WO2006138530A1 - Apparatus, method and system for improved reservoir simulation using an algebraic cascading class linear solver - Google Patents

Apparatus, method and system for improved reservoir simulation using an algebraic cascading class linear solver Download PDF

Info

Publication number
WO2006138530A1
WO2006138530A1 PCT/US2006/023433 US2006023433W WO2006138530A1 WO 2006138530 A1 WO2006138530 A1 WO 2006138530A1 US 2006023433 W US2006023433 W US 2006023433W WO 2006138530 A1 WO2006138530 A1 WO 2006138530A1
Authority
WO
WIPO (PCT)
Prior art keywords
connector
cell
class
cells
connectors
Prior art date
Application number
PCT/US2006/023433
Other languages
French (fr)
Inventor
Hamdi A. Tchelepi
John Wallis
Original Assignee
Schlumberger Technology Corporation
Schlumberger Canada Limited
Services Petroliers Schlumberger
Logined B.V.
Prad Research And Development Limited
Chevron U.S.A. Inc.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Schlumberger Technology Corporation, Schlumberger Canada Limited, Services Petroliers Schlumberger, Logined B.V., Prad Research And Development Limited, Chevron U.S.A. Inc. filed Critical Schlumberger Technology Corporation
Priority to EP06799947A priority Critical patent/EP1893845A1/en
Priority to CN2006800297420A priority patent/CN101287889B/en
Priority to MX2007015937A priority patent/MX2007015937A/en
Priority to CA2612093A priority patent/CA2612093C/en
Priority to AU2006259275A priority patent/AU2006259275B2/en
Priority to EA200800048A priority patent/EA011908B1/en
Publication of WO2006138530A1 publication Critical patent/WO2006138530A1/en
Priority to NO20080180A priority patent/NO20080180L/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B49/00Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
    • G01V20/00
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V2210/00Details of seismic processing or analysis
    • G01V2210/60Analysis
    • G01V2210/66Subsurface modeling
    • G01V2210/663Modeling production-induced effects

Definitions

  • This invention relates to apparatuses, methods and systems for use in reservoir simulation.
  • the invention provides methods, apparatuses and systems for more effectively and efficiently simulating fluid flow in reservoirs using an algebraic cascading class linear solver.
  • unknown properties include, but are not limited to, fluid properties such as water saturation or temperature, for example, or to "rock properties,” such as permeability or porosity to name a few.
  • fluid properties such as water saturation or temperature, for example, or to "rock properties,” such as permeability or porosity to name a few.
  • rock properties such as permeability or porosity to name a few.
  • a cell treated as if it has only a single unknown (typically pressure) is called herein a “single variable cell,” while a cell with more than one unknown is called herein a “multi-variable cell.”
  • a matrix can be constructed to represent the gridded region of interest based on the different types of cells.
  • an object of the present invention is to provide methods, apparatuses and systems for more effectively and efficiently simulating fluid flow in reservoirs while eliminating or minimizing the impact of the problems and limitations described.
  • AIM adaptive implicit method
  • the present invention includes a method for conducting a reservoir simulation with the use of a reservoir model of a region of interest of the reservoir.
  • the region of interest has been gridded into a plurality of cells, each cell having one or more unknown variable and each cell having a node.
  • the steps of the method include creating a graph of the cell nodes; imposing an initial decomposition of the graph into a pre-specified number of domains, such that each cell exists in at least one domain; numbering the cells and the domains, each cell having a key and each cell having a class, wherein the key of each cell is the set of domain numbers to which the cell belongs and the class of each cell being the number of elements in the cell's key; grouping the cells into connectors, each connector being the set of cells that share the same key, with each connector having a connector class, the connector class being the number of elements in the key of each connector; performing a connector reduction step; resetting the class of all locally maximum class connectors to the maximum class held by any connector; forcing the maximum class connectors to contain only one cell; ordering the connectors in increasing order of class; constructing interpolation operator and restriction operator from the ordered connectors; and using the interpolation operator and restriction operator to construct a coarse grid.
  • the coarse grid may be used to determine the unknown variables of the cells.
  • the results of the simulation to may be used to identify opportunities for improving production from the reservoir. One or more of these opportunities may be acted upon to improve production from the reservoir.
  • the gridding may be structured or unstructured.
  • the graph may be two or three dimensional.
  • the simulation may be displayed.
  • the connector reduction step may include merging each connector having only one higher-order neighbor connector with such higher- order neighbor connector.
  • the present invention includes a program storage device readable by a machine, tangibly embodying a program of instructions executable by the machine to perform method steps for conducting a reservoir simulation using a reservoir model wherein a region of interest has been gridded into a plurality of cells. Each cell has one or more unknown variable and each cell has a node.
  • the methods steps may include creating a graph of the cell nodes; imposing an initial decomposition of the graph into a pre-specified number of domains, such that each cell exists in at least one domain; numbering the cells and the domains, each cell having a key and each cell having a class, wherein the key of each cell is the set of domain numbers to which the cell belongs and the class of each cell being the number of elements in the key of the cell; grouping the cells into connectors, each connector being the set of cells that share the same key, with each connector having a connector class, the connector class being the number of elements in the key of each connector; performing a connector reduction step; resetting the class of all locally maximum class connectors to the maximum class held by any connector; forcing the maximum class connector to contain only one cell; ordering the connectors in increasing order of class; constructing interpolation operator and restriction operator from the ordered connectors; and using the interpolation operator and restriction operator to construct a coarse grid.
  • the method steps of program storage device may further include using the coarse grid to determine the unknown variables of the cells.
  • the program storage device may be used for hydrocarbon reservoirs the method steps of the program storage device may also include using results of the simulation to identify opportunities for improving production from the reservoir.
  • the grid may be structured or unstructured.
  • the graph may be two dimensional.
  • the graph may be three dimensional.
  • the method steps of the program storage device may further include displaying the simulation.
  • the simulation may be displayed on many types of display systems, such as for example a computer monitor or a three dimensional display system.
  • the connector reduction step may include merging each connector having only one higher-order neighbor connector with such higher-order neighbor connector.
  • the program storage device may comprise a compact disk.
  • the program storage device may comprise memory on a computer hard drive.
  • the present invention includes a simulation apparatus responsive to input data, adapted for solving a system of linear equations that represent a particular entity, said simulation apparatus generating a set of simulation results when said system of linear equations are solved, said set of simulation results including one or more parameters which characterize said particular entity.
  • a representation of the entity has been gridded into cells, each cell having one or more unknown variable and each cell having a node.
  • the simulation apparatus includes a means for graphing the cell nodes; a means for imposing an initial decomposition of the graph into a pre- specif ⁇ ed number of domains, such that each cell exists in at least one domain; a second means for numbering the cells and the domains; an assigning means for assigning each cell a key such that the key of each cell is the set of domain numbers to which the cell belongs; a second assigning means for assigning each cell a class, the class of each cell being the number of elements in the cell's key; a grouping means for grouping the cells into connectors, each connector being the set of cells that share the same key, with each connector having a connector class, the connector class being the number of elements in the key of each connector; a connector reduction means; a reset means for resetting the class of all locally maximum class connectors to the maximum class held by any connector; a limiting means to force the maximum class connector to contain only one cell; an ordering means to order the connectors in increasing order of class; a means to construct interpolation
  • the simulation apparatus may also include a determining means for using the coarse grid to determine the unknown variables of the cells. If the particular entity is a hydrocarbon reservoir, the simulation apparatus may also include means for using results from the simulation apparatus to identify opportunities for improving production from the reservoir. . If the particular entity is a water producing reservoir, the simulation apparatus may also include means for using results from the simulation apparatus to identify opportunities for improving production from the reservoir or for inhibiting salt water contamination of the reservoir.
  • the grid may be structured or unstructured.
  • the graph may be two dimensional.
  • the grapli may be three dimensional.
  • the simulation apparatus may also include display means for displaying the simulation.
  • the display means may include a computer monitor.
  • the display means may include a three dimensional display system.
  • the connector reduction means may include identifying each connector having only one higher-order neighbor connector and merging each such connector with its higher-order neighbor connector.
  • a sparse matrix is used to represent the graph, the sparse matrix taking the form of A - [a y ⁇ " . where n is the number of cells.
  • the present invention includes an apparatus responsive to a set of input data for displaying a gridded representation of an earth formation.
  • the gridded representation is comprised of a plurality of grid cells and a plurality of simulation results associated with, respectively, with the plurality of cells. Each cell has one or more unknown variables and each cell has a node.
  • the apparatus includes a means for creating a graph of the cell nodes; a means for imposing an initial decomposition of the graph into a pre-specified number of domains, such that each cell exists in at least one domain; a second means for numbering the cells and the domains, an assigning means for assigning each cell a key such that the key of each cell is the set of domain numbers to which the cell belongs; a second assigning means for assigning each cell a class, the class of each cell being the number of elements in the cell's key; a grouping means for grouping the cells into connectors, each connector being the set of cells that share the same key, with each connector having a connector class, the connector class being the number of elements in the key of each connector; a connector reduction means; a reset means for resetting the class of all locally maximum class connectors to the maximum class held by any connector; a limiting means to force the maximum class connector to contain only one cell; an ordering means to order the connectors in increasing order of class; a means to construct interpolation operator
  • the apparatus may also include a determining means for using the coarse grid to determine the unknown variables of the cells.
  • the apparatus may also include means for using results of the simulation to identify opportunities for improving production from the earth formation.
  • the grid may be structured or unstructured.
  • the graph may be two dimensional.
  • the graph may include three dimensions.
  • the apparatus may include a display for displaying the simulation.
  • the display may be many things including but not limited to a computer monitor or a three-dimensional display system.
  • the connector reduction means may include merging each connector which has only one higher-order neighbor connector with such higher-order neighbor connector.
  • the invention includes a method for conducting a reservoir simulation with the use of a reservoir model of a zone of interest, the zone of interest having been gridded into a plurality of cells.
  • Each cell has one or more unknown variables.
  • the method steps include imposing an initial decomposition of the grid into a pre-specif ⁇ ed number of regions, such that each cell exists in at least one region; numbering the cells and the regions, each cell having a key and each cell having a class, wherein the key of each cell is the set of region numbers to which the cell belongs and the class of each cell being the number of elements in the cell's key; grouping the cells into connectors, each connector being the set of cells that share the same key, with each connector having a connector class, the connector class being the number of elements in the key of each connector; performing the connector reduction step; resetting the class of all locally maximum class connectors to the maximum class held by any connector; forcing the maximum class connectors to contain only one cell; ordering the connectors in increasing order of class; constructing interpolation operator
  • the method may also include using the coarse grid to determine the unknown variables of the cells.
  • the gridding may structured or unstructured.
  • the graph may be two dimensional or more than two dimensional.
  • the method may include displaying the simulation.
  • the connector reduction means may include merging each connector which has only one higher-order neighbor connector with such higher-order neighbor connector.
  • the invention includes a program storage device readable by a machine, tangibly embodying a program of instructions executable by the machine to perform method steps for conducting a reservoir simulation using a reservoir model wherein a zone of interest has been gridded into a plurality of cells. Each cell has one or more unknown variables.
  • the method steps may include imposing an initial decomposition of the grid into a pre-specified number of regions, such that each cell exists in at least one region; numbering the cells and the region s, each cell having a key and each cell having a class, wherein the key of each cell is the set of region numbers to which the cell belongs and the class of each cell being the number of elements in the key of the cell; grouping the cells into connectors, each connector being the set of cells that share the same key, with each connector having a connector class, the connector class being the number of elements in the key of each connector; performing a connector reduction step; reset the class of all locally maximum class connectors to the maximum class held by any connector; force the maximum class connector to contain only one cell; order the connectors in increasing order of class; construct interpolation operator and restriction operator from the ordered connectors; use the interpolation operator and restriction operator to construct a coarse grid; and use the coarse grid to determine the unknown variables of the cells.
  • FlG. Ia illustrates a representation of a reservoir.
  • FlG. Ib illustrates an exploded view of a section in the reservoir depicted in FiG. Ia.
  • FlG. 2 is a flowchart of a preferred embodiment of the present invention.
  • FlG. 3 depicts a simplified, three-dimensional view of a region of interest in a reservoir, gridded in accordance with a preferred embodiment of the present invention.
  • FlG. 4 depicts a two-dimensional view of a region of interest 25 in a reservoir (not separately depicted in FlG. 4), finely gridded in accordance with a preferred embodiment of the invention
  • FlG. 5 depicts a simplified, two-dimensional view of a region of interest in a reservoir, the region of interest having been gridded into cells, in accordance with a preferred embodiment of the present invention.
  • FiG. 6 depicts a simplified two-dimensional view of a group of connectors in accordance with a preferred embodiment of the present invention.
  • FiG. 7 depicts ACC ordering in accordance with a preferred embodiment of the present invention.
  • FiG. 8 depicts a multilinear basis function in accordance with a preferred embodiment of the present invention.
  • FiG. 9 depicts a finite element triangulation with 900 nodes (isotropic case) in accordance with a preferred embodiment of the present invention.
  • FiG. 10 depicts ACC ordering on a matrix structure in accordance with a preferred embodiment of the present invention.
  • FiG. 11 depicts a finite element triangulation with 900 nodes (anisotropic case) in accordance with a preferred embodiment of the present invention.
  • FiG. 12 depicts a result of implementing certain steps of FiG. 2, in accordance with a preferred embodiment of the present invention, on the subset of connectors depicted in FIG. 6.
  • FIG. 13 depicts flowchart detailing step 152 of FiG. 2, in accordance with a preferred embodiment of the present invention.
  • FIG. 14 depicts an example of a plot of RAP , a coarse grid matrix, in accordance with a preferred embodiment of the present invention.
  • FiG. Ia illustrates a representation of a reservoir 10, with a section 12, which is depicted in an exploded (two dimensional) view in FlG. Ib.
  • Reservoirs 10 (below the water table) typically contain fluid 20, such as oil, gas, water or a mixture of two or three of those substances filling the pore spaces between the porous media 22 (such as, for example, sandstone or limestone) that makes up the rock of the reservoir.
  • FiG. 2 depicts a flowchart of a preferred embodiment of the present invention. After starting 100, the first step is to grid 110 a region of interest into cells, each cell having a node in its center. Represent 120 a graph of the cell nodes by a sparse matrix:
  • n is the total number of cells. FiG. 2 is further discussed herein.
  • FlG. 3 depicts a three-dimensional view of a region of interest 25 in a reservoir (not separately depicted in FlG. 3), finely gridded in accordance with a preferred embodiment of the invention.
  • the grid 30 divides the region of interest 25 into cells 35, each cell 35 having a node 40 (only one depicted in FlG. 3) at its center.
  • a structured grid is depicted in FlG. 3, the gridding of this invention may be structured or unstructured. Given a grid, the equations that describe the physics are descretized on this grid (there are many different discretization schemes that one can employ). The result can be represented as a graph (i.e., nodes and edges). This "graph" is a complete, yet quite general, representation that is valid regardless of the nature of underlying grid (e.g., structured or unstructured) or the method of discretizing the equations on that grid.
  • Fig. 4 depicts a two-dimensional view of a region of interest 25 in a reservoir (not separately depicted in FlG. 4), finely gridded in accordance with a preferred embodiment of the invention.
  • the grid 30 divides the region of interest 25 into cells 35.
  • the fine grid 30 in Fig. 4 is 49 by 49.
  • the center of each cell 35 in FlG. 4 is a node 40 but the node's are not separately depicted in FiG. 4.
  • Each node 40 is a mathematical center of a cell. One may connect nodes of the cells in a nodal graph.
  • FlG. 5 depicts a preferred embodiment of the present invention with a simplified, two-dimensional view of a region of interest 25 in a reservoir, the region of interest 25 having been gridded into cells, such as cell 45, each cell 45 having a node at its center.
  • Nodal graphs 50, 55 (which have the graph lines passing through the nodes of the cells) are imposed upon the grid in accordance with a preferred embodiment of the present invention.
  • the grid in FlG. 5 includes an eight by eight, coarse nodal graph 50, superimposed on a 49 by 49 fine nodal graph 55. This results in eighty- one domains 60, having overlap 65 on the lines of the eight by eight nodal graph.
  • FlG. 5 also depicts intersections 63, edges 65 and vertices, such as vertex 70, of the nodal graphs. Three dimensional examples would also include faces, not depicted in FIG. 5.
  • the overlaps 65 depicted in FlG. 5, which separate domains from each other, are also called multisectors. Adding a domain to its multisectors, yields overlapped domains, D 1 .
  • the pre-specified number of domains would be the eighty-one (81) overlapped domains 60.
  • the next step in FlG. 2 is to number 140 the cells and the overlapped domains. Every cell has a key, which is a set of the domain numbers to which the cell belongs. Each cell has a class; the class of each cell is the number of elements (domain numbers) in its key. For example, individual cells having nodes (such nodes represented by dots in FiG.
  • the next step is to group 150 the cells into connectors, each connector having a class, with each connector being the set of cells that share the same key.
  • the class of each connector is the number of elements in the key of the connector.
  • a connector of class n will thus separate connectors of class n-1 or lower.
  • FlG. 6 depicts a simplified two-dimensional view of a group of connectors 200, 210, 220, 230, 240, 250, 260, 270, 280 in accordance with a preferred embodiment of the present invention, each connector being the set of cells having the same key.
  • each connector being the set of cells having the same key.
  • connector 200 is the set of cells having key [1] (that is, connector 200 includes cells that are only in overlapped domain one)
  • connector 210 is the set of cells having key [2] (that is connector 210 includes cells that are only in overlapped domain one)
  • connector 220 is the set of cells having key [3]
  • connector 230 is the set of cells having key [4]
  • connector 240 (cells that are heavily vertically striped) is the set of cells having key [1, 2] (that is, connector 240 includes cells that are in both overlapped domain one and overlapped domain two)
  • connector 250 (cells that are heavily horizontally striped) is the set of cells having key [2,3]
  • connector 260 (cells that are vertically striped) is the set of cells having key [3,4]
  • connector 270 (cells that are horizontally striped) is the set of cells having key [4,1]
  • connector 280 is the set having a single cell (that is dotted) at a vertex which has key [1,2,3,4].
  • Connectors 200, 210, 220 and 230 are in class one and individual cells that make up these connectors are not depicted.
  • Connectors 240, 250, 260 and 270 are in class 2 and separate connectors of class 1 , which are neighbors of connectors 240, 250, 260 and 270.
  • Connector 280 is in class 4 and separates connectors of classes 1 and 2.
  • Connector 280 is a connector of the maximum class, which in the example of FlG. 6, is the class of four.
  • K 1 denote the set of all domains which contain cell i. K 1 is called the key of cell i.
  • V denote a set and let V denote the number of elements in set V.
  • the class C 1 of cell i denotes the number of domains which contain cell i:
  • N 1 denote the set of neighbor cells of cell i:
  • N l ⁇ j ⁇ a 1J ⁇ 0 and j ⁇ i ⁇ (£q 6) [0047]
  • E [J [K 1 ⁇
  • Step 152 checks to see if any connector, represented herein by B n has only one higher order neighboring connector ("higher order neighbor" represented herein by B j ), that is, a neighboring connector having a higher class than the class of the connector B 1 .
  • FlG.13 depicts an implementation of step 152 of FiG. 2.
  • Q denotes the set of connector numbers of class t .
  • the symbol h is the number of high order neighbors that a connector has.
  • Set 500 t equal to 1.
  • a locally maximum class connector is defined as a connector whose class is greater than the class of each of its neighboring connectors. Referring again to FlG. 2, the next step in the ACC decomposition is to reset 165 the class K . O ⁇ all locally maximum class connectors B ⁇ , to q, which is the maximum class of any connector.
  • all maximum class connectors are forced 168 to contain only one cell. This is done by selecting one cell from each locally maximum class connector, deleting each one from its containing connector and forming a new connector of class q+1 from each selected cell. Then reset q to the value q+1.
  • the cell originally forming connector 280 could be selected, a new connector with the original connector 280 cell alone would then be formed and the class of the new connector containing only the original connector 280 cell would be increased from four to five.
  • This process may reduce the number of distinct classes.
  • the reordered matrix A has the form
  • A. may be approximately factored as:
  • L is block lower triangular
  • U is block upper triangular
  • D is block diagonal
  • I is the identity matrix of the same dimensions as A .
  • Each column of P represents a basis function.
  • An example of P is depicted in FIG. 8, discussed further herein.
  • RAP is a coarse grid matrix, and an RAP example, in accordance with a preferred embodiment of the present invention, is plotted in FiG. 14 which is discussed further herein.
  • the ACC algebraic coarse grid matrix RAP is sparse and much smaller (perhaps by one or more orders of magnitude) than A and thus the coarse grid linear solution may be performed in highly efficient fashion using either direct solution or iterative solutions using methods such as preconditioned GMRES or ORTHOMIN, or other inexact local solves such as block ILU(K), Nested Factorization, Line Gauss-Seidel. See Y. Saad and M. H.
  • FiG. 7 depicts an example of ACC ordering in accordance with a preferred embodiment of the present invention.
  • the vertical axis 300 represents number of equations; the horizontal axis 310 represents number of unknowns.
  • the plot of Fig. 7 can be regarded as a series of rectangles having a plurality of plotted line segments.
  • Plotted line segment 312 in rectangle 314 in the upper left hand corner is a plot of ACC ordering for all domain class 1 cells, in rows 1-1600 on the horizontal axis 310.
  • Plotted line segment 316 in rectangle 318 is a plot of ACC ordering for all domain class 2 cells, which are the cells on the edges.
  • Plotted line segment 320 in very small rectangle 322 is a plot of ACC ordering for all domain class 4 cells, for the cells on the vertices.
  • Plotted line segment 332 in rectangle 334 represent non-zero couplings from class 2 cells to neighboring class 4 cells.
  • plotted line segment 336 in rectangle 338 represent non-zero couplings from class 4 cells to neighboring class 2 cells due to ACC ordering.
  • FlG. 8 depicts an example of an interpolation operator P, specifically column 37 of a specific example of P for a two-dimensional grid, in accordance with a preferred embodiment of the present invention.
  • a three dimensional grid would yield a four dimensional P, which is less easy to represent in two dimensional figures.
  • the column 37 400 is a multilinear basis function and (loosely) resembles a pyramid with a base 402 (and surrounding area) representing P equal to zero and the tip 404 representing P equals one.
  • FlG. 9 depicts an example of a finite element triangulation with 900 nodes (isotropic case) in accordance with a preferred embodiment of the present invention.
  • squares represent class 4-39 connectors.
  • Triangles represent class 3 connectors, circles represent class 2 connectors and dashed lines represent class 1 connectors.
  • FiG. 10, like FlG. 7, depicts an example of an ACC ordering on a matrix structure in accordance with a preferred embodiment of the present invention and is structured similarly.
  • the example depicted in FlG. 10 has 4 connector classes.
  • FlG. 11 depicts an example of a finite element triangulation in accordance with a preferred embodiment of the present invention taken from the example of FlG. 10.
  • FlG. 11 illustrates an example with 900 nodes (anisotropic case).
  • squares represent class 4-20 connectors.
  • Triangles represent class 3 connectors, circles represent class 2 connectors and dashed lines represent class 1 connectors.
  • FlG. 14 depicts an example of the ACC algebraic coarse grid matrix RAP , illustrating a sparsity pattern of an 8-by-8 coarse grid in accordance with a preferred embodiment of the present invention.
  • the y-axis corresponds to coarse grid equations and the x-axis corresponds to coarse grid unknowns.

Abstract

A method, system, a program storage device and apparatus are disclosed for conducting a reservoir simulation, using a reservoir model of a region of interest, wherein the region of interest has been gridded into cells. Each cell has one or more unknown variable. Each cell has a node. A graph of the nodes is represented by a sparse matrix. The graph is an initially decomposed into a pre-specified number of domains, such that each cell exists in at least one domain. The cells and domains are numbered. Each cell has a key, the key of each cell is the set of domain numbers to which the cell belongs. Each cell has a class, the class of each cell being the number of elements in the cell. The cells are grouped into connectors, each connector being the set of cells that share the same key. Each connector having a connector class, the connector class being the number of elements in the key of the connector. Each connector having only one higher-order neighbor connector is merged with such higher-order neighbor connector. The class of all locally maximum class connectors is reset to the maximum class of held by any connector. The maximum class connector is forced to contain only one cell. The connectors are ordered in increasing order of class. Interpolation operator and restriction operator are constructed from the ordered connectors. The interpolation operator and restriction operator are used to construct a coarse grid. The coarse grid may be used to determine the unknown variables of the cells.

Description

APPARATUS, METHOD AND SYSTEM FOR IMPROVED RESERVOIR SIMULATION USING AN ALGEBRAIC CASCADING CLASS LINEAR SOLVER
RELATED APPLICATIONS
[0001] This claims priority from US Provisional Patent Application 60/690,319 filed June 14, 2005.
BACKGROUND OF THE INVENTION Field of the Invention
[0002] This invention relates to apparatuses, methods and systems for use in reservoir simulation. In particular, the invention provides methods, apparatuses and systems for more effectively and efficiently simulating fluid flow in reservoirs using an algebraic cascading class linear solver.
Background
[0003] Reservoir simulation often requires the numerical solution of the equations that describe the physics governing the complex behaviors of multi-component, multiphase fluid flow in natural porous media in the reservoir and other types of fluid flow elsewhere in the production system. The governing equations typically used to describe the fluid flow are based on the assumption of thermodynamic equilibrium and the principles of conservation of mass, momentum and energy, as described in Aziz & Settari, 1977. The complexity of the physics that govern reservoir fluid flow leads to systems of coupled nonlinear partial differential equations that are not amenable to conventional analytical methods. As a result, numerical solution techniques are necessary.
[0004] A variety of mathematical models, formulations, discretization methods, and solution strategies have been developed and are associated with a grid imposed upon an area of interest in a reservoir. Detailed discussions of the problems of reservoir simulation and the equations dealing with such problems can be found, for example, in a PCT published patent application to ExxonMobil, International Publication No. WO 01/40937, incorporated herein by reference and in U.S. Patent No. 6,662,146 B 1 , incorporated herein by reference. If a grid imposed upon an area of interest in a reservoir is used, the grid may be structured or unstructured. Such grids are comprised of cells, each cell having one or more unknown properties, but with all the cells in the grid having pressure as an unknown. Other unknown properties include, but are not limited to, fluid properties such as water saturation or temperature, for example, or to "rock properties," such as permeability or porosity to name a few. A cell treated as if it has only a single unknown (typically pressure) is called herein a "single variable cell," while a cell with more than one unknown is called herein a "multi-variable cell."
[0005] A matrix can be constructed to represent the gridded region of interest based on the different types of cells.
[0006] The following equation is used to solve for the unknown variables, called x: Ax = b (Eq I) where x is a block vector of the variables representing unknown properties of the cells and b is a block vector of known quantities. Block vector x and block vector b are the same length. Approaches to solving this problem include: Domain Multisector Decomposition (Cleve Ashcraft), Wirebasket Domain Decomposition (Barry Smith), Heirarchical interface decomposition (Henon & Saad), and GMRES (Saad & Shultz). But the problem specifically addressed by the current invention includes solving linear systems associated with large-scale heterogeneous problems for both structured and unstructured grids. The solution must be robust, computationally efficient with excellent convergence rate. The focus is on developing a scalable (i.e., efficient for very large problems) multi-level algebraic approach that relies completely on information contained in the linear system of equations that must be solved. Moreover, it is also essential that the solution be well suited for parallel computation. These requirements pose a great challenge, especially for strongly heterogeneous unstructured-grid problems, and existing methods, including Incomplete Upper-Lower (ILU) factorization and nested factorization, fall well short of meeting all of these essential requirements.
SUMMARY OF THE INVENTION
[0007] In view of the above problems, an object of the present invention is to provide methods, apparatuses and systems for more effectively and efficiently simulating fluid flow in reservoirs while eliminating or minimizing the impact of the problems and limitations described. [0008] While some of the description herein is focused upon dealing with linear system of equations governing the pressure in general-purpose reservoir simulation problems, the present invention is also applicable to AIM (adaptive implicit method) and fully implicit linear systems.
[0010] The present invention includes a method for conducting a reservoir simulation with the use of a reservoir model of a region of interest of the reservoir. The region of interest has been gridded into a plurality of cells, each cell having one or more unknown variable and each cell having a node. The steps of the method include creating a graph of the cell nodes; imposing an initial decomposition of the graph into a pre-specified number of domains, such that each cell exists in at least one domain; numbering the cells and the domains, each cell having a key and each cell having a class, wherein the key of each cell is the set of domain numbers to which the cell belongs and the class of each cell being the number of elements in the cell's key; grouping the cells into connectors, each connector being the set of cells that share the same key, with each connector having a connector class, the connector class being the number of elements in the key of each connector; performing a connector reduction step; resetting the class of all locally maximum class connectors to the maximum class held by any connector; forcing the maximum class connectors to contain only one cell; ordering the connectors in increasing order of class; constructing interpolation operator and restriction operator from the ordered connectors; and using the interpolation operator and restriction operator to construct a coarse grid. The coarse grid may be used to determine the unknown variables of the cells. The results of the simulation to may be used to identify opportunities for improving production from the reservoir. One or more of these opportunities may be acted upon to improve production from the reservoir. The gridding may be structured or unstructured. The graph may be two or three dimensional. The simulation may be displayed. The connector reduction step may include merging each connector having only one higher-order neighbor connector with such higher- order neighbor connector. A sparse matrix may be used to represent the graph, the sparse matrix taking the form of A = \ar }" ._ where n is the number of cells.
[0011] The present invention includes a program storage device readable by a machine, tangibly embodying a program of instructions executable by the machine to perform method steps for conducting a reservoir simulation using a reservoir model wherein a region of interest has been gridded into a plurality of cells. Each cell has one or more unknown variable and each cell has a node. The methods steps may include creating a graph of the cell nodes; imposing an initial decomposition of the graph into a pre-specified number of domains, such that each cell exists in at least one domain; numbering the cells and the domains, each cell having a key and each cell having a class, wherein the key of each cell is the set of domain numbers to which the cell belongs and the class of each cell being the number of elements in the key of the cell; grouping the cells into connectors, each connector being the set of cells that share the same key, with each connector having a connector class, the connector class being the number of elements in the key of each connector; performing a connector reduction step; resetting the class of all locally maximum class connectors to the maximum class held by any connector; forcing the maximum class connector to contain only one cell; ordering the connectors in increasing order of class; constructing interpolation operator and restriction operator from the ordered connectors; and using the interpolation operator and restriction operator to construct a coarse grid. The method steps of program storage device may further include using the coarse grid to determine the unknown variables of the cells. The program storage device may be used for hydrocarbon reservoirs the method steps of the program storage device may also include using results of the simulation to identify opportunities for improving production from the reservoir. The grid may be structured or unstructured. The graph may be two dimensional. The graph may be three dimensional. The method steps of the program storage device may further include displaying the simulation. The simulation may be displayed on many types of display systems, such as for example a computer monitor or a three dimensional display system. The connector reduction step may include merging each connector having only one higher-order neighbor connector with such higher-order neighbor connector. A sparse matrix may be used to represent the graph, the sparse matrix taking the form of A = ψg \" ._ where n is the number of cells. The program storage device may comprise a compact disk. The program storage device may comprise memory on a computer hard drive. The present invention includes a simulation apparatus responsive to input data, adapted for solving a system of linear equations that represent a particular entity, said simulation apparatus generating a set of simulation results when said system of linear equations are solved, said set of simulation results including one or more parameters which characterize said particular entity. A representation of the entity has been gridded into cells, each cell having one or more unknown variable and each cell having a node. The simulation apparatus includes a means for graphing the cell nodes; a means for imposing an initial decomposition of the graph into a pre- specifϊed number of domains, such that each cell exists in at least one domain; a second means for numbering the cells and the domains; an assigning means for assigning each cell a key such that the key of each cell is the set of domain numbers to which the cell belongs; a second assigning means for assigning each cell a class, the class of each cell being the number of elements in the cell's key; a grouping means for grouping the cells into connectors, each connector being the set of cells that share the same key, with each connector having a connector class, the connector class being the number of elements in the key of each connector; a connector reduction means; a reset means for resetting the class of all locally maximum class connectors to the maximum class held by any connector; a limiting means to force the maximum class connector to contain only one cell; an ordering means to order the connectors in increasing order of class; a means to construct interpolation operator and restriction operator from the ordered connectors; and a second constructing means to use the interpolation operator and restriction operator to construct a coarse grid. The simulation apparatus may also include a determining means for using the coarse grid to determine the unknown variables of the cells. If the particular entity is a hydrocarbon reservoir, the simulation apparatus may also include means for using results from the simulation apparatus to identify opportunities for improving production from the reservoir. . If the particular entity is a water producing reservoir, the simulation apparatus may also include means for using results from the simulation apparatus to identify opportunities for improving production from the reservoir or for inhibiting salt water contamination of the reservoir. The grid may be structured or unstructured. The graph may be two dimensional. The grapli may be three dimensional. The simulation apparatus may also include display means for displaying the simulation. The display means may include a computer monitor. The display means may include a three dimensional display system. The connector reduction means may include identifying each connector having only one higher-order neighbor connector and merging each such connector with its higher-order neighbor connector. A sparse matrix is used to represent the graph, the sparse matrix taking the form of A - [ay }" . where n is the number of cells. The present invention includes an apparatus responsive to a set of input data for displaying a gridded representation of an earth formation. The gridded representation is comprised of a plurality of grid cells and a plurality of simulation results associated with, respectively, with the plurality of cells. Each cell has one or more unknown variables and each cell has a node. The apparatus includes a means for creating a graph of the cell nodes; a means for imposing an initial decomposition of the graph into a pre-specified number of domains, such that each cell exists in at least one domain; a second means for numbering the cells and the domains, an assigning means for assigning each cell a key such that the key of each cell is the set of domain numbers to which the cell belongs; a second assigning means for assigning each cell a class, the class of each cell being the number of elements in the cell's key; a grouping means for grouping the cells into connectors, each connector being the set of cells that share the same key, with each connector having a connector class, the connector class being the number of elements in the key of each connector; a connector reduction means; a reset means for resetting the class of all locally maximum class connectors to the maximum class held by any connector; a limiting means to force the maximum class connector to contain only one cell; an ordering means to order the connectors in increasing order of class; a means to construct interpolation operator and restriction operator from the ordered connectors; a second constructing means to use the interpolation operator and restriction operator to construct a coarse grid. The apparatus may also include a determining means for using the coarse grid to determine the unknown variables of the cells. The apparatus may also include means for using results of the simulation to identify opportunities for improving production from the earth formation. The grid may be structured or unstructured. The graph may be two dimensional. The graph may include three dimensions. The apparatus may include a display for displaying the simulation. The display may be many things including but not limited to a computer monitor or a three-dimensional display system. The connector reduction means may include merging each connector which has only one higher-order neighbor connector with such higher-order neighbor connector. A sparse matrix is used to represent the graph, the sparse matrix taking the form of A = {αy. }" .=] where n is the number of cells.
[0014] The invention includes a method for conducting a reservoir simulation with the use of a reservoir model of a zone of interest, the zone of interest having been gridded into a plurality of cells. Each cell has one or more unknown variables. The method steps include imposing an initial decomposition of the grid into a pre-specifϊed number of regions, such that each cell exists in at least one region; numbering the cells and the regions, each cell having a key and each cell having a class, wherein the key of each cell is the set of region numbers to which the cell belongs and the class of each cell being the number of elements in the cell's key; grouping the cells into connectors, each connector being the set of cells that share the same key, with each connector having a connector class, the connector class being the number of elements in the key of each connector; performing the connector reduction step; resetting the class of all locally maximum class connectors to the maximum class held by any connector; forcing the maximum class connectors to contain only one cell; ordering the connectors in increasing order of class; constructing interpolation operator and restriction operator from the ordered connectors; and using the interpolation operator and restriction operator to construct a coarse grid. The method may also include using the coarse grid to determine the unknown variables of the cells. The gridding may structured or unstructured. The graph may be two dimensional or more than two dimensional. The method may include displaying the simulation. The connector reduction means may include merging each connector which has only one higher-order neighbor connector with such higher-order neighbor connector.
[0015] The invention includes a program storage device readable by a machine, tangibly embodying a program of instructions executable by the machine to perform method steps for conducting a reservoir simulation using a reservoir model wherein a zone of interest has been gridded into a plurality of cells. Each cell has one or more unknown variables. The method steps may include imposing an initial decomposition of the grid into a pre-specified number of regions, such that each cell exists in at least one region; numbering the cells and the region s, each cell having a key and each cell having a class, wherein the key of each cell is the set of region numbers to which the cell belongs and the class of each cell being the number of elements in the key of the cell; grouping the cells into connectors, each connector being the set of cells that share the same key, with each connector having a connector class, the connector class being the number of elements in the key of each connector; performing a connector reduction step; reset the class of all locally maximum class connectors to the maximum class held by any connector; force the maximum class connector to contain only one cell; order the connectors in increasing order of class; construct interpolation operator and restriction operator from the ordered connectors; use the interpolation operator and restriction operator to construct a coarse grid; and use the coarse grid to determine the unknown variables of the cells.
[0016] Other objects, features and advantages of the present invention will become apparent to those of skill in art by reference to the figures, the description that follows and the claims.
BRIEF DESCRIPTION OF THE DRAWINGS
[0017] FlG. Ia illustrates a representation of a reservoir.
[0018] FlG. Ib illustrates an exploded view of a section in the reservoir depicted in FiG. Ia.
[0019] FlG. 2 is a flowchart of a preferred embodiment of the present invention.
[0020] FlG. 3 depicts a simplified, three-dimensional view of a region of interest in a reservoir, gridded in accordance with a preferred embodiment of the present invention.
[0021] FlG. 4 depicts a two-dimensional view of a region of interest 25 in a reservoir (not separately depicted in FlG. 4), finely gridded in accordance with a preferred embodiment of the invention
[0022] FlG. 5 depicts a simplified, two-dimensional view of a region of interest in a reservoir, the region of interest having been gridded into cells, in accordance with a preferred embodiment of the present invention. [0023] FiG. 6 depicts a simplified two-dimensional view of a group of connectors in accordance with a preferred embodiment of the present invention,
[0024] FiG. 7 depicts ACC ordering in accordance with a preferred embodiment of the present invention.
[0025] FiG. 8 depicts a multilinear basis function in accordance with a preferred embodiment of the present invention.
[0026] FiG. 9 depicts a finite element triangulation with 900 nodes (isotropic case) in accordance with a preferred embodiment of the present invention.
[0027] FiG. 10 depicts ACC ordering on a matrix structure in accordance with a preferred embodiment of the present invention.
[0028] FiG. 11 depicts a finite element triangulation with 900 nodes (anisotropic case) in accordance with a preferred embodiment of the present invention.
[0029] FiG. 12 depicts a result of implementing certain steps of FiG. 2, in accordance with a preferred embodiment of the present invention, on the subset of connectors depicted in FIG. 6.
[0030] FIG. 13 depicts flowchart detailing step 152 of FiG. 2, in accordance with a preferred embodiment of the present invention.
[0031] FIG. 14 depicts an example of a plot of RAP , a coarse grid matrix, in accordance with a preferred embodiment of the present invention.
DETAILED DESCRIPTION OF THE DRAWINGS
[0032] In the following detailed description of the preferred embodiments and other embodiments of the invention, reference is made to the accompanying drawings. It is to be understood that those of skill in the art will readily see other embodiments and changes may be made without departing from the scope of the invention.
[0033] FiG. Ia illustrates a representation of a reservoir 10, with a section 12, which is depicted in an exploded (two dimensional) view in FlG. Ib. Reservoirs 10 (below the water table) typically contain fluid 20, such as oil, gas, water or a mixture of two or three of those substances filling the pore spaces between the porous media 22 (such as, for example, sandstone or limestone) that makes up the rock of the reservoir. [0034] FiG. 2 depicts a flowchart of a preferred embodiment of the present invention. After starting 100, the first step is to grid 110 a region of interest into cells, each cell having a node in its center. Represent 120 a graph of the cell nodes by a sparse matrix:
Figure imgf000012_0001
where n is the total number of cells. FiG. 2 is further discussed herein.
[0035] FlG. 3 depicts a three-dimensional view of a region of interest 25 in a reservoir (not separately depicted in FlG. 3), finely gridded in accordance with a preferred embodiment of the invention. The grid 30 divides the region of interest 25 into cells 35, each cell 35 having a node 40 (only one depicted in FlG. 3) at its center. Although a structured grid is depicted in FlG. 3, the gridding of this invention may be structured or unstructured. Given a grid, the equations that describe the physics are descretized on this grid (there are many different discretization schemes that one can employ). The result can be represented as a graph (i.e., nodes and edges). This "graph" is a complete, yet quite general, representation that is valid regardless of the nature of underlying grid (e.g., structured or unstructured) or the method of discretizing the equations on that grid.
[0036] Fig. 4 depicts a two-dimensional view of a region of interest 25 in a reservoir (not separately depicted in FlG. 4), finely gridded in accordance with a preferred embodiment of the invention. As with Fig. 3, the grid 30 divides the region of interest 25 into cells 35. The fine grid 30 in Fig. 4 is 49 by 49. The center of each cell 35 in FlG. 4 is a node 40 but the node's are not separately depicted in FiG. 4.
[0037] Each node 40 is a mathematical center of a cell. One may connect nodes of the cells in a nodal graph.
[0038] FlG. 5 depicts a preferred embodiment of the present invention with a simplified, two-dimensional view of a region of interest 25 in a reservoir, the region of interest 25 having been gridded into cells, such as cell 45, each cell 45 having a node at its center. Nodal graphs 50, 55 (which have the graph lines passing through the nodes of the cells) are imposed upon the grid in accordance with a preferred embodiment of the present invention. The grid in FlG. 5 includes an eight by eight, coarse nodal graph 50, superimposed on a 49 by 49 fine nodal graph 55. This results in eighty- one domains 60, having overlap 65 on the lines of the eight by eight nodal graph. FlG. 5 also depicts intersections 63, edges 65 and vertices, such as vertex 70, of the nodal graphs. Three dimensional examples would also include faces, not depicted in FIG. 5.
[0039] The overlaps 65 depicted in FlG. 5, which separate domains from each other, are also called multisectors. Adding a domain to its multisectors, yields overlapped domains, D1 .
[0040] Referring back to FlG. 2, impose 130 an initial decomposition of the graph into a pre-specified number of overlapped domains, such that each cell exists in at least one overlapped domain. In FlG. 5, the pre-specified number of domains would be the eighty-one (81) overlapped domains 60. The next step in FlG. 2 is to number 140 the cells and the overlapped domains. Every cell has a key, which is a set of the domain numbers to which the cell belongs. Each cell has a class; the class of each cell is the number of elements (domain numbers) in its key. For example, individual cells having nodes (such nodes represented by dots in FiG. 5) at (mere) intersections 63 of the nodal graph, such as cell 45, are each only in one domain, with a class of one. Cells having their nodes (such nodes represented as circles in FiG. 5) on the edges 65 are in two overlapping domains with a class of two, while cells at graph nodes (such graph nodes represented as triangles in FlG. 5) at the vertices 70 are in four overlapping domains, with a class of four.
[0041] Referring again to FlG. 2, the next step is to group 150 the cells into connectors, each connector having a class, with each connector being the set of cells that share the same key. The class of each connector is the number of elements in the key of the connector. A connector of class n will thus separate connectors of class n-1 or lower.
[0042] FlG. 6 depicts a simplified two-dimensional view of a group of connectors 200, 210, 220, 230, 240, 250, 260, 270, 280 in accordance with a preferred embodiment of the present invention, each connector being the set of cells having the same key. In FiG. 6, connector 200 is the set of cells having key [1] (that is, connector 200 includes cells that are only in overlapped domain one), connector 210 is the set of cells having key [2] (that is connector 210 includes cells that are only in overlapped domain one, connector 220 is the set of cells having key [3], connector 230 is the set of cells having key [4], connector 240 (cells that are heavily vertically striped) is the set of cells having key [1, 2] (that is, connector 240 includes cells that are in both overlapped domain one and overlapped domain two), connector 250 (cells that are heavily horizontally striped) is the set of cells having key [2,3], connector 260 (cells that are vertically striped) is the set of cells having key [3,4], connector 270 (cells that are horizontally striped) is the set of cells having key [4,1], and connector 280 is the set having a single cell (that is dotted) at a vertex which has key [1,2,3,4]. Connectors 200, 210, 220 and 230 are in class one and individual cells that make up these connectors are not depicted. Connectors 240, 250, 260 and 270 are in class 2 and separate connectors of class 1 , which are neighbors of connectors 240, 250, 260 and 270. Connector 280 is in class 4 and separates connectors of classes 1 and 2. Connector 280 is a connector of the maximum class, which in the example of FlG. 6, is the class of four.
[0043] The relationship among cells can be represented mathematically. Let D1 i = 1, ... , m denote a collection of sets. Each set contains the cell (or node) numbers corresponding to a domain or region of the grid (or nodal graph). These domains may be overlapped or non-overlapped by various well known methods previously mentioned and the union of all m regions is the entire grid (or nodal graph). For each cell i, i = l,...,n let K1 denote the set of all domains which contain cell i. K1 is called the key of cell i. Let V denote a set and let V denote the number of elements in set V. The class C1 of cell i denotes the number of domains which contain cell i:
Figure imgf000014_0001
[0044] Define L1 j = l, ..., g as the set of cells of class j :
L1 = [I]C1 = J] (Eq 4)
[0045] Let q denote the maximum class (which was four in the example of FlG. 6): q ~ max (c, ) (Eq 5)
[0046] Let N1 denote the set of neighbor cells of cell i:
Nl = {j \ a1J ≠ 0 and j ≠ i\ (£q 6) [0047] The neighbors of cell i may be referred to as n,. ,. , r = 1, ... , | JV, | . Let E = [J [K1 }
;=i be the set of unique keys. E is a set consisting of v unique keys:
E = {Ei ,E2 i...,Ev} (Eq T)
such that E, ≤ E J 02 ≤ ... ≤ E.
[0048] The set of connectors B1 ,i = l ... ,v are such that
Figure imgf000015_0001
[0049] Recall that a connector is the set of all cells having the same key and the class of the connector is the number of domains in its key. The class K. of each connector
B1 , i = 1 , ... , v is defined as:
K, = E,
(Eq 9)
[0050] Referring again to Fig. 2, start the ACC (algebraic cascading class) decomposition by performing the connector reduction step 152. Step 152 checks to see if any connector, represented herein by Bn has only one higher order neighboring connector ("higher order neighbor" represented herein by Bj), that is, a neighboring connector having a higher class than the class of the connector B1 . FlG.13 depicts an implementation of step 152 of FiG. 2. JV, denotes the set of neighboring connector numbers of connector i, i = l,..., v . Q( denotes the set of connector numbers of class t . The symbol h is the number of high order neighbors that a connector has. Begin with class 1 connectors and proceed class by class to class q connectors. To do so, set 500 t equal to 1. Set 505 W equal to Q1, and j=l.
Set 510 I = Wj , where A=O and r=l . Set 515 f = »,,.. Determine 520
whether Kt >& and if so, set 525 h = 1 and 5 = t . Set 530 r=r+l . Determine 535 whether r ≤ N1 and if so, go to step 515. If not, merge any connector B1 ,having exactly one higher class neighboring connector Bj , into the higher class connector B . by determining 540 whether h = \ and, if so, set 545: k = κs
Figure imgf000016_0001
[0051] Then set 550 j=j+l. Determine 560 whether j ≤ \w\ then go to step 510. Otherwise, set 565 £ = £ + ! . Determine 570 whethe t < q and if so, go to step 505. Otherwise, end (and proceed to step 160 of FlG. 2).
[0052] A locally maximum class connector is defined as a connector whose class is greater than the class of each of its neighboring connectors. Referring again to FlG. 2, the next step in the ACC decomposition is to reset 165 the class K . OΪ all locally maximum class connectors B} , to q, which is the maximum class of any connector.
K, = max E:
'-1.-.V (Eq 10)
[0053] In a preferred embodiment of the invention, referring again to FlG. 2, all maximum class connectors are forced 168 to contain only one cell. This is done by selecting one cell from each locally maximum class connector, deleting each one from its containing connector and forming a new connector of class q+1 from each selected cell. Then reset q to the value q+1.
[0054] The result of steps 160 and 165 on the subset of connectors depicted in FiG. 6 is depicted in FlG. 12. In FiG. 12, connectors 240, 250, 260 and 270 each have only one neighboring higher order connector (which is connector 280 for each of these), so each of connectors 240, 250, 260 and 270 have each been merged with connector 280 to form one large connector. (This is represented in FlG. 12 by all the cells in connectors 240, 250, 260 and 270 having the same dotted pattern.) Connectors 200, 210, 220 and 230 (the cells of which are not separately depicted) have more than one higher order neighboring connector, so connectors 200, 210, 220 and 230 are left unchanged.
[0055] For the step of 168, the cell originally forming connector 280 (see FlG. 6) could be selected, a new connector with the original connector 280 cell alone would then be formed and the class of the new connector containing only the original connector 280 cell would be increased from four to five.
[0056] Examples of ACC ordering are also plotted in FlGS. 7 and 10 discussed further herein.
[0057] Referring again to FiG. 2, we now order 170 (or re-order) the connectors in increasing order of class using permutation π , such that
Si = Bnu) (Eq Il)
where the class Ω, of connector S1 is
Figure imgf000017_0001
and
Ω, <Ω;+] / = l,...,v-l (Eq l3)
Then write connector S1 in terms of its n, cells (nodes) as
s, = K >52>-- " 5U (Eq 14)
[0058] This process may reduce the number of distinct classes.
[0059] The ACC ordering Ψ which maps cells (nodes) in their original order to the ACC order is: m=0 for i=l,v for k=l, 7z, m=m+l
Figure imgf000017_0002
end end
[0060] Using the permutation Ψ in matrix form the equitation Ax=b becomes:
2V = b (Eq 15) where y = Ψrx (Eq 17) and
(Eq 18)
[0061] The reordered matrix A has the form
Figure imgf000018_0001
where each An i = 1, .. , , q is block diagonal with blocks consisting of the connectors of class i.
[0062] A. may be approximately factored as:
A * LDU (Eq 20)
where L is block lower triangular, U is block upper triangular and D is block diagonal.
[0063] In order to approximately solve
A x = r (Eq 21)
[0064] Next, referring again to Fig. 2, construct 172 an interpolation operator and restriction operator from ACC ordering. To do this, consider the equivalent system:
Figure imgf000018_0002
where
V = Ux (Eq 23)
Since
Figure imgf000018_0003
16 Then
Dη KW rTΠ r-1Ά ^ TU T--I'iW (Eq 25) where
Figure imgf000019_0001
where I is the identity matrix of the same dimensions as A .
[0065] To simplify, the interpolation operator P is written as
P = U-1W (Eq 27)
[0066] Each column of P represents a basis function. An example of P is depicted in FIG. 8, discussed further herein.
[0067] The restriction operator is written as
R = WτI7λ (Eq 28)
[0068] Each row of R represents a second basis function. RAP is a coarse grid matrix, and an RAP example, in accordance with a preferred embodiment of the present invention, is plotted in FiG. 14 which is discussed further herein.
[0069] To use RAP to solve a linear system, block q for vector y is
yg =(RAPyl Rr
(Eq 29) the vector y is represented as
y = y* + Wy (Eq 30)
7—1
[0070] Multiplying both sides on the left by ^ the original solution vector x is obtained as: x = x * +Py0
(Eq 31) [0071] Multiplying on the left by A and rearranging:
tx' - r - My, (Eq 32)
[0072] IfM is some approximate factorization of Λ then we have the approximate solution for** :
Figure imgf000020_0001
[0073] Then the two-step ACC preconditioning is given by:
Figure imgf000020_0002
or
x *
Figure imgf000020_0003
- AP (RAP)'1 Rr) + P(RAP)'1 R r (E 35)
[0074] The ACC algebraic coarse grid matrix RAP is sparse and much smaller (perhaps by one or more orders of magnitude) than A and thus the coarse grid linear solution may be performed in highly efficient fashion using either direct solution or iterative solutions using methods such as preconditioned GMRES or ORTHOMIN, or other inexact local solves such as block ILU(K), Nested Factorization, Line Gauss-Seidel. See Y. Saad and M. H. Schultz.: "GMRES: a generalized minimal residual algorithm for solving nonsymmetric linear systems", SIAM Journal on Scientific and Statistical Computing, 7, PP 856-869, 1986; Vinsome, "P.K.W: "Orthomin, an Iterative Method for Solving Sparse Sets of Simultaneous Linear Equations", SPE 5729 presented at the Fourth Symposium of Numerical Simulation of Reservoir Performance of the Society of Petroleum Engineers of AIME held in Los Angeles, Calif, Feb. 19-20, 1976, all incorporated by reference.
[0075] The overall convergence rate of the preconditioning of the instant invention is typically greatly superior to commonly used methods such as ILU. Also the method is applicable to matrices arising from structured or unstructured grids including one- dimensional, two-dimensional or three-dimensional grids. In addition the method is applicable to matrices with one or more unknowns per cell (node). [0076] FiG. 7 depicts an example of ACC ordering in accordance with a preferred embodiment of the present invention. The vertical axis 300 represents number of equations; the horizontal axis 310 represents number of unknowns.
[0077] The plot of Fig. 7 can be regarded as a series of rectangles having a plurality of plotted line segments. Plotted line segment 312 in rectangle 314 in the upper left hand corner, is a plot of ACC ordering for all domain class 1 cells, in rows 1-1600 on the horizontal axis 310. Plotted line segment 316 in rectangle 318 is a plot of ACC ordering for all domain class 2 cells, which are the cells on the edges. Plotted line segment 320 in very small rectangle 322 is a plot of ACC ordering for all domain class 4 cells, for the cells on the vertices.
[0078] Two rectangles border rectangle 314. Plotted line segments 324 in rectangle 326 represent non-zero couplings from class 1 cells to neighboring class 2 cells due to ACC ordering. Similarly, plotted line segments 328 in rectangle 330 represent nonzero couplings from class 2 cells to neighboring class 1 cells as a result of ACC ordering.
[0079] Plotted line segment 332 in rectangle 334 represent non-zero couplings from class 2 cells to neighboring class 4 cells. Similarly, plotted line segment 336 in rectangle 338 represent non-zero couplings from class 4 cells to neighboring class 2 cells due to ACC ordering.
[0080] FlG. 8 depicts an example of an interpolation operator P, specifically column 37 of a specific example of P for a two-dimensional grid, in accordance with a preferred embodiment of the present invention. (A three dimensional grid would yield a four dimensional P, which is less easy to represent in two dimensional figures.) The column 37 400 is a multilinear basis function and (loosely) resembles a pyramid with a base 402 (and surrounding area) representing P equal to zero and the tip 404 representing P equals one.
[0081] FlG. 9 depicts an example of a finite element triangulation with 900 nodes (isotropic case) in accordance with a preferred embodiment of the present invention. In the example of FlG. 9, squares represent class 4-39 connectors. Triangles represent class 3 connectors, circles represent class 2 connectors and dashed lines represent class 1 connectors. [0082] FiG. 10, like FlG. 7, depicts an example of an ACC ordering on a matrix structure in accordance with a preferred embodiment of the present invention and is structured similarly. The example depicted in FlG. 10 has 4 connector classes.
[0083] FlG. 11 depicts an example of a finite element triangulation in accordance with a preferred embodiment of the present invention taken from the example of FlG. 10. FlG. 11 illustrates an example with 900 nodes (anisotropic case). In the example of FiG. 11, squares represent class 4-20 connectors. Triangles represent class 3 connectors, circles represent class 2 connectors and dashed lines represent class 1 connectors.
[0084] FlG. 14 depicts an example of the ACC algebraic coarse grid matrix RAP , illustrating a sparsity pattern of an 8-by-8 coarse grid in accordance with a preferred embodiment of the present invention. The y-axis corresponds to coarse grid equations and the x-axis corresponds to coarse grid unknowns.
[0085] Although the foregoing is provided for purposes of illustrating, explaining and describing certain embodiments of the invention in particular detail, modifications and adaptations to the described methods, systems and other embodiments will be apparent to those skilled in the art and may be made without departing from the scope or spirit of the invention.

Claims

CLAIMSWhat is claimed is:
1. A method for conducting a reservoir simulation with the use of a reservoir model of a region of interest of a reservoir, the region of interest having been gridded into a plurality of cells, each cell having one or more unknown variable, each cell having a node, comprising the steps of: a) creating a graph of the cell nodes; b) imposing an initial decomposition of the graph into a pre-specified number of domaiηs, such that each cell exists in at least one domain; c) numbering the cells and the domains, each cell having a key and each cell having a class, wherein the key of each cell is the set of domain numbers to which the cell belongs and the class of each cell being the number of elements in the cell's key; d) grouping the cells into connectors, each connector being the set of cells that share the same key, with each connector having a connector class, the connector class being the number of elements in the key of each connector; e) performing a connector reduction step; f) resetting the class of all locally maximum class connectors to the maximum class held by any connector; g) forcing the maximum class connectors to contain only one cell; h) ordering the connectors in increasing order of class; i) constructing an interpolation operator and a restriction operator from the ordered connectors; j) using the interpolation operator and restriction operator to construct a coarse grid.
2. The method of claim 1 further comprising using the coarse grid to determine the unknown variables of the cells.
3. The method of claim 1 further comprising using results of the simulation to identify opportunities for improving production from the reservoir.
4. The method of claim 3 further comprising acting upon at least one of the opportunities to improve production from the reservoir.
5. The method of claim 1, wherein the gridding is structured.
6. The method of claim 1 , wherein the gridding is unstructured.
7. The method of claim 1 wherein the graph is two dimensional.
8. The method of claim 1 wherein the graph is three dimensional.
9. The method of claim 1 further comprising displaying the simulation.
10. The method of claim 9 wherein displaying the simulation is done on a computer monitor.
11. The method of claim 9 wherein displaying the simulation is done on a three dimensional display system.
12. The method of claim 1, wherein step e includes merging each connector having only one higher-order neighbor connector with such higher-order neighbor connector.
13. The method of claim 12 wherein the graph is at least two-dimensional and further comprising using the coarse grid to determine the unknown variables of the cells and displaying the simulation.
14. The method of claim 1 wherein the interpolation operator has one or more columns and each column represents a basis function.
15. The method of claim 1, wherein a sparse matrix is used to represent the graph, the sparse matrix taking the form of:
A — \a n \" where n is the number of cells.
16. A program storage device readable by a machine, tangibly embodying a program of instructions executable by the machine to perform method steps for conducting a reservoir simulation using a reservoir model of a reservoir wherein a region of interest of the reservoir has been gridded into a plurality of cells, each cell having one or more unknown variable, each cell having a node, said method steps comprising: a) create a graph of the cell nodes; b) impose an initial decomposition of the graph into a pre-specified number of domains, such that each cell exists in at least one domain; c) number the cells and the domains, each cell having a key and each cell having a class, wherein the key of each cell is the set of domain numbers to which the cell belongs and the class of each cell being the number of elements in the key of the cell; d) group the cells into connectors, each connector being the set of cells that share the same key, with each connector having a connector class, the connector class being the number of elements in the key of each connector; e) perform a connector reduction step; f) reset the class of all locally maximum class connectors to the maximum class held by any connector; g) force the maximum class connector to contain only one cell; h) order the connectors in increasing order of class; i) construct an interpolation operator and a restriction operator from the ordered connectors; and j) use the interpolation operator and restriction operator to construct a coarse grid.
17. The program storage device of claim 16, said method steps further comprising using the coarse grid to determine the unknown variables of the cells.
18. The program storage device of claim 16 wherein the reservoir is a hydrocarbon reservoir and the method steps further comprising using results of the simulation to identify opportunities for improving production from the reservoir.
19. The program storage device of claim 16, wherein the grid is structured.
20. The program storage device of claim 16, wherein the grid is unstructured.
21. The program storage device of claim 16, wherein the graph is two dimensional.
22. The program storage device of claim 16, wherein the graph is three dimensional.
23. The program storage device of claim 16, wherein the method steps further comprise displaying the simulation.
24. The program storage device of claim 23 wherein the displaying the simulation is performed on a computer monitor.
25. The program storage device of claim 23 wherein the displaying the simulation is performed on a three-dimensional display system.
26. The program storage device of claim 16, wherein step e) of the method steps includes merging each connector which has only one higher-order neighbor connector with such higher-order neighbor connector.
27. The program storage device of claim 16 comprises a compact disk.
28. The program storage device of claim 16 comprises memory on a computer hard drive.
29. The program storage device of claim 16, wherein a sparse matrix is used to represent the graph, the sparse matrix taking the form of:
A = [a ij \" ._ where n is the number of cells.
30. A simulation apparatus responsive to input data, adapted for solving a system of linear equations that represent a particular entity, said simulation apparatus generating a set of simulation results when said system of linear equations are solved, said set of simulation results including one or more parameters which characterize said particular entity, wherein a representation of the entity has been gridded into cells, each cell having one or more unknown variable, each cell having a node, comprising: a) a means for constructing a graph of the cell nodes; b) a means for imposing an initial decomposition of the graph into a pre-specified number of domains, such that each cell exists in at least one domain; c) a second means for numbering the cells and the domains; d) an assigning means for assigning each cell a key such that the key of each cell is the set of domain numbers to which the cell belongs; e) a second assigning means for assigning each cell a class, the class of each cell being the number of elements in the cell's key; f) a grouping means for grouping the cells into connectors, each connector being the set of cells that share the same key, with each connector having a connector class, the connector class being the number of elements in the key of each connector; g) a connector reduction means; h) a reset means for resetting the class of all locally maximum class connectors to the maximum class held by any connector; i) a limiting means to force the maximum class connector to contain only one cell; j) an ordering means to order the connectors in increasing order of class; k) a means to construct an interpolation operator and a restriction operator from the ordered connectors; and
1) a second constructing means to use the interpolation operator and restriction operator to construct a coarse grid.
31. The simulation apparatus of claim 30, further comprising' a determining means for using the coarse grid to determine the unknown variables of the cells.
32. The simulation apparatus of claim 30, wherein the particular entity is a hydrocarbon reservoir and further comprising means for using results from the simulation apparatus to identify opportunities for improving production from the reservoir.
33. The simulation apparatus of claim 30, wherein the particular entity is a water producing reservoir
34. The simulation apparatus of claim 33 further comprising means for using results from the simulation apparatus to identify opportunities for improving water production from the reservoir.
35. The simulation apparatus of claim 33 further comprising means for using results from the simulation apparatus to identify opportunities for inhibiting salt water contamination of the reservoir.
36. The simulation apparatus of claim 30, wherein the grid is structured.
37. The simulation apparatus of claim 30, wherein the grid is unstructured.
38. The simulation apparatus of claim 30, wherein the graph is two dimensional.
39. The simulation apparatus of claim 30, wherein the graph is three dimensional.
40. The simulation apparatus of claim 30, further comprising display means for displaying the simulation.
41. The simulation apparatus of claim 40 wherein the displaying of the simulation is performed on a computer monitor.
42. The simulation apparatus of claim 40 wherein the displaying of the simulation is performed on a three-dimensional display system.
43. The simulation apparatus of claim 30, wherein the connector reduction means includes merging each connector which has only one higher-order neighbor connector with such higher-order neighbor connector.
44. The simulation apparatus of claim 30, wherein a sparse matrix is used to represent the graph, the sparse matrix taking the form of:
Λ (" , where n is the number of cells.
45. An apparatus responsive to a set of input data for displaying a gridded representation of an earth formation comprised of a plurality of grid cells and a plurality of simulation results associated with, respectively, with the plurality of cells, each cell having one or more unknown variable, each cell having a node, comprising: a) a means for creating a graph of the cell nodes; b) a means for imposing an initial decomposition of the graph into a pre-specified number of domains, such that each cell exists in at least one domain; c) a second means for numbering the cells and the domains, d) an assigning means for assigning each cell a key such that the key of each cell is the set of domain numbers to which the cell belongs; e) a second assigning means for assigning each cell a class, the class of each cell being the number of elements in the cell's key; f) a grouping means for grouping the cells into connectors, each connector being the set of cells that share the same key, with each connector having a connector class, the connector class being the number of elements in the key of each connector; g) a connector reduction means; h) a reset means for resetting the class of all locally maximum class connectors to the maximum class held by any connector; i) a limiting means to force the maximum class connector to contain only one cell; j) an ordering means to order the connectors in increasing order of class; k) a means to construct interpolation operator and restriction operator from the ordered connectors;
1) a second constructing means to use the interpolation operator and restriction operator to construct a coarse grid.
46. The apparatus of claim 45, further comprising a determining means for using the coarse grid to determine the unknown variables of the cells.
47. The apparatus of claim 45, further comprising means for using results of the simulation to identify opportunities for improving production from the earth formation.
48. The apparatus of claim 45 wherein the grid is structured.
49. The apparatus of claim 45, wherein the grid is unstructured.
50. The apparatus of claim 45, wherein the graph is two dimensional.
51. The apparatus of claim 45 wherein the graph is three dimensional.
52. The apparatus of claim 45, further comprising a display for displaying the simulation.
53. The apparatus of claim 52 wherein the display includes a computer monitor,
54. The apparatus of claim 53 wherein the display includes a three-dimensional display system.
55. The apparatus of claim 45 wherein the connector reduction means includes means to identify and merge each connector which has only one higher-order neighbor connector with such higher-order neighbor connector.
56. The apparatus of claim 45 wherein a sparse matrix is used to represent the graph, the sparse matrix taking the form of:
A = Ia11 \" where n is the number of cells.
57. A method for conducting a reservoir simulation with the use of a reservoir model of a zone of interest, the zone of interest having been gridded into a plurality of cells, each cell having one or more unknown variable, comprising the steps of: a) imposing an initial decomposition of the grid into a pre-specified number of regions, such that each cell exists in at least one region; b) numbering the cells and the regions, each cell having a key and each cell having a class, wherein the key of each cell is the set of region numbers to which the cell belongs and the class of each cell being the number of elements in the cell's key; c) grouping the cells into connectors, each connector being the set of cells that share the same key, with each connector having a connector class, the connector class being the number of elements in the key of each connector; d) performing the connector reduction step; e) resetting the class of all locally maximum class connectors to the maximum class held by any connector; f) forcing the maximum class connectors to contain only one cell; g) ordering the connectors in increasing order of class; h) constructing interpolation operator and restriction operator from the ordered connectors; and i) using the interpolation operator and restriction operator to construct a coarse grid.
58. The method of claim 57, further comprising using the coarse grid to determine the unknown variables of the cells.
59. The method of claim 57 wherein the gridding is structured.
60. The method of claim 57 wherein the gridding is unstructured.
61. The method of claim 57 wherein the graph is two dimensional.
62. The method of claim 57 wherein the graph is three dimensional.
63. The method of claim 57, further comprising displaying the simulation.
64. The method of claim 57, wherein the connector reduction means includes merging each connector which has only one higher-order neighbor connector with such higher-order neighbor connector.
65. A program storage device readable by a machine, tangibly embodying a program of instructions executable by the machine to perform method steps for conducting a reservoir simulation using a reservoir model wherein a zone of interest has been finely gridded into a plurality of cells, each cell having one or more unknown variable, said method steps comprising: a) impose an initial decomposition of the grid into a pre-specifϊed number of regions, such that each cell exists in at least one region; b) number the cells and the region s, each cell having a key and each cell having a class, wherein the key of each cell is the set of region numbers to which the cell belongs and the class of each cell being the number of elements in the key of the cell; c) group the cells into connectors, each connector being the set of cells that share the same key, with each connector having a connector class, the connector class being the number of elements in the key of each connector; d) perform a connector reduction step; e) reset the class of all locally maximum class connectors to the maximum class held by any connector; f) force the maximum class connector to contain only one cell; g) order the connectors in increasing order of class; h) construct interpolation operator and restriction operator from the ordered connectors; i) use the interpolation operator and restriction operator to construct a coarse grid solution; j) use the coarse grid solution to determine the unknown variables of the cells; and k) use the interpolation operator with the coarse grid solution to re-construct the fine grid.
66. The method of claim 1 wherein the graph of the cell nodes is fine.
67. The method of claim 66 further comprising using the interpolation operator with the coarse grid to re-construct the fine graph.
PCT/US2006/023433 2005-06-14 2006-06-14 Apparatus, method and system for improved reservoir simulation using an algebraic cascading class linear solver WO2006138530A1 (en)

Priority Applications (7)

Application Number Priority Date Filing Date Title
EP06799947A EP1893845A1 (en) 2005-06-14 2006-06-14 Apparatus, method and system for improved reservoir simulation using an algebraic cascading class linear solver
CN2006800297420A CN101287889B (en) 2005-06-14 2006-06-14 Apparatus, method and system for improved reservoir simulation using an algebraic cascading class linear solver
MX2007015937A MX2007015937A (en) 2005-06-14 2006-06-14 Apparatus, method and system for improved reservoir simulation using an algebraic cascading class linear solver.
CA2612093A CA2612093C (en) 2005-06-14 2006-06-14 Apparatus, method and system for improved reservoir simulation using an algebraic cascading class linear solver
AU2006259275A AU2006259275B2 (en) 2005-06-14 2006-06-14 Apparatus, method and system for improved reservoir simulation using an algebraic cascading class linear solver
EA200800048A EA011908B1 (en) 2005-06-14 2006-06-14 Apparatus, method and system for improved reservoir simulation using an algebraic cascading class linear solver
NO20080180A NO20080180L (en) 2005-06-14 2008-01-10 Apparatus, method and system for improved reservoir simulation using a linear, algebraic problem solver with cascaded classes

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US69031905P 2005-06-14 2005-06-14
US60/690,319 2005-06-14

Publications (1)

Publication Number Publication Date
WO2006138530A1 true WO2006138530A1 (en) 2006-12-28

Family

ID=37081578

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/US2006/023433 WO2006138530A1 (en) 2005-06-14 2006-06-14 Apparatus, method and system for improved reservoir simulation using an algebraic cascading class linear solver

Country Status (10)

Country Link
US (1) US7684967B2 (en)
EP (1) EP1893845A1 (en)
CN (1) CN101287889B (en)
AR (1) AR054476A1 (en)
AU (1) AU2006259275B2 (en)
CA (1) CA2612093C (en)
EA (1) EA011908B1 (en)
MX (1) MX2007015937A (en)
NO (1) NO20080180L (en)
WO (1) WO2006138530A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009056992A2 (en) * 2007-11-01 2009-05-07 Schlumberger Canada Limited Reservoir fracture simulation

Families Citing this family (29)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8711146B1 (en) * 2006-11-29 2014-04-29 Carnegie Mellon University Method and apparatuses for solving weighted planar graphs
US8437996B2 (en) * 2007-12-13 2013-05-07 Exxonmobil Upstream Research Company Parallel adaptive data partitioning on a reservoir simulation using an unstructured grid
MX2011000115A (en) * 2008-07-03 2011-04-11 Chevron Usa Inc Multi-scale finite volume method for reservoir simulation.
WO2010039325A1 (en) * 2008-09-30 2010-04-08 Exxonmobil Upstream Reseach Company Method for solving reservoir simulation matrix equation using parallel multi-level incomplete factorizations
US8280709B2 (en) * 2008-10-03 2012-10-02 Schlumberger Technology Corporation Fully coupled simulation for fluid flow and geomechanical properties in oilfield simulation operations
MX2011003802A (en) * 2008-10-09 2011-11-01 Chevron Usa Inc Iterative multi-scale method for flow in porous media.
US8302076B2 (en) * 2008-11-12 2012-10-30 Landmark Graphics Corporation Systems and methods for improved parallel ILU factorization in distributed sparse linear systems
US8350851B2 (en) * 2009-03-05 2013-01-08 Schlumberger Technology Corporation Right sizing reservoir models
US8339396B2 (en) * 2009-03-05 2012-12-25 Schlumberger Technology Corporation Coarsening and splitting techniques
US8600717B2 (en) 2009-05-14 2013-12-03 Schlumberger Technology Corporation Production optimization for oilfields using a mixed-integer nonlinear programming model
US8655632B2 (en) * 2009-09-03 2014-02-18 Schlumberger Technology Corporation Gridless geological modeling
MX2012004456A (en) * 2009-10-28 2012-06-28 Chevron Usa Inc Multiscale finite volume method for reservoir simulation.
AU2011213261B2 (en) * 2010-02-02 2015-04-02 Conocophillips Company Multilevel percolation aggregation solver for petroleum reservoir simulations
CA2801387A1 (en) 2010-07-26 2012-02-02 Exxonmobil Upstream Research Company Method and system for parallel multilevel simulation
CA2805446C (en) 2010-07-29 2016-08-16 Exxonmobil Upstream Research Company Methods and systems for machine-learning based simulation of flow
WO2012015517A1 (en) 2010-07-29 2012-02-02 Exxonmobil Upstream Research Company Methods and systems for machine-learning based simulation of flow
US9063882B1 (en) * 2010-09-09 2015-06-23 Sas Ip, Inc. Matrix preconditioners for simulations of physical fields
US9031674B2 (en) 2010-10-13 2015-05-12 Schlumberger Technology Corporation Lift-gas optimization with choke control
US8660824B2 (en) 2010-12-23 2014-02-25 Schlumberger Technology Corporation Discretely gridding complex fracturing for simulation
US8437999B2 (en) 2011-02-08 2013-05-07 Saudi Arabian Oil Company Seismic-scale reservoir simulation of giant subsurface reservoirs using GPU-accelerated linear equation systems
US9399324B2 (en) * 2011-06-29 2016-07-26 Dow Global Technologies Llc Flame resistant composition, fiber reinforced polyurethane based composite comprising the flame resistant composition and the use thereof
CN104115035B (en) * 2012-02-09 2017-12-01 沙特阿拉伯石油公司 The multistage solution of extensive linear system in porous media emulation in huge reservoir
US9208268B2 (en) 2012-02-14 2015-12-08 Saudi Arabian Oil Company Giga-cell linear solver method and apparatus for massive parallel reservoir simulation
US9690885B2 (en) * 2013-08-16 2017-06-27 Schlumberger Technology Corporation Interactive visualization of reservoir simulation data sets
US10417354B2 (en) * 2013-12-17 2019-09-17 Schlumberger Technology Corporation Model order reduction technique for discrete fractured network simulation
GB2537769B (en) * 2014-01-03 2021-04-14 Logined Bv Graph partitioning to distribute wells in parallel reservoir simulation
US20160202389A1 (en) * 2015-01-12 2016-07-14 Schlumberger Technology Corporation H-matrix preconditioner
US10520643B2 (en) * 2015-10-20 2019-12-31 Pgs Geophysical As Geophysical inversion using sparse modeling
CN114444416B (en) * 2022-04-11 2022-07-05 中国空气动力研究与发展中心计算空气动力研究所 Grid aggregation method and device for fluid dynamics simulation

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2001040937A1 (en) * 1999-12-03 2001-06-07 Exxonmobil Upstream Research Company Method and program for simulating a physical system using object-oriented programming
US6662146B1 (en) * 1998-11-25 2003-12-09 Landmark Graphics Corporation Methods for performing reservoir simulation

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6810370B1 (en) * 1999-03-31 2004-10-26 Exxonmobil Upstream Research Company Method for simulation characteristic of a physical system
US6823297B2 (en) * 2003-03-06 2004-11-23 Chevron U.S.A. Inc. Multi-scale finite-volume method for use in subsurface flow simulation
US7596480B2 (en) * 2005-04-14 2009-09-29 Saudi Arabian Oil Company Solution method and apparatus for large-scale simulation of layered formations

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6662146B1 (en) * 1998-11-25 2003-12-09 Landmark Graphics Corporation Methods for performing reservoir simulation
WO2001040937A1 (en) * 1999-12-03 2001-06-07 Exxonmobil Upstream Research Company Method and program for simulating a physical system using object-oriented programming

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
D. DEBAUN, T. BYER ET AL: "An extensible architecture for next generation scalable parallel reservoir simulation", SOCIETY OF PETROLEUM ENGINEERS, vol. SPE, no. 93274, 31 January 2005 (2005-01-31) - 2 February 2005 (2005-02-02), Houston, pages 1 - 13, XP002403624 *
D.A.COLLINS, J.E.GRABENSTETTER, P.H.SAMMON: "A shared-memory parallel black-oil simulator with a parallel ILU linear solver", SOCIETY OF PETROLEUM ENGINEERS, vol. SPE, no. 79713, 3 February 2003 (2003-02-03) - 5 February 2003 (2003-02-05), Houston, pages 1 - 8, XP002403625 *
See also references of EP1893845A1 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009056992A2 (en) * 2007-11-01 2009-05-07 Schlumberger Canada Limited Reservoir fracture simulation
WO2009056992A3 (en) * 2007-11-01 2011-04-28 Schlumberger Canada Limited Reservoir fracture simulation
US8140310B2 (en) 2007-11-01 2012-03-20 Schlumberger Technology Corporation Reservoir fracture simulation
RU2486336C2 (en) * 2007-11-01 2013-06-27 Лоджинд Б.В. Method of formation breakdown simulation and its estimation, and computer-read carrier

Also Published As

Publication number Publication date
MX2007015937A (en) 2008-04-15
NO20080180L (en) 2008-03-14
EP1893845A1 (en) 2008-03-05
CA2612093C (en) 2014-03-11
AU2006259275A1 (en) 2006-12-28
EA011908B1 (en) 2009-06-30
US7684967B2 (en) 2010-03-23
US20070010979A1 (en) 2007-01-11
CN101287889A (en) 2008-10-15
EA200800048A1 (en) 2008-12-30
AR054476A1 (en) 2007-06-27
CN101287889B (en) 2013-07-24
AU2006259275B2 (en) 2010-03-18
CA2612093A1 (en) 2006-12-28

Similar Documents

Publication Publication Date Title
US7684967B2 (en) Apparatus, method and system for improved reservoir simulation using an algebraic cascading class linear solver
US7516056B2 (en) Apparatus, method and system for improved reservoir simulation using a multiplicative overlapping Schwarz preconditioning for adaptive implicit linear systems
Silin et al. Pore space morphology analysis using maximal inscribed spheres
Silin et al. Robust determination of the pore space morphology in sedimentary rocks
JP2020143572A (en) Computer implementation method, data processing systems, and data storage device
CA2414405C (en) Method and system for modeling geological structures using an unstructured four-dimensional mesh
US20140136171A1 (en) Unstructured Grids For Modeling Reservoirs
US10534877B2 (en) Adaptive multiscale multi-fidelity reservoir simulation
Lee et al. A finite-volume method with hexahedral multiblock grids for modeling flow in porous media
Mallison et al. Unstructured cut-cell grids for modeling complex reservoirs
Liu et al. A parallel framework for reservoir simulators on distributed-memory supercomputers
Noetinger et al. A direct determination of the transient exchange term of fractured media using a continuous time random walk method
Krogstad et al. A multiscale mixed finite-element solver for three-phase black-oil flow
Shi et al. A multiscale probabilistic collocation method for subsurface flow in heterogeneous media
Liu et al. Development of parallel reservoir simulators on distributed-memory supercomputers
EP2678803B1 (en) Variable fidelity simulation of flow in porous media
McCarthy Reservoir characterization: Efficient random-walk methods for upscaling and image selection
Fung et al. Using unstructured grids for modeling densely-spaced complex wells in field-scale reservoir simulation
Chong et al. A unique grid-block system for improved grid orientation
Kalla Use of orthogonal arrays, quasi-Monte Carlo sampling and kriging response models for reservoir simulation with many varying factors
Perovic et al. Interactive data exploration for high-performance fluid flow computations through porous media
Hu et al. A Visual Analytics Framework from Geological Modeling to Reservoir Simulation
May Volume reconstruction of point cloud data sets derived from computational geodynamic simulations
Fadakar-Alghalandis et al. A New Hybrid Mesh-Pipe Method for Modeling Fluid Flow in 3D Discrete Fracture Networks
Wu et al. Conceptualization and modeling of flow and transport through fault zones

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 200680029742.0

Country of ref document: CN

121 Ep: the epo has been informed by wipo that ep was designated in this application
ENP Entry into the national phase

Ref document number: 2612093

Country of ref document: CA

WWE Wipo information: entry into national phase

Ref document number: MX/a/2007/015937

Country of ref document: MX

NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: 2006259275

Country of ref document: AU

WWE Wipo information: entry into national phase

Ref document number: 2006799947

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 208/CHENP/2008

Country of ref document: IN

Ref document number: 200800048

Country of ref document: EA

ENP Entry into the national phase

Ref document number: 2006259275

Country of ref document: AU

Date of ref document: 20060614

Kind code of ref document: A