WO2008058077A2 - Gantry robotics system and related material transport for contour crafting - Google Patents

Gantry robotics system and related material transport for contour crafting Download PDF

Info

Publication number
WO2008058077A2
WO2008058077A2 PCT/US2007/083637 US2007083637W WO2008058077A2 WO 2008058077 A2 WO2008058077 A2 WO 2008058077A2 US 2007083637 W US2007083637 W US 2007083637W WO 2008058077 A2 WO2008058077 A2 WO 2008058077A2
Authority
WO
WIPO (PCT)
Prior art keywords
nozzle
robotic
cables
bridge
nozzle assembly
Prior art date
Application number
PCT/US2007/083637
Other languages
French (fr)
Other versions
WO2008058077A3 (en
Inventor
Behrokh Khoshnevis
Original Assignee
University Of Southern California
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by University Of Southern California filed Critical University Of Southern California
Priority to CA2667483A priority Critical patent/CA2667483C/en
Priority to MX2009004608A priority patent/MX2009004608A/en
Priority to AT07844870T priority patent/ATE512927T1/en
Priority to EP07844870A priority patent/EP2079656B1/en
Publication of WO2008058077A2 publication Critical patent/WO2008058077A2/en
Publication of WO2008058077A3 publication Critical patent/WO2008058077A3/en
Priority to HK10100594.8A priority patent/HK1136810A1/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B13/00Machines or plants for applying liquids or other fluent materials to surfaces of objects or other work by spraying, not covered by groups B05B1/00 - B05B11/00
    • B05B13/02Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work
    • B05B13/04Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work the spray heads being moved during spraying operation
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23QDETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
    • B23Q1/00Members which are comprised in the general build-up of a form of machine, particularly relatively large fixed members
    • B23Q1/01Frames, beds, pillars or like members; Arrangement of ways
    • B23Q1/012Portals
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23QDETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
    • B23Q11/00Accessories fitted to machine tools for keeping tools or parts of the machine in good working condition or for cooling work; Safety devices specially combined with or arranged in, or specially adapted for use in connection with, machine tools
    • B23Q11/001Arrangements compensating weight or flexion on parts of the machine
    • B23Q11/0014Arrangements compensating weight or flexion on parts of the machine using static reinforcing elements, e.g. pre-stressed ties
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25JMANIPULATORS; CHAMBERS PROVIDED WITH MANIPULATION DEVICES
    • B25J19/00Accessories fitted to manipulators, e.g. for monitoring, for viewing; Safety devices combined with or specially adapted for use in connection with manipulators
    • B25J19/0008Balancing devices
    • B25J19/002Balancing devices using counterweights
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25JMANIPULATORS; CHAMBERS PROVIDED WITH MANIPULATION DEVICES
    • B25J5/00Manipulators mounted on wheels or on carriages
    • B25J5/02Manipulators mounted on wheels or on carriages travelling along a guideway
    • B25J5/04Manipulators mounted on wheels or on carriages travelling along a guideway wherein the guideway is also moved, e.g. travelling crane bridge type
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25JMANIPULATORS; CHAMBERS PROVIDED WITH MANIPULATION DEVICES
    • B25J9/00Programme-controlled manipulators
    • B25J9/02Programme-controlled manipulators characterised by movement of the arms, e.g. cartesian coordinate type
    • B25J9/023Cartesian coordinate type
    • B25J9/026Gantry-type

Definitions

  • Construction is usually very labor intensive. Even a modest size structure usually requires the efforts of numerous individuals. This can be very costly. Simultaneously using the time of numerous individuals in an efficient manner can also be challenging.
  • results of the construction effort can also be inconsistent.
  • the appearance and quality of one structure can vary from another built from the same design. This can be caused by differences in the skills, efforts, supervision and techniques employed by those that work on the structures.
  • Construction may also result in wasted material. For example, when wood is used, standard, off-the-shelf lengths must often be cut to meet design requirements, resulting in waste. Construction using manual labor can also be very time-consuming, requiring months and, in some instances, years to complete. Construction can also be hazardous. Many construction workers are killed or seriously injured at construction sites, including about 500,000 in the United States alone.
  • Robotic systems have been used for Contour Crafting construction techniques, e.g., those in which curable cementitious fluids are applied in contours for a building layout/structure.
  • the present disclosure addresses the shortcomings noted for the prior art by presenting techniques, e.g., apparatus and methods, useful for robotic gantry systems that are lightweight while at the same time offering pronounced rigidity or stiffness for moving a fluid delivery nozzle in desired motions within a given volume, such as for implementation in Contour Crafting construction and material delivery techniques.
  • the present disclosure is directed to robotic gantry system and material transport apparatus that use of very light structural members that have sufficient compressive strength, but which may otherwise be weak in the presence of bending forces, in conjunction with cables that provide stiffness against bending. Use of such cables provides needed tension while at the same time allowing the robotic gantry system to be very light compared to solid structures, e.g., those with I-beams, etc.
  • FIG. 1 depicts a perspective view of an embodiment of a robotic gantry system, according to an embodiment of the present disclosure
  • FIG. 2 depicts a close-up perspective view of the sliding connection between a column and rail of FIG. 1;
  • FIG. 3 depicts a close-up perspective of the bridge of FIG. 1;
  • FIG. 4 depicts a close-up perspective of the connection between the bridge and one of the columns of FIG. 1;
  • FIG. 5A depicts another perspective view of the bridge and columns of FIG. 1;
  • FIG. 5B depicts an alternate embodiment of the connection between a bridge and columns, in accordance with a further embodiment of the present disclosure
  • FIG. 6 depicts a perspective view of the robotic gantry system of FIG. 1 with only two cables providing resistance against bending in the X direction shown;
  • FIG. 7 depicts a perspective view of the robotic gantry system of FIG. 1 with cables providing resistance against rotation of the gantry bridge due to the inertia of the metering devices and nozzle assembly that is mounted under the bridge, in addition to those cables shown in FIG. 6;
  • FIG. 8 depicts a perspective view of the robotic gantry system of FIG. 1 with cables that prevent the bridge from bending in the vertical direction, in addition to those cables shown in FIGS. 6-7;
  • FIG. 9 depicts cables that compensate for all the tensile forces of the cables in FIGS. 6-8 above the bridge, in addition to those cables shown in FIG. 6-8;
  • FIGS. 10A-10B depict, respectively, perspective views of a nozzle assembly used with a rotary union and metering devices, in accordance with a further embodiment of the present disclosure
  • FIG. 11 depicts a perspective view of a nozzle assembly with metering devices, rotary union and fluid delivery hose;
  • FIG. 12 depicts a gantry system, similar to that of FIG. 1, with a robotic manipulator and separate moveable tray useful for installing building components to a structure being built;
  • FIGS. 13A-13C depict an alternative embodiment for routing a material transport hose through cable tracks by way of a passive articulated arm.
  • the present disclosure is directed to robotic gantry system and material transport apparatus that use very light structural members that have sufficient compressive strength, but which may otherwise be weak in the presence of bending forces, in conjunction with cables that provide stiffness against bending. Use of such cables provides needed tension while at the same time allowing the robotic gantry system to be very light compared to solid structures, e.g., those with I-beams, etc.
  • FIG. 1 depicts a perspective view of an embodiment of a robotic gantry system 100, according to an embodiment of the present disclosure.
  • the gantry system 100 shown in FIG. 1 has three major structural members: two columns 102(1)- 102(2) that each ride on a rail 103(l)-103(2), and a bridge 104 that connects the columns 102(l)-102(2).
  • the bridge 104 by its design is relatively lightweight for the stiffness it affords, as described in further detail as follows.
  • the gantry system is configured and arranged for moving a fluid delivery assembly (e.g., nozzle) in three- dimensional space (volume) defined by an X axis in the direction of the rails 103(1)- 103(2), a Yin the direction of the bridge 104, and a Z axis in the vertical direction.
  • a fluid delivery assembly e.g., nozzle
  • the two columns 102(l)-102(2) are each supported by two cables that restrict the possible deflection of the columns in the X axis upon highly accelerated/decelerated motion or rapid change of direction along this axis.
  • the main support for the cables are the two square (blue) structures on each end of the bridge.
  • the triangular structure 112 in the middle of the bridge transfers the cable tensile forces to the bridge thereby adding significantly to its stability.
  • the gantry system 100 has three degrees of freedom: in direction of X, along the rails 103(l)-103(2); in direction of Y, along the bridge 104; and, in direction of Z, along the two vertical columns 102(1)-102(2).
  • the gantry system can place a fluid delivery nozzle (not shown) at a desired location in a volume of space for constructing a structure.
  • a fluid delivery nozzle (not shown) at a desired location in a volume of space for constructing a structure.
  • Contour Crafting techniques and/or nozzles as described in U.S. Patent No. 7,153,454, noted previously and incorporated herein by reference, may be used.
  • a special feature of gantry system 100 is that it does not explicitly have a Z axis.
  • the movement in the vertical direction is achieved by the elevation and lowering of the entire bridge 104.
  • This arrangement has several advantages, most notably it has the added stiffness that would be difficult to achieve using prior art designs, e.g., a commonly used vertical mast that rides on the bridge, moving the nozzle along its length.
  • the movement is the X direction can be provided by two servo motors 105(l)-105(2), each exerting linear force through a suitable arrangement, e.g., a rack and pinion arrangement.
  • Each motor 105(l)-105(2) is vertically mounted at the base of each vertical column 102(l)-102(2), which ride on either groove or linear bearings or other sliding mechanisms.
  • Two bearings 108(1)- 108(2) that run inside the U channel under the rail, e.g., 103(1) prevent the columns 102(l)-102(2) from being lifted, which could otherwise happen when sudden change of direction or start and stop take pace.
  • the two motors 105(l)-105(2) can be synchronized through a master-slave protocol implemented by a main controller.
  • the slave motor can be moved each time by the magnitude generated as feed back by the encoder signal of the master motor.
  • the X motors 105(l)-105(2) can be equipped with electro-mechanical brakes (not shown) that can be automatically activated when power is disconnected. Hence the X motors 105(l)-105(2) can be prevented from accidentally being moved out of their parked location by an external force.
  • FIG. 3 movement along the Y direction is made possible by means of a timing belt mechanism that is driven by a third servo motor (108 in FIG. 3 behind the square structure 110).
  • the motor 108 can utilize a right-angle (90 degree shaft conversion) gearhead.
  • the belt drives the cart 112 that holds the nozzle assembly (not shown) under the bridge 104.
  • a counter-mass 114 can be attached to the upper part of the timing belt.
  • the counter-mass 114 can ride on top of the bridge 104 and always moves in the opposite direction if the cart assembly 112. This arrangement prevents side forces that could deflect the entire structure in the direction of the Y axis upon sudden motions or change of directions. Using this arrangement the columns 102(l)-102(2) do not need to be stiffened in the Y direction. This reduces the overall width of the machine 100.
  • Movement along Z direction is provided by the motor shown 140 in FIG. 4.
  • This motor 140 which may also be equipped with a right-angle gearhead, can drive two cable spools (shown as 142 in FIGS. 4 and 5).
  • FIG. 5A depicts another perspective view of the bridge and columns of FIG. 1.
  • the two spools 142 can be connected by way of a long rod, therefore turning one spool would simultaneously turn the other.
  • the spools wind and pull on cables that are secured to the top of each vertical column. This action results in elevation f the bridge assembly. Reverse rotation of the spools lowers the assembly.
  • the driving motor may be equipped with an electro-mechanical brake which activates when electricity is cut off from the motor.
  • An alternative approach would be the use of a worm gear for the Z motor. So-called worm gears cannot be back-driven, hence in the event of power loss the gear inherently prevents the movement of the bridge assembly.
  • both rack and pinion sets can be used instead of the cable approach shown in FIG. 5 A, one on each vertical Z axis column.
  • both pinions may be driven by the same shaft driven by a single servo motor.
  • the pinion of each set may be driven by a servo motor.
  • the two servo motors would be synchronized in the like manner as in the X axis explained earlier (i.e., a master/slave configuration).
  • FIG. 5B shows an alternate embodiment 500 for connecting the bridge to the columns.
  • one difficulty with making gantry system of FIG. 1 deployable for use on construction sites is the alignment problem. If the distance between the rails is not equal to the length of the Y bridge then the misalignment could impede and jam the up and down movement of the Y bridge.
  • one end of the Y bridge 520 may be connected by means of a hinge 524 to its corresponding vertical slide mechanism 522, as shown in FIG. 5B.
  • FIGS. 6 through 9 demonstrates the functions of each set of cables used in the particular embodiment 100 shown in FIG. 1. For the purpose of clarification each set of cable is described incrementally.
  • FIG. 6 depicts a perspective view of the robotic gantry system of FIG. 1 with only two cables 120(1 )-120(2) providing resistance against bending in the X direction shown.
  • the set of cables shown in FIG. 6 provide stiffness in the direction of the X axis. Any deflection of the main horizontal member (the gantry bridge) would necessitate the stretching of the cables shown. Resistance of the cables 120(l)-120(2) would therefore add significantly to the stiffness of the gantry bridge. Stiffness of the gantry bridge is crucial especially during acceleration and decelerations in the X axis direction (such as at the beginning and ending of walls).
  • FIG. 7 depicts a perspective view of the robotic gantry system of FIG. 1 with cables providing resistance against rotation of the gantry bridge due to the inertia of the metering devices and nozzle assembly that is mounted under the bridge, in addition to those cables shown in FIG. 6.
  • FIG. 7 depicts a perspective view of the robotic gantry system of FIG. 1 with cables that prevent the bridge from bending in the vertical direction, in addition to those cables shown in FIGS. 6-7.
  • the cable arrangement shown in FIG. 8, including cables 124(1)-124(4) / serve to prevent the bridge from bending in the vertical direction. Note that the cables facing each other from opposite directions along the length of the bridge overlap over a segment of the bridge. If this overlap does not exist the bridge could still bend along the segment between the two ends of the cable that are connected to the middle region of the bridge.
  • FIG. 9 depicts cables that compensate for all the tensile forces of the cables in FIGS. 6-8 above the bridge, in addition to those cables shown in FIG. 6-8.
  • cables 126(1)-126(2) compensate for all the tensile forces of the aforementioned cables (shown in FIGS. 6-8) above the bridge 102. There are two such cables 126(1)-126(2) / one on each side of the bridge.
  • the gantry system provides only three directions of motion to the fluid delivery nozzle. Rotation motion is preferable, however, for the fluid delivery nozzle to build various geometrical features (such as corners, curves, etc.). Given that cementitious materials used by fluid delivery often require fairly rigid and thick hoses that are hard to wind around the nozzle upon rotation, a mechanism is preferably used that will not need excessive rotation forces and can operate in a relatively small volume.
  • FIGS. 10A-10B depict, respectively, perspective views of a nozzle assembly used with a rotary union and metering devices, in accordance with a further embodiment of the present disclosure.
  • a rotary union 170 such as shown in FIGS. 10A-10B, may be used for such a purpose.
  • a rotary union can receive a fluid in its inlet and direct it through a pipe that can be rotated by an indefinite number of degrees.
  • a Deublin Rotary Union made available by Deublin Company, 2050 Norman Drive West, Waukegan, IL 60085, USA.
  • FIGS. 1OA, FIG. 1OB, and FIG. 11 show how a rotary union 170 may be attached to the gantry cart/platform and its output pipe rotated by a servo motor 180.
  • the output pipe of the rotary union may be attached to metering devices 190 that feed into the fluid delivery nozzle (nozzle 153 in FIG. 11).
  • two metering devicesl90 are used, one for the outside orifices of the fluid delivery nozzle and another for its internal orifice.
  • a different number of metering devices may be used; moreover, any suitable metering device may be used.
  • Exemplary embodiments can utilize metering and pumping devices 190 as described in U.S. Patent Application Serial Number 11/ — , — , entitled “Metering and Pumping Devices,” filed November 2, 2007, attorney docket no. 28080-289, which claims priority to of U.S. Provisional Application Serial No. 60/864,060, entitled “Metering and Pumping Devices," Attorney Docket No. 28080-251, filed November 2, 2006 and U.S. Provisional Application Serial No. 60/864,291, entitled “Metering and Pumping Devices,” Attorney Docket No. 28080-252, filed November 3, 2006; the entire contents of all of which applications is incorporated herein by reference in their entireties.
  • the material hose 107 may ⁇ be directed through the same cable tracks that connect the motors and sensors (such as end of limit switches).
  • a single material hose 107 may be connected to the inlet of the rotary unionl70 mounted on the nozzle assembly cart/platform 150. The single flow may then be divided into two, each entering a metering device the outlets of which are connected to the inlets of the fluid delivery nozzle.
  • FIG. 12 depicts a gantry system 1200, similar to system 100 of FIG. 1, with a robotic manipulator and separate moveable tray useful for installing building components to a structure being built.
  • a robotic manipulator 1210 may be installed on a gantry bridge 1202 that could move on the bridge 1202 jointly with or independently of a nozzle assembly 1220.
  • the manipulator 1210 may be used for placing reinforcement, plumbing, electrical or other modules 1240 inside the structure as it is constructed.
  • a tray 1250 may be used as a source of the modules and may be placed at one end of the gantry work envelope, as shown.
  • Such a tray 1250 may be elevated by its own independent motorized system each time the gantry bridge 1202 is elevated such that the tray 1250 always stays at an elevation that would make the modules 1240 accessible to the robotic manipulator 1210.
  • FIGS. 13A-13C depict an alternative embodiment 1300 for routing the material hose 107 (not shown) through cable tracks is an independent routing approach by means of a passive articulated arm.
  • the advantage of this method/embodiment is reduction in the hose length and the possibility of using larger diameter hoses, which would be problematic to route through cable carriers (because of large diameter and large radius of bend).
  • the articulated arm A-C could be mounted on an adjacent wall or on its own independent vertical truss 200 which could be installed at a corner of the work envelope of the robot (e.g., the North-East corner).
  • the arm may have a desired number of segments, e.g., three segments (A+B+C), that are hinged together. These segments can collectively direct the hose from the material source to the nozzle on the robotic gantry system, e.g., system 100 of FIG. 1.
  • Segment A is hinged at Hl to the vertical post 200 (in FIG. 12C) and can swing in a horizontal plane.
  • This segment can be made of a truss to resist bending as well as torsion forces exerted by Segment B.
  • a cable may be used 220.
  • segment B attached to the end of segment A is segment B which also swings in the horizontal plane only around the hinge shown as H2.
  • the end of segment B is attached by means of a universal joint (which allows swinging sideways as well as up and down) to segment C.
  • the articulated arm moves passively by the force of the robot, however, the major portion of the weight of the material hose is carried by segments A and B of the arm.
  • the only weight exerted on the robot e.g., system 100 of FIG. 1 is a portion of the weight of segment C and a portion of the weight of the hose segment that is placed on segment C. Note that for the sake of clarity the material hose is not drawn in the FIGS. 13A-13C.

Abstract

Apparatus and methods are disclosed that are useful for robotic gantry systems that are lightweight while at the same time offering rigidity or stiffness for implementation in Contour Crafting construction and material delivery techniques. The present disclosure is directed to robotic gantry system and material transport apparatus that use of very light structural members that have sufficient compressive strength, but which may otherwise be weak in the presence of bending forces, in conjunction with cables that provide stiffness against bending. Use of such cables provides needed tension while at the same time allowing the robotic gantry system to be very light compared to solid structures, e.g., those with I-beams, etc. Material delivery systems including passive articulated arms are also disclosed.

Description

GANTRY ROBOTICS SYSTEM AND RELATED MATERIAL TRANSPORT FOR CONTOUR CRAFTING
CROSS-REFERENCE TO RELATED APPLICATION
[0001] This application claims priority to U.S. Provisional Patent Application Serial Number 60/864,293, entitled "Gantry Robotics System and Related Material Transport for Contour Crafting/' filed November 3, 2006, attorney docket no. 28080- 253, and U.S. Patent Application Serial No. 11/934,507, filed November 2, 2007, entitled "Gantry Robotics System and Related Material Transport for Contour Crafting," attorney docket no. 28080-296, the contents of both of which are incorporated herein by reference in their entirety.
GOVERNMENT INTEREST
[0002] This invention was made with government support under Office of Naval Research Grant No. N000140510850 awarded by the United States Government. The government has certain rights in the invention.
BACKGROUND
[0003] Constructing homes, offices, boats and other structures has an ancient heritage. Despite all of the centuries of development, however, there can be difficulties and problems.
[0004] Construction is usually very labor intensive. Even a modest size structure usually requires the efforts of numerous individuals. This can be very costly. Simultaneously using the time of numerous individuals in an efficient manner can also be challenging.
[0005] The results of the construction effort can also be inconsistent. The appearance and quality of one structure can vary from another built from the same design. This can be caused by differences in the skills, efforts, supervision and techniques employed by those that work on the structures.
[0006] Construction may also result in wasted material. For example, when wood is used, standard, off-the-shelf lengths must often be cut to meet design requirements, resulting in waste. Construction using manual labor can also be very time-consuming, requiring months and, in some instances, years to complete. Construction can also be hazardous. Many construction workers are killed or seriously injured at construction sites, including about 500,000 in the United States alone.
[0007] Robotic systems have been used for Contour Crafting construction techniques, e.g., those in which curable cementitious fluids are applied in contours for a building layout/structure.
[0008] One robotic approach has used a gantry structure. Because of cost, speed of motion, ease of transport and erection at site, safety and energy conservation it is important for the gantry to be as light as possible. Design of light weight large gantries has been seen as a challenge for applications that require accuracy. Moreover, large size results in flexing of structural members the increase in stiffness of which usually results in added weight, given a material (aluminum, steel, composites, etc.) for the members. Also, material delivery to the nozzle of such gantry systems, which move in a large volume in the 3D space, have proven to be difficult to implement. Furthermore, delivery of the material to the nozzle given the localized motions of the nozzle (rotation and deflections) can also present significant challenges.
[0009] What is needed, therefore, are robotic systems that are lightweight while at the same time offering pronounced rigidity or stiffness for implementation in Contour Crafting construction and material delivery techniques. SUMMARY
[0010] The present disclosure addresses the shortcomings noted for the prior art by presenting techniques, e.g., apparatus and methods, useful for robotic gantry systems that are lightweight while at the same time offering pronounced rigidity or stiffness for moving a fluid delivery nozzle in desired motions within a given volume, such as for implementation in Contour Crafting construction and material delivery techniques.
[0011] The present disclosure is directed to robotic gantry system and material transport apparatus that use of very light structural members that have sufficient compressive strength, but which may otherwise be weak in the presence of bending forces, in conjunction with cables that provide stiffness against bending. Use of such cables provides needed tension while at the same time allowing the robotic gantry system to be very light compared to solid structures, e.g., those with I-beams, etc.
[0012] Various techniques useful in conjunction with the subject matter of the present application are described in: U.S. Provisional Patent Application Serial Number 60/733,451, entitled "Material Delivery Approaches for Contour Crafting," filed November 4, 2005, attorney docket no. 28080-193; and U.S. Provisional Patent Application Serial No. 60/820,046, entitled "Accumulated Design for Cementitious Material Delivery/' filed July 21, 2006, attorney docket no. 28080-216. The entire content of both of these applications is incorporated herein by reference.
[0013] Additional useful techniques are described in: U.S. Patent Application Serial No. 11/566,027, entitled "Material Delivery System Using Decoupling Accumulator," Behrokh Khoshnevis, Inventor; Attorney Docket No. 28080-231, filed November 2, 2006; U.S. Patent Application Serial No. 11/556,048, entitled "Dry Material Transport and Extrusion," Attorney Docket No. 28080-246, filed November 2, 2006; and U.S. Provisional Application Serial No. 60/864,060, entitled "Metering and Pumping Devices/' Attorney Docket No. 28080-251, filed November 2, 2006. The entire content of all of these applications is incorporated herein by reference.
[0014] Additional useful techniques are described in: U.S. Patent Application Serial No. 10/760,963, entitled "Multi-Nozzle Assembly for Extrusion of Wall," Attorney Docket No. 28080-115, filed January 20, 2004, which claims priority to and incorporates by reference U.S. Provisional Application Serial No. 60/441,572, entitled "Automated Construction," Attorney Docket No. 28080-097, filed January 21, 2003. This application is also related to U.S. Patent Application Serial No. 11/040,401, entitled "Robotic Systems for Automated Construction," Attorney Docket No. 28080- 149, filed January 21, 2005, U.S. Patent Application Serial No. 11/040,602, entitled "Automated Plumbing, Wiring, and Reinforcement," Attorney Docket No. 28080- 154, filed January 21, 2005, and U.S. Patent Application Serial No. 11/040,518, entitled "Mixer-Extruder Assembly," filed January 21, 2005, Attorney Docket No. 28080-155, all three of which claim priority to U.S. Provisional Application Serial No. 60/537,756, entitled "Automated Construction Using Extrusion," Attorney Docket No. 28080-124, filed January 20, 2004. This application is also related to the following U.S. Provisional Applications: Serial No. 60/730,560, entitled "Contour Crafting Nozzle and Features for Fabrication of Hollow Structures," Attorney Docket No. 28080-190, filed October 26, 2005; Serial No. 60/730,418, entitled "Deployable Contour Crafting Machine," Attorney Docket No. 28080-191, filed October 26, 2006; Serial No. 60/744,483, entitled "Compliant, Low Profile, Non-Protruding and Genderless Docking System for Robotic Modules," Attorney Docket No. 28080-202, filed April 7, 2006; and Serial No. 60/807,867, entitled "Lifting and Emptying System for Bagged Materials," Attorney Docket No. 28080-212, filed July 20, 2006. This application is also related to U.S. Patent Application Serial No. 11/552,741, entitled "Deployable Contour Crafting," Attorney Docket No. 28080-227, filed October 25, 2006, and U.S. Patent Application Serial No. 11/552,885, entitled "Extruded Wall with Rib-Like Interior/' Attorney Docket No. 28080-229, filed October 25, 2006. The entire content of all of these applications is incorporated herein by reference.
[0015] Other features and advantages of the present disclosure will be understood upon reading and understanding the detailed description of exemplary embodiments, described herein, in conjunction with reference to the drawings.
BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Aspects of the disclosure may be more fully understood from the following description when read together with the accompanying drawings, which are to be regarded as illustrative in nature, and not as limiting. In the drawings, like elements are indicated by the same reference character(s). The drawings are not necessarily to scale, emphasis instead placed on the principles of the disclosure. In the drawings:
[0017] FIG. 1 depicts a perspective view of an embodiment of a robotic gantry system, according to an embodiment of the present disclosure;
[0018] FIG. 2 depicts a close-up perspective view of the sliding connection between a column and rail of FIG. 1;
[0019] FIG. 3 depicts a close-up perspective of the bridge of FIG. 1;
[0020] FIG. 4 depicts a close-up perspective of the connection between the bridge and one of the columns of FIG. 1;
[0021] FIG. 5A depicts another perspective view of the bridge and columns of FIG. 1;
[0022] FIG. 5B depicts an alternate embodiment of the connection between a bridge and columns, in accordance with a further embodiment of the present disclosure;
[0023] FIG. 6 depicts a perspective view of the robotic gantry system of FIG. 1 with only two cables providing resistance against bending in the X direction shown; [0024] FIG. 7 depicts a perspective view of the robotic gantry system of FIG. 1 with cables providing resistance against rotation of the gantry bridge due to the inertia of the metering devices and nozzle assembly that is mounted under the bridge, in addition to those cables shown in FIG. 6;
[0025] FIG. 8 depicts a perspective view of the robotic gantry system of FIG. 1 with cables that prevent the bridge from bending in the vertical direction, in addition to those cables shown in FIGS. 6-7;
[0026] FIG. 9 depicts cables that compensate for all the tensile forces of the cables in FIGS. 6-8 above the bridge, in addition to those cables shown in FIG. 6-8;
[0027] FIGS. 10A-10B depict, respectively, perspective views of a nozzle assembly used with a rotary union and metering devices, in accordance with a further embodiment of the present disclosure;
[0028] FIG. 11 depicts a perspective view of a nozzle assembly with metering devices, rotary union and fluid delivery hose;
[0029] FIG. 12 depicts a gantry system, similar to that of FIG. 1, with a robotic manipulator and separate moveable tray useful for installing building components to a structure being built; and
[0030] FIGS. 13A-13C depict an alternative embodiment for routing a material transport hose through cable tracks by way of a passive articulated arm.
[0031] While certain embodiments are depicted in the drawings, one skilled in the art will appreciate that the embodiments depicted are illustrative and that variations of those shown, as well as other embodiments described herein, may be envisioned and practiced within the scope of the present disclosure. DETAILED DESCRIPTION
[0032] The present disclosure is directed to robotic gantry system and material transport apparatus that use very light structural members that have sufficient compressive strength, but which may otherwise be weak in the presence of bending forces, in conjunction with cables that provide stiffness against bending. Use of such cables provides needed tension while at the same time allowing the robotic gantry system to be very light compared to solid structures, e.g., those with I-beams, etc.
THE GANTRY
Motion elements, energy sources and mechanical motion transfer mechanisms
[0033] FIG. 1 depicts a perspective view of an embodiment of a robotic gantry system 100, according to an embodiment of the present disclosure. The gantry system 100 shown in FIG. 1 has three major structural members: two columns 102(1)- 102(2) that each ride on a rail 103(l)-103(2), and a bridge 104 that connects the columns 102(l)-102(2). The bridge 104 by its design is relatively lightweight for the stiffness it affords, as described in further detail as follows. The gantry system is configured and arranged for moving a fluid delivery assembly (e.g., nozzle) in three- dimensional space (volume) defined by an X axis in the direction of the rails 103(1)- 103(2), a Yin the direction of the bridge 104, and a Z axis in the vertical direction.
[0034] As shown in FIG. 1, the two columns 102(l)-102(2) are each supported by two cables that restrict the possible deflection of the columns in the X axis upon highly accelerated/decelerated motion or rapid change of direction along this axis. The main support for the cables are the two square (blue) structures on each end of the bridge. The triangular structure 112 in the middle of the bridge transfers the cable tensile forces to the bridge thereby adding significantly to its stability.
[0035] The gantry system 100 has three degrees of freedom: in direction of X, along the rails 103(l)-103(2); in direction of Y, along the bridge 104; and, in direction of Z, along the two vertical columns 102(1)-102(2). By providing such three-dimensional movement under the control of an appropriate motion controller, the gantry system can place a fluid delivery nozzle (not shown) at a desired location in a volume of space for constructing a structure. In exemplary embodiments/ Contour Crafting techniques and/or nozzles as described in U.S. Patent No. 7,153,454, noted previously and incorporated herein by reference, may be used.
[0036] A special feature of gantry system 100 is that it does not explicitly have a Z axis. The movement in the vertical direction is achieved by the elevation and lowering of the entire bridge 104. This arrangement has several advantages, most notably it has the added stiffness that would be difficult to achieve using prior art designs, e.g., a commonly used vertical mast that rides on the bridge, moving the nozzle along its length.
[0037] As described previously, it is often difficult to maintain stiffness for such a mast structure. Also, if the space along he height is limited (such as a factory for building prefab houses or components) then the mast would need to be telescopic in structure which would add significantly to the machine complexity, cost, and inaccuracy that could only be remedied by expensive linear bearings and excessive motion transfer components.
[0038] As shown in FIG. 2, the movement is the X direction can be provided by two servo motors 105(l)-105(2), each exerting linear force through a suitable arrangement, e.g., a rack and pinion arrangement. Each motor 105(l)-105(2) is vertically mounted at the base of each vertical column 102(l)-102(2), which ride on either groove or linear bearings or other sliding mechanisms. Two bearings 108(1)- 108(2) that run inside the U channel under the rail, e.g., 103(1) prevent the columns 102(l)-102(2) from being lifted, which could otherwise happen when sudden change of direction or start and stop take pace. [0039] The two motors 105(l)-105(2) can be synchronized through a master-slave protocol implemented by a main controller. In such an arrangement, the slave motor can be moved each time by the magnitude generated as feed back by the encoder signal of the master motor. To prevent out-of-sync situation during power shut down, the X motors 105(l)-105(2) can be equipped with electro-mechanical brakes (not shown) that can be automatically activated when power is disconnected. Hence the X motors 105(l)-105(2) can be prevented from accidentally being moved out of their parked location by an external force.
[0040] Referring now to FIG. 3, movement along the Y direction is made possible by means of a timing belt mechanism that is driven by a third servo motor (108 in FIG. 3 behind the square structure 110). For compactness purpose the motor 108 can utilize a right-angle (90 degree shaft conversion) gearhead. Note that the belt drives the cart 112 that holds the nozzle assembly (not shown) under the bridge 104.
[0041] To neutralize or mitigate the effects of the momentum of the mass of the cart assembly 112, a counter-mass 114 can be attached to the upper part of the timing belt. The counter-mass 114 can ride on top of the bridge 104 and always moves in the opposite direction if the cart assembly 112. This arrangement prevents side forces that could deflect the entire structure in the direction of the Y axis upon sudden motions or change of directions. Using this arrangement the columns 102(l)-102(2) do not need to be stiffened in the Y direction. This reduces the overall width of the machine 100.
[0042] Movement along Z direction is provided by the motor shown 140 in FIG. 4. This motor 140, which may also be equipped with a right-angle gearhead, can drive two cable spools (shown as 142 in FIGS. 4 and 5).
[0043] FIG. 5A depicts another perspective view of the bridge and columns of FIG. 1. The two spools 142 can be connected by way of a long rod, therefore turning one spool would simultaneously turn the other. The spools wind and pull on cables that are secured to the top of each vertical column. This action results in elevation f the bridge assembly. Reverse rotation of the spools lowers the assembly.
[0044] To prevent the possibility of a sudden fall of the bridge at the time of power shut down or failure, the driving motor may be equipped with an electro-mechanical brake which activates when electricity is cut off from the motor. An alternative approach would be the use of a worm gear for the Z motor. So-called worm gears cannot be back-driven, hence in the event of power loss the gear inherently prevents the movement of the bridge assembly.
[0045] In exemplary embodiments, two rack and pinion sets can be used instead of the cable approach shown in FIG. 5 A, one on each vertical Z axis column. For such embodiments, both pinions may be driven by the same shaft driven by a single servo motor. Alternatively, the pinion of each set may be driven by a servo motor. The two servo motors would be synchronized in the like manner as in the X axis explained earlier (i.e., a master/slave configuration).
Easing the Alignment Problem
[0046] FIG. 5B shows an alternate embodiment 500 for connecting the bridge to the columns. As can be appreciated, one difficulty with making gantry system of FIG. 1 deployable for use on construction sites is the alignment problem. If the distance between the rails is not equal to the length of the Y bridge then the misalignment could impede and jam the up and down movement of the Y bridge. To allow for errors in misalignment of the rails, one end of the Y bridge 520 may be connected by means of a hinge 524 to its corresponding vertical slide mechanism 522, as shown in FIG. 5B. Given that the other end of the Y bridge is connected to the corresponding column by bearing mechanisms at least in two points with some vertical distance; and given that both ends of the Y bridge are suspended by cables (not shown), or are engaged with the columns through rack and pinions, the entire structure will still have no degree of freedom and will hence rigidly stand unless moved by motors. Under this arrangement in case of rail misalignment, up and down motion of Y bridge would force the angle of the columns with respect to the horizon to deviate slightly from 90 degrees, but no jamming would occur. This of course would create some error in the geometry of the fabricated structure, however, slight errors are not crucial in most building construction applications for which the gantry is intended.
[0047] The sequence of FIGS. 6 through 9 demonstrates the functions of each set of cables used in the particular embodiment 100 shown in FIG. 1. For the purpose of clarification each set of cable is described incrementally.
[0048] FIG. 6 depicts a perspective view of the robotic gantry system of FIG. 1 with only two cables 120(1 )-120(2) providing resistance against bending in the X direction shown. The set of cables shown in FIG. 6 provide stiffness in the direction of the X axis. Any deflection of the main horizontal member (the gantry bridge) would necessitate the stretching of the cables shown. Resistance of the cables 120(l)-120(2) would therefore add significantly to the stiffness of the gantry bridge. Stiffness of the gantry bridge is crucial especially during acceleration and decelerations in the X axis direction (such as at the beginning and ending of walls).
[0049] FIG. 7 depicts a perspective view of the robotic gantry system of FIG. 1 with cables providing resistance against rotation of the gantry bridge due to the inertia of the metering devices and nozzle assembly that is mounted under the bridge, in addition to those cables shown in FIG. 6.
[0050] The cable arrangement shown in FIG. 7, including cables 122(1)-122(2), is used to provide stiffness against rotation of the gantry bridge 104 due to the inertia of the metering devices and nozzle assembly that is mounted under the bridge. The imbalance of the mass on top and bottom of the bridge would result in forces that tend to rotate the bridge upon acceleration and deceleration along the X axis. The triangular structure 112 in the middle of the bridge transfers the cable tensile forces to the bridge thereby adding significantly to its stability. [0051] FIG. 8 depicts a perspective view of the robotic gantry system of FIG. 1 with cables that prevent the bridge from bending in the vertical direction, in addition to those cables shown in FIGS. 6-7.
[0052] The cable arrangement shown in FIG. 8, including cables 124(1)-124(4)/ serve to prevent the bridge from bending in the vertical direction. Note that the cables facing each other from opposite directions along the length of the bridge overlap over a segment of the bridge. If this overlap does not exist the bridge could still bend along the segment between the two ends of the cable that are connected to the middle region of the bridge.
[0053] FIG. 9 depicts cables that compensate for all the tensile forces of the cables in FIGS. 6-8 above the bridge, in addition to those cables shown in FIG. 6-8.
[0054] In FIG. 9, cables 126(1)-126(2) compensate for all the tensile forces of the aforementioned cables (shown in FIGS. 6-8) above the bridge 102. There are two such cables 126(1)-126(2)/ one on each side of the bridge.
[0055] Note that in this arrangement the only compressive force is supplied by the bridge structural member. The rest of the forces are all tensile and provided by the various cables. The tension in each of the cables is accurately adjustable. A systematic procedure must be followed when tightening the cables so that true alignment is achieved. The main indicator of alignment is the perpendicularity of the square frames to the bridge.
MATERIAL TRANSPORT
[0056] As pointed out earlier, the gantry system provides only three directions of motion to the fluid delivery nozzle. Rotation motion is preferable, however, for the fluid delivery nozzle to build various geometrical features (such as corners, curves, etc.). Given that cementitious materials used by fluid delivery often require fairly rigid and thick hoses that are hard to wind around the nozzle upon rotation, a mechanism is preferably used that will not need excessive rotation forces and can operate in a relatively small volume.
[0057] FIGS. 10A-10B depict, respectively, perspective views of a nozzle assembly used with a rotary union and metering devices, in accordance with a further embodiment of the present disclosure.
[0058] In exemplary embodiments according to the present disclosure, a rotary union 170, such as shown in FIGS. 10A-10B, may be used for such a purpose. A rotary union can receive a fluid in its inlet and direct it through a pipe that can be rotated by an indefinite number of degrees. In certain exemplary embodiments, a Deublin Rotary Union, made available by Deublin Company, 2050 Norman Drive West, Waukegan, IL 60085, USA.
[0059] FIGS. 1OA, FIG. 1OB, and FIG. 11 show how a rotary union 170 may be attached to the gantry cart/platform and its output pipe rotated by a servo motor 180. The output pipe of the rotary union may be attached to metering devices 190 that feed into the fluid delivery nozzle (nozzle 153 in FIG. 11).
[0060] In the embodiments shown, two metering devicesl90 are used, one for the outside orifices of the fluid delivery nozzle and another for its internal orifice. In other embodiments, a different number of metering devices (including just one) may be used; moreover, any suitable metering device may be used.
[0061] Exemplary embodiments can utilize metering and pumping devices 190 as described in U.S. Patent Application Serial Number 11/ — , — , entitled "Metering and Pumping Devices," filed November 2, 2007, attorney docket no. 28080-289, which claims priority to of U.S. Provisional Application Serial No. 60/864,060, entitled "Metering and Pumping Devices," Attorney Docket No. 28080-251, filed November 2, 2006 and U.S. Provisional Application Serial No. 60/864,291, entitled "Metering and Pumping Devices," Attorney Docket No. 28080-252, filed November 3, 2006; the entire contents of all of which applications is incorporated herein by reference in their entireties.
[0062] As was previously described concerning FIG. 1, the material hose 107 may¬ be directed through the same cable tracks that connect the motors and sensors (such as end of limit switches). A single material hose 107 may be connected to the inlet of the rotary unionl70 mounted on the nozzle assembly cart/platform 150. The single flow may then be divided into two, each entering a metering device the outlets of which are connected to the inlets of the fluid delivery nozzle.
[0063] FIG. 12 depicts a gantry system 1200, similar to system 100 of FIG. 1, with a robotic manipulator and separate moveable tray useful for installing building components to a structure being built.
[0064] As shown in FIG. 12, a robotic manipulator 1210 may be installed on a gantry bridge 1202 that could move on the bridge 1202 jointly with or independently of a nozzle assembly 1220. The manipulator 1210 may be used for placing reinforcement, plumbing, electrical or other modules 1240 inside the structure as it is constructed. In exemplary embodiments, a tray 1250 may be used as a source of the modules and may be placed at one end of the gantry work envelope, as shown. Such a tray 1250 may be elevated by its own independent motorized system each time the gantry bridge 1202 is elevated such that the tray 1250 always stays at an elevation that would make the modules 1240 accessible to the robotic manipulator 1210.
[0065] FIGS. 13A-13C depict an alternative embodiment 1300 for routing the material hose 107 (not shown) through cable tracks is an independent routing approach by means of a passive articulated arm. The advantage of this method/embodiment is reduction in the hose length and the possibility of using larger diameter hoses, which would be problematic to route through cable carriers (because of large diameter and large radius of bend). [0066] The articulated arm A-C could be mounted on an adjacent wall or on its own independent vertical truss 200 which could be installed at a corner of the work envelope of the robot (e.g., the North-East corner). The arm may have a desired number of segments, e.g., three segments (A+B+C), that are hinged together. These segments can collectively direct the hose from the material source to the nozzle on the robotic gantry system, e.g., system 100 of FIG. 1.
[0067] Segment A is hinged at Hl to the vertical post 200 (in FIG. 12C) and can swing in a horizontal plane. This segment can be made of a truss to resist bending as well as torsion forces exerted by Segment B. To assist the structure in resisting bending forces a cable may be used 220. In the embodiment shown, attached to the end of segment A is segment B which also swings in the horizontal plane only around the hinge shown as H2. Finally, the end of segment B is attached by means of a universal joint (which allows swinging sideways as well as up and down) to segment C.
[0068] For the embodiment of FIGS. 13A-13C, the articulated arm moves passively by the force of the robot, however, the major portion of the weight of the material hose is carried by segments A and B of the arm. The only weight exerted on the robot (e.g., system 100 of FIG. 1) is a portion of the weight of segment C and a portion of the weight of the hose segment that is placed on segment C. Note that for the sake of clarity the material hose is not drawn in the FIGS. 13A-13C.
[0069] While certain embodiments have been described herein, it will be understood by one skilled in the art that the methods, systems, and apparatus of the present disclosure may be embodied in other specific forms without departing from the spirit thereof.
[0070] Accordingly, the embodiments described herein, and as claimed in the attached claims, are to be considered in all respects as illustrative of the present disclosure and not restrictive.

Claims

GANTRYROBOTICS SYSTEM AND RELATED MATERIAL TRANSPORTFOR CONTOUR CRAFTINGCLAIMS:What is claimed is:
1. A robotic gantry system comprising:
first and second columns each riding a rail;
a bridge connecting the first and second columns, the bridge including one or more cables configured and arranged to resist bending of the bridge;
a first plurality of cables providing the columns and the bridge with resistance to bending;
a nozzle assembly slidably connected to the bridge; and
a plurality of motors configured and arranged to move the first and second columns as a unit, the bridge, and/or the platform, and wherein the plurality of motors are configured and arranged to move the nozzle assembly in a horizontal X direction, a horizontal Y direction, and a vertical Z direction, wherein the platform can be located at a desired location within a volume; and
a motion controller configured and arranged to control the motion and position of the nozzle assembly in the volume.
2. The robotic system of claim 1, wherein the nozzle assembly comprises a nozzle connected to a nozzle platform.
3. The robotic gantry system of claim 1, wherein the first plurality of cables includes two cables providing resistance against bending in the horizontal X direction;
4. The robotic gantry system of claim 1, wherein the plurality of cables includes two or more cables providing resistance against rotation of the gantry bridge due to the inertia of the nozzle platform mounted to the bridge;
5. The robotic gantry system of claim 1, wherein the plurality of cables includes two or more cables that prevent the bridge from bending in the horizontal Y direction.
6. The robotic gantry system of claim 1, wherein the plurality of cables include a second plurality of cables configured and arranged to compensate for the tensile forces of the first plurality of cables.
7. The robotic gantry system of claim 1, wherein the position controller comprises a position sensor configured to sense the position of the nozzle assembly with respect to one or more reference locations.
8. The robotic gantry system of claim 2, further comprising a counter weight coupled to a timing belt coupled to the nozzle platform.
9. The robotic gantry system of claim 7, wherein the position sensor comprises a laser rangefinder, the laser rangefinder including: a transmitter configured to generate laser light and transmit the laser light to one or more reflectors positioned at a respective one of the one or more reference locations; a receiver configured to receive laser light generated by the transmitter and back-scattered from the reflectors, and a photodetector configured to detect the intensity of the received light; and a processor configured to determine the position of the nozzle assembly by measuring the time required for the laser light to travel to and from each of the retroref lector s.
10 The robotic gantry system of claim 2, further comprising a material feed system configured to feed material to the nozzle, wherein the material feed system includes a container configured to store material, and a fluid delivery tube configured to deliver material stored in the container to the nozzle.
11. The robotic gantry system of claim 1, further comprising a robotic manipulator connected to the bridge and configured and arranged to install building components on a structure being built.
12 The robotic gantry system of claim 11, further comprising a movable tray configured and arranged to be at an elevation accessible to the robotic manipulator.
13. The robotic gantry system of claim 1, wherein the nozzle assembly comprises a multi-nozzle assembly including: a first nozzle configured to extrude material through a first outlet; a second nozzle configured to extrude material through a second outlet; a third nozzle configured to extrude material through a third outlet, the third outlet being between the first and second outlets; and a first and second trowel configured to shape material extruded from the first and second nozzles, respectively.
14. The robotic gantry system of claim 13, wherein the multi-nozzle assembly further includes a nozzle position controller configured to controllably vary the height of at least one of the outlets with respect to the height of at least one of the other outlets.
15. The robotic gantry system of claim 10, further comprising one or more metering devices configured and arranged to meter a supply of fluid to the nozzle assembly.
16. The robotic gantry system of claim 10, wherein the material feed system comprises a passive articulated arm configured and arranged to support a fluid delivery hose.
17. The robotic gantry system of claim 16, wherein the passive articulated arm comprises a vertical truss.
18. The robotic gantry system of claim 17, wherein the vertical truss further comprises a cantilever with a distal end and a proximal end that is connected to the vertical truss by a hinge.
19. A construction apparatus, comprising:
a movable gantry platform including a cross-member extending between, and slidably mounted across, a pair of opposite side-members;
a plurality of cables connected to the cross-member and the pair of opposite side-members, wherein the plurality of cables are configured and arranged to provide resistance to bending;
a nozzle assembly movably coupled to the cross-member and configured to extrude material through an outlet;
and a lifting mechanism configured to controllably lift the platform to a height sufficient for the nozzle assembly to extrude a layer of material on top of a previously extruded layer of material.
20. The construction apparatus of claim 19, wherein the nozzle assembly includes a nozzle configured to extrude material through an outlet, and a trowel configured to shape material extruded from the nozzle.
21. The construction apparatus of claim 20, wherein the lifting mechanism is configured to exert force on the cables so as to cause the plurality of cables to collectively hoist the gantry platform to a desired height.
22. The construction apparatus of claim 19, wherein the movable gantry platform comprises a plurality of cross-members, each of the cross-members extending between, and slidably mounted across, the pair of opposite side-members; and wherein the movable gantry platform further comprises a plurality of nozzle assemblies, each of the nozzle assemblies movably coupled to a respective one of the cross-members.
23. The construction apparatus of claim 19, further comprising one or more attachment members extending from points along the gantry platform and configured to anchor the gantry platform to a rigid structure, each of the attachment members having a wheel affixed thereto, the wheel configured to be in contact with the rigid structure.
24. The construction apparatus of claim 19, wherein the nozzle assembly comprises a multi-nozzle assembly including:
a first nozzle configured to extrude material through a first outlet;
a second nozzle configured to extrude material through a second outlet;
a third nozzle configured to extrude material through a third outlet, the third outlet being between the first and second outlets; and
first and second trowels configured to shape material extruded from the first and second nozzles, respectively.
25. A mobile robotic system, comprising:
a movable robotic base including first and second columns each riding a rail, a bridge connecting the first and second columns, the bridge including one or more cables configured and arranged to resist bending of the bridge, and a first plurality of cables providing the columns and the bridge with resistance to bending;
an articulated robotic arm extending from the robotic base;
a nozzle assembly coupled to a distal end of the robotic arm, the nozzle assembly configured to extrude material through an outlet; and
a material feeding system mounted on the robotic base and configured to feed material to the nozzle assembly.
PCT/US2007/083637 2006-11-03 2007-11-05 Gantry robotics system and related material transport for contour crafting WO2008058077A2 (en)

Priority Applications (5)

Application Number Priority Date Filing Date Title
CA2667483A CA2667483C (en) 2006-11-03 2007-11-05 Gantry robotics system and related material transport for contour crafting
MX2009004608A MX2009004608A (en) 2006-11-03 2007-11-05 Gantry robotics system and related material transport for contour crafting.
AT07844870T ATE512927T1 (en) 2006-11-03 2007-11-05 PORTAL ROBOT SYSTEM
EP07844870A EP2079656B1 (en) 2006-11-03 2007-11-05 Robotic gantry system
HK10100594.8A HK1136810A1 (en) 2006-11-03 2010-01-20 Robotic gantry system

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
US86429306P 2006-11-03 2006-11-03
US60/864,293 2006-11-03
US11/934,507 US8029710B2 (en) 2006-11-03 2007-11-02 Gantry robotics system and related material transport for contour crafting
US11/934,507 2007-11-02

Publications (2)

Publication Number Publication Date
WO2008058077A2 true WO2008058077A2 (en) 2008-05-15
WO2008058077A3 WO2008058077A3 (en) 2008-07-31

Family

ID=39365290

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/US2007/083637 WO2008058077A2 (en) 2006-11-03 2007-11-05 Gantry robotics system and related material transport for contour crafting

Country Status (7)

Country Link
US (1) US8029710B2 (en)
EP (2) EP2324971B1 (en)
AT (1) ATE512927T1 (en)
CA (1) CA2667483C (en)
HK (1) HK1136810A1 (en)
MX (1) MX2009004608A (en)
WO (1) WO2008058077A2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106181981A (en) * 2016-09-28 2016-12-07 天津工业大学 A kind of three-dimensional machinery arm configuration measured for camera scanning steel plate
CN106872157A (en) * 2016-12-19 2017-06-20 天津工业大学 A kind of heavy machine tool structural member erection stress testing experiment platform
WO2018210287A1 (en) * 2017-05-18 2018-11-22 北京华沁智联科技有限公司 Guide rail

Families Citing this family (66)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8801415B2 (en) 2005-01-21 2014-08-12 University Of Southern California Contour crafting extrusion nozzles
IT1392130B1 (en) * 2008-11-03 2012-02-22 Eden Technology Srl AUTOMATIC STEERING DEVICE FOR LIFTING TRUCKS AND MANUFACTURED TRANSPORT TRUCKS.
US8863773B2 (en) * 2008-11-10 2014-10-21 University Of Southern California Fluid metering device using free-moving piston
CN102395731B (en) * 2009-04-15 2014-08-20 Vsl国际股份公司 Overhead form traveller and method
CN102166750B (en) * 2011-05-16 2014-01-29 机械科学研究总院先进制造技术研究中心 Positioning beam and robot linear motion unit with same
US8434657B2 (en) 2011-06-09 2013-05-07 Landoll Corporation Gantry-based welding system and method
US8210418B1 (en) 2011-06-09 2012-07-03 Landoll Corporation Multi-station, gantry-based automated welding system
CN203141825U (en) * 2012-11-30 2013-08-21 广州市华南橡胶轮胎有限公司 Movable type rubber extrusion equipment
CN103266779B (en) * 2013-05-23 2016-03-30 广州建筑股份有限公司 A kind of sliding and lifting construction equipment and method thereof of crossing horizontal obstacle thing
US20140363532A1 (en) * 2013-06-10 2014-12-11 Kirk W. Wolfgram Multiple color extrusion type three dimensional printer
US9140023B2 (en) * 2013-07-29 2015-09-22 Richard J. McCaffrey Portable robotic casting of volumetric modular building components
EP3082678A1 (en) * 2013-12-20 2016-10-26 The Procter & Gamble Company Base for a flexible mount converter
JP2017523323A (en) 2014-04-16 2017-08-17 ユニバーシティー オブ サザン カリフォルニア Automated construction of towers and columns
US9892463B1 (en) 2014-04-25 2018-02-13 State Farm Mutual Automobile Insurance Company System and methods for community-based cause of loss determination
US9486917B2 (en) 2014-04-30 2016-11-08 The Boeing Company Mobile automated assembly tool for aircraft structures
US10000298B2 (en) 2014-04-30 2018-06-19 The Boeing Company Metrology system for positioning assemblies
US10017277B2 (en) 2014-04-30 2018-07-10 The Boeing Company Apparatus, system, and method for supporting a wing assembly
US10118714B2 (en) 2014-04-30 2018-11-06 The Boeing Company System and method for positioning an automated assembly tool relative to a structure
US9776330B2 (en) 2014-04-30 2017-10-03 The Boeing Company Crawler robot and supporting platform
US9708079B2 (en) * 2014-04-30 2017-07-18 The Boeing Company Mobile automated overhead assembly tool for aircraft structures
US10427254B2 (en) 2014-04-30 2019-10-01 The Boeing Company Flexible manufacturing for aircraft structures
US9579679B2 (en) * 2014-05-28 2017-02-28 The Boeing Company Aircraft coating application system and method
US9856037B2 (en) * 2014-06-18 2018-01-02 The Boeing Company Stabilization of an end of an extended-reach apparatus in a limited-access space
US10573146B1 (en) 2014-10-07 2020-02-25 State Farm Mutual Automobile Insurance Company Systems and methods for improved assisted or independent living environments
JP6402684B2 (en) * 2015-06-10 2018-10-10 トヨタ自動車株式会社 Display device
CN105035745A (en) * 2015-07-31 2015-11-11 苏州速腾电子科技有限公司 Carrying device
US20170167148A1 (en) * 2015-12-10 2017-06-15 Caterpillar Inc. Construction system
HUP1600186A2 (en) 2016-03-08 2017-09-28 Cnc-Instruments Bt Device and method for constructing buildings by 3d printing
US9919510B2 (en) 2016-04-12 2018-03-20 Massachusetts Institute Of Technology Methods and apparatus for additive manufacturing with molten glass
ES2899585T3 (en) 2016-07-15 2022-03-14 Fastbrick Ip Pty Ltd Material transport boom
WO2018009978A1 (en) * 2016-07-15 2018-01-18 Fastbrick Ip Pty Ltd Adhesive applicator and object placing head incorporating the same
US10635758B2 (en) 2016-07-15 2020-04-28 Fastbrick Ip Pty Ltd Brick/block laying machine incorporated in a vehicle
AT518899B1 (en) 2016-08-05 2018-02-15 Metallconcept Gmbh Apparatus for producing at least one three-dimensional composite body for the construction industry
US11273574B2 (en) 2016-08-29 2022-03-15 United States Of America As Represented By The Secretary Of The Army Scalable three dimensional printing apparatus
CN106315413B (en) * 2016-08-29 2017-11-07 宁夏巨能机器人股份有限公司 A kind of control system and its control method of gantry truss robot
US10307959B2 (en) * 2016-09-29 2019-06-04 The United States Of America As Represented By The Secretary Of The Army Concrete delivery system
US10061323B2 (en) * 2016-12-22 2018-08-28 Advanced Construction Robotics, Inc. Autonomous apparatus and system for repetitive tasks in construction project
US10675769B2 (en) 2017-01-27 2020-06-09 The Boeing Company Cable carrier crossover supplying four non-static locations
US10344906B2 (en) 2017-01-27 2019-07-09 The Boeing Company Isolated human work platform for stabilized positioning of collaborative robotics
US10745251B2 (en) * 2017-01-27 2020-08-18 The Boeing Company Belt drive dual robot gantry
US10815679B2 (en) 2017-01-27 2020-10-27 The Boeing Company System for four collaborative robots and humans in a narrowing work envelope
RU177441U1 (en) * 2017-04-04 2018-02-21 федеральное государственное бюджетное образовательное учреждение высшего образования "Белгородский государственный технологический университет им. В.Г. Шухова" BUILDING ROBOT
US10920434B1 (en) 2017-06-23 2021-02-16 Kent Douglas Pearson, Jr. Portable robotic construction system
US11441899B2 (en) 2017-07-05 2022-09-13 Fastbrick Ip Pty Ltd Real time position and orientation tracker
US11656357B2 (en) 2017-08-17 2023-05-23 Fastbrick Ip Pty Ltd Laser tracker with improved roll angle measurement
US20210016438A1 (en) 2017-08-17 2021-01-21 Fastbrick Ip Pty Ltd Interaction system configuration
AU2018348785A1 (en) 2017-10-11 2020-05-07 Fastbrick Ip Pty Ltd Machine for conveying objects and multi-bay carousel for use therewith
ES2726921B2 (en) * 2018-04-10 2020-05-25 Evolution Construction System S L ROBOTIZED CONSTRUCTION SYSTEM.
SI25656A (en) 2018-06-01 2019-12-31 Jože Abram Mixing head for a three-dimensional printer for wall building printing and printing method
RU188945U1 (en) * 2018-07-13 2019-04-30 федеральное государственное бюджетное образовательное учреждение высшего образования "Белгородский государственный технологический университет им. В.Г. Шухова" PORTAL MANIPULATOR FOR OBTAINING LARGE-SIZED PRODUCTS BY ADDITIVE PRINTING
US10782696B2 (en) 2018-09-07 2020-09-22 The Boeing Company Mobile fixture apparatuses and methods
US11072439B2 (en) 2018-09-07 2021-07-27 The Boeing Company Mobile fixture apparatuses and methods
US10472095B1 (en) 2018-09-07 2019-11-12 The Boeing Company Mobile fixture apparatuses and methods
WO2020065375A1 (en) 2018-09-26 2020-04-02 Trawi 3D Constructions S.A.R.L. Three dimensional printer apparatus
US11124961B2 (en) 2018-11-13 2021-09-21 Stratasys, Inc. System and method for 3D construction printing
US10597264B1 (en) 2018-12-20 2020-03-24 Advanced Construction Robotics, Inc. Semi-autonomous system for carrying and placing elongate objects
WO2020131120A1 (en) * 2018-12-21 2020-06-25 Icon Llc Systems and methods for the construction of structures utilizing additive manufacturing techniques
US11408166B2 (en) * 2018-12-21 2022-08-09 Icon Technology, Inc. Systems and methods for the construction of structures utilizing additive manufacturing techniques
EP3927915A1 (en) 2019-02-19 2021-12-29 Basf Se 3d printing method for producing concrete-containing segments of a 3d object
DE102019109019A1 (en) 2019-04-05 2020-10-08 Liebherr-Werk Biberach Gmbh Construction and / or material handling machine and method for guiding and moving a work head
CZ2019387A3 (en) * 2019-06-19 2020-02-26 České vysoké učení technické v Praze A device for changing the dynamic stiffness of a gantry or overhung structure
CN110342243A (en) * 2019-06-23 2019-10-18 北京鲲鹏神通科技有限公司 A kind of unmanned intelligent kitchen reclaimer robot
EP3771539B1 (en) * 2019-08-01 2023-04-19 Fundación Tecnalia Research & Innovation Printing heads for printing with cementitious material
IT202000030872A1 (en) * 2020-12-15 2022-06-15 Faspar S P A SUPPORT AND HANDLING GROUP FOR A TOOL GRIPPING DEVICE
US11708937B2 (en) * 2021-03-04 2023-07-25 Caterpillar Inc. Method and apparatus for gantry system mobility
FI129894B (en) * 2021-05-21 2022-10-31 Cimcorp Oy Storage partition wall

Family Cites Families (51)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US634026A (en) * 1899-05-29 1899-10-03 William H H Pittman Trussed suspension-bridge.
US984517A (en) * 1910-02-28 1911-02-14 Rudolph Rollinger Outside wall.
US1578511A (en) * 1923-02-08 1926-03-30 Frederic E Gladwin Wall construction
US2556503A (en) * 1947-09-22 1951-06-12 George T Nelson Automatically steered carriage for road paving machines
GB781465A (en) 1954-03-29 1957-08-21 Cyril Walter Kenward Improvements in or relating to positioning, assembling or manipulating apparatus
US3221456A (en) * 1960-05-27 1965-12-07 Dor Seal Ltd Pane support and seal
SE319892B (en) * 1968-06-17 1970-01-26 N Larsson
US3562991A (en) * 1968-07-29 1971-02-16 Paul W Kustusch Building wall construction and module therefor
US3826196A (en) * 1969-10-08 1974-07-30 Wallace Prod Corp B Load-handling gantries
US3909863A (en) * 1972-09-11 1975-10-07 Krupp Gmbh Bridge crane girder
GB1446853A (en) * 1972-12-08 1976-08-18 Dobie C H Gantry cranes
US3966533A (en) * 1973-04-19 1976-06-29 Goldsworthy Engineering, Inc. On-site wall structure formation
US3957137A (en) * 1974-03-12 1976-05-18 Vermette Howard H Portable material lift
US4040105A (en) 1975-09-23 1977-08-02 International Business Machines Corporation Magnetic disk drive unit with flexible skirt
US4051805A (en) 1975-11-11 1977-10-04 Amchem Products, Inc. Can washing and coating system
US4067446A (en) * 1976-02-24 1978-01-10 Ray Louis F Cable stay crane
US4066723A (en) * 1976-03-19 1978-01-03 Caterpillar Tractor Co. Method and apparatus for making fibrous concrete
US4060205A (en) 1976-11-08 1977-11-29 Allis-Chalmers Corporation Hydraulic accumulator for use with gyratory crushers and combination of such accumulator with a gyratory crusher
US4464803A (en) * 1982-04-28 1984-08-14 Bonasso S G Tension arch structure
US4475976A (en) * 1983-12-23 1984-10-09 The Boeing Company Method and apparatus for forming composite material articles
US4658485A (en) * 1984-08-21 1987-04-21 Yang Tai Her Machine tool with articulated crossbeam
US4637738A (en) * 1985-07-31 1987-01-20 Vincent Barkley Alignment compensator for linear bearings
US4747745A (en) * 1985-11-21 1988-05-31 Marathon Letourneau Company Selective beam gantry crane
US4833855A (en) * 1987-04-27 1989-05-30 Winter Amos G Iv Prefabricated panel having a joint thereon
US4781067A (en) * 1987-04-30 1988-11-01 Sonoscan, Inc. Balanced scanning mechanism
US5040431A (en) * 1988-01-22 1991-08-20 Canon Kabushiki Kaisha Movement guiding mechanism
US4850382A (en) * 1988-09-14 1989-07-25 Barnes Drill Co. Work booth for a robot
GB2233928B (en) * 1989-05-23 1992-12-23 Brother Ind Ltd Apparatus and method for forming three-dimensional article
DK0500225T3 (en) * 1991-01-31 1996-02-05 Texas Instruments Inc System, method and process for computer controlled production of three-dimensional objects from computer data
US5665382A (en) * 1993-02-22 1997-09-09 Vivorx Pharmaceuticals, Inc. Methods for the preparation of pharmaceutically active agents for in vivo delivery
US5664382A (en) 1993-09-09 1997-09-09 Melnick; David W. Method for making block forms for receiving concrete
NL9400124A (en) * 1994-01-27 1995-09-01 Buro Eco Home Structure and building element therefor.
US5617515A (en) * 1994-07-11 1997-04-01 Dynetics, Inc. Method and apparatus for controlling and programming a robot or other moveable object
US5529471A (en) * 1995-02-03 1996-06-25 University Of Southern California Additive fabrication apparatus and method
DE29615574U1 (en) * 1996-09-06 1998-01-15 Siemens Ag Device for temporarily increasing the load-bearing capacity of bridge girders
US6103161A (en) * 1997-02-03 2000-08-15 Lopez; Jose Luis Santamaria Procedure and device for manufacturing plastic extruded sheets
US5848458A (en) * 1997-05-15 1998-12-15 Northrop Grumman Corporation Reconfigurable gantry tool
US6001181A (en) * 1997-08-01 1999-12-14 Northrop Grumman Corporation Automated sealant applicator
US6170220B1 (en) * 1998-01-16 2001-01-09 James Daniel Moore, Jr. Insulated concrete form
US6423261B1 (en) * 1999-02-02 2002-07-23 Daniel R. Joseph Blown film extrusion apparatus and method with improved collapsing frame
US6246203B1 (en) * 1999-02-05 2001-06-12 Silicon Valley Group, Inc. Direct skew control and interlock of gantry
DE19963948A1 (en) * 1999-12-31 2001-07-26 Zsolt Herbak Model making process
US6662516B2 (en) * 2001-02-12 2003-12-16 Seismic Rehab, Llc Reinforced wall structures and methods
US20030164200A1 (en) * 2001-03-16 2003-09-04 American Controls, Inc. Assembly line fluid filling system and method
US6989887B2 (en) * 2001-06-06 2006-01-24 Nikon Corporation Dual force mode fine stage apparatus
DE10211754B4 (en) 2002-03-14 2004-03-11 Peter Meyer Support frame structure for a high-speed processing device
DE10216571A1 (en) 2002-04-13 2003-10-30 1 1 Prototyping Herbak Gmbh Device for moving a working head in space
US7153454B2 (en) * 2003-01-21 2006-12-26 University Of Southern California Multi-nozzle assembly for extrusion of wall
US7001464B1 (en) * 2003-03-05 2006-02-21 Erdman Automation Corporation System and process for glazing glass to windows and door frames
US6976599B1 (en) * 2003-09-26 2005-12-20 The United States Of America As Represented By The Secretary Of The Navy Multi-rail dual hoisting crane
DE102004047525A1 (en) 2004-09-28 2006-04-06 Dynexa Gmbh Reduced inertia gantry crane system especially for machining large workpieces has the gantry made of a framework of struts reinforced by insert panels

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See references of EP2079656A4 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106181981A (en) * 2016-09-28 2016-12-07 天津工业大学 A kind of three-dimensional machinery arm configuration measured for camera scanning steel plate
CN106872157A (en) * 2016-12-19 2017-06-20 天津工业大学 A kind of heavy machine tool structural member erection stress testing experiment platform
CN106872157B (en) * 2016-12-19 2019-10-25 天津工业大学 A kind of heavy machine tool structural member erection stress testing experiment platform
WO2018210287A1 (en) * 2017-05-18 2018-11-22 北京华沁智联科技有限公司 Guide rail

Also Published As

Publication number Publication date
MX2009004608A (en) 2009-05-15
ATE512927T1 (en) 2011-07-15
CA2667483A1 (en) 2008-05-15
US8029710B2 (en) 2011-10-04
WO2008058077A3 (en) 2008-07-31
EP2324971A1 (en) 2011-05-25
HK1136810A1 (en) 2010-07-09
EP2079656A2 (en) 2009-07-22
US20100025349A1 (en) 2010-02-04
CA2667483C (en) 2015-06-30
EP2324971B1 (en) 2012-05-23
EP2079656B1 (en) 2011-06-15
EP2079656A4 (en) 2010-01-20

Similar Documents

Publication Publication Date Title
EP2324971B1 (en) Gantry robotics system with a counter-mass
EP3485109B1 (en) Boom for material transport
EP3434845B1 (en) Automated brick laying system and method of use thereof
US11926051B2 (en) Apparatus and method for cable-driven robotics
CN111409069B (en) Method for solving kinematic speed of rope traction parallel robot with variable structure
CN110919625B (en) Three-dimensional orbital transfer device and method for rail-mounted robot
CN103846649A (en) Two-stage parallel robot device applied to precision assembly
WO2014094339A1 (en) Gantry-type hull section marking machine
CN105401727A (en) Modularized 3D building printer
CN203064952U (en) Foldable transportation device mounted on stair railing
CN105798903A (en) Drilling table surface swing pipe manipulator
CN213062878U (en) Construction lifting operation protection platform
CN108381521A (en) The mechanism in six degree of freedom of High Mach number high dynamic pressure lift model captive trajectory testing
US5115886A (en) Movable platform for construction sites
CN115338582A (en) Device and method for assisting steel structure welding
JP3176266B2 (en) Panel mounting device and mounting method
CN208005671U (en) The mechanism in six degree of freedom of High Mach number high dynamic pressure lift model captive trajectory testing
CN206952980U (en) A kind of setting-out robot moving platform for construction and decoration
CN214323419U (en) Water supply device for robot
CN212559137U (en) Movable multi-dimensional position adjusting mechanism
CN111872222B (en) Large-size high-rigidity double-sided incremental forming machine tool
CN113324687A (en) Automatic butt joint system and method for two square cabins
CN113605704B (en) Movable concrete 3D printing device and construction method thereof
CN219031571U (en) Elevator well portal crane
CN113459172B (en) High-precision robot transmission truss

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 07844870

Country of ref document: EP

Kind code of ref document: A2

WWE Wipo information: entry into national phase

Ref document number: 2667483

Country of ref document: CA

WWE Wipo information: entry into national phase

Ref document number: MX/A/2009/004608

Country of ref document: MX

NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: 2007844870

Country of ref document: EP