole tool |
US7992637B2 (en) * | 2008-04-02 | 2011-08-09 | Baker Hughes Incorporated | Reverse flow in-flow control device |
US8931570B2 (en) | 2008-05-08 | 2015-01-13 | Baker Hughes Incorporated | Reactive in-flow control device for subterranean wellbores |
US7775273B2 (en) * | 2008-07-25 | 2010-08-17 | Schlumberber Technology Corporation | Tool using outputs of sensors responsive to signaling |
GB0818010D0 (en) * | 2008-10-02 | 2008-11-05 | Petrowell Ltd | Improved control system |
US7987909B2 (en) * | 2008-10-06 | 2011-08-02 | Superior Engery Services, L.L.C. | Apparatus and methods for allowing fluid flow inside at least one screen and outside a pipe disposed in a well bore |
CA2742365C (en) * | 2008-11-03 | 2014-03-18 | Exxonmobil Upstream Research Company | Well flow control systems and methods |
US8496055B2 (en) * | 2008-12-30 | 2013-07-30 | Schlumberger Technology Corporation | Efficient single trip gravel pack service tool |
BRPI1013547A2 (en) | 2009-04-14 | 2016-04-12 | Exxonmobil Upstream Res Co | tubular assembly adapted for downhole use, and method for operating a hydrocarbon-related well |
US8604634B2 (en) * | 2009-06-05 | 2013-12-10 | Schlumberger Technology Corporation | Energy harvesting from flow-induced vibrations |
US20110030965A1 (en) * | 2009-08-05 | 2011-02-10 | Coronado Martin P | Downhole Screen with Valve Feature |
US8695710B2 (en) | 2011-02-10 | 2014-04-15 | Halliburton Energy Services, Inc. | Method for individually servicing a plurality of zones of a subterranean formation |
US8276675B2 (en) * | 2009-08-11 | 2012-10-02 | Halliburton Energy Services Inc. | System and method for servicing a wellbore |
US8668012B2 (en) | 2011-02-10 | 2014-03-11 | Halliburton Energy Services, Inc. | System and method for servicing a wellbore |
US8668016B2 (en) | 2009-08-11 | 2014-03-11 | Halliburton Energy Services, Inc. | System and method for servicing a wellbore |
US8230935B2 (en) * | 2009-10-09 | 2012-07-31 | Halliburton Energy Services, Inc. | Sand control screen assembly with flow control capability |
CA2891734C (en) | 2009-11-06 | 2017-08-22 | Weatherford Technology Holdings, Llc | Method and apparatus for a wellbore accumulator system assembly |
US8272443B2 (en) * | 2009-11-12 | 2012-09-25 | Halliburton Energy Services Inc. | Downhole progressive pressurization actuated tool and method of using the same |
MY164284A (en) | 2009-11-20 | 2017-11-30 | Exxonmobil Upstream Res Co | Open-hole packer for alternate path gravel packing, and method for completing an open-hole wellbore |
US8261842B2 (en) | 2009-12-08 | 2012-09-11 | Halliburton Energy Services, Inc. | Expandable wellbore liner system |
US8210258B2 (en) * | 2009-12-22 | 2012-07-03 | Baker Hughes Incorporated | Wireline-adjustable downhole flow control devices and methods for using same |
US8469107B2 (en) * | 2009-12-22 | 2013-06-25 | Baker Hughes Incorporated | Downhole-adjustable flow control device for controlling flow of a fluid into a wellbore |
US8469105B2 (en) * | 2009-12-22 | 2013-06-25 | Baker Hughes Incorporated | Downhole-adjustable flow control device for controlling flow of a fluid into a wellbore |
US8424609B2 (en) * | 2010-03-16 | 2013-04-23 | Baker Hughes Incorporated | Apparatus and method for controlling fluid flow between formations and wellbores |
US8316952B2 (en) | 2010-04-13 | 2012-11-27 | Schlumberger Technology Corporation | System and method for controlling flow through a sand screen |
US8256522B2 (en) | 2010-04-15 | 2012-09-04 | Halliburton Energy Services, Inc. | Sand control screen assembly having remotely disabled reverse flow control capability |
WO2011149597A1 (en) | 2010-05-26 | 2011-12-01 | Exxonmobil Upstream Research Company | Assembly and method for multi-zone fracture stimulation of a reservoir using autonomous tubular units |
US20120061095A1 (en) * | 2010-06-24 | 2012-03-15 | Christian Capderou | Apparatus and Method For Remote Actuation of A Downhole Assembly |
CA2813690A1 (en) | 2010-10-05 | 2012-04-12 | Packers Plus Energy Services Inc. | Wireline conveyed apparatus for wellbore fluid treatment |
US20120145382A1 (en) * | 2010-12-13 | 2012-06-14 | I-Tec As | System and Method for Operating Multiple Valves |
US8978765B2 (en) * | 2010-12-13 | 2015-03-17 | I-Tec As | System and method for operating multiple valves |
US9404348B2 (en) | 2010-12-17 | 2016-08-02 | Exxonmobil Upstream Research Company | Packer for alternate flow channel gravel packing and method for completing a wellbore |
BR112013013148B1 (en) | 2010-12-17 | 2020-07-21 | Exxonmobil Upstream Research Company | well bore apparatus and methods for zonal isolation and flow control |
CN103534436B (en) | 2010-12-17 | 2018-01-19 | 埃克森美孚上游研究公司 | Autonomous type downhole conveyance system |
EA026663B1 (en) | 2010-12-17 | 2017-05-31 | Эксонмобил Апстрим Рисерч Компани | Wellbore apparatus and methods for multi-zone well completion, production and injection |
SG190875A1 (en) | 2010-12-17 | 2013-07-31 | Exxonmobil Upstream Res Co | Method for automatic control and positioning of autonomous downhole tools |
EA032493B1 (en) | 2010-12-17 | 2019-06-28 | Эксонмобил Апстрим Рисерч Компани | Crossover joint for connecting eccentric flow paths to concentric flow paths |
US20120168181A1 (en) * | 2010-12-29 | 2012-07-05 | Baker Hughes Incorporated | Conformable inflow control device and method |
CN201953360U (en) * | 2010-12-30 | 2011-08-31 | 淄博东森石油技术发展有限公司 | Pressure-regulating water-controlling sand control pipe |
US8522879B2 (en) * | 2011-01-05 | 2013-09-03 | Baker Hughes Incorporated | Method and apparatus for controlling fluid flow into a borehole |
US9062530B2 (en) * | 2011-02-09 | 2015-06-23 | Schlumberger Technology Corporation | Completion assembly |
US8403052B2 (en) | 2011-03-11 | 2013-03-26 | Halliburton Energy Services, Inc. | Flow control screen assembly having remotely disabled reverse flow control capability |
US8752631B2 (en) * | 2011-04-07 | 2014-06-17 | Baker Hughes Incorporated | Annular circulation valve and methods of using same |
US9441440B2 (en) | 2011-05-02 | 2016-09-13 | Peak Completion Technologies, Inc. | Downhole tools, system and method of using |
US9567832B2 (en) | 2011-05-02 | 2017-02-14 | Peak Completion Technologies Inc. | Downhole tools, system and method of using |
US9611719B2 (en) | 2011-05-02 | 2017-04-04 | Peak Completion Technologies, Inc. | Downhole tool |
US8555957B2 (en) * | 2011-05-19 | 2013-10-15 | Kuei-Hsien Shen | Crude oil production equipment |
WO2012161854A2 (en) | 2011-05-23 | 2012-11-29 | Exxonmobil Upstream Research Company | Safety system for autonomous downhole tool |
US8893811B2 (en) | 2011-06-08 | 2014-11-25 | Halliburton Energy Services, Inc. | Responsively activated wellbore stimulation assemblies and methods of using the same |
US9200502B2 (en) * | 2011-06-22 | 2015-12-01 | Schlumberger Technology Corporation | Well-based fluid communication control assembly |
US8485225B2 (en) | 2011-06-29 | 2013-07-16 | Halliburton Energy Services, Inc. | Flow control screen assembly having remotely disabled reverse flow control capability |
US8739889B2 (en) | 2011-08-01 | 2014-06-03 | Baker Hughes Incorporated | Annular pressure regulating diaphragm and methods of using same |
US8899334B2 (en) | 2011-08-23 | 2014-12-02 | Halliburton Energy Services, Inc. | System and method for servicing a wellbore |
US8267178B1 (en) * | 2011-09-01 | 2012-09-18 | Team Oil Tools, Lp | Valve for hydraulic fracturing through cement outside casing |
EP2761125B1 (en) * | 2011-09-27 | 2018-11-07 | Halliburton Energy Services, Inc. | Wellbore flow control devices comprising coupled flow regulating assemblies and methods for use thereof |
US8955585B2 (en) | 2011-09-27 | 2015-02-17 | Halliburton Energy Services, Inc. | Forming inclusions in selected azimuthal orientations from a casing section |
US8662178B2 (en) | 2011-09-29 | 2014-03-04 | Halliburton Energy Services, Inc. | Responsively activated wellbore stimulation assemblies and methods of using the same |
GB2495502B (en) | 2011-10-11 | 2017-09-27 | Halliburton Mfg & Services Ltd | Valve actuating apparatus |
GB2495504B (en) | 2011-10-11 | 2018-05-23 | Halliburton Mfg & Services Limited | Downhole valve assembly |
GB2497913B (en) | 2011-10-11 | 2017-09-20 | Halliburton Mfg & Services Ltd | Valve actuating apparatus |
GB2497506B (en) | 2011-10-11 | 2017-10-11 | Halliburton Mfg & Services Ltd | Downhole contingency apparatus |
US9593559B2 (en) | 2011-10-12 | 2017-03-14 | Exxonmobil Upstream Research Company | Fluid filtering device for a wellbore and method for completing a wellbore |
AU2011378772B2 (en) * | 2011-10-14 | 2016-05-05 | Halliburton Energy Services, Inc. | Well screen with extending filter |
EP2820235B1 (en) * | 2012-03-02 | 2020-02-19 | Halliburton Energy Services Inc. | Downhole fluid flow control screen having autonomous pressure sensitive valve |
US9187991B2 (en) | 2012-03-02 | 2015-11-17 | Halliburton Energy Services, Inc. | Downhole fluid flow control system having pressure sensitive autonomous operation |
US8991509B2 (en) | 2012-04-30 | 2015-03-31 | Halliburton Energy Services, Inc. | Delayed activation activatable stimulation assembly |
US20130327138A1 (en) * | 2012-06-07 | 2013-12-12 | Bennett M. Richard | Systems and Methods for Distributed Downhole Sensing Using a Polymeric Sensor System |
US9784070B2 (en) | 2012-06-29 | 2017-10-10 | Halliburton Energy Services, Inc. | System and method for servicing a wellbore |
WO2014025338A1 (en) * | 2012-08-07 | 2014-02-13 | Halliburton Energy Services, Inc. | Mechanically adjustable flow control assembly |
US9033056B2 (en) | 2012-08-15 | 2015-05-19 | Halliburton Energy Srvices, Inc. | Pressure activated down hole systems and methods |
US9238954B2 (en) * | 2012-08-15 | 2016-01-19 | Halliburton Energy Services, Inc. | Pressure activated down hole systems and methods |
US8893783B2 (en) | 2012-09-26 | 2014-11-25 | Halliburton Energy Services, Inc. | Tubing conveyed multiple zone integrated intelligent well completion |
MX371144B (en) | 2012-09-26 | 2020-01-20 | Halliburton Energy Services Inc | Snorkel tube with debris barrier for electronic gauges placed on sand screens. |
EP2900904A1 (en) * | 2012-09-26 | 2015-08-05 | Halliburton Energy Services, Inc. | Single trip multi-zone completion systems and methods |
US9598952B2 (en) | 2012-09-26 | 2017-03-21 | Halliburton Energy Services, Inc. | Snorkel tube with debris barrier for electronic gauges placed on sand screens |
US8720553B2 (en) | 2012-09-26 | 2014-05-13 | Halliburton Energy Services, Inc. | Completion assembly and methods for use thereof |
BR112015006548B1 (en) * | 2012-09-26 | 2020-12-15 | Halliburton Energy Services, Inc | METHODS OF COMPLETING AN UNDERGROUND WELL, AND OF OPERATING A COMPLEMENTARY UNIT DURING THE PRODUCTION OF AN UNDERGROUND WELL, AND, COMPLETING UNIT TO OPERATE IN AN UNDERGROUND WELL |
US9163488B2 (en) | 2012-09-26 | 2015-10-20 | Halliburton Energy Services, Inc. | Multiple zone integrated intelligent well completion |
WO2014051564A1 (en) * | 2012-09-26 | 2014-04-03 | Halliburton Energy Services, Inc. | Single trip multi-zone completion systems and methods |
US8857518B1 (en) | 2012-09-26 | 2014-10-14 | Halliburton Energy Services, Inc. | Single trip multi-zone completion systems and methods |
BR112015006647B1 (en) * | 2012-09-26 | 2020-10-20 | Halliburton Energy Services, Inc | well sensor system and detection method in a well bore |
BR122015024188B1 (en) * | 2012-09-26 | 2021-05-04 | Halliburton Energy Services, Inc | METHOD OF PRODUCING ONE OR MORE TRAINING ZONES |
AU2012391060B2 (en) | 2012-09-26 | 2017-02-02 | Halliburton Energy Services, Inc. | Method of placing distributed pressure gauges across screens |
WO2014065962A1 (en) | 2012-10-26 | 2014-05-01 | Exxonmobil Upstream Research Company | Wellbore apparatus and method for sand control using gravel reserve |
WO2014070135A1 (en) * | 2012-10-29 | 2014-05-08 | Halliburton Energy Services, Inc. | Subterranean well tools with directionally controlling flow layer |
US9322239B2 (en) | 2012-11-13 | 2016-04-26 | Exxonmobil Upstream Research Company | Drag enhancing structures for downhole operations, and systems and methods including the same |
US10138707B2 (en) | 2012-11-13 | 2018-11-27 | Exxonmobil Upstream Research Company | Method for remediating a screen-out during well completion |
US9382781B2 (en) * | 2012-12-19 | 2016-07-05 | Baker Hughes Incorporated | Completion system for accomodating larger screen assemblies |
CN103075134B (en) * | 2013-01-18 | 2015-11-18 | 中国石油天然气股份有限公司 | Air injection and steam match note tubing string automatically |
CA2900131A1 (en) * | 2013-02-08 | 2014-08-14 | Petrowell Limited | Downhole tool and method |
US9759038B2 (en) | 2013-02-08 | 2017-09-12 | Weatherford Technology Holdings, Llc | Downhole tool and method |
WO2014149396A2 (en) | 2013-03-15 | 2014-09-25 | Exxonmobil Upstream Research Company | Apparatus and methods for well control |
US9725989B2 (en) | 2013-03-15 | 2017-08-08 | Exxonmobil Upstream Research Company | Sand control screen having improved reliability |
BR112015018227A2 (en) | 2013-03-21 | 2017-07-18 | Halliburton Energy Services Inc | pipeline pressure operated downhole fluid flow control system |
WO2014182311A1 (en) * | 2013-05-10 | 2014-11-13 | Halliburton Energy Services, Inc. | Interventionless downhole screen and method of actuation |
US9476282B2 (en) | 2013-06-24 | 2016-10-25 | Team Oil Tools, Lp | Method and apparatus for smooth bore toe valve |
US9828837B2 (en) | 2013-07-12 | 2017-11-28 | Baker Hughes | Flow control devices including a sand screen having integral standoffs and methods of using the same |
US9512701B2 (en) | 2013-07-12 | 2016-12-06 | Baker Hughes Incorporated | Flow control devices including a sand screen and an inflow control device for use in wellbores |
GB2534293B (en) | 2013-08-20 | 2017-04-19 | Halliburton Energy Services Inc | Sand control assemblies including flow rate regulators |
US10386215B2 (en) * | 2013-08-23 | 2019-08-20 | Baker Hughes, A Ge Company, Llc | Method for monitoring a flow using distributed acoustic sensing |
US10465461B2 (en) | 2013-09-16 | 2019-11-05 | Baker Hughes, A Ge Company, Llc | Apparatus and methods setting a string at particular locations in a wellbore for performing a wellbore operation |
US9926772B2 (en) | 2013-09-16 | 2018-03-27 | Baker Hughes, A Ge Company, Llc | Apparatus and methods for selectively treating production zones |
GB2532692B (en) | 2013-09-16 | 2017-02-01 | Baker Hughes Inc | Apparatus and methods for locating a particular location in a wellbore for performing a wellbore operation |
US9574408B2 (en) | 2014-03-07 | 2017-02-21 | Baker Hughes Incorporated | Wellbore strings containing expansion tools |
WO2015099685A1 (en) | 2013-12-23 | 2015-07-02 | Halliburton Energy Services Inc. | Adjustable choke device for a production tube |
US9879501B2 (en) | 2014-03-07 | 2018-01-30 | Baker Hughes, A Ge Company, Llc | Multizone retrieval system and method |
US9670756B2 (en) | 2014-04-08 | 2017-06-06 | Exxonmobil Upstream Research Company | Wellbore apparatus and method for sand control using gravel reserve |
US10145222B2 (en) | 2014-05-02 | 2018-12-04 | Superior Energy Services, Llc | Over-coupling screen communication system |
US10358897B2 (en) | 2014-05-02 | 2019-07-23 | Superior Energy Services, Llc | Over-coupling screen communication system |
WO2016028414A1 (en) | 2014-08-21 | 2016-02-25 | Exxonmobil Upstream Research Company | Bidirectional flow control device for facilitating stimulation treatments in a subterranean formation |
US9951596B2 (en) | 2014-10-16 | 2018-04-24 | Exxonmobil Uptream Research Company | Sliding sleeve for stimulating a horizontal wellbore, and method for completing a wellbore |
WO2016065233A1 (en) * | 2014-10-24 | 2016-04-28 | Schlumberger Canada Limited | Eutectic flow control devices |
GB2561606B (en) * | 2017-04-21 | 2021-01-13 | Weatherford Tech Holdings Llc | Downhole Valve Assembly |
WO2018226225A1 (en) | 2017-06-08 | 2018-12-13 | Schlumberger Technology Corporation | Hydraulic indexing system |
CN107461177B (en) * | 2017-09-04 | 2023-05-26 | 长江大学 | Pressure-controlled screen pipe device |
US10662745B2 (en) | 2017-11-22 | 2020-05-26 | Exxonmobil Upstream Research Company | Perforation devices including gas supply structures and methods of utilizing the same |
WO2019103777A1 (en) | 2017-11-22 | 2019-05-31 | Exxonmobil Upstream Research Company | Perforation devices including trajectory-altering structures and methods of utilizing the same |
JP6957027B2 (en) * | 2018-06-13 | 2021-11-02 | 株式会社みかづきハイドレート | Resource collection system using pressure-induced thermal shock wave conductor |
WO2019246501A1 (en) | 2018-06-22 | 2019-12-26 | Schlumberger Technology Corporation | Full bore electric flow control valve system |
AU2019304882B2 (en) * | 2018-07-19 | 2024-02-08 | Halliburton Energy Services, Inc. | Wireless electronic flow control node used in a screen joint with shunts |
US11536112B2 (en) | 2019-02-05 | 2022-12-27 | Schlumberger Technology Corporation | System and methodology for controlling actuation of devices downhole |
PE20212185A1 (en) | 2019-02-18 | 2021-11-11 | Lilly Co Eli | FORMULATION OF THERAPEUTIC ANTIBODIES |
CN112211602B (en) * | 2019-07-09 | 2022-07-05 | 中国石油天然气股份有限公司 | Gas quantity distribution device, gas distributor, pipe column for layered gas injection and method |
US11371623B2 (en) | 2019-09-18 | 2022-06-28 | Saudi Arabian Oil Company | Mechanisms and methods for closure of a flow control device |
US11041367B2 (en) | 2019-11-25 | 2021-06-22 | Saudi Arabian Oil Company | System and method for operating inflow control devices |
GB2610780A (en) * | 2020-07-20 | 2023-03-15 | Halliburton Energy Services Inc | Internally adjustable flow control module |
US20220235628A1 (en) * | 2021-01-28 | 2022-07-28 | Saudi Arabian Oil Company | Controlling fluid flow through a wellbore tubular |
GB2604371B (en) * | 2021-03-03 | 2023-12-06 | Equinor Energy As | Improved inflow control device |
US20230003104A1 (en) * | 2021-07-02 | 2023-01-05 | Halliburton Energy Services, Inc. | Pressure indication alignment using an orientation port and two radial orientation slots |
CN114542025B (en) * | 2022-03-16 | 2023-03-31 | 四川大学 | Three-stage adjustable throttling and pressure measuring preset underground throttle |
US20230304385A1 (en) * | 2022-03-24 | 2023-09-28 | Saudi Arabian Oil Company | Selective inflow control device, system, and method |
US11702904B1 (en) | 2022-09-19 | 2023-07-18 | Lonestar Completion Tools, LLC | Toe valve having integral valve body sub and sleeve |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5111883A (en) * | 1990-05-24 | 1992-05-12 | Winsor Savery | Vacuum apparatus and process for in-situ removing underground liquids and vapors |
US5896928A (en) * | 1996-07-01 | 1999-04-27 | Baker Hughes Incorporated | Flow restriction device for use in producing wells |
US6276458B1 (en) * | 1999-02-01 | 2001-08-21 | Schlumberger Technology Corporation | Apparatus and method for controlling fluid flow |
US6371208B1 (en) * | 1999-06-24 | 2002-04-16 | Baker Hughes Incorporated | Variable downhole choke |
US6371210B1 (en) * | 2000-10-10 | 2002-04-16 | Weatherford/Lamb, Inc. | Flow control apparatus for use in a wellbore |
US6405800B1 (en) * | 1999-01-21 | 2002-06-18 | Osca, Inc. | Method and apparatus for controlling fluid flow in a well |
Family Cites Families (122)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1975162A (en) | 1931-08-11 | 1934-10-02 | Leslie A Layne | Method for placing divided materials at relatively inaccessible points |
US2342913A (en) | 1940-04-15 | 1944-02-29 | Edward E Johnson Inc | Deep well screen |
US2344909A (en) | 1940-04-15 | 1944-03-21 | Edward E Johnson Inc | Deep well screen |
US3005507A (en) | 1957-09-30 | 1961-10-24 | Houston Oil Field Mat Co Inc | Fluid by-pass for rotary drill bits |
US3486558A (en) | 1968-08-05 | 1969-12-30 | Wilber A Maxwell | Apparatus for setting liners in boreholes of wells |
US3627046A (en) | 1969-11-10 | 1971-12-14 | Lynes Inc | Method and apparatus for positioning and gravel packing a production screen in a well bore |
US3865188A (en) | 1974-02-27 | 1975-02-11 | Gearhart Owen Industries | Method and apparatus for selectively isolating a zone of subterranean formation adjacent a well |
US4018283A (en) * | 1976-03-25 | 1977-04-19 | Exxon Production Research Company | Method and apparatus for gravel packing wells |
US4103741A (en) * | 1977-06-01 | 1978-08-01 | Tool Masters, Inc. | Oil well perforation testing device |
US4200150A (en) * | 1978-10-19 | 1980-04-29 | Texaco Inc. | Methods and hydraulically expandable self-cleaning sand screens |
US4418754A (en) | 1981-12-02 | 1983-12-06 | Halliburton Company | Method and apparatus for gravel packing a zone in a well |
US4428428A (en) | 1981-12-22 | 1984-01-31 | Dresser Industries, Inc. | Tool and method for gravel packing a well |
US4494608A (en) | 1982-12-06 | 1985-01-22 | Otis Engineering Corporation | Well injection system |
US4553595A (en) | 1984-06-01 | 1985-11-19 | Texaco Inc. | Method for forming a gravel packed horizontal well |
US4558742A (en) | 1984-07-13 | 1985-12-17 | Texaco Inc. | Method and apparatus for gravel packing horizontal wells |
US4646839A (en) | 1984-11-23 | 1987-03-03 | Exxon Production Research Co. | Method and apparatus for through-the-flowline gravel packing |
US4627488A (en) | 1985-02-20 | 1986-12-09 | Halliburton Company | Isolation gravel packer |
US4886432A (en) | 1988-06-23 | 1989-12-12 | Engineering Enterprises, Inc. | Bladder pump assembly |
US4932474A (en) | 1988-07-14 | 1990-06-12 | Marathon Oil Company | Staged screen assembly for gravel packing |
US4858690A (en) | 1988-07-27 | 1989-08-22 | Completion Services, Inc. | Upward movement only actuated gravel pack system |
US5228526A (en) | 1989-06-23 | 1993-07-20 | Vshivkov Andrei N | Overflow valve of drill string |
US4945991A (en) | 1989-08-23 | 1990-08-07 | Mobile Oil Corporation | Method for gravel packing wells |
US5008664A (en) * | 1990-01-23 | 1991-04-16 | Quantum Solutions, Inc. | Apparatus for inductively coupling signals between a downhole sensor and the surface |
US5082052A (en) | 1991-01-31 | 1992-01-21 | Mobil Oil Corporation | Apparatus for gravel packing wells |
US5113935A (en) | 1991-05-01 | 1992-05-19 | Mobil Oil Corporation | Gravel packing of wells |
US5161613A (en) | 1991-08-16 | 1992-11-10 | Mobil Oil Corporation | Apparatus for treating formations using alternate flowpaths |
US5161618A (en) | 1991-08-16 | 1992-11-10 | Mobil Oil Corporation | Multiple fractures from a single workstring |
DE4138414C2 (en) * | 1991-11-22 | 1993-10-07 | Ieg Ind Engineering Gmbh | Arrangement for cleaning contaminated groundwater |
US5343949A (en) | 1992-09-10 | 1994-09-06 | Halliburton Company | Isolation washpipe for earth well completions and method for use in gravel packing a well |
NO306127B1 (en) | 1992-09-18 | 1999-09-20 | Norsk Hydro As | Process and production piping for the production of oil or gas from an oil or gas reservoir |
US5361843A (en) * | 1992-09-24 | 1994-11-08 | Halliburton Company | Dedicated perforatable nipple with integral isolation sleeve |
US5355956A (en) | 1992-09-28 | 1994-10-18 | Halliburton Company | Plugged base pipe for sand control |
US5309988A (en) | 1992-11-20 | 1994-05-10 | Halliburton Company | Electromechanical shifter apparatus for subsurface well flow control |
US5332039A (en) | 1992-12-07 | 1994-07-26 | Texaco Inc. | Selective dual gravel pack |
US5333688A (en) | 1993-01-07 | 1994-08-02 | Mobil Oil Corporation | Method and apparatus for gravel packing of wells |
US5636487A (en) * | 1993-10-12 | 1997-06-10 | Fligg; Robert E. | Insulation supporting strip and holding bracket for receiving it |
US5390966A (en) | 1993-10-22 | 1995-02-21 | Mobil Oil Corporation | Single connector for shunt conduits on well tool |
US5386874A (en) | 1993-11-08 | 1995-02-07 | Halliburton Company | Perphosphate viscosity breakers in well fracture fluids |
US5419394A (en) | 1993-11-22 | 1995-05-30 | Mobil Oil Corporation | Tools for delivering fluid to spaced levels in a wellbore |
US5443117A (en) | 1994-02-07 | 1995-08-22 | Halliburton Company | Frac pack flow sub |
US5476143A (en) | 1994-04-28 | 1995-12-19 | Nagaoka International Corporation | Well screen having slurry flow paths |
US5609204A (en) | 1995-01-05 | 1997-03-11 | Osca, Inc. | Isolation system and gravel pack assembly |
US5515915A (en) | 1995-04-10 | 1996-05-14 | Mobil Oil Corporation | Well screen having internal shunt tubes |
US5588487A (en) | 1995-09-12 | 1996-12-31 | Mobil Oil Corporation | Tool for blocking axial flow in gravel-packed well annulus |
US5636691A (en) | 1995-09-18 | 1997-06-10 | Halliburton Energy Services, Inc. | Abrasive slurry delivery apparatus and methods of using same |
NO954352D0 (en) | 1995-10-30 | 1995-10-30 | Norsk Hydro As | Device for flow control in a production pipe for production of oil or gas from an oil and / or gas reservoir |
UA67719C2 (en) * | 1995-11-08 | 2004-07-15 | Shell Int Research | Deformable well filter and method for its installation |
US5722490A (en) | 1995-12-20 | 1998-03-03 | Ely And Associates, Inc. | Method of completing and hydraulic fracturing of a well |
US5676208A (en) | 1996-01-11 | 1997-10-14 | Halliburton Company | Apparatus and methods of preventing screen collapse in gravel packing operations |
US5730223A (en) | 1996-01-24 | 1998-03-24 | Halliburton Energy Services, Inc. | Sand control screen assembly having an adjustable flow rate and associated methods of completing a subterranean well |
US5699860A (en) | 1996-02-22 | 1997-12-23 | Halliburton Energy Services, Inc. | Fracture propping agents and methods |
GB2320731B (en) | 1996-04-01 | 2000-10-25 | Baker Hughes Inc | Downhole flow control devices |
AU3880397A (en) * | 1996-07-11 | 1998-02-09 | Board Of Trustees Of The Leland Stanford Junior University | High-speed inter-modality image registration via iterative feature matching |
US6047773A (en) | 1996-08-09 | 2000-04-11 | Halliburton Energy Services, Inc. | Apparatus and methods for stimulating a subterranean well |
US5848645A (en) | 1996-09-05 | 1998-12-15 | Mobil Oil Corporation | Method for fracturing and gravel-packing a well |
US6116343A (en) | 1997-02-03 | 2000-09-12 | Halliburton Energy Services, Inc. | One-trip well perforation/proppant fracturing apparatus and methods |
US5842516A (en) | 1997-04-04 | 1998-12-01 | Mobil Oil Corporation | Erosion-resistant inserts for fluid outlets in a well tool and method for installing same |
US5868200A (en) | 1997-04-17 | 1999-02-09 | Mobil Oil Corporation | Alternate-path well screen having protected shunt connection |
US5921318A (en) | 1997-04-21 | 1999-07-13 | Halliburton Energy Services, Inc. | Method and apparatus for treating multiple production zones |
US6281489B1 (en) * | 1997-05-02 | 2001-08-28 | Baker Hughes Incorporated | Monitoring of downhole parameters and tools utilizing fiber optics |
CA2236944C (en) | 1997-05-06 | 2005-12-13 | Baker Hughes Incorporated | Flow control apparatus and methods |
US5890533A (en) | 1997-07-29 | 1999-04-06 | Mobil Oil Corporation | Alternate path well tool having an internal shunt tube |
US5988285A (en) | 1997-08-25 | 1999-11-23 | Schlumberger Technology Corporation | Zone isolation system |
US5964296A (en) | 1997-09-18 | 1999-10-12 | Halliburton Energy Services, Inc. | Formation fracturing and gravel packing tool |
GB9721496D0 (en) | 1997-10-09 | 1997-12-10 | Ocre Scotland Ltd | Downhole valve |
US6481494B1 (en) | 1997-10-16 | 2002-11-19 | Halliburton Energy Services, Inc. | Method and apparatus for frac/gravel packs |
US6003600A (en) | 1997-10-16 | 1999-12-21 | Halliburton Energy Services, Inc. | Methods of completing wells in unconsolidated subterranean zones |
US6397950B1 (en) | 1997-11-21 | 2002-06-04 | Halliburton Energy Services, Inc. | Apparatus and method for removing a frangible rupture disc or other frangible device from a wellbore casing |
US6059032A (en) | 1997-12-10 | 2000-05-09 | Mobil Oil Corporation | Method and apparatus for treating long formation intervals |
US6082454A (en) * | 1998-04-21 | 2000-07-04 | Baker Hughes Incorporated | Spooled coiled tubing strings for use in wellbores |
US6302208B1 (en) | 1998-05-15 | 2001-10-16 | David Joseph Walker | Gravel pack isolation system |
US6257338B1 (en) | 1998-11-02 | 2001-07-10 | Halliburton Energy Services, Inc. | Method and apparatus for controlling fluid flow within wellbore with selectively set and unset packer assembly |
US6619397B2 (en) | 1998-11-03 | 2003-09-16 | Baker Hughes Incorporated | Unconsolidated zonal isolation and control |
US6263966B1 (en) * | 1998-11-16 | 2001-07-24 | Halliburton Energy Services, Inc. | Expandable well screen |
US6450263B1 (en) | 1998-12-01 | 2002-09-17 | Halliburton Energy Services, Inc. | Remotely actuated rupture disk |
US6230803B1 (en) | 1998-12-03 | 2001-05-15 | Baker Hughes Incorporated | Apparatus and method for treating and gravel-packing closely spaced zones |
FR2790508B1 (en) | 1999-03-05 | 2001-04-27 | Schlumberger Services Petrol | WELL BOTTOM FLOW CONTROL DEVICE, EQUIPPED WITH A GASKET PROTECTIVE SHIRT |
US6227303B1 (en) | 1999-04-13 | 2001-05-08 | Mobil Oil Corporation | Well screen having an internal alternate flowpath |
US6347666B1 (en) * | 1999-04-22 | 2002-02-19 | Schlumberger Technology Corporation | Method and apparatus for continuously testing a well |
US6679324B2 (en) | 1999-04-29 | 2004-01-20 | Shell Oil Company | Downhole device for controlling fluid flow in a well |
US6513599B1 (en) | 1999-08-09 | 2003-02-04 | Schlumberger Technology Corporation | Thru-tubing sand control method and apparatus |
US6220345B1 (en) | 1999-08-19 | 2001-04-24 | Mobil Oil Corporation | Well screen having an internal alternate flowpath |
US6343651B1 (en) | 1999-10-18 | 2002-02-05 | Schlumberger Technology Corporation | Apparatus and method for controlling fluid flow with sand control |
US6446729B1 (en) | 1999-10-18 | 2002-09-10 | Schlumberger Technology Corporation | Sand control method and apparatus |
AU782553B2 (en) * | 2000-01-05 | 2005-08-11 | Baker Hughes Incorporated | Method of providing hydraulic/fiber conduits adjacent bottom hole assemblies for multi-step completions |
US6478091B1 (en) | 2000-05-04 | 2002-11-12 | Halliburton Energy Services, Inc. | Expandable liner and associated methods of regulating fluid flow in a well |
US6457518B1 (en) | 2000-05-05 | 2002-10-01 | Halliburton Energy Services, Inc. | Expandable well screen |
GB2362398B (en) * | 2000-05-16 | 2002-11-13 | Fmc Corp | Device for installation and flow test of subsea completions |
US6554064B1 (en) * | 2000-07-13 | 2003-04-29 | Halliburton Energy Services, Inc. | Method and apparatus for a sand screen with integrated sensors |
DZ3387A1 (en) | 2000-07-18 | 2002-01-24 | Exxonmobil Upstream Res Co | PROCESS FOR TREATING MULTIPLE INTERVALS IN A WELLBORE |
US6789621B2 (en) | 2000-08-03 | 2004-09-14 | Schlumberger Technology Corporation | Intelligent well system and method |
US6695054B2 (en) | 2001-01-16 | 2004-02-24 | Schlumberger Technology Corporation | Expandable sand screen and methods for use |
US6681854B2 (en) | 2000-11-03 | 2004-01-27 | Schlumberger Technology Corp. | Sand screen with communication line conduit |
US6848510B2 (en) | 2001-01-16 | 2005-02-01 | Schlumberger Technology Corporation | Screen and method having a partial screen wrap |
US6494261B1 (en) | 2000-08-16 | 2002-12-17 | Halliburton Energy Services, Inc. | Apparatus and methods for perforating a subterranean formation |
GB2399847A (en) * | 2000-08-17 | 2004-09-29 | Abb Offshore Systems Ltd | Flow control device |
US6464007B1 (en) | 2000-08-22 | 2002-10-15 | Exxonmobil Oil Corporation | Method and well tool for gravel packing a long well interval using low viscosity fluids |
GB2368079B (en) * | 2000-10-18 | 2005-07-27 | Renovus Ltd | Well control |
US20020088744A1 (en) * | 2001-01-11 | 2002-07-11 | Echols Ralph H. | Well screen having a line extending therethrough |
US6805202B2 (en) | 2001-01-16 | 2004-10-19 | Weatherford/Lamb, Inc. | Well screen cover |
US6488082B2 (en) | 2001-01-23 | 2002-12-03 | Halliburton Energy Services, Inc. | Remotely operated multi-zone packing system |
GB2371319B (en) * | 2001-01-23 | 2003-08-13 | Schlumberger Holdings | Completion Assemblies |
US6622794B2 (en) | 2001-01-26 | 2003-09-23 | Baker Hughes Incorporated | Sand screen with active flow control and associated method of use |
US6684950B2 (en) * | 2001-03-01 | 2004-02-03 | Schlumberger Technology Corporation | System for pressure testing tubing |
US6557634B2 (en) | 2001-03-06 | 2003-05-06 | Halliburton Energy Services, Inc. | Apparatus and method for gravel packing an interval of a wellbore |
US6644412B2 (en) | 2001-04-25 | 2003-11-11 | Weatherford/Lamb, Inc. | Flow control apparatus for use in a wellbore |
US6786285B2 (en) | 2001-06-12 | 2004-09-07 | Schlumberger Technology Corporation | Flow control regulation method and apparatus |
US6588507B2 (en) * | 2001-06-28 | 2003-07-08 | Halliburton Energy Services, Inc. | Apparatus and method for progressively gravel packing an interval of a wellbore |
US6877553B2 (en) * | 2001-09-26 | 2005-04-12 | Weatherford/Lamb, Inc. | Profiled recess for instrumented expandable components |
US6932161B2 (en) * | 2001-09-26 | 2005-08-23 | Weatherford/Lams, Inc. | Profiled encapsulation for use with instrumented expandable tubular completions |
US6772837B2 (en) * | 2001-10-22 | 2004-08-10 | Halliburton Energy Services, Inc. | Screen assembly having diverter members and method for progressively treating an interval of a welibore |
US6719064B2 (en) * | 2001-11-13 | 2004-04-13 | Schlumberger Technology Corporation | Expandable completion system and method |
US6719051B2 (en) | 2002-01-25 | 2004-04-13 | Halliburton Energy Services, Inc. | Sand control screen assembly and treatment method using the same |
US6899176B2 (en) | 2002-01-25 | 2005-05-31 | Halliburton Energy Services, Inc. | Sand control screen assembly and treatment method using the same |
US7096945B2 (en) * | 2002-01-25 | 2006-08-29 | Halliburton Energy Services, Inc. | Sand control screen assembly and treatment method using the same |
US20030141062A1 (en) * | 2002-01-30 | 2003-07-31 | Cowan Jack C. | Method for decreasing lost circulation during well operations using water absorbent polymers |
US6776238B2 (en) * | 2002-04-09 | 2004-08-17 | Halliburton Energy Services, Inc. | Single trip method for selectively fracture packing multiple formations traversed by a wellbore |
US7055598B2 (en) * | 2002-08-26 | 2006-06-06 | Halliburton Energy Services, Inc. | Fluid flow control device and method for use of same |
US6854522B2 (en) * | 2002-09-23 | 2005-02-15 | Halliburton Energy Services, Inc. | Annular isolators for expandable tubulars in wellbores |
US6886634B2 (en) | 2003-01-15 | 2005-05-03 | Halliburton Energy Services, Inc. | Sand control screen assembly having an internal isolation member and treatment method using the same |
US6857476B2 (en) | 2003-01-15 | 2005-02-22 | Halliburton Energy Services, Inc. | Sand control screen assembly having an internal seal element and treatment method using the same |
US8011438B2 (en) * | 2005-02-23 | 2011-09-06 | Schlumberger Technology Corporation | Downhole flow control with selective permeability |
-
2002
- 2002-08-26 US US10/227,935 patent/US7055598B2/en not_active Expired - Fee Related
-
2003
- 2003-05-27 US US10/445,818 patent/US20040035591A1/en not_active Abandoned
- 2003-07-31 AU AU2003261322A patent/AU2003261322A1/en not_active Abandoned
- 2003-07-31 WO PCT/US2003/024003 patent/WO2004018839A2/en not_active Application Discontinuation
-
2004
- 2004-02-09 ES ES10005235.6T patent/ES2676544T3/en not_active Expired - Lifetime
- 2004-02-09 HU HUE10005235A patent/HUE038498T2/en unknown
-
2006
- 2006-03-21 US US11/385,167 patent/US20060157257A1/en not_active Abandoned
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5111883A (en) * | 1990-05-24 | 1992-05-12 | Winsor Savery | Vacuum apparatus and process for in-situ removing underground liquids and vapors |
US5896928A (en) * | 1996-07-01 | 1999-04-27 | Baker Hughes Incorporated | Flow restriction device for use in producing wells |
US6405800B1 (en) * | 1999-01-21 | 2002-06-18 | Osca, Inc. | Method and apparatus for controlling fluid flow in a well |
US6276458B1 (en) * | 1999-02-01 | 2001-08-21 | Schlumberger Technology Corporation | Apparatus and method for controlling fluid flow |
US6371208B1 (en) * | 1999-06-24 | 2002-04-16 | Baker Hughes Incorporated | Variable downhole choke |
US6371210B1 (en) * | 2000-10-10 | 2002-04-16 | Weatherford/Lamb, Inc. | Flow control apparatus for use in a wellbore |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7419002B2 (en) | 2001-03-20 | 2008-09-02 | Reslink G.S. | Flow control device for choking inflowing fluids in a well |
US7673678B2 (en) | 2004-12-21 | 2010-03-09 | Schlumberger Technology Corporation | Flow control device with a permeable membrane |
US7543641B2 (en) | 2006-03-29 | 2009-06-09 | Schlumberger Technology Corporation | System and method for controlling wellbore pressure during gravel packing operations |
US7857050B2 (en) | 2006-05-26 | 2010-12-28 | Schlumberger Technology Corporation | Flow control using a tortuous path |
US8196668B2 (en) | 2006-12-18 | 2012-06-12 | Schlumberger Technology Corporation | Method and apparatus for completing a well |
US8025072B2 (en) | 2006-12-21 | 2011-09-27 | Schlumberger Technology Corporation | Developing a flow control system for a well |
US7789145B2 (en) | 2007-06-20 | 2010-09-07 | Schlumberger Technology Corporation | Inflow control device |
Also Published As
Publication number | Publication date |
---|---|
US7055598B2 (en) | 2006-06-06 |
US20060157257A1 (en) | 2006-07-20 |
HUE038498T2 (en) | 2018-10-29 |
ES2676544T3 (en) | 2018-07-20 |
WO2004018839A3 (en) | 2004-06-03 |
US20040035578A1 (en) | 2004-02-26 |
US20040035591A1 (en) | 2004-02-26 |
AU2003261322A1 (en) | 2004-03-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7055598B2 (en) | Fluid flow control device and method for use of same | |
EP1423583B1 (en) | Adjustable well screen assembly | |
US6702018B2 (en) | Apparatus and method for gravel packing an interval of a wellbore | |
CN100353022C (en) | Surface flow controlled valve and screen | |
US6978840B2 (en) | Well screen assembly and system with controllable variable flow area and method of using same for oil well fluid production | |
US7367395B2 (en) | Sand control completion having smart well capability and method for use of same | |
US7243724B2 (en) | Apparatus and method for treating an interval of a wellbore | |
EP0786577B1 (en) | Sand control screen assembly having an adjustable flow rate and associated methods of completing a subterranean well | |
AU2002339538A1 (en) | Adjustable well screen assembly | |
US6814139B2 (en) | Gravel packing apparatus having an integrated joint connection and method for use of same | |
OA12723A (en) | Well communication system. | |
US11512563B2 (en) | Systems and methods for opening screen joints | |
AU2016216652B2 (en) | Gravel Packing Apparatus Having Locking Jumper Tubes | |
EP2900905B1 (en) | Tubing conveyed multiple zone integrated intelligent well completion | |
US20030188865A1 (en) | Method for assembly of a gravel packing apparatus having expandable channels |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AK | Designated states |
Kind code of ref document: A2 Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BY BZ CA CH CN CO CR CU CZ DE DK DM DZ EC EE ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NO NZ OM PH PL PT RO RU SC SD SE SG SK SL TJ TM TN TR TT TZ UA UG UZ VC VN YU ZA ZM ZW |
|
AL | Designated countries for regional patents |
Kind code of ref document: A2 Designated state(s): GH GM KE LS MW MZ SD SL SZ TZ UG ZM ZW AM AZ BY KG KZ MD RU TJ TM AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LU MC NL PT RO SE SI SK TR BF BJ CF CG CI CM GA GN GQ GW ML MR NE SN TD TG |
|
121 | Ep: the epo has been informed by wipo that ep was designated in this application | ||
122 | Ep: pct application non-entry in european phase | ||
NENP | Non-entry into the national phase |
Ref country code: JP |
|
WWW | Wipo information: withdrawn in national office |
Country of ref document: JP |